ML20065J574: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML20065J574
| number = ML20065J574
| issue date = 03/31/1994
| issue date = 03/31/1994
| title = Monthly Operating Repts for Mar 1994 for Braidwood Nuclear Generating Station.W/940412 Ltr
| title = Monthly Operating Repts for Mar 1994 for Braidwood Nuclear Generating Station
| author name = Kofron K, Stanczak P
| author name = Kofron K, Stanczak P
| author affiliation = COMMONWEALTH EDISON CO.
| author affiliation = COMMONWEALTH EDISON CO.
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:,
{{#Wiki_filter:,
o                C:mmenw:xith Edisan
C:mmenw:xith Edisan o
        ,              Braidwood Nuclear Power Station Route #1, Box 84                                                                 .
Braidwood Nuclear Power Station Route #1, Box 84
    's                 Braceville, Illinois 60407                                                       i Telephone B15/458-2801 April 12,1994 BW/94-0059 4
's Braceville, Illinois 60407 i
i Director Office of Resource Management                                                             q
Telephone B15/458-2801 April 12,1994 BW/94-0059 4
            'U. S. Nuclear Regulatory Commission                                                         .
i Director Office of Resource Management q
Washington, D.C. 20555 Attn: Document Control Desk
'U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Attn: Document Control Desk


==Dear Sir:==
==Dear Sir:==
Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclear Generating Station for the period March 1 through March 31,1994, pi
Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclear Generating Station for the period March 1 through March 31,1994, pi
                                                                      'ofron Station Manager Braidwood Station Attachments cc:     J. B. Martin, 'NRC, Region III R. R. Assa, U.S.N.R.C.
'ofron Station Manager Braidwood Station Attachments cc:
J. B. Martin, 'NRC, Region III R. R. Assa, U.S.N.R.C.
I.D.;N.S.
I.D.;N.S.
NRC Resident Inspector, Dwd INPO Records Center D. L. Farrar, Nuc. Reg. Serv. Mgr.
NRC Resident Inspector, Dwd INPO Records Center D. L. Farrar, Nuc. Reg. Serv. Mgr.
D. M. Saccomando, Nuc. Lic. Admin.
D. M. Saccomando, Nuc. Lic. Admin.
D. R. Eggett, Nuc. Eng. Dept.
D. R. Eggett, Nuc. Eng. Dept.
S. M. Berg, Jr., Site V.P., Dwd Nuc. Fuel Serv., PWR Plant Support Results Eng. Group, Sys. Eng., Dwd Nuc. Group, Sys. Eng., Bwd I.D.N.S. . Resident inspector, Dwd.
S. M. Berg, Jr., Site V.P., Dwd Nuc. Fuel Serv., PWR Plant Support Results Eng. Group, Sys. Eng., Dwd Nuc. Group, Sys. Eng., Bwd I.D.N.S.. Resident inspector, Dwd.
J. M. Bunecicky, Westinghouse D. R. Seavers, A.N.I.
J. M. Bunecicky, Westinghouse D. R. Seavers, A.N.I.
9404180297 940331                                                                 /f PDR     ADOCK 05000456                                                           b R                           PDR 1OUU1O s
9404180297 940331
1
/f PDR ADOCK 05000456 b
                                                                                                    ..i
R PDR 1OUU1O 1
s
..i


1 I
1 llRAIDWOOD NUCLEAR POWER STATION UNIT I AND UNIT 2 i
l llRAIDWOOD NUCLEAR POWER STATION           I I
MONTilLY PERFORMANCE REPORT l
l UNIT I AND UNIT 2 l
Commonwealth Edison Company NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 1
i MONTilLY PERFORMANCE REPORT l
l 1
Commonwealth Edison Company 1
I I
NRC DOCKET NO. 050-456, LICENSE NO. NPF-72   l NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 1
l l
l


I. MONTIILY REPORT FOR BRAIDWOOD UNIT 1 A.  
I.
MONTIILY REPORT FOR BRAIDWOOD UNIT 1 A.


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Braidwood Unit I entered the month of March 1994 at approximately 88%
OF OPERATING EXPERIENCE Braidwood Unit I entered the month of March 1994 at approximately 88%
capable. The Unit was shutdown on March 4 to begin refueling outage A I R04.
capable. The Unit was shutdown on March 4 to begin refueling outage A I R04.
                                                                                        .)
.)
i
i


B. -       OPERATING DATA REPORT                                         Docket No: 50 - 456 Unit: Draidwood i Date: 4/10/94 Completed by:   P. ' Stanceak Telephone:. 815-458-2801 OPERATING STATUS
B. -
: 1) Reporting Period: hLarsh_.199.4           Gross llours: 244
OPERATING DATA REPORT Docket No: 50 - 456 Unit: Draidwood i Date: 4/10/94 Completed by:
: 2) Currently Authorized Power Level (MWt):             141J.
P. ' Stanceak Telephone:. 815-458-2801 OPERATING STATUS
Design Electrical Rating (MWe-gross):             1121 Design Electrical Rating (MWe-net):               1120
: 1) Reporting Period: hLarsh_.199.4 Gross llours: 244
,                  . Max Dependable Capacity (MWe-gross):             1171 Max Dependable Capacity (MWe-net):               1120
: 2) Currently Authorized Power Level (MWt):
: 3) Power level to which restricted (If Any):           None
141J.
: 4)   Reasons for restrictions (If Any):             - Nnns I.his mo .         Yr to dats           Cumulative 5). Report Period flours:                             744.0-           2,160.0             49,713.0   ,
Design Electrical Rating (MWe-gross):
: 6) llours Reactor Critical:                             74.5           1,490.5             39,088.7
1121 Design Electrical Rating (MWe-net):
: 7) RX Reserve Shutdown flours:                               .0             .0 -                 .0
1120
: 8) llours Generator on Line:                             72.2           1,488.2             38,513.2
. Max Dependable Capacity (MWe-gross):
: 9) Unit Reserve Shutdown liours:                             .0             .0                   .0
1171 Max Dependable Capacity (MWe-net):
: 10) Gross Thermal Energy (MWilt):                   200,276.9         4,812,341.1         117,752,868.1 1I) Gross Elect. Energy (MWII):                     69,630.0         1,676,250.0         40,490,837.0
1120
: 12) Net Elect. Energy (MWil):                       58,431.0         1,612,610.0         38,755,427.0
: 3) Power level to which restricted (If Any):
: 13) Reactor Service Factor:                                 10.0             69.0                 78.6
None 4)
: 14) Reactor Availability Factor:                           10.0             69.0                 78.6
Reasons for restrictions (If Any):
: 15) Unit Service Factor:                                     9.7             68.9                 77.5
- Nnns I.his mo.
: 16) Unit Availability Factor:                                 9.7 .           68.9                 77.5
Yr to dats Cumulative 5). Report Period flours:
: 17) Unit Capacity Factor (MDC NET):                           7.0             66.7                 69.6
744.0-2,160.0 49,713.0
: 18) Unit Capacity Factor (DER NET):                           7.0             66.7                 69.6
: 6) llours Reactor Critical:
: 19) Unit Forced Outage Rate:                                 0.0             0.0                 9.2
74.5 1,490.5 39,088.7
: 20) Unit Forced Outage flours:                             . 0.0               0.0             3,905.1
: 7) RX Reserve Shutdown flours:
.0
.0 -
.0
: 8) llours Generator on Line:
72.2 1,488.2 38,513.2
: 9) Unit Reserve Shutdown liours:
.0
.0
.0
: 10) Gross Thermal Energy (MWilt):
200,276.9 4,812,341.1 117,752,868.1 1I) Gross Elect. Energy (MWII):
69,630.0 1,676,250.0 40,490,837.0
: 12) Net Elect. Energy (MWil):
58,431.0 1,612,610.0 38,755,427.0
: 13) Reactor Service Factor:
10.0 69.0 78.6
: 14) Reactor Availability Factor:
10.0 69.0 78.6
: 15) Unit Service Factor:
9.7 68.9 77.5
: 16) Unit Availability Factor:
9.7.
68.9 77.5
: 17) Unit Capacity Factor (MDC NET):
7.0 66.7 69.6
: 18) Unit Capacity Factor (DER NET):
7.0 66.7 69.6
: 19) Unit Forced Outage Rate:
0.0 0.0 9.2
: 20) Unit Forced Outage flours:
. 0.0 0.0 3,905.1
: 21) Shutdown Schedule Over Next 6 Months. Refuel 3/4/94
: 21) Shutdown Schedule Over Next 6 Months. Refuel 3/4/94
: 22) If Shutdown at End of Reporting Period, Estimated Date of Startup.               4/27/94
: 22) If Shutdown at End of Reporting Period, Estimated Date of Startup.
4/27/94


        . [i;                                                                                 ;
. [i; 1
1 i
i C..
l C..       AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 456 Unit: Braidwood 1 Date: 4/10/94 Completed by: P. Stanczak Telephone:   815 458 2801 MONTH: M ARCil 1994 Day         MWe-nql                     D_ay a      .M We-net
AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 456 Unit: Braidwood 1 Date: 4/10/94 Completed by:
: 1)           28_6                     16)           d2
P. Stanczak Telephone:
: 2)           223                       17)           d2
815 458 2801 MONTH: M ARCil 1994 Day MWe-nql D_ay
: 3)           835                       18)           d2
.M We-net a
: 4)           d2                       19)           d3
1) 28_6 16) d2 2) 223 17) d2 3) 835 18) d2 4) d2 19) d3 5) d2 20) d3 6) d2 21) d2 7) da 22) d2 8) d2 23) d2 9) d2 24) d2 10) d2 25) d2-1I) d2
: 5)           d2                       20)           d3
- 26) d2 12) d2 27) d2 13) d2 28) d2 14) d2 29) d2 15) d2 30) d2 31) d2
: 6)           d2                       21)           d2
* Due to condenser efficiency 4
: 7)           da                       22)           d2
e i~
: 8)             d2                     23)           d2
v
: 9)             d2                     24)           d2
: 10)           d2                       25)           d2-1I)             d2                     - 26)           d2
: 12)             d2                     27)           d2
: 13)             d2                     28)           d2
: 14)           d2                       29)           d2
: 15)           d2                       30)           d2
: 31)           d2
* Due to condenser efficiency 4                     e                     -
                                                                            ,          i~ v


D.     UNIT SHUTDOWNS / REDUCTIONS                                                                                                                                             Docket No.: 50 - 456 Unit:       Braidwood 1 Date:     4/10/94 Completed by:       P. Stanczak
D.
<                                                                                                                                                                                  Telephone:       815-458-2801 REPORT PERIOD: MARCH 1994 LER-                             Cause & Corrective Action h         Date .             Tvoe               Hours                           Reason                                 Method             Number   System Component         to Prevent Recurrence 15       940304             S                   669.5                           C                                                 1                       REFUEL OUTAGE TYPE                         REASON                                                                                                           METHOD                                   SYSTEM & COMPONENT F - Forced                 A - Equipment Failure Maint or Test                                                                                 1 - Manual S - Scheduled                 B - Maint or Test                                                                                               2 - Manual Scram                         Exhibit F & Instructions for C - Refueling                                                                                                     3 - Auto Scram                           Preparation of Data Entry Sheet D - Regulatory Restriction                                                                                       4 - Continued                             Licensee Event Report (LER) File E - Operator Training & Licensee                                                                                 5 - Reduced Load                         (NUREG-0161).
UNIT SHUTDOWNS / REDUCTIONS Docket No.: 50 - 456 Unit:
Examination                                                                                                                                                                                         ;
Braidwood 1 Date:
F - Administration G - Oper Error H - Other-
4/10/94 Completed by:
P. Stanczak Telephone:
815-458-2801 REPORT PERIOD: MARCH 1994 LER-Cause & Corrective Action h
Date.
Tvoe Hours Reason Method Number System Component to Prevent Recurrence 15 940304 S
669.5 C
1 REFUEL OUTAGE TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee 5 - Reduced Load (NUREG-0161).
Examination F - Administration G - Oper Error H - Other-


Docket No.: 50 - 456 E. SAFETY / RELIEF VALVE OPERATIONS Unit:     Braidwood 1 Date:     4/10/94 Completed by: P. Stanczak Telephone: 815-458-2801 Valves           No. & Type                                     Plant Date         Actuated .         Actuation                                   Condition                           Description of Event None t
E.
                                  ---  -:--._..__----__.---_-.-__.---_-_--.,_x_---
SAFETY / RELIEF VALVE OPERATIONS Docket No.: 50 - 456 Unit:
                                                            -                          - _ _ _ _ - - _ _ --. . - < ~         -                  .m >
Braidwood 1 Date:
                                                                                                                                                                ' M
4/10/94 Completed by:
P. Stanczak Telephone:
815-458-2801 Valves No. & Type Plant Date Actuated.
Actuation Condition Description of Event None t
-:--._..__----__.---_-.-__.---_-_--.,_x_---
--.. - < ~
.m
' M


I l
I l
F. LICENSEE EVENT REPORTS - UNIT 1 The following is a tabular summary of al! Licensee Event Reports submitted during the reporting period, March I through March 31,1994. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50,73.
F.
Licensee Event Report Number           Date               Title of Occurrence 94 - 001               03/04/94         Valves May Not Stroke Under Certain-Conditions due to Design Deficiency.
LICENSEE EVENT REPORTS - UNIT 1 The following is a tabular summary of al! Licensee Event Reports submitted during the reporting period, March I through March 31,1994. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50,73.
94 - 002               03/21/94         Main Control Room Ventilation Dampers Declared Inoperable due to Battery Failure.
Licensee Event Report Number Date Title of Occurrence 94 - 001 03/04/94 Valves May Not Stroke Under Certain-Conditions due to Design Deficiency.
94 - 002 03/21/94 Main Control Room Ventilation Dampers Declared Inoperable due to Battery Failure.
V f
V f


                                                                                        \
\\
II. MONTIILY REPORT FOR BRAIDWOOD UNIT 2 A.-  
II.
MONTIILY REPORT FOR BRAIDWOOD UNIT 2 A.-  


==SUMMARY==
==SUMMARY==
Line 126: Line 162:
d
d


B.-     OPERATING DATA REPORT                                     Docket No:     50 - 457 Unit: Braidwood 2 Date: 4/10/94 Completed by:   P. Stanczak .
B.-
OPERATING DATA REPORT Docket No:
50 - 457 Unit: Braidwood 2 Date: 4/10/94 Completed by:
P. Stanczak.
Telephone: 815-458-2801 OPERATING STATUS
Telephone: 815-458-2801 OPERATING STATUS
: 1) Reporting Period: hf arch 1994           Gross Hours: 744
: 1) Reporting Period: hf arch 1994 Gross Hours: 744
: 2) Currently Authorized Power Level (MWt):             310.
: 2) Currently Authorized Power Level (MWt):
Design Electrical Rating (MWe-gross):           1175 Design Electrical Rating (MWe-net):             112.0 Max Dependable Capacity (MWe-gross):             1175 Max Dependable Capacity (MWe-net):               1120
310.
: 3) Power level to which restricted (if Any):         None-
Design Electrical Rating (MWe-gross):
: 4)     Reasons for restrictions (if Any):             None This mo       Yr to dats       Cumulative
1175 Design Electrical Rating (MWe-net):
: 5)   Report Period I-lours:                         744.0         2,160.0         47,795.0
112.0 Max Dependable Capacity (MWe-gross):
: 6)   Hours Reactor Critical:                         744.0         2,160.0         40,474.1
1175 Max Dependable Capacity (MWe-net):
: 7)   RX Reserve Shutdown llours:                         .0             .0                   '0
1120
: 8)   Hours Generator on Line:                       744.0         2,160.0         40,146.3
: 3) Power level to which restricted (if Any):
: 9)   Unit Reserve Shutdown Hours:                       .0             .0                   0
None-4)
: 10) Gross Thermal Energy (MWHt):                 2,522,680.1     6,411,499.8     120,899,696.8
Reasons for restrictions (if Any):
: 11) Gross Elect. Energy (MWii):                   873,754.0     2,216,186.0       41,330,009.0
None This mo Yr to dats Cumulative 5)
: 12) Net Elect. Energy (MWII):                     855,782.0   -2,148,532.0       39,615,115.0
Report Period I-lours:
: 13) Reactor Service Factor:                           100.0           100.0               84.7 14)' Reactor Availability Factor:                     100.0           100.0.             _84.7
744.0 2,160.0 47,795.0 6)
: 15) Unit Service Factor:                               100.0           100.0               84.0
Hours Reactor Critical:
: 16) Unit Availability Factor:                         100.0           100.0               84.0
744.0 2,160.0 40,474.1 7)
: 17) Unit Capacity Factor (MDC NET):                   102.7             88.8               74.0
RX Reserve Shutdown llours:
: 18) Unit Capacity Factor (DER NET):                   102.7             88.8             - 74.0 ;
.0
: 19) Unit Forced Outage Rate:                             0.0             0.0               . 3.5
.0
: 20) Unit Forced Outage Hours:                             0.0             0.0           1,446.0
'0 8)
: 21) Shutdown Schedule Over Next 6 Months.     Refuel 9/94
Hours Generator on Line:
: 22) If Shutdown at End of Reporting Period, Estimated Date of Startup.                 N/A
744.0 2,160.0 40,146.3 9)
                                                                                                                .i
Unit Reserve Shutdown Hours:
                                                                                                                  .1
.0
.0 0
: 10) Gross Thermal Energy (MWHt):
2,522,680.1 6,411,499.8 120,899,696.8
: 11) Gross Elect. Energy (MWii):
873,754.0 2,216,186.0 41,330,009.0
: 12) Net Elect. Energy (MWII):
855,782.0
-2,148,532.0 39,615,115.0
: 13) Reactor Service Factor:
100.0 100.0 84.7 14)' Reactor Availability Factor:
100.0 100.0.
_84.7
: 15) Unit Service Factor:
100.0 100.0 84.0
: 16) Unit Availability Factor:
100.0 100.0 84.0
: 17) Unit Capacity Factor (MDC NET):
102.7 88.8 74.0
: 18) Unit Capacity Factor (DER NET):
102.7 88.8
- 74.0 ;
: 19) Unit Forced Outage Rate:
0.0 0.0
. 3.5
: 20) Unit Forced Outage Hours:
0.0 0.0 1,446.0
: 21) Shutdown Schedule Over Next 6 Months.
Refuel 9/94
: 22) If Shutdown at End of Reporting Period, Estimated Date of Startup.
N/A
.i
.1


1 e, -
1 e, -
l C.       AVERAGE DAILY UNIT NET POWER LEVEL LOG                               l Docket No: 50 - 457         l Unit: Braidwood 2 ]
C.
!.-                                                                      Date: 4/10/94     -l Completed by: P. Stanczak Telephone: 815-458'2801 i
AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 457 Unit: Braidwood 2
E M_QNTH:' MARCH 1994 l
]
P_ax     Mwe-net                     p_ay     Mwe. net I)         1141
Date: 4/10/94
* 16)           1154 *
-l Completed by:
: 2)         I144.*                 17)           1156 *
P. Stanczak Telephone: 815-458'2801 i
                      .3)         1143
E M_QNTH:' MARCH 1994 P_ax Mwe-net p_ay Mwe. net I) 1141
* 18)           1155 *
* 16) 1154
: 4)         1I29
* 2)
* 19)           i157 *
I144.*
: 5)         1133
17) 1156 *
* 20)           1156 *
.3) 1143
: 6)         LR9*                   21)           1156 *
* 18) 1155
: 7)         1838
* 4) 1I29
* 22)           1159 *
* 19) i157
: 8)           1147
* 5) 1133
* 23)           1157 *
* 20) 1156
: 9)           1156
* 6)
* 24)           '1155 *               ;
LR9*
: 10)         UM*                     25)           1157 *
21) 1156
: 11)         1156
* 7) 1838
* 26)           1158 *
* 22) 1159
: 12)           1156
* 8) 1147
* 27)           1159
* 23) 1157
* j
* 9) 1156
: 13)         B51
* 24)
* 28)           1159
'1155
* l
* 10)
: 14)           1156
UM*
* 29)           1159 *
25) 1157
: 15)         Ll_5_4
* 11) 1156
* 30)           LL59 *
* 26) 1158
: 31)           1086
* 12) 1156
* Due to condenser efficiency                                       ]
* 27) 1159
:l 4
* j 13)
B51
* 28) 1159
* 14) 1156
* 29) 1159
* 15)
Ll_5_4
* 30)
LL59
* 31) 1086
* Due to condenser efficiency
]
4


i D.       UNIT SHUTDOWNS / REDUCTIONS                                                               Docket No.: 50 - 457               '
i D.
Unit:     Braidwood 2 Date:   4/10/94 Completed by:     P. Stanczak Telephone:     F 15-458-2801 REPORT PERIDD: MARCH 1994 LER                               Cause & Corrective Action
UNIT SHUTDOWNS / REDUCTIONS Docket No.: 50 - 457 Unit:
              &          Date           Tvoe     Hours   Reason   Method Number       System Component       to Prevent Recurrence None TYPE                     REASON                                       METHOD                               SYSTEM & COMPONENT F Forced               A - Equipment Failure Maint or Test           1 - Manual S - Scheduled           B - Maint or Test                           2 - Manual Scram                     Exhibit F & Instructions for -
Braidwood 2 Date:
C - Refueling -                               3 - Auto Scram                       Preparation of Data Entry Sheet D. - Regulatory Restriction                   4 - Continued                       Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load                     (NUREG-0161).
4/10/94 Completed by:
P. Stanczak Telephone:
F 15-458-2801 REPORT PERIDD: MARCH 1994 LER Cause & Corrective Action Date Tvoe Hours Reason Method Number System Component to Prevent Recurrence None TYPE REASON METHOD SYSTEM & COMPONENT F Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for -
C - Refueling -
3 - Auto Scram Preparation of Data Entry Sheet D. - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).
F - A_dministration G - Oper Error
F - A_dministration G - Oper Error
                            - H - Other
- H - Other w
                                                                                                                      . -                        _  _  w


x E.                             SAFETY RELIEF VALVE OPERATIONS                                     Docket No.: 50 - 457 Unit:     Braidwood 2 Date:     4/10/94 Completed by:     P. Stanczak Telephone:     815-458-2801.
x E.
Valves         No. & Type       Plant
SAFETY RELIEF VALVE OPERATIONS Docket No.: 50 - 457 Unit:
                                          -Date                   Actuated         Actuation     Condition     Description of Event None 1
Braidwood 2 Date:
_mm.._ _ _ . . _ _ - _- __.-____-._____.__.__.__.-.-m__.__m.__m    __  _ _.__ _..___4 -_ m __  -      =                ,                ,
4/10/94 Completed by:
P. Stanczak Telephone:
815-458-2801.
Valves No. & Type Plant
-Date Actuated Actuation Condition Description of Event None 1
=
mm..
.-.-m m.
m 4
m


i l
i F. LICENSEE EVENT REPORTS - UNIT 2
      .-                                                                                                      l l
'l The following is a tabular summary of all Licensee Event Reports' submitted during the reporting period March I through March 31,1994. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73.
I l
Licensee Event Esport Number Date Title of Occurrgng.g 94 - 001 03/02/94 Valves Not Included in Primary Containment Integrity Verification Surveillance due to Preservice Design i
F. LICENSEE EVENT REPORTS - UNIT 2                                                             l
Deficiency.
                                                                                                            'l The following is a tabular summary of all Licensee Event Reports' submitted during the reporting period March I through March 31,1994. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73.
.}}
Licensee Event Esport Number             Date         Title of Occurrgng.g 94 - 001                 03/02/94     Valves Not Included in Primary Containment Integrity Verification Surveillance due to Preservice Design             i Deficiency.
..-                                                                .      .}}

Latest revision as of 19:38, 16 December 2024

Monthly Operating Repts for Mar 1994 for Braidwood Nuclear Generating Station
ML20065J574
Person / Time
Site: Braidwood  
Issue date: 03/31/1994
From: Kofron K, Stanczak P
COMMONWEALTH EDISON CO.
To:
NRC, NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BW-94-0059, BW-94-59, NUDOCS 9404180297
Download: ML20065J574 (14)


Text

,

C:mmenw:xith Edisan o

Braidwood Nuclear Power Station Route #1, Box 84

's Braceville, Illinois 60407 i

Telephone B15/458-2801 April 12,1994 BW/94-0059 4

i Director Office of Resource Management q

'U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn: Document Control Desk

Dear Sir:

Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclear Generating Station for the period March 1 through March 31,1994, pi

'ofron Station Manager Braidwood Station Attachments cc:

J. B. Martin, 'NRC, Region III R. R. Assa, U.S.N.R.C.

I.D.;N.S.

NRC Resident Inspector, Dwd INPO Records Center D. L. Farrar, Nuc. Reg. Serv. Mgr.

D. M. Saccomando, Nuc. Lic. Admin.

D. R. Eggett, Nuc. Eng. Dept.

S. M. Berg, Jr., Site V.P., Dwd Nuc. Fuel Serv., PWR Plant Support Results Eng. Group, Sys. Eng., Dwd Nuc. Group, Sys. Eng., Bwd I.D.N.S.. Resident inspector, Dwd.

J. M. Bunecicky, Westinghouse D. R. Seavers, A.N.I.

9404180297 940331

/f PDR ADOCK 05000456 b

R PDR 1OUU1O 1

s

..i

1 llRAIDWOOD NUCLEAR POWER STATION UNIT I AND UNIT 2 i

MONTilLY PERFORMANCE REPORT l

Commonwealth Edison Company NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 1

I.

MONTIILY REPORT FOR BRAIDWOOD UNIT 1 A.

SUMMARY

OF OPERATING EXPERIENCE Braidwood Unit I entered the month of March 1994 at approximately 88%

capable. The Unit was shutdown on March 4 to begin refueling outage A I R04.

.)

i

B. -

OPERATING DATA REPORT Docket No: 50 - 456 Unit: Draidwood i Date: 4/10/94 Completed by:

P. ' Stanceak Telephone:. 815-458-2801 OPERATING STATUS

1) Reporting Period: hLarsh_.199.4 Gross llours: 244
2) Currently Authorized Power Level (MWt):

141J.

Design Electrical Rating (MWe-gross):

1121 Design Electrical Rating (MWe-net):

1120

. Max Dependable Capacity (MWe-gross):

1171 Max Dependable Capacity (MWe-net):

1120

3) Power level to which restricted (If Any):

None 4)

Reasons for restrictions (If Any):

- Nnns I.his mo.

Yr to dats Cumulative 5). Report Period flours:

744.0-2,160.0 49,713.0

6) llours Reactor Critical:

74.5 1,490.5 39,088.7

7) RX Reserve Shutdown flours:

.0

.0 -

.0

8) llours Generator on Line:

72.2 1,488.2 38,513.2

9) Unit Reserve Shutdown liours:

.0

.0

.0

10) Gross Thermal Energy (MWilt):

200,276.9 4,812,341.1 117,752,868.1 1I) Gross Elect. Energy (MWII):

69,630.0 1,676,250.0 40,490,837.0

12) Net Elect. Energy (MWil):

58,431.0 1,612,610.0 38,755,427.0

13) Reactor Service Factor:

10.0 69.0 78.6

14) Reactor Availability Factor:

10.0 69.0 78.6

15) Unit Service Factor:

9.7 68.9 77.5

16) Unit Availability Factor:

9.7.

68.9 77.5

17) Unit Capacity Factor (MDC NET):

7.0 66.7 69.6

18) Unit Capacity Factor (DER NET):

7.0 66.7 69.6

19) Unit Forced Outage Rate:

0.0 0.0 9.2

20) Unit Forced Outage flours:

. 0.0 0.0 3,905.1

21) Shutdown Schedule Over Next 6 Months. Refuel 3/4/94
22) If Shutdown at End of Reporting Period, Estimated Date of Startup.

4/27/94

. [i; 1

i C..

AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 456 Unit: Braidwood 1 Date: 4/10/94 Completed by:

P. Stanczak Telephone:

815 458 2801 MONTH: M ARCil 1994 Day MWe-nql D_ay

.M We-net a

1) 28_6 16) d2 2) 223 17) d2 3) 835 18) d2 4) d2 19) d3 5) d2 20) d3 6) d2 21) d2 7) da 22) d2 8) d2 23) d2 9) d2 24) d2 10) d2 25) d2-1I) d2

- 26) d2 12) d2 27) d2 13) d2 28) d2 14) d2 29) d2 15) d2 30) d2 31) d2

  • Due to condenser efficiency 4

e i~

v

D.

UNIT SHUTDOWNS / REDUCTIONS Docket No.: 50 - 456 Unit:

Braidwood 1 Date:

4/10/94 Completed by:

P. Stanczak Telephone:

815-458-2801 REPORT PERIOD: MARCH 1994 LER-Cause & Corrective Action h

Date.

Tvoe Hours Reason Method Number System Component to Prevent Recurrence 15 940304 S

669.5 C

1 REFUEL OUTAGE TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee 5 - Reduced Load (NUREG-0161).

Examination F - Administration G - Oper Error H - Other-

E.

SAFETY / RELIEF VALVE OPERATIONS Docket No.: 50 - 456 Unit:

Braidwood 1 Date:

4/10/94 Completed by:

P. Stanczak Telephone:

815-458-2801 Valves No. & Type Plant Date Actuated.

Actuation Condition Description of Event None t

-:--._..__----__.---_-.-__.---_-_--.,_x_---

--.. - < ~

.m

' M

I l

F.

LICENSEE EVENT REPORTS - UNIT 1 The following is a tabular summary of al! Licensee Event Reports submitted during the reporting period, March I through March 31,1994. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50,73.

Licensee Event Report Number Date Title of Occurrence 94 - 001 03/04/94 Valves May Not Stroke Under Certain-Conditions due to Design Deficiency.

94 - 002 03/21/94 Main Control Room Ventilation Dampers Declared Inoperable due to Battery Failure.

V f

\\

II.

MONTIILY REPORT FOR BRAIDWOOD UNIT 2 A.-

SUMMARY

OF OPERATING EXPERIENCE Braidwood Unit 2 entered the month of March 1994 at approximately 100%

capable. The Unit operated routinely through the end of the month.

d

B.-

OPERATING DATA REPORT Docket No:

50 - 457 Unit: Braidwood 2 Date: 4/10/94 Completed by:

P. Stanczak.

Telephone: 815-458-2801 OPERATING STATUS

1) Reporting Period: hf arch 1994 Gross Hours: 744
2) Currently Authorized Power Level (MWt):

310.

Design Electrical Rating (MWe-gross):

1175 Design Electrical Rating (MWe-net):

112.0 Max Dependable Capacity (MWe-gross):

1175 Max Dependable Capacity (MWe-net):

1120

3) Power level to which restricted (if Any):

None-4)

Reasons for restrictions (if Any):

None This mo Yr to dats Cumulative 5)

Report Period I-lours:

744.0 2,160.0 47,795.0 6)

Hours Reactor Critical:

744.0 2,160.0 40,474.1 7)

RX Reserve Shutdown llours:

.0

.0

'0 8)

Hours Generator on Line:

744.0 2,160.0 40,146.3 9)

Unit Reserve Shutdown Hours:

.0

.0 0

10) Gross Thermal Energy (MWHt):

2,522,680.1 6,411,499.8 120,899,696.8

11) Gross Elect. Energy (MWii):

873,754.0 2,216,186.0 41,330,009.0

12) Net Elect. Energy (MWII):

855,782.0

-2,148,532.0 39,615,115.0

13) Reactor Service Factor:

100.0 100.0 84.7 14)' Reactor Availability Factor:

100.0 100.0.

_84.7

15) Unit Service Factor:

100.0 100.0 84.0

16) Unit Availability Factor:

100.0 100.0 84.0

17) Unit Capacity Factor (MDC NET):

102.7 88.8 74.0

18) Unit Capacity Factor (DER NET):

102.7 88.8

- 74.0 ;

19) Unit Forced Outage Rate:

0.0 0.0

. 3.5

20) Unit Forced Outage Hours:

0.0 0.0 1,446.0

21) Shutdown Schedule Over Next 6 Months.

Refuel 9/94

22) If Shutdown at End of Reporting Period, Estimated Date of Startup.

N/A

.i

.1

1 e, -

C.

AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 457 Unit: Braidwood 2

]

Date: 4/10/94

-l Completed by:

P. Stanczak Telephone: 815-458'2801 i

E M_QNTH:' MARCH 1994 P_ax Mwe-net p_ay Mwe. net I) 1141

  • 16) 1154
  • 2)

I144.*

17) 1156 *

.3) 1143

  • 18) 1155
  • 4) 1I29
  • 19) i157
  • 5) 1133
  • 20) 1156
  • 6)

LR9*

21) 1156

  • 7) 1838
  • 22) 1159
  • 8) 1147
  • 23) 1157
  • 9) 1156
  • 24)

'1155

  • 10)

UM*

25) 1157

  • 11) 1156
  • 26) 1158
  • 12) 1156
  • 27) 1159
  • j 13)

B51

  • 28) 1159
  • 14) 1156
  • 29) 1159
  • 15)

Ll_5_4

  • 30)

LL59

  • 31) 1086
  • Due to condenser efficiency

]

4

i D.

UNIT SHUTDOWNS / REDUCTIONS Docket No.: 50 - 457 Unit:

Braidwood 2 Date:

4/10/94 Completed by:

P. Stanczak Telephone:

F 15-458-2801 REPORT PERIDD: MARCH 1994 LER Cause & Corrective Action Date Tvoe Hours Reason Method Number System Component to Prevent Recurrence None TYPE REASON METHOD SYSTEM & COMPONENT F Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for -

C - Refueling -

3 - Auto Scram Preparation of Data Entry Sheet D. - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).

F - A_dministration G - Oper Error

- H - Other w

x E.

SAFETY RELIEF VALVE OPERATIONS Docket No.: 50 - 457 Unit:

Braidwood 2 Date:

4/10/94 Completed by:

P. Stanczak Telephone:

815-458-2801.

Valves No. & Type Plant

-Date Actuated Actuation Condition Description of Event None 1

=

mm..

.-.-m m.

m 4

m

i F. LICENSEE EVENT REPORTS - UNIT 2

'l The following is a tabular summary of all Licensee Event Reports' submitted during the reporting period March I through March 31,1994. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73.

Licensee Event Esport Number Date Title of Occurrgng.g 94 - 001 03/02/94 Valves Not Included in Primary Containment Integrity Verification Surveillance due to Preservice Design i

Deficiency.

.