{{#Wiki_filter:FENOC Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077 L-03-121 August 7, 2003 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50412, License No. NPF-73 hMonthly Overating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of July, 2003.
RespectfullJr W. Pearce            _            _
                                                - - XX  --  Vice-President BVPS DTJ/cmg Enclosures cc:    NRC Regional Office King of Prussia, PA aZd'
 
UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE August 1, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD:                    Jutv 2003 (1) Reason                                      (2) Method A - Equipment Failure (Explain)                    I - Manual 8 - Maintenance or Test                          2 - Manual Trip I Scram C - Refueling                                    3 - Automatic Trip Scram D - Regulatory Restriction                        4 - Continuation E - Operator Training I Ucense Examination          - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
 
==SUMMARY==
The Unit operated at a nominal value of 100% ouput for the entire month.
                                          -w
 
OPERATING DATA REPORT DOCKET NO.:            50-334 UNIT NAME:              311S UNIT 61 REPORT DATEs            08/01/03 COMPLETED BY:          DAVID T. JONES TELEPHONE:              (724) 682-4962 e -t  * *  -*    * *  * - -  -  - -  -.
la. REPORTING PERIOD:    JULY 2003
* Notes: Rated thermal power at *
* BVPS-1 was uprated from 2652 MWt*
: 1. DESIGN ELECTRICAL RATING (Net MWe):        835
* to 2689 MWt on 10/20/01. Met
* MDC was also uprated from 2.--  WI. DEPENDABLE CAPACITY -Net-MWala
* 810_j-    to 82!ae.
3              __          '
                                                                *aaaa          a    at**
                                                                                      *_*  a
* __
* _  a  a THIS MONTH      YEAR TO DATE                  CUMULATIVE 3a. HOURS IN REPORTING PERIOD:                          744.0              5087.0                    238871.0
: 3. NO. OF EBS. REACTOR WAS CRITICAL:                    744.0              3786.5                    164378.0
: 4. SERVICE HOURS GENERATOR ON LINE:                    744.0              3739.9                    161851.9
: 5. UNIT RESERVE SHUTDOWN HOURSs                          0.0                  0.0                        0.0
: 6. NET ELECTRICAL ENERGY GEN.    (KH):              618520.0          2938309.0                121594316.0
: 7. GROSS ELECT. ENERGY GEN.  (KWH):                654650.0          3122697.0                129792287.0
: 8. GROSS THERNAL ENERGY GEN.  (KWH)s              1998416.0          9530273.0                399801582.5
: 9. UNIT AVAILABILITY FACTOR ()                          100.0                  73.5                      69.2
: 10. UNIT CAPACITY FACTOR (XMC)    (%):                - 101.3                  70.4                      64.6
: 11. UNIT FORCED OUTAGE RATE (b)s                          0.0                  1.5                      15.4
 
UNIT SHUTDOWNS DOCKET NO.            50-412 UNIT NAME            BVPS Unit #2 DATE      August 1,2003 COMPLETED BY                David T. Jones TELEPHONE            (724) 682-4962 REPORTING PERIOD:                            JuIv 2003 No.        Date          Type              Duration  Reason      Method of                    Cause / Corrective Actions (YAMID)      F Forced            (Hours)      (1)        Shutting S: Scheduled                                Down (2)                              Comments NONE.
(1)Reason                                                (2)Method A - Equipment Failure (Explain)                          1 - manual B - Maintenance or Test                                2 - Manual TdpI Scram C- Refueling                                            3 - Automatic Tdp I Scram D- Regulatory RestrIction                              4 - ContInuation E - Operator Training / icense Examination              5 - Other (Explain)
F -Administrative G-Operational Error (Explain)
H -Other (Explain)
 
==SUMMARY==
The Unit operated at a nominal value of 100% ouput for the entire month.
_ H
          ~ ~_
_      ,    _.            ,    .111-  .
_  ~~      ~    ~      -b          -                        _~1                wo            "
 
OPERATING DATA REPORT DOCKET NO0 2                  50-412 UNIT NAME:                    JYPS UNIT 62 REPORT DATE:                  08/01/03 COMPLETED EYs                  DAVID T. JONES
                                                            ,.;                      TELEPHONE                      1(724) 682-4962
                                                                                * ** *
* 0        0  *0*0*0****            *
* REPORTING PERIODS            JULY 2003
* Noten2      Rated thermal power at
* 2n.
* BVPS-2 was uprated from 2652 aWt SESIGN ELECTRICAL RATING (Net            xwe)2      836
* to 2689 Xut on 10/30/01.                    Net
* 1.
* MDC was also uprated from
* 2.-    IX=. -DEPEND1=LE CAPACITY4Net EWe) 2---831                -          - 120 _tafe-to 831l                            _        *
                                                                            , 0    * *
* 0    *  *  *  **    *      *  **
* THIS MONTH          YEAR TO DATE                        CUMULaTXVE 3a. HOURS IN    REPORTING PERIOD:                                  744.0                  5087.0                        137654.0
: 3. nO. OF EPS. REACTOR =AS CRITICAL:                            744.0                  5087.0                        114642.1
: 4. SERVICE HOURS GENERATOR ON LINE:                                744.0                  5087.0                        113913.5
: 5. UNIT RESERVE SHUTDOWN          HOURS:                            0.0                        0.0                            0.0
: 6. NET ELECTRICAL ENERGY GEN.          (KWH):                617505.0              4250052.0                      89432455.0
: 7. GROSS ELECT. ENERGY GEN.      (MMW),                    649959.0              4468585.0                      94500630.0
: 8. GROSS THERMAL ENERGY GEN.          (KWA) t                  1997943.0            13577191.0                      288176802.0
: 9. UNIT AVAILABILITY FACTOR          (%)t                          100.0                      100.0                            82.8
: 10. UNIT CAPACITY FACTOR        (MDC)    (%):                      99.9                      100.5                            78.0
: 11. UNIT FORCED OUTAGE RATE          (%)t                            0.0                        0.0                            9.4 owww".}}


=Text=
=Text=

Latest revision as of 13:06, 25 March 2020

July 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2
ML032320303
Person / Time
Site: Beaver Valley
Issue date: 08/07/2003
From: Pearce L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-03-121
Download: ML032320303 (5)


Text

FENOC Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077 L-03-121 August 7, 2003 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50412, License No. NPF-73 hMonthly Overating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of July, 2003.

RespectfullJr W. Pearce _ _

- - XX -- Vice-President BVPS DTJ/cmg Enclosures cc: NRC Regional Office King of Prussia, PA aZd'

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE August 1, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: Jutv 2003 (1) Reason (2) Method A - Equipment Failure (Explain) I - Manual 8 - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3 - Automatic Trip Scram D - Regulatory Restriction 4 - Continuation E - Operator Training I Ucense Examination - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% ouput for the entire month.

-w

OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: 311S UNIT 61 REPORT DATEs 08/01/03 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 e -t * * -* * * * - - - - - -.

la. REPORTING PERIOD: JULY 2003

  • Notes: Rated thermal power at *
  • BVPS-1 was uprated from 2652 MWt*
1. DESIGN ELECTRICAL RATING (Net MWe): 835
  • to 2689 MWt on 10/20/01. Met
  • MDC was also uprated from 2.-- WI. DEPENDABLE CAPACITY -Net-MWala
  • 810_j- to 82!ae.

3 __ '

  • aaaa a at**
  • _* a
  • __
  • _ a a THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5087.0 238871.0
3. NO. OF EBS. REACTOR WAS CRITICAL: 744.0 3786.5 164378.0
4. SERVICE HOURS GENERATOR ON LINE: 744.0 3739.9 161851.9
5. UNIT RESERVE SHUTDOWN HOURSs 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (KH): 618520.0 2938309.0 121594316.0
7. GROSS ELECT. ENERGY GEN. (KWH): 654650.0 3122697.0 129792287.0
8. GROSS THERNAL ENERGY GEN. (KWH)s 1998416.0 9530273.0 399801582.5
9. UNIT AVAILABILITY FACTOR () 100.0 73.5 69.2
10. UNIT CAPACITY FACTOR (XMC) (%): - 101.3 70.4 64.6
11. UNIT FORCED OUTAGE RATE (b)s 0.0 1.5 15.4

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE August 1,2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: JuIv 2003 No. Date Type Duration Reason Method of Cause / Corrective Actions (YAMID) F Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE.

(1)Reason (2)Method A - Equipment Failure (Explain) 1 - manual B - Maintenance or Test 2 - Manual TdpI Scram C- Refueling 3 - Automatic Tdp I Scram D- Regulatory RestrIction 4 - ContInuation E - Operator Training / icense Examination 5 - Other (Explain)

F -Administrative G-Operational Error (Explain)

H -Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% ouput for the entire month.

_ H

~ ~_

_ , _. , .111- .

_ ~~ ~ ~ -b - _~1 wo "

OPERATING DATA REPORT DOCKET NO0 2 50-412 UNIT NAME: JYPS UNIT 62 REPORT DATE: 08/01/03 COMPLETED EYs DAVID T. JONES

,.; TELEPHONE 1(724) 682-4962

  • ** *
  • 0 0 *0*0*0**** *
  • REPORTING PERIODS JULY 2003
  • Noten2 Rated thermal power at
  • 2n.
  • BVPS-2 was uprated from 2652 aWt SESIGN ELECTRICAL RATING (Net xwe)2 836
  • to 2689 Xut on 10/30/01. Net
  • 1.
  • MDC was also uprated from
  • 2.- IX=. -DEPEND1=LE CAPACITY4Net EWe) 2---831 - - 120 _tafe-to 831l _ *

, 0 * *

  • 0 * * * ** * * **
  • THIS MONTH YEAR TO DATE CUMULaTXVE 3a. HOURS IN REPORTING PERIOD: 744.0 5087.0 137654.0
3. nO. OF EPS. REACTOR =AS CRITICAL: 744.0 5087.0 114642.1
4. SERVICE HOURS GENERATOR ON LINE: 744.0 5087.0 113913.5
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (KWH): 617505.0 4250052.0 89432455.0
7. GROSS ELECT. ENERGY GEN. (MMW), 649959.0 4468585.0 94500630.0
8. GROSS THERMAL ENERGY GEN. (KWA) t 1997943.0 13577191.0 288176802.0
9. UNIT AVAILABILITY FACTOR (%)t 100.0 100.0 82.8
10. UNIT CAPACITY FACTOR (MDC) (%): 99.9 100.5 78.0
11. UNIT FORCED OUTAGE RATE (%)t 0.0 0.0 9.4 owww".

Text

FENOC Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077 L-03-121 August 7, 2003 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50412, License No. NPF-73 hMonthly Overating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of July, 2003.

RespectfullJr W. Pearce _ _

- - XX -- Vice-President BVPS DTJ/cmg Enclosures cc: NRC Regional Office King of Prussia, PA aZd'

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE August 1, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: Jutv 2003 (1) Reason (2) Method A - Equipment Failure (Explain) I - Manual 8 - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3 - Automatic Trip Scram D - Regulatory Restriction 4 - Continuation E - Operator Training I Ucense Examination - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% ouput for the entire month.

-w

OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: 311S UNIT 61 REPORT DATEs 08/01/03 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 e -t * * -* * * * - - - - - -.

la. REPORTING PERIOD: JULY 2003

  • Notes: Rated thermal power at *
  • BVPS-1 was uprated from 2652 MWt*
1. DESIGN ELECTRICAL RATING (Net MWe): 835
  • to 2689 MWt on 10/20/01. Met
  • MDC was also uprated from 2.-- WI. DEPENDABLE CAPACITY -Net-MWala
  • 810_j- to 82!ae.

3 __ '

  • aaaa a at**
  • _* a
  • __
  • _ a a THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5087.0 238871.0
3. NO. OF EBS. REACTOR WAS CRITICAL: 744.0 3786.5 164378.0
4. SERVICE HOURS GENERATOR ON LINE: 744.0 3739.9 161851.9
5. UNIT RESERVE SHUTDOWN HOURSs 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (KH): 618520.0 2938309.0 121594316.0
7. GROSS ELECT. ENERGY GEN. (KWH): 654650.0 3122697.0 129792287.0
8. GROSS THERNAL ENERGY GEN. (KWH)s 1998416.0 9530273.0 399801582.5
9. UNIT AVAILABILITY FACTOR () 100.0 73.5 69.2
10. UNIT CAPACITY FACTOR (XMC) (%): - 101.3 70.4 64.6
11. UNIT FORCED OUTAGE RATE (b)s 0.0 1.5 15.4

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE August 1,2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: JuIv 2003 No. Date Type Duration Reason Method of Cause / Corrective Actions (YAMID) F Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments NONE.

(1)Reason (2)Method A - Equipment Failure (Explain) 1 - manual B - Maintenance or Test 2 - Manual TdpI Scram C- Refueling 3 - Automatic Tdp I Scram D- Regulatory RestrIction 4 - ContInuation E - Operator Training / icense Examination 5 - Other (Explain)

F -Administrative G-Operational Error (Explain)

H -Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% ouput for the entire month.

_ H

~ ~_

_ , _. , .111- .

_ ~~ ~ ~ -b - _~1 wo "

OPERATING DATA REPORT DOCKET NO0 2 50-412 UNIT NAME: JYPS UNIT 62 REPORT DATE: 08/01/03 COMPLETED EYs DAVID T. JONES

,.; TELEPHONE 1(724) 682-4962

  • ** *
  • 0 0 *0*0*0**** *
  • REPORTING PERIODS JULY 2003
  • Noten2 Rated thermal power at
  • 2n.
  • BVPS-2 was uprated from 2652 aWt SESIGN ELECTRICAL RATING (Net xwe)2 836
  • to 2689 Xut on 10/30/01. Net
  • 1.
  • MDC was also uprated from
  • 2.- IX=. -DEPEND1=LE CAPACITY4Net EWe) 2---831 - - 120 _tafe-to 831l _ *

, 0 * *

  • 0 * * * ** * * **
  • THIS MONTH YEAR TO DATE CUMULaTXVE 3a. HOURS IN REPORTING PERIOD: 744.0 5087.0 137654.0
3. nO. OF EPS. REACTOR =AS CRITICAL: 744.0 5087.0 114642.1
4. SERVICE HOURS GENERATOR ON LINE: 744.0 5087.0 113913.5
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (KWH): 617505.0 4250052.0 89432455.0
7. GROSS ELECT. ENERGY GEN. (MMW), 649959.0 4468585.0 94500630.0
8. GROSS THERMAL ENERGY GEN. (KWA) t 1997943.0 13577191.0 288176802.0
9. UNIT AVAILABILITY FACTOR (%)t 100.0 100.0 82.8
10. UNIT CAPACITY FACTOR (MDC) (%): 99.9 100.5 78.0
11. UNIT FORCED OUTAGE RATE (%)t 0.0 0.0 9.4 owww".