CPSES-200400280, Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 99: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-V -TXU TXU Energy           MikeBlevins                                                     Rcf IOCFR50.71(c' Comanche Peak Steam   Senior Vice President & Principal Nuclear Officer                 e .       . e)
{{#Wiki_filter:-V -TXU TXU Energy MikeBlevins Rcf IOCFR50.71(c' Comanche Peak Steam Senior Vice President & Principal Nuclear Officer e.
e)
ElectricStation P.O. Box 1002 (EO1)
ElectricStation P.O. Box 1002 (EO1)
Glen Rose.TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevins@txu.com CPSES-200400280 Log # TXX-04002 File# 10010 February 2, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Glen Rose.TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevins@txu.com CPSES-200400280 Log # TXX-04002 File#
10010 February 2, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50445 AND 50446 TRANSMITTAL OF ELECTRONIC LICENSING BASIS DOCUMENTS INCLUDING CERTIFIED FSAR AMENDMENT 99 REF:       I)     NRC letter from Timothy J. Polich to Mr. C. L. Terry dated September 25, 1995, "Exemption to 10 CFR 50.71 (e)(4),
DOCKET NOS. 50445 AND 50446 TRANSMITTAL OF ELECTRONIC LICENSING BASIS DOCUMENTS INCLUDING CERTIFIED FSAR AMENDMENT 99 REF:
I)
NRC letter from Timothy J. Polich to Mr. C. L. Terry dated September 25, 1995, "Exemption to 10 CFR 50.71 (e)(4),
Comanche Peak Steam Electric Station Units 1 and 2" Gentlemen:
Comanche Peak Steam Electric Station Units 1 and 2" Gentlemen:
In accordance with the requirements of 10CFR50.71(e) and the exemption granted by Reference 1, TXU Generation Company LP (TXU Energy), the owner of CPSES Units 1 and 2, herewith submits Amendment 99 to the updated Final Safety Analysis Report (FSAR). Amendment 99 is a revision to the existing updated FSAR and brings the FSAR up to date as of August 2, 2003. Plant changes which occurred subsequent to August 2, 2003, have been included as time allowed. TXU Energy certifies that the information presented in this revision to the updated FSAR accurately reflects changes to the plant completed prior to August 2, 2003.
In accordance with the requirements of 1 OCFR50.71(e) and the exemption granted by Reference 1, TXU Generation Company LP (TXU Energy), the owner of CPSES Units 1 and 2, herewith submits Amendment 99 to the updated Final Safety Analysis Report (FSAR). Amendment 99 is a revision to the existing updated FSAR and brings the FSAR up to date as of August 2, 2003. Plant changes which occurred subsequent to August 2, 2003, have been included as time allowed. TXU Energy certifies that the information presented in this revision to the updated FSAR accurately reflects changes to the plant completed prior to August 2, 2003.
The Fire Protection Report (FPR), for the purpose of compliance with 10CFR50.71(e), is considered to be part of the FSAR. Accordingly, the FPR through Revision 20 is also certified to accurately reflect changes completed prior to August 2, 2003.
The Fire Protection Report (FPR), for the purpose of compliance with 10CFR50.71(e), is considered to be part of the FSAR. Accordingly, the FPR through Revision 20 is also certified to accurately reflect changes completed prior to August 2, 2003.
AO 40`5
AO 40`5


I TXX-04002 Page 2 of 2 In addition to the FSAR and FPR, the enclosed CD-ROM includes the following Licensing Basis Documents (LBDs) updated through February 2,2004:
I TXX-04002 Page 2 of 2 In addition to the FSAR and FPR, the enclosed CD-ROM includes the following Licensing Basis Documents (LBDs) updated through February 2,2004:
* FSAR (Amendment 99)
FSAR (Amendment 99)
* Technical Specifications (TS) (Amendment 108)
Technical Specifications (TS) (Amendment 108)
* Technical Specifications Bases (Revision 32)
Technical Specifications Bases (Revision 32)
* Technical Requirements Manual (TRM) and TRM Bases (Revision 45)
Technical Requirements Manual (TRM) and TRM Bases (Revision 45)
* Emergency Plan (EP) (Revision 31)
Emergency Plan (EP) (Revision 31)
* Offsite Dose Calculation Manual (ODCM) (Revision 20)
Offsite Dose Calculation Manual (ODCM) (Revision 20)
* Fire Protection Report (FPR) (Revision 20)
Fire Protection Report (FPR) (Revision 20)
* Inservice Testing Plan (IST) (Revision 21)
Inservice Testing Plan (IST) (Revision 21)
* Core Operating Limits Report (COLR) (Cycle 10 for Unit I and Cycle 8 for Unit 2)
Core Operating Limits Report (COLR) (Cycle 10 for Unit I and Cycle 8 for Unit 2)
* Pressure Temperature Limits Report (PTLR) (Revision 2 for Unit 1 and Revision 3 for Unit 2)
Pressure Temperature Limits Report (PTLR) (Revision 2 for Unit 1 and Revision 3 for Unit 2)
* Operating License (OL) (Amendment 108)
Operating License (OL) (Amendment 108)
This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2.
This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2.
Should you have questions concerning this submittal, please contact Carl Corbin at 254-897-0121, or e-mail at ccorbinletxu.com.
Should you have questions concerning this submittal, please contact Carl Corbin at 254-897-0121, or e-mail at ccorbinletxu.com.
Sincerely, TXU Generation Company LP By:   TXU Generation Management Company LLC, Its General Partner Mike Blevins CBC/cbc Enclosure c-     B. S. Mallett, Region IV W. D. Johnson, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES}}
Sincerely, TXU Generation Company LP By:
TXU Generation Management Company LLC, Its General Partner Mike Blevins CBC/cbc Enclosure c -
B. S. Mallett, Region IV W. D. Johnson, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES}}

Latest revision as of 04:49, 16 January 2025

Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 99
ML040550122
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/02/2004
From: Blevins M
TXU Electric
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
10010, CPSES-200400280, TXX-04002
Download: ML040550122 (2)


Text

-V -TXU TXU Energy MikeBlevins Rcf IOCFR50.71(c' Comanche Peak Steam Senior Vice President & Principal Nuclear Officer e.

e)

ElectricStation P.O. Box 1002 (EO1)

Glen Rose.TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevins@txu.com CPSES-200400280 Log # TXX-04002 File#

10010 February 2, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50445 AND 50446 TRANSMITTAL OF ELECTRONIC LICENSING BASIS DOCUMENTS INCLUDING CERTIFIED FSAR AMENDMENT 99 REF:

I)

NRC letter from Timothy J. Polich to Mr. C. L. Terry dated September 25, 1995, "Exemption to 10 CFR 50.71 (e)(4),

Comanche Peak Steam Electric Station Units 1 and 2" Gentlemen:

In accordance with the requirements of 1 OCFR50.71(e) and the exemption granted by Reference 1, TXU Generation Company LP (TXU Energy), the owner of CPSES Units 1 and 2, herewith submits Amendment 99 to the updated Final Safety Analysis Report (FSAR). Amendment 99 is a revision to the existing updated FSAR and brings the FSAR up to date as of August 2, 2003. Plant changes which occurred subsequent to August 2, 2003, have been included as time allowed. TXU Energy certifies that the information presented in this revision to the updated FSAR accurately reflects changes to the plant completed prior to August 2, 2003.

The Fire Protection Report (FPR), for the purpose of compliance with 10CFR50.71(e), is considered to be part of the FSAR. Accordingly, the FPR through Revision 20 is also certified to accurately reflect changes completed prior to August 2, 2003.

AO 40`5

I TXX-04002 Page 2 of 2 In addition to the FSAR and FPR, the enclosed CD-ROM includes the following Licensing Basis Documents (LBDs) updated through February 2,2004:

FSAR (Amendment 99)

Technical Specifications (TS) (Amendment 108)

Technical Specifications Bases (Revision 32)

Technical Requirements Manual (TRM) and TRM Bases (Revision 45)

Emergency Plan (EP) (Revision 31)

Offsite Dose Calculation Manual (ODCM) (Revision 20)

Fire Protection Report (FPR) (Revision 20)

Inservice Testing Plan (IST) (Revision 21)

Core Operating Limits Report (COLR) (Cycle 10 for Unit I and Cycle 8 for Unit 2)

Pressure Temperature Limits Report (PTLR) (Revision 2 for Unit 1 and Revision 3 for Unit 2)

Operating License (OL) (Amendment 108)

This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2.

Should you have questions concerning this submittal, please contact Carl Corbin at 254-897-0121, or e-mail at ccorbinletxu.com.

Sincerely, TXU Generation Company LP By:

TXU Generation Management Company LLC, Its General Partner Mike Blevins CBC/cbc Enclosure c -

B. S. Mallett, Region IV W. D. Johnson, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES