RS-12-159, 12Q0108.10-R-002, Revision 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Braidwood Station, Unit 2. Part 4 of 5: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status:       N   U Seismic Walkdown Checklist (SWC)
{{#Wiki_filter:Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status:
Equipment ID No.:     21P08E Equipment Class:     (16) Battery Chargers and Inverters Equipment
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
21P08E Equipment Class:
(16) Battery Chargers and Inverters Equipment


== Description:==
== Description:==
INSTRUMENT BUS 214 INVERTER - DIV. 22 Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 451.00 ft, ALL Manufacturer/Model:
INSTRUMENT BUS 214 INVERTER - DIV. 22 Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used, to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used, to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       Yes of SWEL items requiring such verification)?
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                     Yes
Yes of SWEL items requiring such verification)?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                           Yes
: 2.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                             Yes
Is the anchorage free of bent, broken, missing or loose hardware?
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                             Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes
Drawing 20E-0-3391BK Revision D Anchor spacing is 10" at 2 locations while drawing specifies 12". NSWP-S-05 allows 2 diameter relocation which would equal 10" for 1" diameterexpansion anchors therefore OK.
: 3.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-3391BK Revision D Anchor spacing is 10" at 2 locations while drawing specifies 12". NSWP-S-05 allows 2 diameter relocation which would equal 10" for 1" diameter expansion anchors therefore OK.
: 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-254
C-254


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: M     N U Seismic Walkdown Checklist (SWC) '
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: M N U Seismic Walkdown Checklist (SWC) '
Equipment ID No.:   21P08E Equipment Class:   (16) Battery Chargers and Inverters Equipment
Equipment ID No.:
21P08E Equipment Class:
(16) Battery Chargers and Inverters Equipment


== Description:==
== Description:==
INSTRUMENT BUS 214 INVERTER - DIV. 22 Interaction Effects
INSTRUMENT BUS 214 INVERTER - DIV. 22 Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic block walls.
Seismic block walls.
No bulb guards on lights but they would not impact equipment if they fell. S&L Std E-103 -ok
No bulb guards on lights but they would not impact equipment if they fell. S&L Std E-103 -ok
: 9. Do attached lines have adequate flexibility to avoid damage?                                           Yes 1.0. Based on the above seismic interaction evaluations, is equipment free of                               Yes potentially adverse seismic interaction effects?
: 9.
Other Adverse Conditions
Do attached lines have adequate flexibility to avoid damage?
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
1.0.
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:                                               Marlene Delaney         Date:   10/1/2012 Philip Gazda                             10/1/2012 C-255
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-255


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: M. N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: M.
Equipment ID No.: 21P08E Equipment Class: (16) Bat tery Chargers and Inverters Equipment
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
21P08E Equipment Class:
(16) Bat Equipment


== Description:==
== Description:==
INSTRUIMENT BUS 214 INVERTER - DIV. 22 Photos Zlf-UtSt (NV-bbVb) 1-31-12 U23                         21P1::: (NI-5-95) 7-31-12 024 C-256
INSTRU tery Chargers and Inverters IMENT BUS 214 INVERTER - DIV. 22 Photos Zlf-UtSt (NV-bbVb) 1-31-12 U23 21P1::: (NI-5-95) 7-31-12 024 C-256


Braidwood Station Unit 2 12Q0108.1 0-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status:       N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1 0-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status:
Equipment ID No.: 21P08E Equipment Class: (16) Battery Chargers and Inverters Equipment
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
21P08E Equipment Class:
(16) Battery Chargers and Inverters Equipment


== Description:==
== Description:==
INSTRUMENT BUS 214 INVERTER- DIV. 22 21P08E (NP-6695) 7-31-12 025                         21POSE 7-31-12 020 C-257
INSTRUMENT BUS 214 INVERTER-DIV. 22 21P08E (NP-6695) 7-31-12 025 21POSE 7-31-12 020 C-257


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N
Equipment ID No.: 21P08E Equipment Class: (16) Battery Chargers and Inverters iipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
21P08E Equipment Class:
(16) Battery Chargers and Inverters iipment


== Description:==
== Description:==
INSTRUMENT BUS 214 INVERTER - DIV. 22 21P08E 7-31-12 021 C-258
INSTRUMENT BUS 214 INVERTER - DIV. 22 21P08E 7-31-12 021 C-258


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N
Equipment ID No.:   21Y-0606 Equipment Class:     (18) Instruments on Racks Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
21Y-0606 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
RH HX 2A OUT li/P TRANSDUCER Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 364.00 ft, ALL Manufacturer/Model:
RH HX 2A OUT li/P TRANSDUCER Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 364.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoracqe
Anchoracqe
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                             Not Applicable
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                 Not Applicable
of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                     Not Applicable
No
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                   Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                       Yes potentially adverse seismic conditions?
Is the anchorage free of bent, broken, missing or loose hardware?
Attached to well-anchoredrack 2PL86J C-259
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Attached to well-anchored rack 2PL86J Yes C-259


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:   21Y-0606 Equipment Class:     (18) Instruments on Racks Equipment
Equipment ID No.:
21Y-0606 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
RH HX 2A OUT I/P TRANSDUCER Interaction Effects
RH HX 2A OUT I/P TRANSDUCER Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                     Yes
: 7.
: 8. Are overhead equipment, distribution systems,.ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
Overheadfire protection piping and HVAC is well-supported
Yes
: 9. Do attached lines have adequate flexibility to avoid damage?                                           Yes
: 8.
: 10. Based on the above seismic interaction evaluations, is equipment free of                               Yes potentially adverse seismic interaction effects?
Are overhead equipment, distribution systems,.ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Other Adverse Conditions
Overhead fire protection piping and HVAC is well-supported
: 11. Have you looked for and found no adverse seismic conditions that could                                   Yes adversely affect the safety functions of the equipment?
: 9.
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 pm Evaluated by:                                                 Marlene Delaney       Date:   10/1/2012 Philip Gazda                             10/1/2012 C-260
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-260


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N
Equipment ID No.: 21Y-0606 Equipment Class: (18) Instruments on Racks Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
21Y-0606 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
RH HX 2A OUT I/P TRANSDUCER Photos Z IY-bSUb5 -Z-1IZ U4Vd C-261
RH HX 2A OUT I/P TRANSDUCER Photos Z IY -bSUb5  
-Z-1IZ U4Vd C-261


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N
Equipment ID No.:     21Y-0607 Equipment Class:     (18) Instruments on Racks Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
21Y-0607 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
RH HX #2B OUT I/P TRANSDUCER Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 364.00 ft, ALL Manufacturer/Model:
RH HX #2B OUT I/P TRANSDUCER Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 364.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                           Not Applicable
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                 Not Applicable
No of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                   Not Applicable
: 2.
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                   Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is the anchorage free of bent, broken, missing or loose hardware?
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
Not Applicable
Well-supported rack C-262
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Well-supported rack Yes C-262


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:   21Y-0607 Equipment Class:     (18) Instruments on Racks Equipment
Equipment ID No.:
21Y-0607 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
RH HX #2B OUT I/P TRANSDUCER Interaction Effects
RH HX #2B OUT I/P TRANSDUCER Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
Yes
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic block walls
Seismic block walls
: 9. Do attached lines have adequate flexibility to avoid damage?                                         Yes
: 9.
: 10. Based on the above seismic interaction evaluations, is equipment free of                             Yes potentially adverse seismic interaction effects?
Do attached lines have adequate flexibility to avoid damage?
Other Adverse Conditions
Yes Yes
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
: 10.
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 pm Evaluated by:                                                 Marlene Delaney     Date:   10/1/2012 Philip Gazda                           10/1/2012 C-263
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-263


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 21Y-0607 Equipment Class: (18) Instruments on Racks Equipment
Equipment ID No.:
Equipment Class:
Equipment


== Description:==
== Description:==
RH HX #2B OUT I/P TRANSDUCER Photos 21Y-606 8-2-12 049                                 21Y-606 8-2-12 050 C-264
Photos 21Y-0607 (18) Instruments on Racks RH HX #2B OUT I/P TRANSDUCER 21Y-606 8-2-12 049 21Y-606 8-2-12 050 C-264


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N
Equipment ID No.:   2MS001C Equipment Class:     (7) Fluid-Operated Valves Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS001C Equipment Class:
(7) Fluid-Operated Valves Equipment


== Description:==
== Description:==
MS ISOL VLV LOOP 2C ASMBLY Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 377.00 ft, ALL Manufacturer/Model:
MS ISOL VLV LOOP 2C ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 377.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                         No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                             Not Applicable
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                 Not Applicable
of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                     Not Applicable
No
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                   Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                       Yes potentially adverse seismic conditions?
Is the anchorage free of bent, broken, missing or loose hardware?
C-265
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-265


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M     ,N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M  
Equipment ID No.:     2MS001C Equipment Class:     (7) Fluid-Operated Valves Equipment
, N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS001C Equipment Class:
(7) Fluid-Operated Valves Equipment


== Description:==
== Description:==
MS ISOL VLV LOOP 2C ASMBLY Interaction Effects
MS ISOL VLV LOOP 2C ASMBLY Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?                                         Yes
Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                             Yes potentially adverse seismic interaction effects?
: 8.
Other Adverse Conditions
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no adverse seismic conditions that could                               Yes adversely affect the safety functions of the equipment?
Yes
Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 pm Evaluated by:                                                 Marlene Delaney     Date:   10/1/2012 Philip Gazda                           10/1/2012 C-266
: 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-266


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MS001C Equipment Class: (7) Fluid-Operated Valves Equipment
Equipment ID No.:
2MS001C Equipment Class:
(7) Fluid-Operated Valves Equipment


== Description:==
== Description:==
MS ISOL VLV LOOP 2C ASMBLY Photos 2MSO301 (AWB - UAMAUEU IULA I ION JOIN I             2Mb001U 8-1-12 AM 001 AND WEATHER STRIP) 8-1-12 AM 008 C-267
MS ISOL VLV LOOP 2C ASMBLY Photos 2MSO301 (AWB - UAMAUEU IULA I ION JOIN I AND WEATHER STRIP) 8-1-12 AM 008 2Mb001U 8-1-12 AM 001 C-267


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M] N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:   2MS001C Equipment Class:   (7) Fluid-Operated Valves nmant na'qrrinfinn- MS ISOL VLV LOOP 2C ASMBLY 2MS001C 8-1-12 AM 002                               2MS001C 8-1-12 AM 003 C-268
Equipment ID No.:
Equipment Class:
nmant na'qrrinfinn-2MS001C (7) Fluid-Operated Valves MS ISOL VLV LOOP 2C ASMBLY 2MS001C 8-1-12 AM 002 2MS001C 8-1-12 AM 003 C-268


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2MS018C Equipment Class:     (8) Motor-Operated and Solenoid-Operated Valves Equipment
Equipment ID No.:
2MS018C Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
S/G 2C PORV Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 404.00 ft, ALL Manufacturer/Model:
S/G 2C PORV Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 404.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                         No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                             Not Applicable
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                 Not Applicable
of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                     Not Applicable
No
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                   Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                       Yes potentially adverse seismic conditions?
Is the anchorage free of bent, broken, missing or loose hardware?
C-269
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-269


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2MS018C Equipment Class:     (8) Motor-Operated and Solenoid-Operated Valves Equipment
Equipment ID No.:
2MS018C Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
S/G 2C PORV Interaction Effects
S/G 2C PORV Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?                                         Yes
Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                             Yes potentially adverse seismic interaction effects?
: 8.
Other Adverse Conditions
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
Yes
Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by:                                                 Marlene Delaney       Date:   10/1/2012 Philip Gazda                           10/1/2012 C-270
: 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-270


Braidwood Station Unit 2 12QO108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12QO108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
Equipment ID No.: 2MS018C Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS018C Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
S/G 2C PORV 2MS018C 8-1-12 AM 004                               2MS018C 8-1-12 AM 005 C-271
S/G 2C PORV 2MS018C 8-1-12 AM 004 2MS018C 8-1-12 AM 005 C-271


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M-j N     U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M-j N U
Equipment ID No.:   2MS018C Equipment Class:   (8) Motor-Operated and Solenoid-Operated Valves Pirminmcanf 'aarrinfinn. 5qi/ 92. PC)P\/
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS018C Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Pirminmcanf 'aarrinfinn.
5qi/
: 92. PC)P\\/
C-272
C-272


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status:
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status:
* N U Seismic Walkdown Checklist (SWC)
* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2MS018D Equipment Class:     (8) Motor-Operated and Solenoid-Operated Valves Equipment
Equipment ID No.:
2MS018D Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
S/G 2D PORV ASMBLY Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 401.00 ft, ALL Manufacturer/Model:
S/G 2D PORV ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 401.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of.equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of.equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage.
Anchorage.
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                         No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                             Not Applicable
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                 Not Applicable
of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                     Not Applicable
No
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                   Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                       Yes potentially adverse seismic conditions?
Is the anchorage free of bent, broken, missing or loose hardware?
C-273
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-273


Braidwood Station Unit 2 12Q0108.10-R-0P2 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M   N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-0P2 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U
Equipment ID No.:     2MS018D Equipment Class:     (8) Motor-Operated and Solenoid-Operated Valves Equipment
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS018D Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
S/G 2D PORV ASMBLY Interaction Effects
S/G 2D PORV ASMBLY Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?                                         Yes
Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                             Yes potentially adverse seismic interaction effects?
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other Adverse Conditions
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
: 11.
Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by:                                               Marlene Delaney       Date:   10/1/2012 Philip Gazda                             10/1/2012 C-274
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-274


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
Equipment ID No.:   2MS018D Equipment Class:   (8) Motor-Operated and Solenoid-Operated Valves Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS018D Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
S/G 2D PORV ASMBLY Photos ZM,-iU1lSL (AVVb - UNIN I-ALLU 05-1--1 AM U1 Z C-275
S/G 2D PORV ASMBLY Photos ZM,-iU1lSL (AVVb - UNIN I-ALLU 05-1--1 AM U1 Z C-275


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N
Equipment ID No.:     2MS018D Equipment Class:     (8) Motor-Operated and Solenoid-Operated Valves Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS018D Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
S/G 2D PORV ASMBLY
S/G 2D PORV ASMBLY
                            = L I I ý     r I 2MS018D 8-1-12 AM 010                                 2MS018D 8-1-12 AM 011 C-276
= L I I  
ý r
I 2MS018D 8-1-12 AM 010 2MS018D 8-1-12 AM 011 C-276


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status:       N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status:
Equipment ID No.:     2PA03J Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PA03J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3)
PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3)
Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoracie
Anchoracie
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       Yes of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                       Yes
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                             Yes
Yes of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                               Yes Flooris tiled
: 2.
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                               Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is the anchorage free of bent, broken, missing or loose hardware?
Drawing 20E-0-3391C Revision BM Weld exceeds drawing requirement
Yes
: 6. Based on the above anchorage evaluations, is the anchorage free of                                       Yes potentially adverse seismic conditions?
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes Floor is tiled
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-339 1 C Revision BM Weld exceeds drawing requirement
: 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-277
C-277


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:   2PA03J Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
Equipment ID No.:
2PA03J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3)
PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3)
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
Yes Yes
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
No bulb guards but lights wouldn't impact equipment if they fell. S&L Std E-103 -ok
No bulb guards but lights wouldn't impact equipment if they fell. S&L Std E-103 -ok
: 9. Do attached lines have adequate flexibility to avoid damage?                                           Yes
: 9.
: 10. Based on the above seismic interaction evaluations, is equipment free of                               Yes potentially adverse seismic interaction effects?
Do attached lines have adequate flexibility to avoid damage?
Other Adverse Conditions
Yes
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
: 10.
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:                                               Marlene Delaney         Date:   10/1/2012 Philip Gazda                             10/1/2012 C-278
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-278


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N
Equipment ID No.: 2PA03J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PA03J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3)
PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3)
Photos 2PA03J 7-31-12 035                                   2PA03J 7-31-12 036 C-279
Photos 2PA03J 7-31-12 035 2PA03J 7-31-12 036 C-279


Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status:       N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status:
Equipment ID No.:     2PA09J Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PA09J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
PROTECTION SYSTEM CABINET (SSPS Cab. Train A)
PROTECTION SYSTEM CABINET (SSPS Cab. Train A)
Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       Yes of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                     Yes
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                           Yes
Yes of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                             Yes Flooris tiled
: 2.
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                             Yes This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes Floor is tiled
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-339 IC Revision BM Weld exceeds drawing requirements
Drawing 20E-0-339 IC Revision BM Weld exceeds drawing requirements
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
: 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-280
C-280


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: FT] N     U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: FT] N U
Equipment ID No.:   2PAO9J Equipment Class:   (20) Instrumentation and Control Panels and Cabinets Equipment
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PAO9J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
PROTECTION SYSTEM CABINET (SSPS Cab. Train A)
PROTECTION SYSTEM CABINET (SSPS Cab. Train A)
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
No bulb guards but lights wouldn't damage equipment if they fell. S&L Std E-103 -ok
Yes
: 9. Do attached lines have adequate flexibility to avoid damage?                                           Yes
: 8.
: 10. Based on the above seismic interaction evaluations, is equipment free of                               Yes potentially adverse seismic interaction effects?
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Other Adverse Conditions
No bulb guards but lights wouldn't damage equipment if they fell. S&L Std E-103 -ok Yes
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
: 9.
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:                                               Marlene Delaney       Date:   10/1/2012 Philip Gazda                             10/1/2012 C-281
Do attached lines have adequate flexibility to avoid damage?
Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-281


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status:       N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status:
Equipment ID No.: 2PA09J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PA09J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
PROTECTION SYSTEM CABINET (SSPS Cab. Train A)
PROTECTION SYSTEM CABINET (SSPS Cab. Train A)
Photos 2PA 09J (AWB -MSAC TEST PANEL) 7-31-12 039           2PA 09J (AWB -MSAC TEST PANEL) 7-31-12 040 C-282
Photos 2PA 09J (AWB -MSAC TEST PANEL) 7-31-12 039 2PA 09J (AWB -MSAC TEST PANEL) 7-31-12 040 C-282


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: M N
Equipment ID No.: 2PAO9J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PAO9J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
PROTECTION SYSTEM CABINET (SSPS Cab. Train A)
PROTECTION SYSTEM CABINET (SSPS Cab. Train A)
            -MSAC TEST PANEL) 7-31-12 041           2PAO9J 7-31-12 037 C-283
-MSAC TEST PANEL) 7-31-12 041 2PAO9J 7-31-12 037 C-283


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N
Equipment ID No.: 2PAO9J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PAO9J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
PROTECTION SYSTEM CABINET (SSPS Cab. Train A) 2PA09J 7-31-12 038 C-284
PROTECTION SYSTEM CABINET (SSPS Cab. Train A) 2PA09J 7-31-12 038 C-284


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status:       N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status:
Equipment ID No.:     2PA27J Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PA27J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
AUX SAFEGUARD RELAY CABINET (A)
AUX SAFEGUARD RELAY CABINET (A)
Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraqge
Anchoraqge
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       Yes of SWEL items requiring such verification)?
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                       Yes
Yes of SWEL items requiring such verification)?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                           Yes
: 2.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                               Yes Flooris tiled
Is the anchorage free of bent, broken, missing or loose hardware?
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                             Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes
Drawing20E-0-3391C Revision BM Weld exceeds drawing requirements
: 3.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes Floor is tiled
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-3391C Revision BM Weld exceeds drawing requirements
: 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-285
C-285


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M] N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2PA27J Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
Equipment ID No.:
2PA27J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
AUX SAFEGUARD RELAY CABINET (A)
AUX SAFEGUARD RELAY CABINET (A)
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
No bulb guards on lights but would not damage equipment if they fell. S&L Std E- 103 -ok
: 8.
: 9. Do attached lines have adequate flexibility to avoid damage?                                         Yes
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 10. Based on the above seismic interaction evaluations, is equipment free of                             Yes potentially adverse seismic interaction effects?
No bulb guards on lights but would not damage equipment if they fell. S&L Std E-103 -ok
Other Adverse Conditions
: 9.
: 11. Have you looked for and found no adverse seismic conditions that could                               Yes adversely affect the safety functions of the equipment?.
Do attached lines have adequate flexibility to avoid damage?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:                                                 Marlene Delaney       Date:   10/1/2012 Philip Gazda                           10/1/2012 C-286
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?.
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-286


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
Equipment ID No.: 2PA27J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PA27J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
AUX SAFEGUARD RELAY CABINET (A),
AUX SAFEGUARD RELAY CABINET (A),
Photos ZI'APZ(J I-L*1-1Z U4Z                                 2PA27J 7-31-12 043 C-287
Photos ZI'APZ(J I-L*1-1Z U4Z 2PA27J 7-31-12 043 C-287


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: F     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: F N
Equipment ID No.: 2PA27J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PA27J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
AUX SAFEGUARD RELAY CABINET (A) 2PA27J 7-31-12 044 C-288
AUX SAFEGUARD RELAY CABINET (A) 2PA27J 7-31-12 044 C-288


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: r]     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: r]
Equipment ID No.:     2PI-0633 Equipment Class:     (18) Instruments on Racks Equipment
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PI-0633 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
SFP PMP SUCTION PRESSURE INDICATOR Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       FH, 401.00 ft, ALL Manufacturer/Model:
SFP PMP SUCTION PRESSURE INDICATOR Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
FH, 401.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoracqe
Anchoracqe
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                         No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                             Not Applicable
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                   Not Applicable
No of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                     Not Applicable
: 2.
    ,5. Is the anchorage configuration consistent with plant documentation? (Note:                     Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is the anchorage free of bent, broken, missing or loose hardware?
: 6. Based on the above anchorage evaluations, is the anchorage free of                                       Yes potentially adverse seismic conditions?
Not Applicable
Rack mounted to wall Nut at 7:00 location is loose. Two otherscrews are tight and are more than adequate to supportsmall weight of pressure indicator. No immediate concern. IR 1394916 was written.
: 3.
C-289
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
,5. Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Rack mounted to wall Nut at 7:00 location is loose. Two other screws are tight and are more than adequate to support small weight of pressure indicator. No immediate concern. IR 1394916 was written.
Yes C-289


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2PI-0633 Equipment Class:     (18) Instruments on Racks Equipment
Equipment ID No.:
2PI-0633 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
SFP PMP SUCTION PRESSURE INDICATOR Interaction Effects
SFP PMP SUCTION PRESSURE INDICATOR Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?                                         Yes
Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                             Yes potentially adverse seismic interaction effects?
: 8.
Other Adverse Conditions
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adverselyaffect the safety functions of the equipment?
Yes
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 pm Evaluated by:                                               Marlene Delaney       Date:   10/1/2012 Philip Gazda                             10/1/2012 C-290
: 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adverselyaffect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-290


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N
Equipment ID No.: 2PI-0633 Equipment Class: (18) Instruments on Racks Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PI-0633 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
SFP PMP SUCTION PRESSURE INDICATOR Photos 2PI-0633 7-30-12 PM 001 C-291
SFP PMP SUCTION PRESSURE INDICATOR Photos 2PI-0633 7-30-12 PM 001 C-291


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2PL07J Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
Equipment ID No.:
2PL07J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
2A DG 1DG01KA CONTROL PANEL Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 401.00 ft, ALL Manufacturer/Model:
2A DG 1DG01KA CONTROL PANEL Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 401.00 ft, ALL Manufacturer/Model:
-Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
-Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                       Yes
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                           Yes
of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                               Yes Flooris coated
No
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                   Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
Is the anchorage free of bent, broken, missing or loose hardware?
C-292
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Floor is coated
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes Yes Yes Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-292


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M   N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U
Equipment ID No.:     2PLO7J Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PLO7J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
2A DG lDG01KA CONTROL PANEL Interaction Effects
2A DG lDG01KA CONTROL PANEL Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                     Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
OverheadHVAC well-supported
Yes
: 9. Do attached lines have adequate flexibility to avoid damage?                                           Yes
: 8.
: 10. Based on the above seismic interaction evaluations, is equipment free of                               Yes potentially adverse seismic interaction effects?
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Other Adverse Conditions
Overhead HVAC well-supported
: 11. Have you looked for and found no adverse seismic conditions that could                                   Yes adversely affect the safety functions of the equipment?
: 9.
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 pm Evaluated by:                                                 Marlene Delaney       Date:   10/1/2012 Philip Gazda                             10/1/2012 C-293
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-293


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PL07J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Equipment ID No.:
2PL07J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
2A DG lDG01KA CONTROL PANEL Photos 2PL07J 7-31-12 095                                   2PL07J 7-31-12 096 C-294
2A DG lDG01KA CONTROL PANEL Photos 2PL07J 7-31-12 095 2PL07J 7-31-12 096 C-294


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U
Equipment ID No.:     2PL08J Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PL08J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
2B DG 2DG01KB Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 401.00 ft, ALL Manufacturer/Model:
2B DG 2DG01KB Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 401.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchora-ge
Anchora-ge
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                         No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                       Yes
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation.?                           Yes
of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                               Yes
No
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                   Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
Is the anchorage free of bent, broken, missing or loose hardware?
C-295
Yes
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation.?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-295


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2PL08J Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
Equipment ID No.:
2PL08J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
2B DG 2DG01 KB Interaction Effects
2B DG 2DG01 KB Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely, to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?                                         Yes
Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                             Yes potentially adverse seismic interaction effects?
: 8.
Other Adverse Conditions
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely, to collapse onto the equipment?
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
Yes
Small hairline crack in wall is not a structural/seismicissue Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 Evaluated by:                                               Marlene Delaney       Date:   10/1/12 Philip Gazda                             10/1/12 C-296
: 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Small hairline crack in wall is not a structural/seismic issue Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 Evaluated by:
Marlene Delaney Date:
10/1/12 Philip Gazda 10/1/12 C-296


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N
Equipment ID No.: 2PL08J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PL08J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
2B DG 2DG01 KB Photos 2PL08J 7-31-12 104 C-297
2B DG 2DG01 KB Photos 2PL08J 7-31-12 104 C-297


Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status:       N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status:
Equipment ID No.:     2PM05J Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PM05J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
MAIN CONTROL BOARD Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 451.00 ft, ALL Manufacturer/Model:
MAIN CONTROL BOARD Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at.the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at.the end of this checklist for documenting other comments.
Anchoraae
Anchoraae
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                         Yes of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                       Yes
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                             Yes
Yes of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                               Yes
: 2.
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                               Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is the anchorage free of bent, broken, missing or loose hardware?
Drawing 20E-0-3391AN Revision U. Additional detailed information from CalculationDetail#8276 Revision B pages 2 to 6 which is input into Structural Calculation 7.16.10.2 (2113/85).
Yes
Due to configuration of the panels and the control room, it is not possible to verify all the welds (front/back, interior/exterior)for the control room panels.
: 3.
Welds that are seen are good, matching the drawings and otherinputs without cracks, corrosion, etc. Cabinetsopened for inspection.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-3391AN Revision U. Additional detailed information from Calculation Detail #8276 Revision B pages 2 to 6 which is input into Structural Calculation 7.16.10.2 (2113/85).
Due to configuration of the panels and the control room, it is not possible to verify all the welds (front/back, interior/exterior) for the control room panels.
Welds that are seen are good, matching the drawings and other inputs without cracks, corrosion, etc. Cabinets opened for inspection.
C-298
C-298


Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:   2PM05J Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
Equipment ID No.:
2PM05J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
MAIN CONTROL BOARD
MAIN CONTROL BOARD
: 6. Based on the above anchorage evaluations, is the anchorage free of                                   Yes potentially adverse seismic conditions?
: 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
See associatedarea walk-by
Yes
: 9. Do attached lines have adequate flexibility to avoid damage?                                         Yes
: 8.
: 10. Based on the above seismic interaction evaluations, is equipment free of                             Yes potentially adverse seismic interaction effects?
Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
See associated area walk-by
: 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                               Yes adversely affect the safety functions of the equipment?
: 11.
No structural/seismicissues Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am C-299
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
No structural/seismic issues Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am C-299


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PM05J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Equipment ID No.:
2PM05J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
MAIN CONTROL BOARD Evaluated by:                                         Marlene Delaney     Date:   10/1/2012 Philip Gazda                           10/1/2012 Photos 2PM05J 7-31-12 045                                   2PM05J 7-31-12 046 C-300
MAIN CONTROL BOARD Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 Photos 2PM05J 7-31-12 045 2PM05J 7-31-12 046 C-300


Braidwood Station Unit 2 1200108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 1200108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N
Equipment ID No.: 2PMO5J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PMO5J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
MAIN CONTROL BOARD 2PM05J 7-31-12 055 C-301
MAIN CONTROL BOARD 2PM05J 7-31-12 055 C-301


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: L     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: L N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2PM06J Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
Equipment ID No.:
2PM06J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
MAIN CONTROL BOARD Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 451.00 ft, ALL Manufacturer/Model:
MAIN CONTROL BOARD Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       Yes of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                     Yes
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                           Yes
Yes of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                             Yes
: 2.
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                             Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-3391AN Revision U. Additional detailed information from Calculation Detail #8276 Revision B pages 7 to 9 which is input into Structural Calculation 7.16.10.2 (2113/85).
Drawing 20E-0-3391AN Revision U. Additional detailed information from Calculation Detail #8276 Revision B pages 7 to 9 which is input into Structural Calculation 7.16.10.2 (2113/85).
Due to configuration of the panels and the control room, it is not possible to venfy all the welds (front/back, interior/exterior)for the control room panels.
Due to configuration of the panels and the control room, it is not possible to venfy all the welds (front/back, interior/exterior) for the control room panels.
Welds that are seen are good, matching the drawings and other inputs without cracks, corrosion, etc.
Welds that are seen are good, matching the drawings and other inputs without cracks, corrosion, etc.
C-302
C-302


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:   2PM06J Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
Equipment ID No.:
2PM06J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
MAIN CONTROL BOARD
MAIN CONTROL BOARD
: 6. Based on the above anchorage evaluations, is the anchorage free of                                       Yes potentially adverse seismic conditions?
: 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                     Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
see associatedarea walk-by (AWC 13)
Yes
: 9. Do attached lines have adequate flexibility to avoid damage?                                           Yes
: 8.
: 10. Based on the above seismic interaction evaluations, is equipment free of                               Yes potentially adverse seismic interaction effects?
Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
see associated area walk-by (AWC 13)
: 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am C-303
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am C-303


Braidwood Station Unit 2 1200108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 1200108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:   2PM06J Equipment Class:   (20) Instrumentation and Control Panels and Cabinets Equipment
Equipment ID No.:
Equipment Class:
Equipment


== Description:==
== Description:==
MAIN CONTROL BOARD Evaluated by:                                           Marlene Delaney     Date:   10/1/2012 Philip Gazda                           10/1/2012 Photos
2PM06J (20) Instrumentation and Control Panels and Cabinets MAIN CONTROL BOARD Evaluated by:
                        ;10M1 2PM06J 7-31-12 048                                     2PM06J 7-31-12 049 C-304
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 Photos
;10M1 2PM06J 7-31-12 048 2PM06J 7-31-12 049 C-304


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N
Equipment ID No.: 2PM06J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PM06J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
MAIN CONTROL BOARD I
MAIN CONTROL BOARD I
2PM06J 7-31-12 052                                   2PM06J 7-31-12 053 C-305
2PM06J 7-31-12 052 2PM06J 7-31-12 053 C-305


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status:   j   N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status:
Equipment ID No.:     2PM07J Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
j N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PM07J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
MAIN CONTROL BOARD Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 451.00 ft, ALL Manufacturer/Model:
MAIN CONTROL BOARD Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       Yes of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                       Yes
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                             Yes
Yes of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                               Yes
: 2.
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                               Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-3391AJ Revision F.
Drawing 20E-0-3391AJ Revision F.
Due to configurationof the panels and the control room, it is not possible to verify all the welds (front/back, interior/exterior)for the control room panels.
Due to configuration of the panels and the control room, it is not possible to verify all the welds (front/back, interior/exterior) for the control room panels.
Welds that are seen are good, matching the drawings and other inputs without cracks, corrosion,etc. Cabinets were opened to perform verification.
Welds that are seen are good, matching the drawings and other inputs without cracks, corrosion, etc. Cabinets were opened to perform verification.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                       Yes potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-306
C-306


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2PM07J Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
Equipment ID No.:
2PM07J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
MAIN CONTROL BOARD Interaction Effects
MAIN CONTROL BOARD Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
see associatedarea walk-by
Yes
: 9. Do attached lines have adequate flexibility to avoid damage?                                         Yes
: 8.
: 10. Based on the above seismic interaction evaluations, is equipment free of                             Yes potentially adverse seismic interaction effects?
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Other Adverse Conditions
see associated area walk-by
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am C-307
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am C-307


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U
Equipment ID No.: 2PM07J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PM07J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
MAIN CONTROL BOARD Evaluated by:                                         Marlene Delaney     Date:   10/1/2012 Philip Gazda                           10/1/2012 Photos 2PM07J 7-31-12 050 C-308
MAIN CONTROL BOARD Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 Photos 2PM07J 7-31-12 050 C-308


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:   . 2PM11J Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
Equipment ID No.:. 2PM11J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
MAIN CONTROL BOARD Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 451.00 ft, ALL Manufacturer/Model:
MAIN CONTROL BOARD Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                     Yes
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                           Yes
of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                             Yes
No
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                 Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
Is the anchorage free of bent, broken, missing or loose hardware?
C-309
Yes
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-309


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2PM11J Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
Equipment ID No.:
2PM11J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


== Description:==
== Description:==
MAIN CONTROL BOARD Interaction Effects
MAIN CONTROL BOARD Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
see associatedarea walk-by
Yes
: 9. Do attached lines have adequate flexibility to avoid damage?                                         Yes
: 8.
: 10. Based on the above seismic interaction evaluations, is equipment free of                             Yes potentially adverse seismic interaction effects?
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Other Adverse Conditions
see associated area walk-by
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
: 9.
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:                                                 Marlene Delaney       Date:   10/1/2012 Philip Gazda                           10/1/2012 C-310
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-310


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PM11J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Equipment ID No.:
Equipment Class:
Equipment


== Description:==
== Description:==
MAIN CONTROL BOARD Photos ZFMl ii t-31-1z u1bi C-311
2PM11J (20) Instrumentation and Control Panels and Cabinets MAIN CONTROL BOARD Photos ZFMl ii t-31-1z u1bi C-311


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2PT-0514 Equipment Class:     (18) Instruments on Racks Equipment
Equipment ID No.:
2PT-0514 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
STM GEN LOOP 2A STEAM PRESS PR Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 377.00 ft, ALL Manufacturer/Model:
STM GEN LOOP 2A STEAM PRESS PR Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 377.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                           Not Applicable
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?               Not Applicable
of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                   Not Applicable
No
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                 Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?             I Well-mounted on rack that is anchoredwith large anchors C-312
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
I Well-mounted on rack that is anchored with large anchors Yes C-312


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2PT-0514 Equipment Class:     (18) Instruments on Racks Equipment
Equipment ID No.:
2PT-0514 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
STM GEN LOOP 2A STEAM PRESS PR Interaction Effects
STM GEN LOOP 2A STEAM PRESS PR Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?                                           Yes
Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                               Yes potentially adverse seismic interaction effects?
: 8.
Other Adverse Conditions
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
  .11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
: 9.
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by:                                               Marlene Delaney         Date:   10/1/2012 Philip Gazda                             10/1/2012 C-313
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
.11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-313


Braidwood Station Unit 2 12Q01 08.1 O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q01 08.1 O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
Equipment ID No.: 2PT-0514 Equipment Class: (18) Instruments on Racks Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PT-0514 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
STM GEN LOOP 2A STEAM PRESS PR Photos 2PT- 0514 (AWB) 8-1-12 AM 017                       2PT-0514 8-1-12 AM 015 C-314
STM GEN LOOP 2A STEAM PRESS PR Photos 2PT- 0514 (AWB) 8-1-12 AM 017 2PT-0514 8-1-12 AM 015 C-314


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PT-0514 Equipment Class: (18) Instruments on Racks Equipment
Equipment ID No.:
2PT-0514 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
STM GEN LOOP 2A STEAM PRESS PR 2PT-0514 8-1-12 AM 016 C-315
STM GEN LOOP 2A STEAM PRESS PR 2PT-0514 8-1-12 AM 016 C-315


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2PT-0546 Equipment Class:     (18) Instruments on Racks Equipment
Equipment ID No.:
2PT-0546 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
STM GEN LOOP 2D STEAM PRESS PR Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 377.00 ft, ALL Manufacturer/Model:
STM GEN LOOP 2D STEAM PRESS PR Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 377.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                         No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                           Not Applica.ble
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?               Not Applicable
No of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                   Not Applicable
: 2.
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                 Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is the anchorage free of bent, broken, missing or loose hardware?
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
Not Applica.ble
Well mounted on rack Rack is welded to embed plate C-316
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Well mounted on rack Rack is welded to embed plate Yes C-316


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:   2PT-0546 Equipment Class:     (18) Instruments on Racks Equipment
Equipment ID No.:
2PT-0546 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
STM GEN LOOP 2D STEAM PRESS PR Interaction Effects
STM GEN LOOP 2D STEAM PRESS PR Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?                                         Yes
Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                             Yes potentially adverse seismic interaction effects?
: 8.
Other Adverse Conditions
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
Yes
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by:                                               Marlene Delaney       Date:   10/1/2012 Philip Gazda                             10/1/2012 C-317
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-317


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N
Equipment ID No.: 2PT-0546 Equipment Class: (18) Instruments on Racks Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PT-0546 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
STM GEN LOOP 2D STEAM PRESS PR Photos C-318
STM GEN LOOP 2D STEAM PRESS PR Photos C-318


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:   2PT-0935 Equipment Class:     (18) Instruments on Racks Equipment
Equipment ID No.:
2PT-0935 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
CNMT PRESS XMTTR Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 451.00 ft, ALL Manufacturer/Model:
CNMT PRESS XMTTR Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                         No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                           Not Applicable
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                 Not Applicable
of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                   Not Applicable
No
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                   Not Applicable This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
: 2.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
Is the anchorage free of bent, broken, missing or loose hardware?
Instrument mounted on rack that is welded to embed plate C-319
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Instrument mounted on rack that is welded to embed plate Yes C-319


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2PT-0935 Equipment Class:     (18) Instruments on Racks Equipment
Equipment ID No.:
2PT-0935 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
CNMT PRESS XMTTR Interaction Effects
CNMT PRESS XMTTR Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?                                         Yes
: 8.
: 10. Based on the above seismic interaction evaluations, is equipment free of                             Yes potentially adverse seismic interaction effects?
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Other Adverse Conditions
: 9.
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
Do attached lines have adequate flexibility to avoid damage?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by:                                               Marlene Delaney       Date:   10/1/2012 Philip Gazda                             10/1/2012 C-320
Yes Yes Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-320


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
Equipment ID No.:     2PT-0935 Equipment Class:     (18) Instruments on Racks Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PT-0935 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
CNMT PRESS XMTTR Photos 21- 1-U9.3b (NF--bb~Jb) US-2-1 Z ~                             -U!J.S t ZVI        F-UO t$-Z-I Z UZI C-321
CNMT PRESS XMTTR Photos 21-1 -U9.3b (NF--bb~Jb) US-2-1 Z ~
ZVI
-U!J.S t F-UO t$-Z-I Z UZI C-321


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: F     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PT-0935 Equipment Class: (18) Instruments on Racks Equipment
Equipment ID No.:
2PT-0935 Equipment Class:
(18) Instruments on Racks Equipment


== Description:==
== Description:==
CNMT PRESS XMTTR ZF 1-0935 U-2-1 2 024                               2F1-' 0935 U-2-1 2 025 C-322
CNMT PRESS XMTTR ZF 1 -0935 U-2-1 2 024 2F1-' 0935 U-2-1 2 025 C-322


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status:       N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status:
Equipment ID No.:     2RH01PA Equipment Class:     (6) Vertical Pumps Equipment
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH01PA Equipment Class:
(6) Vertical Pumps Equipment


== Description:==
== Description:==
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 346.00 ft, ALL Manufacturer/Model:
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 346.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoracie
Anchoracie
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       Yes of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent,, broken, missing or loose hardware?                                     Yes
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                           Yes
Yes of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                               Yes
: 2.
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                             Yes This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
Is the anchorage free of bent,, broken, missing or loose hardware?
DrawingM-1219 Sheet 2 Revision Y Equipment is contaminatedso anchordiameternot measured but visual verification performed
Yes
: 6. Based on the above anchorage evaluations, is the anchoragefree of                                       Yes potentially adverse seismic conditions?
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing M-1219 Sheet 2 Revision Y Equipment is contaminated so anchor diameter not measured but visual verification performed
: 6.
Based on the above anchorage evaluations, is the anchoragefree of Yes potentially adverse seismic conditions?
C-323
C-323


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status:   Y   N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status:
Equipment ID No.:   2RH01PA Equipment Class:     (6) Vertical Pumps Equipment
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH01PA Equipment Class:
(6) Vertical Pumps Equipment


== Description:==
== Description:==
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Interaction Effects
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                     Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?                                           Yes
Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                               Yes potentially adverse seismic interaction effects?
: 8.
Other Adverse Conditions
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no adverse seismic conditions that could                                   Yes adversely affect the safety functions of the equipment?
Yes
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by:                                               Marlene Delaney       Date:   10/1/2012 Philip Gazda                             10/1/2012 C-324
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-324


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: M N
Equipment ID No.: 2RH01PA Equipment Class: (6) Vertical Pumps Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH01PA Equipment Class:
(6) Vertical Pumps Equipment


== Description:==
== Description:==
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Photos 2RHO1PA 7-30-12 AM 032                         21RHO1PA 7-30-12 AM 033 C-325
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Photos 2RHO1PA 7-30-12 AM 032 21RHO1PA 7-30-12 AM 033 C-325


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RH01PA Equipment Class: (6) Vertical Pumps Equipment
Equipment ID No.:
2RH01PA Equipment Class:
(6) Vertical Pumps Equipment


== Description:==
== Description:==
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY 2RH01 PA 7-30-12 AM 034                         ZKHUI VA (-SU-1 2 AM UJb C-326
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY 2RH01 PA 7-30-12 AM 034 ZKHUI VA (-SU-1 2 AM UJb C-326


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N
Equipment ID No.: 2RH01PA Equipment Class: (6) Vertical Pumps Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH01PA Equipment Class:
(6) Vertical Pumps Equipment


== Description:==
== Description:==
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY 2RH01PA 7-30-12 AM 036 C-327
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY 2RH01PA 7-30-12 AM 036 C-327


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: MI N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: MI N U
Equipment ID No.:     2RH01PA-A Equipment Class:     (21) Tanks and Heat Exchangers Equipment
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH01PA-A Equipment Class:
(21) Tanks and Heat Exchangers Equipment


== Description:==
== Description:==
RH PUMP 2A SEAL COOLER Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 346.00 ft, ALL Manufacturer/Model:
RH PUMP 2A SEAL COOLER Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 346.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       No of SWEL items requiring such verification)?
: 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
Mounted to skid. Well-anchored.
Mounted to skid. Well-anchored.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                           Not Applicable
: 2.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?               Not Applicable
Is the anchorage free of bent, broken, missing or loose hardware?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                   Not Applicable
No Not Applicable
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                 Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 3.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
Is the anchorage free of corrosion that is more than mild surface oxidation?
C-328
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-328


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: [M N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: [M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2RHO1 PA-A Equipment Class:     (21) Tanks and Heat Exchangers Equipment
Equipment ID No.:
2RHO1 PA-A Equipment Class:
(21) Tanks and Heat Exchangers Equipment


== Description:==
== Description:==
RH PUMP 2A SEAL COOLER Interaction Effects
RH PUMP 2A SEAL COOLER Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?                                         Yes
Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                             Yes potentially adverse seismic interaction effects?
: 8.
Other Adverse Conditions
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
Yes
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by:                                                 Marlene Delaney       Date:   10/1/2012 Philip Gazda                           10/1/2012 C-329
: 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-329


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RH01PA-A Equipment Class: (21) Tanks and Heat Exchangers Equipment
Equipment ID No.:
2RH01PA-A Equipment Class:
(21) Tanks and Heat Exchangers Equipment


== Description:==
== Description:==
RH PUMP 2A SEAL COOLER Photos 2RHOI PA-A 7-30-12 AM 030                           2RH01 PA-A 7-30-12 AM 031 C-330
RH PUMP 2A SEAL COOLER Photos 2RHOI PA-A 7-30-12 AM 030 2RH01 PA-A 7-30-12 AM 031 C-330


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2RH610 Equipment Class:     (8) Motor-Operated and Solenoid-Operated Valves Equipment
Equipment ID No.:
2RH610 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
RHR PUMP 2A MINFLOW VLV ASMBLY Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 357.00 ft, ALL Manufacturer/Model:
RHR PUMP 2A MINFLOW VLV ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 357.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                         No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                           Not Applicable
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                 Not Applicable
of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                   Not Applicable
No
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                   Not Applicable This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
: 2.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
Is the anchorage free of bent, broken, missing or loose hardware?
C-331
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-331


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2RH610 Equipment Class:     (8) Motor-Operated and Solenoid-Operated Valves Equipment
Equipment ID No.:
2RH610 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
RHR PUMP 2A MINFLOW VLV ASMBLY, Interaction Effects
RHR PUMP 2A MINFLOW VLV ASMBLY, Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
Yes
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Nearby block walls are seismic.
Nearby block walls are seismic.
Nearby scaffolding is laterallysupported with stand-offs on 3 walls. Cannot damage equipment if it were to move in the free direction.
Nearby scaffolding is laterally supported with stand-offs on 3 walls. Cannot damage equipment if it were to move in the free direction.
: 9. Do attached lines have adequate flexibility to avoid damage?                                         Yes
: 9.
: 10. Based on the above seismic interaction evaluations, is equipment free of                             Yes potentially adverse seismic interaction effects?
Do attached lines have adequate flexibility to avoid damage?
Other Adverse Conditions
: 10.
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Valve is a MOV and is robust.
Valve is a MOV and is robust.
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Valve class changed from fluid operated valve as indicated on SWEL.
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Valve class changed from fluid operated valve as indicated on SWEL.
Evaluated by:                                                 Marlene Delaney       Date:   10/1/2012 Philip Gazda                           10/1/2012 C-332
Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-332


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status:       IN U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status:
Equipment ID No.: 2RH610 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
IN U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH610 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
RHR PUMP 2A MINFLOWVLV ASMBLY Photos 2RH610 7-30-12 AM 018                               2RH610 7-30-12 AM 019 C-333
RHR PUMP 2A MINFLOWVLV ASMBLY Photos 2RH610 7-30-12 AM 018 2RH610 7-30-12 AM 019 C-333


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N
Equipment ID No.: 2RH610 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH610 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
RHR PUMP 2A MINFLOW VLV ASMBLY 2RH610 8-2-12 002 C-334
RHR PUMP 2A MINFLOW VLV ASMBLY 2RH610 8-2-12 002 C-334


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N
Equipment ID No.:   2RH8716B Equipment Class:     (8) Motor-Operated and Solenoid-Operated Valves Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH8716B Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
RH HX 2B DISCH CROSSTIE VLV ASMBLY Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 364.00 ft, ALL Manufacturer/Model:
RH HX 2B DISCH CROSSTIE VLV ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 364.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchora-ae
Anchora-ae
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                           Not Applicable
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?               Not Applicable
of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                   Not Applicable
No
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                 Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
Is the anchorage free of bent, broken, missing or loose hardware?
C-335
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-335


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2RH8716B Equipment Class:     (8) Motor-Operated and Solenoid-Operated Valves Equipment
Equipment ID No.:
2RH8716B Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
RH HX 2B DISCH CROSSTIE VLV ASMBLY Interaction Effects
RH HX 2B DISCH CROSSTIE VLV ASMBLY Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?                                         Yes
: 8.
: 10. Based on the above seismic interaction evaluations, is equipment free of                             Yes potentially adverse seismic interaction effects?
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Other Adverse Conditions
: 9.
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
Do attached lines have adequate flexibility to avoid damage?
Weil-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by:                                                 Marlene Delaney       Date:   10/1/2012 Philip Gazda                           10/1/2012 C-336
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Weil-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-336


Braidwood Station Unit 2 12Q01 08.1 0-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q01 08.1 0-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
Equipment ID No.: 2RH8716B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH8716B Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
RH HX 2B DISCH CROSSTIE VLV ASMBLY Photos 2RH8716B 7-30-12 AM 043                             2RH8716B 7-30-12 AM 044 C-337
RH HX 2B DISCH CROSSTIE VLV ASMBLY Photos 2RH8716B 7-30-12 AM 043 2RH8716B 7-30-12 AM 044 C-337


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RH8716B Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EauiDment
Equipment ID No.:
2RH8716B Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves EauiDment


== Description:==
== Description:==
RH HX 2B DISCH CROSSTIE VLV ASMBLY C-338
RH HX 2B DISCH CROSSTIE VLV ASMBLY C-338


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2SI8801A Equipment Class:     (7) Fluid-Operated Valves Equipment
Equipment ID No.:
2SI8801A Equipment Class:
(7) Fluid-Operated Valves Equipment


== Description:==
== Description:==
CHG PUMP TO COLD LEG INJ ISOL ASMBLY Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 375.00 ft, ALL Manufacturer/Model:
CHG PUMP TO COLD LEG INJ ISOL ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 375.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                             Not Applicable
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                 Not Applicable
No of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                     Not Applicable
: 2.
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                   Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is the anchorage free of bent, broken, missing or loose hardware?
: 6. Based on the above anchorage evaluations, is the anchorage free of                                       Yes potentially adverse seismic conditions?
Not Applicable
C-339
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-339


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2SI8801A Equipment Class:     (7) Fluid-Operated Valves Equipment
Equipment ID No.:
2SI8801A Equipment Class:
(7) Fluid-Operated Valves Equipment


== Description:==
== Description:==
CHG PUMP TO COLD LEG INJ ISOL ASMBLY Interaction Effects
CHG PUMP TO COLD LEG INJ ISOL ASMBLY Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Gallery above is well-supported
Gallery above is well-supported
: 9. Do attached lines have adequate flexibility to avoid damage?                                         Yes
: 9.
: 10. Based on the above seismic interaction evaluations, is equipment free of                             Yes potentially adverse seismic interaction effects?
Do attached lines have adequate flexibility to avoid damage?
Other Adverse Conditions
: 10.
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by:                                               Marlene Delaney       Date:   10/11/2012 62       "Philip                   Gazda                             10/1/2012 C-340
Yes Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by:
Marlene Delaney Date:
10/11/2012 62 "Philip Gazda 10/1/2012 C-340


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
Equipment ID No.: 2SI8801A Equipment Class: (7) Fluid-Operated Valves Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SI8801A Equipment Class:
(7) Fluid-Operated Valves Equipment


== Description:==
== Description:==
CHG PUMP TO COLD LEG INJ ISOL ASMBLY ZZ5i6dOIA d5-Z-1Z U15                                 Z,,.?I$UIA d-Z-1Z U15O C-341
CHG PUMP TO COLD LEG INJ ISOL ASMBLY ZZ5i6dOIA d5-Z-1Z U15 Z,,.?I$UIA d-Z-1Z U15O C-341


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SI8801A Equipment Class: (7) Fluid-Operated Valves Equipment
Equipment ID No.:
2SI8801A Equipment Class:
(7) Fluid-Operated Valves Equipment


== Description:==
== Description:==
CHG PUMP TO COLD LEG INJ ISOL ASMBLY ZZAMUIA O-Z-1Z UI I C-342
CHG PUMP TO COLD LEG INJ ISOL ASMBLY ZZAMUIA O-Z-1Z UI I C-342


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2SI8801B Equipment Class:     (7) Fluid-Operated Valves Equipment
Equipment ID No.:
2SI8801B Equipment Class:
(7) Fluid-Operated Valves Equipment


== Description:==
== Description:==
CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 375.00 ft, ALL Manufacturer/Model:
CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 375.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                         No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                             Not Applicable
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                 Not Applicable
of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                     Not Applicable
No
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                   Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                       Yes potentially adverse seismic conditions?
Is the anchorage free of bent, broken, missing or loose hardware?
C-343
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-343


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2SI8801B Equipment Class:     (7) Fluid-Operated Valves Equipment
Equipment ID No.:
2SI8801B Equipment Class:
(7) Fluid-Operated Valves Equipment


== Description:==
== Description:==
CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Interaction Effects
CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                     Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
Overheadgallety is well-supported
Yes
: 9. Do attached lines have adequate flexibility to avoid damage?                                           Yes
: 8.
: 10. Based on the above seismic interaction evaluations, is equipment free of                               Yes
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
      . potentially adverse seismic interaction effects?
Overhead gallety is well-supported
Other Adverse Conditions
: 9.
: 11. Have you looked for and found no adverse seismic conditions that could                                   Yes adversely affect the safety functions of the equipment?
Do attached lines have adequate flexibility to avoid damage?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by:                                               Marlene Delaney       Date:   10/1/2012 (7   ' "-Philip                 Gazda                             10/1/2012 C-344
Yes Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of
. potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 (7 '  
"-Philip Gazda 10/1/2012 C-344


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SI8801B Equipment Class: (7) Fluid-Operated Valves Equipment
Equipment ID No.:
2SI8801B Equipment Class:
(7) Fluid-Operated Valves Equipment


== Description:==
== Description:==
CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Photos 2SI8801B 8-2-12 019 C-345
CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Photos 2SI8801B 8-2-12 019 C-345


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M   N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U
Equipment ID No.:     2SX004 Equipment Class:     (8) Motor-Operated and Solenoid-Operated Valves Equipment
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX004 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
CC HX 2 INLT VLV ASMBLY Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 330.00 ft, ALL Manufacturer/Model:
CC HX 2 INLT VLV ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 330.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                           Not Applicable
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?               Not Applicable
of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                   Not Applicable
No
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                 Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
Is the anchorage free of bent, broken, missing or loose hardware?
C-346
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-346


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:   2SX004 Equipment Class:     (8) Motor-Operated and Solenoid-Operated Valves Equipment
Equipment ID No.:
2SX004 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
CC HX 2 INLT VLV ASMBLY Interaction Effects
CC HX 2 INLT VLV ASMBLY Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?                                           Yes
Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                               Yes potentially adverse seismic interaction effects?
: 8.
Other Adverse Conditions
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no adverse seismic conditions that could                                   Yes adversely affect the safety functions of the equipment?
Yes
Robust valve on well-supported pipe Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:                                                 Marlene Delaney       Date:   10/1/2012 Philip Gazda                             10/1/2012 C-347
: 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Robust valve on well-supported pipe Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-347


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
Equipment ID No.: 2SX004 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX004 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
CC HX 2 INLT VLV ASMBLY Photos 26)WU413-1-1Z FM U15                               2ZZXUU46~-1-12 HMU1Th C-348
CC HX 2 INLT VLV ASMBLY Photos 26)WU413-1-1Z FM U15 2ZZXUU46~-1-12 HMU1Th C-348


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SX004 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Equipment ID No.:
2SX004 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
CC HX 2 INLT VLV ASMBLY 2SX004 8-1-12 PM 017 C-349
CC HX 2 INLT VLV ASMBLY 2SX004 8-1-12 PM 017 C-349


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N
Equipment ID No.:     2SX005 Equipment Class:     (8) Motor-Operated and Solenoid-Operated Valves Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX005 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
U-0 CC HX INLET VLV ASMBLY Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 330.00 ft, ALL Manufacturer/Model:
U-0 CC HX INLET VLV ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 330.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                           Not Applicable
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?               Not Applicable
of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                   Not Applicable
No
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                 Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
Is the anchorage free of bent, broken, missing or loose hardware?
C-350
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-350


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M   N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U
Equipment ID No.:     2SX005 Equipment Class:     (8) Motor-Operated and Solenoid-Operated Valves Equipment
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX005 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
U-0 CC HX INLET VLVASMBLY Interaction Effects
U-0 CC HX INLET VLVASMBLY Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?                                           Yes
Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                               Yes potentially adverse seismic interaction effects?
: 8.
Other Adverse Conditions
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
Yes
Robust, well-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:                                               Marlene Delaney       Date:   10/1/2012 Philip Gazda                             10/1/2012 C-351
: 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Robust, well-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-351


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status:       N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status:
Equipment ID No.: 2SX005 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX005 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
U-0 CC HX INLET VLV ASMBLY Photos 2SX005 8-1-12 PM 021                               2SX005 8-1-12 PM 022 C-352
U-0 CC HX INLET VLV ASMBLY Photos 2SX005 8-1-12 PM 021 2SX005 8-1-12 PM 022 C-352


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:   2SX01AA Equipment Class:     (21) Tanks and Heat Exchangers Equipment
Equipment ID No.:
2SX01AA Equipment Class:
(21) Tanks and Heat Exchangers Equipment


== Description:==
== Description:==
2A SX PUMP LUBE OIL COOLER Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 330.00 ft, ALL Manufacturer/Model:
2A SX PUMP LUBE OIL COOLER Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 330.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                           Not Applicable
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?               Not Applicable
No of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                   Not Applicable
: 2.
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                 Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is the anchorage free of bent, broken, missing or loose hardware?
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
Not Applicable
Equipment is an in-line mounted coolerwith no anchorage details.
: 3.
C-353
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Equipment is an in-line mounted cooler with no anchorage details.
Yes C-353


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2SX01AA Equipment Class:     (21) Tanks and Heat Exchangers Equipment
Equipment ID No.:
2SX01AA Equipment Class:
(21) Tanks and Heat Exchangers Equipment


== Description:==
== Description:==
2A SX PUMP LUBE OIL COOLER Interaction Effects
2A SX PUMP LUBE OIL COOLER Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?                                         Yes
: 8.
: 10. Based on the above seismic interaction evaluations, is equipment free of                             Yes potentially adverse seismic interaction effects?
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Other Adverse Conditions
Yes Yes
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
: 9.
Well-supported IR written on component (tagged) but no impact to seismic safety functions Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:                                                 Marlene Delaney     Date:   10/1/2012 Philip Gazda                           10/1/2012 C-354
Do attached lines have adequate flexibility to avoid damage?
Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Well-supported IR written on component (tagged) but no impact to seismic safety functions Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-354


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SX01AA Equipment Class: (21) Tanks and Heat Exchangers Equipment
Equipment ID No.:
Equipment Class:
Equipment


== Description:==
== Description:==
2A SX PUMP LUBE OIL COOLER Photos C-355
2SX01AA (21) Tanks and Heat Exchangers 2A SX PUMP LUBE OIL COOLER Photos C-355


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2SX01PA Equipment Class:     (5) Horizontal Pumps Equipment
Equipment ID No.:
2SX01PA Equipment Class:
(5) Horizontal Pumps Equipment


== Description:==
== Description:==
PUMP, 2A ESSENTIAL SER WTR ASMBLY Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 330.00 ft, ALL Manufacturer/Model:
PUMP, 2A ESSENTIAL SER WTR ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 330.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchora-ge
Anchora-ge
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                     Yes
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                           Yes
of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                             Yes
No
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                 Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
Is the anchorage free of bent, broken, missing or loose hardware?
Well-anchored C-356
Yes
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Well-anchored Yes C-356


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U
Equipment ID No.:   2SX01PA Equipment Class:     (5) Horizontal Pumps Equipment
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX01PA Equipment Class:
(5) Horizontal Pumps Equipment


== Description:==
== Description:==
PUMP, 2A ESSENTIAL SER WTR ASMBLY Interaction Effects
PUMP, 2A ESSENTIAL SER WTR ASMBLY Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?                                           Yes
Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                               Yes potentially adverse seismic interaction effects?
: 8.
Other Adverse Conditions
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no adverse seismic conditions that could                                   Yes adversely affect the safety functions of the equipment?
Yes
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:                                               Marlene Delaney       Date:   10/1/2012 Philip Gazda                             10/1/2012 C-357
: 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-357


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SX01PA Equipment Class: (5) Horizontal Pumps Equipment
Equipment ID No.:
2SX01PA Equipment Class:
(5) Horizontal Pumps Equipment


== Description:==
== Description:==
PUMP, 2A ESSENTIAL SER WTR ASMBLY Photos 2bXU1 PA 8-1-12 PM 011                           2SX01PA8-1-12 PM 010 C-358
PUMP, 2A ESSENTIAL SER WTR ASMBLY Photos 2bXU1 PA 8-1-12 PM 011 2SX01PA8-1-12 PM 010 C-358


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2SX01PA-C Equipment Class:     (5) Horizontal Pumps Equipment
Equipment ID No.:
2SX01PA-C Equipment Class:
(5) Horizontal Pumps Equipment


== Description:==
== Description:==
PUMP, 2A SX AUX LUBE OIL PP Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 330.00 ft, ALL Manufacturer/Model:
PUMP, 2A SX AUX LUBE OIL PP Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 330.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraqe
Anchoraqe
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                           Not Applicable
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?               Not Applicable
No of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                   Not Applicable
: 2.
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                 Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is the anchorage free of bent, broken, missing or loose hardware?
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Equipment is mounted to oil reservoir. Well-anchored.
Equipment is mounted to oil reservoir. Well-anchored.
C-359
Yes C-359


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:   2SX01PA-C Equipment Class:     (5) Horizontal Pumps Equipment
Equipment ID No.:
2SX01PA-C Equipment Class:
(5) Horizontal Pumps Equipment


== Description:==
== Description:==
PUMP, 2A SX AUX LUBE OIL PP Interaction Effects
PUMP, 2A SX AUX LUBE OIL PP Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                     Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?                                           Yes
: 8.
: 10. Based on the above seismic interaction evaluations, is equipment free of                               Yes potentially adverse seismic interaction effects?
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Other Adverse Conditions
: 9.
: 11. Have you looked for and found no adverse seismic conditions that could                                   Yes adversely affect the safety functions of the equipment?
Do attached lines have adequate flexibility to avoid damage?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:                                               Marlene Delaney         Date:   10/1/2012
: 10.
                                        .°         Philip Gazda                             10/1/2012 C-360
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012
.° Philip Gazda 10/1/2012 C-360


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M     N   U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N
Equipment ID No.: 2SXO1PA-C Equipment Class: (5) Horizontal Pumps Equipment
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SXO1PA-C Equipment Class:
(5) Horizontal Pumps Equipment


== Description:==
== Description:==
PUMP, 2A SX AUX LUBE OIL PP Photos 2SX01 PA-C 8-1-12 PM 006 C-361
PUMP, 2A SX AUX LUBE OIL PP Photos 2SX01 PA-C 8-1-12 PM 006 C-361


Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2SX033 Equipment Class:     (8) Motor-Operated and Solenoid-Operated Valves Equipment
Equipment ID No.:
2SX033 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Project:   Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):       Auxiliary, 330.00 ft, ALL Manufacturer/Model:
ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 330.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                       No of SWEL items requiring such verification)?
: 1.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                           Not Applicable
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                 Not Applicable
of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                   Not Applicable
No
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                   Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                     Yes potentially adverse seismic conditions?
Is the anchorage free of bent, broken, missing or loose hardware?
C-362
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-362


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2SX033 Equipment Class:     (8) Motor-Operated and Solenoid-Operated Valves Equipment
Equipment ID No.:
2SX033 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Interaction Effects
ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                   Yes
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                         Yes masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?                                           Yes
Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                               Yes potentially adverse seismic interaction effects?
: 8.
Other Adverse Conditions
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no adverse seismic conditions that could                                 Yes adversely affect the safety functions of the equipment?
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Robust, well-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm
Robust, well-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm
                        /~4~LA(             4d4_
/~4~LA(
Evaluated by:                                               Marlene Delaney       Date:   10/1/2012 Philip Gazda                             10/1/2012 C-363
4d4_
Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-363


Braidwood Station Unit 2 12Q01 08.1 O-R-002 Rev. 0 Correspondence No.: RS-1 2-159 Sheet 3 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q01 08.1 O-R-002 Rev. 0 Correspondence No.: RS-1 2-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SX033 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Equipment ID No.:
2SX033 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
== Description:==
ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Photos 2SX033 (NP-6695) 8-1-12 PM 020                     2SX033 8-1-12 PM 018 C-364
ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Photos 2SX033 (NP-6695) 8-1-12 PM 020 2SX033 8-1-12 PM 018 C-364


Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M     N U Seismic Walkdown Checklist (SWC)
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2SX033 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauioment Descriotion: ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY 2SX033 8-1-12 PM 019 C-365}}
Equipment ID No.:
2SX033 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Eauioment Descriotion:
ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY 2SX033 8-1-12 PM 019 C-365}}

Latest revision as of 21:30, 11 January 2025

12Q0108.10-R-002, Revision 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Braidwood Station, Unit 2. Part 4 of 5
ML12339A227
Person / Time
Site: Braidwood  
Issue date: 11/16/2012
From: Delaney M
Exelon Generation Co, Stevenson & Associates
To:
Office of Nuclear Reactor Regulation
References
RS-12-159 12Q0108.10-R-002, Rev 0
Download: ML12339A227 (112)


Text

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status:

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

21P08E Equipment Class:

(16) Battery Chargers and Inverters Equipment

Description:

INSTRUMENT BUS 214 INVERTER - DIV. 22 Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used, to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50%

Yes of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-0-3391BK Revision D Anchor spacing is 10" at 2 locations while drawing specifies 12". NSWP-S-05 allows 2 diameter relocation which would equal 10" for 1" diameter expansion anchors therefore OK.

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-254

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: M N U Seismic Walkdown Checklist (SWC) '

Equipment ID No.:

21P08E Equipment Class:

(16) Battery Chargers and Inverters Equipment

Description:

INSTRUMENT BUS 214 INVERTER - DIV. 22 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic block walls.

No bulb guards on lights but they would not impact equipment if they fell. S&L Std E-103 -ok

9.

Do attached lines have adequate flexibility to avoid damage?

1.0.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-255

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: M.

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

21P08E Equipment Class:

(16) Bat Equipment

Description:

INSTRU tery Chargers and Inverters IMENT BUS 214 INVERTER - DIV. 22 Photos Zlf-UtSt (NV-bbVb) 1-31-12 U23 21P1::: (NI-5-95) 7-31-12 024 C-256

Braidwood Station Unit 2 12Q0108.1 0-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status:

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

21P08E Equipment Class:

(16) Battery Chargers and Inverters Equipment

Description:

INSTRUMENT BUS 214 INVERTER-DIV. 22 21P08E (NP-6695) 7-31-12 025 21POSE 7-31-12 020 C-257

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

21P08E Equipment Class:

(16) Battery Chargers and Inverters iipment

Description:

INSTRUMENT BUS 214 INVERTER - DIV. 22 21P08E 7-31-12 021 C-258

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

21Y-0606 Equipment Class:

(18) Instruments on Racks Equipment

Description:

RH HX 2A OUT li/P TRANSDUCER Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoracqe

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Attached to well-anchored rack 2PL86J Yes C-259

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

21Y-0606 Equipment Class:

(18) Instruments on Racks Equipment

Description:

RH HX 2A OUT I/P TRANSDUCER Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems,.ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead fire protection piping and HVAC is well-supported

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 pm Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-260

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

21Y-0606 Equipment Class:

(18) Instruments on Racks Equipment

Description:

RH HX 2A OUT I/P TRANSDUCER Photos Z IY -bSUb5

-Z-1IZ U4Vd C-261

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

21Y-0607 Equipment Class:

(18) Instruments on Racks Equipment

Description:

RH HX #2B OUT I/P TRANSDUCER Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

No of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Well-supported rack Yes C-262

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

21Y-0607 Equipment Class:

(18) Instruments on Racks Equipment

Description:

RH HX #2B OUT I/P TRANSDUCER Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic block walls

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 pm Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-263

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

Equipment

Description:

Photos 21Y-0607 (18) Instruments on Racks RH HX #2B OUT I/P TRANSDUCER 21Y-606 8-2-12 049 21Y-606 8-2-12 050 C-264

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2MS001C Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

MS ISOL VLV LOOP 2C ASMBLY Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 377.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-265

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M

, N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2MS001C Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

MS ISOL VLV LOOP 2C ASMBLY Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 pm Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-266

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2MS001C Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

MS ISOL VLV LOOP 2C ASMBLY Photos 2MSO301 (AWB - UAMAUEU IULA I ION JOIN I AND WEATHER STRIP) 8-1-12 AM 008 2Mb001U 8-1-12 AM 001 C-267

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

nmant na'qrrinfinn-2MS001C (7) Fluid-Operated Valves MS ISOL VLV LOOP 2C ASMBLY 2MS001C 8-1-12 AM 002 2MS001C 8-1-12 AM 003 C-268

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2MS018C Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

S/G 2C PORV Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 404.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-269

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2MS018C Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

S/G 2C PORV Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-270

Braidwood Station Unit 2 12QO108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2MS018C Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

S/G 2C PORV 2MS018C 8-1-12 AM 004 2MS018C 8-1-12 AM 005 C-271

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M-j N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2MS018C Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Pirminmcanf 'aarrinfinn.

5qi/

92. PC)P\\/

C-272

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status:

  • N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2MS018D Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

S/G 2D PORV ASMBLY Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 401.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of.equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage.

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-273

Braidwood Station Unit 2 12Q0108.10-R-0P2 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2MS018D Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

S/G 2D PORV ASMBLY Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-274

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2MS018D Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

S/G 2D PORV ASMBLY Photos ZM,-iU1lSL (AVVb - UNIN I-ALLU 05-1--1 AM U1 Z C-275

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2MS018D Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

S/G 2D PORV ASMBLY

= L I I

ý r

I 2MS018D 8-1-12 AM 010 2MS018D 8-1-12 AM 011 C-276

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status:

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PA03J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3)

Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoracie

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

Yes of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Floor is tiled

5.

Is the anchorage configuration consistent with plant documentation? (Note:

Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-0-339 1 C Revision BM Weld exceeds drawing requirement

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-277

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PA03J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3)

Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

No bulb guards but lights wouldn't impact equipment if they fell. S&L Std E-103 -ok

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-278

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PA03J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3)

Photos 2PA03J 7-31-12 035 2PA03J 7-31-12 036 C-279

Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status:

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PA09J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

PROTECTION SYSTEM CABINET (SSPS Cab. Train A)

Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

Yes of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Floor is tiled

5.

Is the anchorage configuration consistent with plant documentation? (Note:

Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-0-339 IC Revision BM Weld exceeds drawing requirements

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-280

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: FT] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PAO9J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

PROTECTION SYSTEM CABINET (SSPS Cab. Train A)

Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

No bulb guards but lights wouldn't damage equipment if they fell. S&L Std E-103 -ok Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-281

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status:

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PA09J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

PROTECTION SYSTEM CABINET (SSPS Cab. Train A)

Photos 2PA 09J (AWB -MSAC TEST PANEL) 7-31-12 039 2PA 09J (AWB -MSAC TEST PANEL) 7-31-12 040 C-282

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PAO9J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

PROTECTION SYSTEM CABINET (SSPS Cab. Train A)

-MSAC TEST PANEL) 7-31-12 041 2PAO9J 7-31-12 037 C-283

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PAO9J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

PROTECTION SYSTEM CABINET (SSPS Cab. Train A) 2PA09J 7-31-12 038 C-284

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status:

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PA27J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

AUX SAFEGUARD RELAY CABINET (A)

Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraqge

1. Is anchorage configuration verification required (i.e., is the item one of the 50%

Yes of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Floor is tiled

5.

Is the anchorage configuration consistent with plant documentation? (Note:

Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-0-3391C Revision BM Weld exceeds drawing requirements

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-285

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PA27J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

AUX SAFEGUARD RELAY CABINET (A)

Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

No bulb guards on lights but would not damage equipment if they fell. S&L Std E-103 -ok

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?.

Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-286

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PA27J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

AUX SAFEGUARD RELAY CABINET (A),

Photos ZI'APZ(J I-L*1-1Z U4Z 2PA27J 7-31-12 043 C-287

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PA27J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

AUX SAFEGUARD RELAY CABINET (A) 2PA27J 7-31-12 044 C-288

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: r]

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PI-0633 Equipment Class:

(18) Instruments on Racks Equipment

Description:

SFP PMP SUCTION PRESSURE INDICATOR Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

FH, 401.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoracqe

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

No of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

,5. Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Rack mounted to wall Nut at 7:00 location is loose. Two other screws are tight and are more than adequate to support small weight of pressure indicator. No immediate concern. IR 1394916 was written.

Yes C-289

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PI-0633 Equipment Class:

(18) Instruments on Racks Equipment

Description:

SFP PMP SUCTION PRESSURE INDICATOR Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adverselyaffect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 pm Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-290

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PI-0633 Equipment Class:

(18) Instruments on Racks Equipment

Description:

SFP PMP SUCTION PRESSURE INDICATOR Photos 2PI-0633 7-30-12 PM 001 C-291

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PL07J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

2A DG 1DG01KA CONTROL PANEL Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 401.00 ft, ALL Manufacturer/Model:

-Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Floor is coated

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes Yes Yes Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-292

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PLO7J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

2A DG lDG01KA CONTROL PANEL Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead HVAC well-supported

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 pm Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-293

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PL07J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

2A DG lDG01KA CONTROL PANEL Photos 2PL07J 7-31-12 095 2PL07J 7-31-12 096 C-294

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PL08J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

2B DG 2DG01KB Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 401.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora-ge

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation.?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-295

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PL08J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

2B DG 2DG01 KB Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely, to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Small hairline crack in wall is not a structural/seismic issue Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 Evaluated by:

Marlene Delaney Date:

10/1/12 Philip Gazda 10/1/12 C-296

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PL08J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

2B DG 2DG01 KB Photos 2PL08J 7-31-12 104 C-297

Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status:

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PM05J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

MAIN CONTROL BOARD Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at.the end of this checklist for documenting other comments.

Anchoraae

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

Yes of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-0-3391AN Revision U. Additional detailed information from Calculation Detail #8276 Revision B pages 2 to 6 which is input into Structural Calculation 7.16.10.2 (2113/85).

Due to configuration of the panels and the control room, it is not possible to verify all the welds (front/back, interior/exterior) for the control room panels.

Welds that are seen are good, matching the drawings and other inputs without cracks, corrosion, etc. Cabinets opened for inspection.

C-298

Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PM05J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

MAIN CONTROL BOARD

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?

See associated area walk-by

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

No structural/seismic issues Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am C-299

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PM05J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

MAIN CONTROL BOARD Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 Photos 2PM05J 7-31-12 045 2PM05J 7-31-12 046 C-300

Braidwood Station Unit 2 1200108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PMO5J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

MAIN CONTROL BOARD 2PM05J 7-31-12 055 C-301

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: L N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PM06J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

MAIN CONTROL BOARD Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

Yes of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-0-3391AN Revision U. Additional detailed information from Calculation Detail #8276 Revision B pages 7 to 9 which is input into Structural Calculation 7.16.10.2 (2113/85).

Due to configuration of the panels and the control room, it is not possible to venfy all the welds (front/back, interior/exterior) for the control room panels.

Welds that are seen are good, matching the drawings and other inputs without cracks, corrosion, etc.

C-302

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PM06J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

MAIN CONTROL BOARD

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?

see associated area walk-by (AWC 13)

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am C-303

Braidwood Station Unit 2 1200108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

Equipment

Description:

2PM06J (20) Instrumentation and Control Panels and Cabinets MAIN CONTROL BOARD Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 Photos

10M1 2PM06J 7-31-12 048 2PM06J 7-31-12 049 C-304

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PM06J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

MAIN CONTROL BOARD I

2PM06J 7-31-12 052 2PM06J 7-31-12 053 C-305

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status:

j N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PM07J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

MAIN CONTROL BOARD Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

Yes of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-0-3391AJ Revision F.

Due to configuration of the panels and the control room, it is not possible to verify all the welds (front/back, interior/exterior) for the control room panels.

Welds that are seen are good, matching the drawings and other inputs without cracks, corrosion, etc. Cabinets were opened to perform verification.

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-306

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PM07J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

MAIN CONTROL BOARD Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

see associated area walk-by

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am C-307

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PM07J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

MAIN CONTROL BOARD Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 Photos 2PM07J 7-31-12 050 C-308

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:. 2PM11J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

MAIN CONTROL BOARD Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-309

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PM11J Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

MAIN CONTROL BOARD Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

see associated area walk-by

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-310

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

Equipment

Description:

2PM11J (20) Instrumentation and Control Panels and Cabinets MAIN CONTROL BOARD Photos ZFMl ii t-31-1z u1bi C-311

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PT-0514 Equipment Class:

(18) Instruments on Racks Equipment

Description:

STM GEN LOOP 2A STEAM PRESS PR Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 377.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

I Well-mounted on rack that is anchored with large anchors Yes C-312

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PT-0514 Equipment Class:

(18) Instruments on Racks Equipment

Description:

STM GEN LOOP 2A STEAM PRESS PR Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

.11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-313

Braidwood Station Unit 2 12Q01 08.1 O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PT-0514 Equipment Class:

(18) Instruments on Racks Equipment

Description:

STM GEN LOOP 2A STEAM PRESS PR Photos 2PT- 0514 (AWB) 8-1-12 AM 017 2PT-0514 8-1-12 AM 015 C-314

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PT-0514 Equipment Class:

(18) Instruments on Racks Equipment

Description:

STM GEN LOOP 2A STEAM PRESS PR 2PT-0514 8-1-12 AM 016 C-315

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PT-0546 Equipment Class:

(18) Instruments on Racks Equipment

Description:

STM GEN LOOP 2D STEAM PRESS PR Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 377.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

No of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applica.ble

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Well mounted on rack Rack is welded to embed plate Yes C-316

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PT-0546 Equipment Class:

(18) Instruments on Racks Equipment

Description:

STM GEN LOOP 2D STEAM PRESS PR Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-317

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PT-0546 Equipment Class:

(18) Instruments on Racks Equipment

Description:

STM GEN LOOP 2D STEAM PRESS PR Photos C-318

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PT-0935 Equipment Class:

(18) Instruments on Racks Equipment

Description:

CNMT PRESS XMTTR Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Instrument mounted on rack that is welded to embed plate Yes C-319

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PT-0935 Equipment Class:

(18) Instruments on Racks Equipment

Description:

CNMT PRESS XMTTR Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-320

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PT-0935 Equipment Class:

(18) Instruments on Racks Equipment

Description:

CNMT PRESS XMTTR Photos 21-1 -U9.3b (NF--bb~Jb) US-2-1 Z ~

ZVI

-U!J.S t F-UO t$-Z-I Z UZI C-321

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2PT-0935 Equipment Class:

(18) Instruments on Racks Equipment

Description:

CNMT PRESS XMTTR ZF 1 -0935 U-2-1 2 024 2F1-' 0935 U-2-1 2 025 C-322

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status:

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2RH01PA Equipment Class:

(6) Vertical Pumps Equipment

Description:

PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 346.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoracie

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

Yes of SWEL items requiring such verification)?

2.

Is the anchorage free of bent,, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing M-1219 Sheet 2 Revision Y Equipment is contaminated so anchor diameter not measured but visual verification performed

6.

Based on the above anchorage evaluations, is the anchoragefree of Yes potentially adverse seismic conditions?

C-323

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2RH01PA Equipment Class:

(6) Vertical Pumps Equipment

Description:

PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-324

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2RH01PA Equipment Class:

(6) Vertical Pumps Equipment

Description:

PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Photos 2RHO1PA 7-30-12 AM 032 21RHO1PA 7-30-12 AM 033 C-325

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2RH01PA Equipment Class:

(6) Vertical Pumps Equipment

Description:

PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY 2RH01 PA 7-30-12 AM 034 ZKHUI VA (-SU-1 2 AM UJb C-326

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2RH01PA Equipment Class:

(6) Vertical Pumps Equipment

Description:

PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY 2RH01PA 7-30-12 AM 036 C-327

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: MI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2RH01PA-A Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

RH PUMP 2A SEAL COOLER Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 346.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Mounted to skid. Well-anchored.

2.

Is the anchorage free of bent, broken, missing or loose hardware?

No Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-328

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: [M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2RHO1 PA-A Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

RH PUMP 2A SEAL COOLER Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-329

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2RH01PA-A Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

RH PUMP 2A SEAL COOLER Photos 2RHOI PA-A 7-30-12 AM 030 2RH01 PA-A 7-30-12 AM 031 C-330

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2RH610 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

RHR PUMP 2A MINFLOW VLV ASMBLY Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 357.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-331

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2RH610 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

RHR PUMP 2A MINFLOW VLV ASMBLY, Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Nearby block walls are seismic.

Nearby scaffolding is laterally supported with stand-offs on 3 walls. Cannot damage equipment if it were to move in the free direction.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Valve is a MOV and is robust.

Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Valve class changed from fluid operated valve as indicated on SWEL.

Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-332

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status:

IN U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2RH610 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

RHR PUMP 2A MINFLOWVLV ASMBLY Photos 2RH610 7-30-12 AM 018 2RH610 7-30-12 AM 019 C-333

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2RH610 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

RHR PUMP 2A MINFLOW VLV ASMBLY 2RH610 8-2-12 002 C-334

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2RH8716B Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

RH HX 2B DISCH CROSSTIE VLV ASMBLY Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora-ae

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-335

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2RH8716B Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

RH HX 2B DISCH CROSSTIE VLV ASMBLY Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Weil-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-336

Braidwood Station Unit 2 12Q01 08.1 0-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2RH8716B Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

RH HX 2B DISCH CROSSTIE VLV ASMBLY Photos 2RH8716B 7-30-12 AM 043 2RH8716B 7-30-12 AM 044 C-337

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2RH8716B Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves EauiDment

Description:

RH HX 2B DISCH CROSSTIE VLV ASMBLY C-338

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SI8801A Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

CHG PUMP TO COLD LEG INJ ISOL ASMBLY Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 375.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

No of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-339

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SI8801A Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

CHG PUMP TO COLD LEG INJ ISOL ASMBLY Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Gallery above is well-supported

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by:

Marlene Delaney Date:

10/11/2012 62 "Philip Gazda 10/1/2012 C-340

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SI8801A Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

CHG PUMP TO COLD LEG INJ ISOL ASMBLY ZZ5i6dOIA d5-Z-1Z U15 Z,,.?I$UIA d-Z-1Z U15O C-341

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SI8801A Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

CHG PUMP TO COLD LEG INJ ISOL ASMBLY ZZAMUIA O-Z-1Z UI I C-342

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SI8801B Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 375.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-343

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SI8801B Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead gallety is well-supported

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of

. potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by:

Marlene Delaney Date:

10/1/2012 (7 '

"-Philip Gazda 10/1/2012 C-344

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SI8801B Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Photos 2SI8801B 8-2-12 019 C-345

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX004 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

CC HX 2 INLT VLV ASMBLY Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 330.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-346

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX004 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

CC HX 2 INLT VLV ASMBLY Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Robust valve on well-supported pipe Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-347

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX004 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

CC HX 2 INLT VLV ASMBLY Photos 26)WU413-1-1Z FM U15 2ZZXUU46~-1-12 HMU1Th C-348

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX004 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

CC HX 2 INLT VLV ASMBLY 2SX004 8-1-12 PM 017 C-349

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX005 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

U-0 CC HX INLET VLV ASMBLY Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 330.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-350

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX005 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

U-0 CC HX INLET VLVASMBLY Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Robust, well-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-351

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status:

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX005 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

U-0 CC HX INLET VLV ASMBLY Photos 2SX005 8-1-12 PM 021 2SX005 8-1-12 PM 022 C-352

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX01AA Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

2A SX PUMP LUBE OIL COOLER Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 330.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

No of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Equipment is an in-line mounted cooler with no anchorage details.

Yes C-353

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX01AA Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

2A SX PUMP LUBE OIL COOLER Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Well-supported IR written on component (tagged) but no impact to seismic safety functions Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-354

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

Equipment

Description:

2SX01AA (21) Tanks and Heat Exchangers 2A SX PUMP LUBE OIL COOLER Photos C-355

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX01PA Equipment Class:

(5) Horizontal Pumps Equipment

Description:

PUMP, 2A ESSENTIAL SER WTR ASMBLY Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 330.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora-ge

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Well-anchored Yes C-356

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX01PA Equipment Class:

(5) Horizontal Pumps Equipment

Description:

PUMP, 2A ESSENTIAL SER WTR ASMBLY Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-357

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX01PA Equipment Class:

(5) Horizontal Pumps Equipment

Description:

PUMP, 2A ESSENTIAL SER WTR ASMBLY Photos 2bXU1 PA 8-1-12 PM 011 2SX01PA8-1-12 PM 010 C-358

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX01PA-C Equipment Class:

(5) Horizontal Pumps Equipment

Description:

PUMP, 2A SX AUX LUBE OIL PP Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 330.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraqe

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

No of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Equipment is mounted to oil reservoir. Well-anchored.

Yes C-359

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX01PA-C Equipment Class:

(5) Horizontal Pumps Equipment

Description:

PUMP, 2A SX AUX LUBE OIL PP Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:

Marlene Delaney Date:

10/1/2012

.° Philip Gazda 10/1/2012 C-360

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SXO1PA-C Equipment Class:

(5) Horizontal Pumps Equipment

Description:

PUMP, 2A SX AUX LUBE OIL PP Photos 2SX01 PA-C 8-1-12 PM 006 C-361

Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX033 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Project:

Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 330.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-362

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX033 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Robust, well-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm

/~4~LA(

4d4_

Evaluated by:

Marlene Delaney Date:

10/1/2012 Philip Gazda 10/1/2012 C-363

Braidwood Station Unit 2 12Q01 08.1 O-R-002 Rev. 0 Correspondence No.: RS-1 2-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX033 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Photos 2SX033 (NP-6695) 8-1-12 PM 020 2SX033 8-1-12 PM 018 C-364

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2SX033 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Eauioment Descriotion:

ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY 2SX033 8-1-12 PM 019 C-365