{{#Wiki_filter:Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status: | {{#Wiki_filter:Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status: | ||
Equipment ID No.: | N U | ||
Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: | |||
21P08E Equipment Class: | |||
(16) Battery Chargers and Inverters Equipment | |||
== Description:== | == Description:== | ||
INSTRUMENT BUS 214 INVERTER - DIV. 22 Project: | INSTRUMENT BUS 214 INVERTER - DIV. 22 Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 451.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used, to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used, to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Yes of SWEL items requiring such verification)? | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | : 2. | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | Is the anchorage free of bent, broken, missing or loose hardware? | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | Yes | ||
Drawing 20E-0-3391BK Revision D Anchor spacing is 10" at 2 locations while drawing specifies 12". NSWP-S-05 allows 2 diameter relocation which would equal 10" for 1" | : 3. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of corrosion that is more than mild surface oxidation? | ||
Yes | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
Yes | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Drawing 20E-0-3391BK Revision D Anchor spacing is 10" at 2 locations while drawing specifies 12". NSWP-S-05 allows 2 diameter relocation which would equal 10" for 1" diameter expansion anchors therefore OK. | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
C-254 | C-254 | ||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: M | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: M N U Seismic Walkdown Checklist (SWC) ' | ||
Equipment ID No.: | Equipment ID No.: | ||
21P08E Equipment Class: | |||
(16) Battery Chargers and Inverters Equipment | |||
== Description:== | == Description:== | ||
INSTRUMENT BUS 214 INVERTER - DIV. 22 Interaction Effects | INSTRUMENT BUS 214 INVERTER - DIV. 22 Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 8. | |||
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Seismic block walls. | Seismic block walls. | ||
No bulb guards on lights but they would not impact equipment if they fell. S&L Std E-103 -ok | No bulb guards on lights but they would not impact equipment if they fell. S&L Std E-103 -ok | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | : 9. | ||
Other Adverse Conditions | Do attached lines have adequate flexibility to avoid damage? | ||
: 11. Have you looked for and found no adverse seismic conditions that could | 1.0. | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by: | Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | ||
Yes Yes Yes Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-255 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: M. N U Seismic Walkdown Checklist (SWC) | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: M. | ||
Equipment ID No.: | N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
21P08E Equipment Class: | |||
(16) Bat Equipment | |||
== Description:== | == Description:== | ||
INSTRU tery Chargers and Inverters IMENT BUS 214 INVERTER - DIV. 22 Photos Zlf-UtSt (NV-bbVb) 1-31-12 U23 21P1::: (NI-5-95) 7-31-12 024 C-256 | |||
Braidwood Station Unit 2 12Q0108.1 0-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: | Braidwood Station Unit 2 12Q0108.1 0-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: | ||
Equipment ID No.: | N U | ||
Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: | |||
21P08E Equipment Class: | |||
(16) Battery Chargers and Inverters Equipment | |||
== Description:== | == Description:== | ||
INSTRUMENT BUS 214 INVERTER- DIV. 22 21P08E (NP-6695) 7-31-12 025 | INSTRUMENT BUS 214 INVERTER-DIV. 22 21P08E (NP-6695) 7-31-12 025 21POSE 7-31-12 020 C-257 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
21P08E Equipment Class: | |||
(16) Battery Chargers and Inverters iipment | |||
== Description:== | == Description:== | ||
INSTRUMENT BUS 214 INVERTER - DIV. 22 21P08E 7-31-12 021 C-258 | INSTRUMENT BUS 214 INVERTER - DIV. 22 21P08E 7-31-12 021 C-258 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
21Y-0606 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
RH HX 2A OUT li/P TRANSDUCER Project: | RH HX 2A OUT li/P TRANSDUCER Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 364.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchoracqe | Anchoracqe | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | No | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | : 2. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of bent, broken, missing or loose hardware? | ||
Attached to well- | Not Applicable | ||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Attached to well-anchored rack 2PL86J Yes C-259 | |||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
21Y-0606 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
RH HX 2A OUT I/P TRANSDUCER Interaction Effects | RH HX 2A OUT I/P TRANSDUCER Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems,.ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
Yes | |||
: 9. Do attached lines have adequate flexibility to avoid damage? | : 8. | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | Are overhead equipment, distribution systems,.ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
Other Adverse Conditions | Overhead fire protection piping and HVAC is well-supported | ||
: 11. Have you looked for and found no adverse seismic conditions that could | : 9. | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 pm Evaluated by: | Do attached lines have adequate flexibility to avoid damage? | ||
Yes Yes | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 pm Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-260 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N | ||
Equipment ID No.: 21Y-0606 Equipment Class: (18) Instruments on Racks Equipment | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
21Y-0606 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
RH HX 2A OUT I/P TRANSDUCER Photos Z IY-bSUb5 | RH HX 2A OUT I/P TRANSDUCER Photos Z IY -bSUb5 | ||
-Z-1IZ U4Vd C-261 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
21Y-0607 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
RH HX #2B OUT I/P TRANSDUCER Project: | RH HX #2B OUT I/P TRANSDUCER Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 364.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | No of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | : 2. | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | Is the anchorage free of bent, broken, missing or loose hardware? | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Not Applicable | ||
Well-supported rack C-262 | : 3. | ||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Well-supported rack Yes C-262 | |||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
21Y-0607 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
RH HX #2B OUT I/P TRANSDUCER Interaction Effects | RH HX #2B OUT I/P TRANSDUCER Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
Yes | |||
: 8. | |||
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Seismic block walls | Seismic block walls | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | : 9. | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | Do attached lines have adequate flexibility to avoid damage? | ||
Other Adverse Conditions | Yes Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could | : 10. | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 pm Evaluated by: | Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | ||
Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 pm Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-263 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
Equipment Class: | |||
Equipment | |||
== Description:== | == Description:== | ||
RH HX #2B OUT I/P TRANSDUCER | Photos 21Y-0607 (18) Instruments on Racks RH HX #2B OUT I/P TRANSDUCER 21Y-606 8-2-12 049 21Y-606 8-2-12 050 C-264 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2MS001C Equipment Class: | |||
(7) Fluid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
MS ISOL VLV LOOP 2C ASMBLY Project: | MS ISOL VLV LOOP 2C ASMBLY Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 377.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | No | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | : 2. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of bent, broken, missing or loose hardware? | ||
C-265 | Not Applicable | ||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-265 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M | ||
Equipment ID No.: | , N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2MS001C Equipment Class: | |||
(7) Fluid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
MS ISOL VLV LOOP 2C ASMBLY Interaction Effects | MS ISOL VLV LOOP 2C ASMBLY Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | : 8. | ||
Other Adverse Conditions | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
: 11. Have you looked for and found no adverse seismic conditions that could | Yes | ||
Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 pm Evaluated by: | : 9. | ||
Do attached lines have adequate flexibility to avoid damage? | |||
Yes | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 pm Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-266 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2MS001C Equipment Class: | |||
(7) Fluid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
MS ISOL VLV LOOP 2C ASMBLY Photos 2MSO301 (AWB - UAMAUEU IULA I ION JOIN I | MS ISOL VLV LOOP 2C ASMBLY Photos 2MSO301 (AWB - UAMAUEU IULA I ION JOIN I AND WEATHER STRIP) 8-1-12 AM 008 2Mb001U 8-1-12 AM 001 C-267 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M] N U Seismic Walkdown Checklist (SWC) | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M] N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
Equipment Class: | |||
nmant na'qrrinfinn-2MS001C (7) Fluid-Operated Valves MS ISOL VLV LOOP 2C ASMBLY 2MS001C 8-1-12 AM 002 2MS001C 8-1-12 AM 003 C-268 | |||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2MS018C Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
S/G 2C PORV Project: | S/G 2C PORV Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 404.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | No | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | : 2. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of bent, broken, missing or loose hardware? | ||
C-269 | Not Applicable | ||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-269 | |||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2MS018C Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
S/G 2C PORV Interaction Effects | S/G 2C PORV Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | : 8. | ||
Other Adverse Conditions | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
: 11. Have you looked for and found no adverse seismic conditions that could | Yes | ||
Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by: | : 9. | ||
Do attached lines have adequate flexibility to avoid damage? | |||
Yes | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-270 | |||
Braidwood Station Unit 2 12QO108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M | Braidwood Station Unit 2 12QO108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2MS018C Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
S/G 2C PORV 2MS018C 8-1-12 AM 004 | S/G 2C PORV 2MS018C 8-1-12 AM 004 2MS018C 8-1-12 AM 005 C-271 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M-j N | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M-j N U | ||
Equipment ID No.: | Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2MS018C Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Pirminmcanf 'aarrinfinn. | |||
5qi/ | |||
: 92. PC)P\\/ | |||
C-272 | C-272 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: | ||
* N U Seismic Walkdown Checklist (SWC) | * N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2MS018D Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
S/G 2D PORV ASMBLY Project: | S/G 2D PORV ASMBLY Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 401.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of.equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of.equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage. | Anchorage. | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | No | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | : 2. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of bent, broken, missing or loose hardware? | ||
C-273 | Not Applicable | ||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-273 | |||
Braidwood Station Unit 2 12Q0108.10-R-0P2 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: | Braidwood Station Unit 2 12Q0108.10-R-0P2 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U | ||
Equipment ID No.: | Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2MS018D Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
S/G 2D PORV ASMBLY Interaction Effects | S/G 2D PORV ASMBLY Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | : 8. | ||
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
: 9. | |||
Do attached lines have adequate flexibility to avoid damage? | |||
Yes Yes Yes | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | Other Adverse Conditions | ||
: 11. Have you looked for and found no adverse seismic conditions that could | : 11. | ||
Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by: | Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | ||
Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-274 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2MS018D Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
S/G 2D PORV ASMBLY Photos ZM,-iU1lSL | S/G 2D PORV ASMBLY Photos ZM,-iU1lSL (AVVb - UNIN I-ALLU 05-1--1 AM U1 Z C-275 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2MS018D Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
S/G 2D PORV ASMBLY | S/G 2D PORV ASMBLY | ||
= L I I | |||
ý r | |||
I 2MS018D 8-1-12 AM 010 2MS018D 8-1-12 AM 011 C-276 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: | ||
Equipment ID No.: | N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PA03J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3) | PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3) | ||
Project: | Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 451.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchoracie | Anchoracie | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | Yes of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | : 2. | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | Is the anchorage free of bent, broken, missing or loose hardware? | ||
Drawing 20E-0- | Yes | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | : 3. | ||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
Yes | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
Yes Floor is tiled | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Drawing 20E-0-339 1 C Revision BM Weld exceeds drawing requirement | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
C-277 | C-277 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PA03J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3) | PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3) | ||
Interaction Effects | Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
Yes Yes | |||
: 8. | |||
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
No bulb guards but lights wouldn't impact equipment if they fell. S&L Std E-103 -ok | No bulb guards but lights wouldn't impact equipment if they fell. S&L Std E-103 -ok | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | : 9. | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | Do attached lines have adequate flexibility to avoid damage? | ||
Other Adverse Conditions | Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could | : 10. | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by: | Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | ||
Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-278 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PA03J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3) | PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3) | ||
Photos 2PA03J 7-31-12 035 | Photos 2PA03J 7-31-12 035 2PA03J 7-31-12 036 C-279 | ||
Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status: | Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status: | ||
Equipment ID No.: | N U | ||
Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: | |||
2PA09J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
PROTECTION SYSTEM CABINET (SSPS Cab. Train A) | PROTECTION SYSTEM CABINET (SSPS Cab. Train A) | ||
Project: | Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 451.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | Yes of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | : 2. | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | Is the anchorage free of bent, broken, missing or loose hardware? | ||
Yes | |||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
Yes | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
Yes Floor is tiled | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Drawing 20E-0-339 IC Revision BM Weld exceeds drawing requirements | Drawing 20E-0-339 IC Revision BM Weld exceeds drawing requirements | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | : 6. | ||
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
C-280 | C-280 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: FT] N | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: FT] N U | ||
Equipment ID No.: | Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PAO9J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
PROTECTION SYSTEM CABINET (SSPS Cab. Train A) | PROTECTION SYSTEM CABINET (SSPS Cab. Train A) | ||
Interaction Effects | Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
No bulb guards but lights wouldn't damage equipment if they fell. S&L Std E-103 -ok | Yes | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | : 8. | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
Other Adverse Conditions | No bulb guards but lights wouldn't damage equipment if they fell. S&L Std E-103 -ok Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could | : 9. | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by: | Do attached lines have adequate flexibility to avoid damage? | ||
Yes | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-281 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: | ||
Equipment ID No.: | N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PA09J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
PROTECTION SYSTEM CABINET (SSPS Cab. Train A) | PROTECTION SYSTEM CABINET (SSPS Cab. Train A) | ||
Photos 2PA 09J (AWB -MSAC TEST PANEL) 7-31-12 039 | Photos 2PA 09J (AWB -MSAC TEST PANEL) 7-31-12 039 2PA 09J (AWB -MSAC TEST PANEL) 7-31-12 040 C-282 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PAO9J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
PROTECTION SYSTEM CABINET (SSPS Cab. Train A) | PROTECTION SYSTEM CABINET (SSPS Cab. Train A) | ||
-MSAC TEST PANEL) 7-31-12 041 2PAO9J 7-31-12 037 C-283 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PAO9J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
PROTECTION SYSTEM CABINET (SSPS Cab. Train A) 2PA09J 7-31-12 038 C-284 | PROTECTION SYSTEM CABINET (SSPS Cab. Train A) 2PA09J 7-31-12 038 C-284 | ||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: | ||
Equipment ID No.: | N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PA27J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
AUX SAFEGUARD RELAY CABINET (A) | AUX SAFEGUARD RELAY CABINET (A) | ||
Project: | Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 451.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchoraqge | Anchoraqge | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Yes of SWEL items requiring such verification)? | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | : 2. | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | Is the anchorage free of bent, broken, missing or loose hardware? | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | Yes | ||
: 3. | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of corrosion that is more than mild surface oxidation? | ||
Yes | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
Yes Floor is tiled | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Drawing 20E-0-3391C Revision BM Weld exceeds drawing requirements | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
C-285 | C-285 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M] N U Seismic Walkdown Checklist (SWC) | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M] N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PA27J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
AUX SAFEGUARD RELAY CABINET (A) | AUX SAFEGUARD RELAY CABINET (A) | ||
Interaction Effects | Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
No bulb guards on lights but would not damage equipment if they fell. S&L Std E- 103 -ok | : 8. | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | No bulb guards on lights but would not damage equipment if they fell. S&L Std E-103 -ok | ||
Other Adverse Conditions | : 9. | ||
: 11. Have you looked for and found no adverse seismic conditions that could | Do attached lines have adequate flexibility to avoid damage? | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by: | : 10. | ||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Yes Yes Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?. | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-286 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N | ||
Equipment ID No.: 2PA27J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PA27J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
AUX SAFEGUARD RELAY CABINET (A), | AUX SAFEGUARD RELAY CABINET (A), | ||
Photos ZI'APZ(J I-L*1-1Z U4Z | Photos ZI'APZ(J I-L*1-1Z U4Z 2PA27J 7-31-12 043 C-287 | ||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: F | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: F N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PA27J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
AUX SAFEGUARD RELAY CABINET (A) 2PA27J 7-31-12 044 C-288 | AUX SAFEGUARD RELAY CABINET (A) 2PA27J 7-31-12 044 C-288 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: r] | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: r] | ||
Equipment ID No.: | N U | ||
Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: | |||
2PI-0633 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
SFP PMP SUCTION PRESSURE INDICATOR Project: | SFP PMP SUCTION PRESSURE INDICATOR Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
FH, 401.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchoracqe | Anchoracqe | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | No of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | : 2. | ||
Is the anchorage free of bent, broken, missing or loose hardware? | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Not Applicable | ||
Rack mounted to wall Nut at 7:00 location is loose. Two | : 3. | ||
C-289 | Is the anchorage free of corrosion that is more than mild surface oxidation? | ||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
,5. Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Rack mounted to wall Nut at 7:00 location is loose. Two other screws are tight and are more than adequate to support small weight of pressure indicator. No immediate concern. IR 1394916 was written. | |||
Yes C-289 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PI-0633 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
SFP PMP SUCTION PRESSURE INDICATOR Interaction Effects | SFP PMP SUCTION PRESSURE INDICATOR Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | : 8. | ||
Other Adverse Conditions | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
: 11. Have you looked for and found no adverse seismic conditions that could | Yes | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 pm Evaluated by: | : 9. | ||
Do attached lines have adequate flexibility to avoid damage? | |||
Yes | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adverselyaffect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 pm Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-290 | |||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N | ||
Equipment ID No.: 2PI-0633 Equipment Class: (18) Instruments on Racks Equipment | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PI-0633 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
SFP PMP SUCTION PRESSURE INDICATOR Photos 2PI-0633 7-30-12 PM 001 C-291 | SFP PMP SUCTION PRESSURE INDICATOR Photos 2PI-0633 7-30-12 PM 001 C-291 | ||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PL07J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
2A DG 1DG01KA CONTROL PANEL Project: | 2A DG 1DG01KA CONTROL PANEL Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 401.00 ft, ALL Manufacturer/Model: | |||
-Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | -Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | No | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | : 2. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of bent, broken, missing or loose hardware? | ||
C-292 | : 3. | ||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
Floor is coated | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Yes Yes Yes Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-292 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U | ||
Equipment ID No.: | Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PLO7J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
2A DG lDG01KA CONTROL PANEL Interaction Effects | 2A DG lDG01KA CONTROL PANEL Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
Yes | |||
: 9. Do attached lines have adequate flexibility to avoid damage? | : 8. | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
Other Adverse Conditions | Overhead HVAC well-supported | ||
: 11. Have you looked for and found no adverse seismic conditions that could | : 9. | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 pm Evaluated by: | Do attached lines have adequate flexibility to avoid damage? | ||
Yes Yes | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 pm Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-293 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PL07J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
2A DG lDG01KA CONTROL PANEL Photos 2PL07J 7-31-12 095 | 2A DG lDG01KA CONTROL PANEL Photos 2PL07J 7-31-12 095 2PL07J 7-31-12 096 C-294 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U | ||
Equipment ID No.: | Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PL08J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
2B DG 2DG01KB Project: | 2B DG 2DG01KB Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 401.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchora-ge | Anchora-ge | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation.? | of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | No | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | : 2. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of bent, broken, missing or loose hardware? | ||
C-295 | Yes | ||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation.? | |||
Yes | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
Yes | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-295 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PL08J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
2B DG 2DG01 KB Interaction Effects | 2B DG 2DG01 KB Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | : 8. | ||
Other Adverse Conditions | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely, to collapse onto the equipment? | ||
: 11. Have you looked for and found no adverse seismic conditions that could | Yes | ||
Small hairline crack in wall is not a structural/ | : 9. | ||
Do attached lines have adequate flexibility to avoid damage? | |||
Yes | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Small hairline crack in wall is not a structural/seismic issue Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/12 Philip Gazda 10/1/12 C-296 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PL08J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
2B DG 2DG01 KB Photos 2PL08J 7-31-12 104 C-297 | 2B DG 2DG01 KB Photos 2PL08J 7-31-12 104 C-297 | ||
Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: | Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: | ||
Equipment ID No.: | N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PM05J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
MAIN CONTROL BOARD Project: | MAIN CONTROL BOARD Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 451.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at.the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at.the end of this checklist for documenting other comments. | ||
Anchoraae | Anchoraae | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | Yes of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | : 2. | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | Is the anchorage free of bent, broken, missing or loose hardware? | ||
Drawing 20E-0-3391AN Revision U. Additional detailed information from | Yes | ||
Due to configuration of the panels and the control room, it is not possible to verify all the welds (front/back, interior/exterior)for the control room panels. | : 3. | ||
Welds that are seen are good, matching the drawings and | Is the anchorage free of corrosion that is more than mild surface oxidation? | ||
Yes | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
Yes | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Drawing 20E-0-3391AN Revision U. Additional detailed information from Calculation Detail #8276 Revision B pages 2 to 6 which is input into Structural Calculation 7.16.10.2 (2113/85). | |||
Due to configuration of the panels and the control room, it is not possible to verify all the welds (front/back, interior/exterior) for the control room panels. | |||
Welds that are seen are good, matching the drawings and other inputs without cracks, corrosion, etc. Cabinets opened for inspection. | |||
C-298 | C-298 | ||
Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M | Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PM05J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
MAIN CONTROL BOARD | MAIN CONTROL BOARD | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | : 6. | ||
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects | Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
See | Yes | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | : 8. | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | ||
See associated area walk-by | |||
: 9. | |||
Do attached lines have adequate flexibility to avoid damage? | |||
Yes | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | Other Adverse Conditions | ||
: 11. Have you looked for and found no adverse seismic conditions that could | : 11. | ||
No structural/ | Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | ||
No structural/seismic issues Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am C-299 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: 2PM05J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment | Equipment ID No.: | ||
2PM05J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
MAIN CONTROL BOARD Evaluated by: | MAIN CONTROL BOARD Evaluated by: | ||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 Photos 2PM05J 7-31-12 045 2PM05J 7-31-12 046 C-300 | |||
Braidwood Station Unit 2 1200108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M | Braidwood Station Unit 2 1200108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PMO5J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
MAIN CONTROL BOARD 2PM05J 7-31-12 055 C-301 | MAIN CONTROL BOARD 2PM05J 7-31-12 055 C-301 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: L | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: L N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PM06J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
MAIN CONTROL BOARD Project: | MAIN CONTROL BOARD Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 451.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | Yes of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | : 2. | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | Is the anchorage free of bent, broken, missing or loose hardware? | ||
Yes | |||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
Yes | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
Yes | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Drawing 20E-0-3391AN Revision U. Additional detailed information from Calculation Detail #8276 Revision B pages 7 to 9 which is input into Structural Calculation 7.16.10.2 (2113/85). | Drawing 20E-0-3391AN Revision U. Additional detailed information from Calculation Detail #8276 Revision B pages 7 to 9 which is input into Structural Calculation 7.16.10.2 (2113/85). | ||
Due to configuration of the panels and the control room, it is not possible to venfy all the welds (front/back, interior/exterior)for the control room panels. | Due to configuration of the panels and the control room, it is not possible to venfy all the welds (front/back, interior/exterior) for the control room panels. | ||
Welds that are seen are good, matching the drawings and other inputs without cracks, corrosion, etc. | Welds that are seen are good, matching the drawings and other inputs without cracks, corrosion, etc. | ||
C-302 | C-302 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PM06J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
MAIN CONTROL BOARD | MAIN CONTROL BOARD | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | : 6. | ||
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | |||
Interaction Effects | Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
see | Yes | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | : 8. | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment? | ||
see associated area walk-by (AWC 13) | |||
: 9. | |||
Do attached lines have adequate flexibility to avoid damage? | |||
Yes | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects? | |||
Other Adverse Conditions | Other Adverse Conditions | ||
: 11. Have you looked for and found no adverse seismic conditions that could | : 11. | ||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am C-303 | Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am C-303 | ||
Braidwood Station Unit 2 1200108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M | Braidwood Station Unit 2 1200108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
Equipment Class: | |||
Equipment | |||
== Description:== | == Description:== | ||
MAIN CONTROL BOARD Evaluated by: | 2PM06J (20) Instrumentation and Control Panels and Cabinets MAIN CONTROL BOARD Evaluated by: | ||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 Photos | |||
;10M1 2PM06J 7-31-12 048 2PM06J 7-31-12 049 C-304 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PM06J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
MAIN CONTROL BOARD I | MAIN CONTROL BOARD I | ||
2PM06J 7-31-12 052 | 2PM06J 7-31-12 052 2PM06J 7-31-12 053 C-305 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: | ||
Equipment ID No.: | j N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PM07J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
MAIN CONTROL BOARD Project: | MAIN CONTROL BOARD Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 451.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | Yes of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | : 2. | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | Is the anchorage free of bent, broken, missing or loose hardware? | ||
Yes | |||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
Yes | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
Yes | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Drawing 20E-0-3391AJ Revision F. | Drawing 20E-0-3391AJ Revision F. | ||
Due to | Due to configuration of the panels and the control room, it is not possible to verify all the welds (front/back, interior/exterior) for the control room panels. | ||
Welds that are seen are good, matching the drawings and other inputs without cracks, corrosion,etc. Cabinets were opened to perform verification. | Welds that are seen are good, matching the drawings and other inputs without cracks, corrosion, etc. Cabinets were opened to perform verification. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | : 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions? | ||
C-306 | C-306 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PM07J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
MAIN CONTROL BOARD Interaction Effects | MAIN CONTROL BOARD Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
see | Yes | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | : 8. | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
Other Adverse Conditions | see associated area walk-by | ||
: 11. Have you looked for and found no adverse seismic conditions that could | : 9. | ||
Do attached lines have adequate flexibility to avoid damage? | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Yes Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am C-307 | Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am C-307 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U | ||
Equipment ID No.: 2PM07J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment | Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PM07J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
MAIN CONTROL BOARD Evaluated by: | MAIN CONTROL BOARD Evaluated by: | ||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 Photos 2PM07J 7-31-12 050 C-308 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.:. 2PM11J Equipment Class: | ||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
MAIN CONTROL BOARD Project: | MAIN CONTROL BOARD Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 451.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | No | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | : 2. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of bent, broken, missing or loose hardware? | ||
C-309 | Yes | ||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
Yes | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
Yes | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-309 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PM11J Equipment Class: | |||
(20) Instrumentation and Control Panels and Cabinets Equipment | |||
== Description:== | == Description:== | ||
MAIN CONTROL BOARD Interaction Effects | MAIN CONTROL BOARD Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
see | Yes | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | : 8. | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
Other Adverse Conditions | see associated area walk-by | ||
: 11. Have you looked for and found no adverse seismic conditions that could | : 9. | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by: | Do attached lines have adequate flexibility to avoid damage? | ||
Yes Yes | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-310 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
Equipment Class: | |||
Equipment | |||
== Description:== | == Description:== | ||
MAIN CONTROL BOARD Photos ZFMl ii t-31-1z u1bi C-311 | 2PM11J (20) Instrumentation and Control Panels and Cabinets MAIN CONTROL BOARD Photos ZFMl ii t-31-1z u1bi C-311 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PT-0514 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
STM GEN LOOP 2A STEAM PRESS PR Project: | STM GEN LOOP 2A STEAM PRESS PR Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 377.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | No | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | : 2. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of bent, broken, missing or loose hardware? | ||
Not Applicable | |||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
I Well-mounted on rack that is anchored with large anchors Yes C-312 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PT-0514 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
STM GEN LOOP 2A STEAM PRESS PR Interaction Effects | STM GEN LOOP 2A STEAM PRESS PR Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | : 8. | ||
Other Adverse Conditions | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
: 9. | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by: | Do attached lines have adequate flexibility to avoid damage? | ||
Yes Yes | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Other Adverse Conditions | |||
.11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-313 | |||
Braidwood Station Unit 2 12Q01 08.1 O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M | Braidwood Station Unit 2 12Q01 08.1 O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PT-0514 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
STM GEN LOOP 2A STEAM PRESS PR Photos 2PT- 0514 (AWB) 8-1-12 AM 017 | STM GEN LOOP 2A STEAM PRESS PR Photos 2PT- 0514 (AWB) 8-1-12 AM 017 2PT-0514 8-1-12 AM 015 C-314 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PT-0514 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
STM GEN LOOP 2A STEAM PRESS PR 2PT-0514 8-1-12 AM 016 C-315 | STM GEN LOOP 2A STEAM PRESS PR 2PT-0514 8-1-12 AM 016 C-315 | ||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PT-0546 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
STM GEN LOOP 2D STEAM PRESS PR Project: | STM GEN LOOP 2D STEAM PRESS PR Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 377.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | No of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | : 2. | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | Is the anchorage free of bent, broken, missing or loose hardware? | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Not Applica.ble | ||
Well mounted on rack Rack is welded to embed plate C-316 | : 3. | ||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Well mounted on rack Rack is welded to embed plate Yes C-316 | |||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PT-0546 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
STM GEN LOOP 2D STEAM PRESS PR Interaction Effects | STM GEN LOOP 2D STEAM PRESS PR Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | : 8. | ||
Other Adverse Conditions | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
: 11. Have you looked for and found no adverse seismic conditions that could | Yes | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by: | : 9. | ||
Do attached lines have adequate flexibility to avoid damage? | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-317 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PT-0546 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
STM GEN LOOP 2D STEAM PRESS PR Photos C-318 | STM GEN LOOP 2D STEAM PRESS PR Photos C-318 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PT-0935 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
CNMT PRESS XMTTR Project: | CNMT PRESS XMTTR Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 451.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | No | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | : 2. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of bent, broken, missing or loose hardware? | ||
Instrument mounted on rack that is welded to embed plate C-319 | Not Applicable | ||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Instrument mounted on rack that is welded to embed plate Yes C-319 | |||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PT-0935 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
CNMT PRESS XMTTR Interaction Effects | CNMT PRESS XMTTR Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | : 8. | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
Other Adverse Conditions | : 9. | ||
: 11. Have you looked for and found no adverse seismic conditions that could | Do attached lines have adequate flexibility to avoid damage? | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by: | Yes Yes Yes | ||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-320 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2PT-0935 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
CNMT PRESS XMTTR Photos 21- 1-U9.3b (NF--bb~Jb) US-2-1 Z ~ | CNMT PRESS XMTTR Photos 21-1 -U9.3b (NF--bb~Jb) US-2-1 Z ~ | ||
ZVI | |||
-U!J.S t F-UO t$-Z-I Z UZI C-321 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: F | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2PT-0935 Equipment Class: | |||
(18) Instruments on Racks Equipment | |||
== Description:== | == Description:== | ||
CNMT PRESS XMTTR ZF 1-0935 U-2-1 2 024 | CNMT PRESS XMTTR ZF 1 -0935 U-2-1 2 024 2F1-' 0935 U-2-1 2 025 C-322 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status: | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status: | ||
Equipment ID No.: | N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2RH01PA Equipment Class: | |||
(6) Vertical Pumps Equipment | |||
== Description:== | == Description:== | ||
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Project: | PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 346.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchoracie | Anchoracie | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent,, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | Yes of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | : 2. | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | Is the anchorage free of bent,, broken, missing or loose hardware? | ||
Yes | |||
: 6. Based on the above anchorage evaluations, is the anchoragefree of | : 3. | ||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
Yes | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
Yes | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Drawing M-1219 Sheet 2 Revision Y Equipment is contaminated so anchor diameter not measured but visual verification performed | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchoragefree of Yes potentially adverse seismic conditions? | |||
C-323 | C-323 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: | ||
Equipment ID No.: | Y N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2RH01PA Equipment Class: | |||
(6) Vertical Pumps Equipment | |||
== Description:== | == Description:== | ||
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Interaction Effects | PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | : 8. | ||
Other Adverse Conditions | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
: 11. Have you looked for and found no adverse seismic conditions that could | Yes | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by: | : 9. | ||
Do attached lines have adequate flexibility to avoid damage? | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-324 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2RH01PA Equipment Class: | |||
(6) Vertical Pumps Equipment | |||
== Description:== | == Description:== | ||
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Photos 2RHO1PA 7-30-12 AM 032 | PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Photos 2RHO1PA 7-30-12 AM 032 21RHO1PA 7-30-12 AM 033 C-325 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2RH01PA Equipment Class: | |||
(6) Vertical Pumps Equipment | |||
== Description:== | == Description:== | ||
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY 2RH01 PA 7-30-12 AM 034 | PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY 2RH01 PA 7-30-12 AM 034 ZKHUI VA (-SU-1 2 AM UJb C-326 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2RH01PA Equipment Class: | |||
(6) Vertical Pumps Equipment | |||
== Description:== | == Description:== | ||
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY 2RH01PA 7-30-12 AM 036 C-327 | PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY 2RH01PA 7-30-12 AM 036 C-327 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: MI N U Seismic Walkdown Checklist (SWC) | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: MI N U | ||
Equipment ID No.: | Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2RH01PA-A Equipment Class: | |||
(21) Tanks and Heat Exchangers Equipment | |||
== Description:== | == Description:== | ||
RH PUMP 2A SEAL COOLER Project: | RH PUMP 2A SEAL COOLER Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 346.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
Is anchorage configuration verification required (i.e., is the item one of the 50% | |||
of SWEL items requiring such verification)? | |||
Mounted to skid. Well-anchored. | Mounted to skid. Well-anchored. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | : 2. | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | Is the anchorage free of bent, broken, missing or loose hardware? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | No Not Applicable | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | : 3. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of corrosion that is more than mild surface oxidation? | ||
C-328 | : 4. | ||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-328 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: [M N U Seismic Walkdown Checklist (SWC) | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: [M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2RHO1 PA-A Equipment Class: | |||
(21) Tanks and Heat Exchangers Equipment | |||
== Description:== | == Description:== | ||
RH PUMP 2A SEAL COOLER Interaction Effects | RH PUMP 2A SEAL COOLER Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | : 8. | ||
Other Adverse Conditions | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
: 11. Have you looked for and found no adverse seismic conditions that could | Yes | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by: | : 9. | ||
Do attached lines have adequate flexibility to avoid damage? | |||
Yes | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-329 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2RH01PA-A Equipment Class: | |||
(21) Tanks and Heat Exchangers Equipment | |||
== Description:== | == Description:== | ||
RH PUMP 2A SEAL COOLER Photos 2RHOI PA-A 7-30-12 AM 030 | RH PUMP 2A SEAL COOLER Photos 2RHOI PA-A 7-30-12 AM 030 2RH01 PA-A 7-30-12 AM 031 C-330 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2RH610 Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
RHR PUMP 2A MINFLOW VLV ASMBLY Project: | RHR PUMP 2A MINFLOW VLV ASMBLY Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 357.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | No | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | : 2. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of bent, broken, missing or loose hardware? | ||
C-331 | Not Applicable | ||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-331 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2RH610 Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
RHR PUMP 2A MINFLOW VLV ASMBLY, Interaction Effects | RHR PUMP 2A MINFLOW VLV ASMBLY, Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
Yes | |||
: 8. | |||
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Nearby block walls are seismic. | Nearby block walls are seismic. | ||
Nearby scaffolding is | Nearby scaffolding is laterally supported with stand-offs on 3 walls. Cannot damage equipment if it were to move in the free direction. | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | : 9. | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | Do attached lines have adequate flexibility to avoid damage? | ||
Other Adverse Conditions | : 10. | ||
: 11. Have you looked for and found no adverse seismic conditions that could | Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | ||
Yes Yes Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Valve is a MOV and is robust. | Valve is a MOV and is robust. | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Valve class changed from fluid operated valve as indicated on SWEL. | Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Valve class changed from fluid operated valve as indicated on SWEL. | ||
Evaluated by: | Evaluated by: | ||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-332 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: | ||
Equipment ID No.: | IN U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2RH610 Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
RHR PUMP 2A MINFLOWVLV ASMBLY Photos 2RH610 7-30-12 AM 018 | RHR PUMP 2A MINFLOWVLV ASMBLY Photos 2RH610 7-30-12 AM 018 2RH610 7-30-12 AM 019 C-333 | ||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2RH610 Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
RHR PUMP 2A MINFLOW VLV ASMBLY 2RH610 8-2-12 002 C-334 | RHR PUMP 2A MINFLOW VLV ASMBLY 2RH610 8-2-12 002 C-334 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2RH8716B Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
RH HX 2B DISCH CROSSTIE VLV ASMBLY Project: | RH HX 2B DISCH CROSSTIE VLV ASMBLY Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 364.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchora-ae | Anchora-ae | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | No | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | : 2. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of bent, broken, missing or loose hardware? | ||
C-335 | Not Applicable | ||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-335 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2RH8716B Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
RH HX 2B DISCH CROSSTIE VLV ASMBLY Interaction Effects | RH HX 2B DISCH CROSSTIE VLV ASMBLY Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | : 8. | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
Other Adverse Conditions | : 9. | ||
: 11. Have you looked for and found no adverse seismic conditions that could | Do attached lines have adequate flexibility to avoid damage? | ||
Weil-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by: | : 10. | ||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Yes Yes Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Weil-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-336 | |||
Braidwood Station Unit 2 12Q01 08.1 0-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M | Braidwood Station Unit 2 12Q01 08.1 0-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2RH8716B Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
RH HX 2B DISCH CROSSTIE VLV ASMBLY Photos 2RH8716B 7-30-12 AM 043 | RH HX 2B DISCH CROSSTIE VLV ASMBLY Photos 2RH8716B 7-30-12 AM 043 2RH8716B 7-30-12 AM 044 C-337 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2RH8716B Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves EauiDment | |||
== Description:== | == Description:== | ||
RH HX 2B DISCH CROSSTIE VLV ASMBLY C-338 | RH HX 2B DISCH CROSSTIE VLV ASMBLY C-338 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SI8801A Equipment Class: | |||
(7) Fluid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
CHG PUMP TO COLD LEG INJ ISOL ASMBLY Project: | CHG PUMP TO COLD LEG INJ ISOL ASMBLY Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 375.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | No of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | : 2. | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | Is the anchorage free of bent, broken, missing or loose hardware? | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Not Applicable | ||
C-339 | : 3. | ||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-339 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SI8801A Equipment Class: | |||
(7) Fluid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
CHG PUMP TO COLD LEG INJ ISOL ASMBLY Interaction Effects | CHG PUMP TO COLD LEG INJ ISOL ASMBLY Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 8. | |||
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Gallery above is well-supported | Gallery above is well-supported | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | : 9. | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | Do attached lines have adequate flexibility to avoid damage? | ||
Other Adverse Conditions | : 10. | ||
: 11. Have you looked for and found no adverse seismic conditions that could | Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by: | Yes Yes Yes Yes Other Adverse Conditions | ||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by: | |||
Marlene Delaney Date: | |||
10/11/2012 62 "Philip Gazda 10/1/2012 C-340 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2SI8801A Equipment Class: | |||
(7) Fluid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
CHG PUMP TO COLD LEG INJ ISOL ASMBLY ZZ5i6dOIA d5-Z-1Z U15 | CHG PUMP TO COLD LEG INJ ISOL ASMBLY ZZ5i6dOIA d5-Z-1Z U15 Z,,.?I$UIA d-Z-1Z U15O C-341 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SI8801A Equipment Class: | |||
(7) Fluid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
CHG PUMP TO COLD LEG INJ ISOL ASMBLY ZZAMUIA O-Z-1Z UI I C-342 | CHG PUMP TO COLD LEG INJ ISOL ASMBLY ZZAMUIA O-Z-1Z UI I C-342 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SI8801B Equipment Class: | |||
(7) Fluid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Project: | CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 375.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | No | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | : 2. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of bent, broken, missing or loose hardware? | ||
C-343 | Not Applicable | ||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-343 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SI8801B Equipment Class: | |||
(7) Fluid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Interaction Effects | CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
Yes | |||
: 9. Do attached lines have adequate flexibility to avoid damage? | : 8. | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
Overhead gallety is well-supported | |||
Other Adverse Conditions | : 9. | ||
: 11. Have you looked for and found no adverse seismic conditions that could | Do attached lines have adequate flexibility to avoid damage? | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by: | Yes Yes | ||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of | |||
. potentially adverse seismic interaction effects? | |||
Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 (7 ' | |||
"-Philip Gazda 10/1/2012 C-344 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SI8801B Equipment Class: | |||
(7) Fluid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Photos 2SI8801B 8-2-12 019 C-345 | CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Photos 2SI8801B 8-2-12 019 C-345 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U | ||
Equipment ID No.: | Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2SX004 Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
CC HX 2 INLT VLV ASMBLY Project: | CC HX 2 INLT VLV ASMBLY Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 330.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | No | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | : 2. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of bent, broken, missing or loose hardware? | ||
C-346 | Not Applicable | ||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-346 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SX004 Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
CC HX 2 INLT VLV ASMBLY Interaction Effects | CC HX 2 INLT VLV ASMBLY Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | : 8. | ||
Other Adverse Conditions | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
: 11. Have you looked for and found no adverse seismic conditions that could | Yes | ||
Robust valve on well-supported pipe Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by: | : 9. | ||
Do attached lines have adequate flexibility to avoid damage? | |||
Yes | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Robust valve on well-supported pipe Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-347 | |||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2SX004 Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
CC HX 2 INLT VLV ASMBLY Photos 26)WU413-1-1Z FM U15 | CC HX 2 INLT VLV ASMBLY Photos 26)WU413-1-1Z FM U15 2ZZXUU46~-1-12 HMU1Th C-348 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SX004 Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
CC HX 2 INLT VLV ASMBLY 2SX004 8-1-12 PM 017 C-349 | CC HX 2 INLT VLV ASMBLY 2SX004 8-1-12 PM 017 C-349 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2SX005 Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
U-0 CC HX INLET VLV ASMBLY Project: | U-0 CC HX INLET VLV ASMBLY Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 330.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | No | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | : 2. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of bent, broken, missing or loose hardware? | ||
C-350 | Not Applicable | ||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-350 | |||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U | ||
Equipment ID No.: | Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2SX005 Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
U-0 CC HX INLET VLVASMBLY Interaction Effects | U-0 CC HX INLET VLVASMBLY Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | : 8. | ||
Other Adverse Conditions | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
: 11. Have you looked for and found no adverse seismic conditions that could | Yes | ||
Robust, well-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by: | : 9. | ||
Do attached lines have adequate flexibility to avoid damage? | |||
Yes | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Robust, well-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-351 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: | ||
Equipment ID No.: | N U | ||
Seismic Walkdown Checklist (SWC) | |||
Equipment ID No.: | |||
2SX005 Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
U-0 CC HX INLET VLV ASMBLY Photos 2SX005 8-1-12 PM 021 | U-0 CC HX INLET VLV ASMBLY Photos 2SX005 8-1-12 PM 021 2SX005 8-1-12 PM 022 C-352 | ||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SX01AA Equipment Class: | |||
(21) Tanks and Heat Exchangers Equipment | |||
== Description:== | == Description:== | ||
2A SX PUMP LUBE OIL COOLER Project: | 2A SX PUMP LUBE OIL COOLER Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 330.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | No of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | : 2. | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | Is the anchorage free of bent, broken, missing or loose hardware? | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Not Applicable | ||
Equipment is an in-line mounted | : 3. | ||
C-353 | Is the anchorage free of corrosion that is more than mild surface oxidation? | ||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Equipment is an in-line mounted cooler with no anchorage details. | |||
Yes C-353 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SX01AA Equipment Class: | |||
(21) Tanks and Heat Exchangers Equipment | |||
== Description:== | == Description:== | ||
2A SX PUMP LUBE OIL COOLER Interaction Effects | 2A SX PUMP LUBE OIL COOLER Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | : 8. | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
Other Adverse Conditions | Yes Yes | ||
: 11. Have you looked for and found no adverse seismic conditions that could | : 9. | ||
Well-supported IR written on component (tagged) but no impact to seismic safety functions Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by: | Do attached lines have adequate flexibility to avoid damage? | ||
Yes | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Well-supported IR written on component (tagged) but no impact to seismic safety functions Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-354 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
Equipment Class: | |||
Equipment | |||
== Description:== | == Description:== | ||
2A SX PUMP LUBE OIL COOLER Photos C-355 | 2SX01AA (21) Tanks and Heat Exchangers 2A SX PUMP LUBE OIL COOLER Photos C-355 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SX01PA Equipment Class: | |||
(5) Horizontal Pumps Equipment | |||
== Description:== | == Description:== | ||
PUMP, 2A ESSENTIAL SER WTR ASMBLY Project: | PUMP, 2A ESSENTIAL SER WTR ASMBLY Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 330.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchora-ge | Anchora-ge | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | No | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | : 2. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of bent, broken, missing or loose hardware? | ||
Well-anchored C-356 | Yes | ||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
Yes | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
Yes | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Well-anchored Yes C-356 | |||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U | ||
Equipment ID No.: | Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2SX01PA Equipment Class: | |||
(5) Horizontal Pumps Equipment | |||
== Description:== | == Description:== | ||
PUMP, 2A ESSENTIAL SER WTR ASMBLY Interaction Effects | PUMP, 2A ESSENTIAL SER WTR ASMBLY Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | : 8. | ||
Other Adverse Conditions | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
: 11. Have you looked for and found no adverse seismic conditions that could | Yes | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by: | : 9. | ||
Do attached lines have adequate flexibility to avoid damage? | |||
Yes | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-357 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SX01PA Equipment Class: | |||
(5) Horizontal Pumps Equipment | |||
== Description:== | == Description:== | ||
PUMP, 2A ESSENTIAL SER WTR ASMBLY Photos 2bXU1 PA 8-1-12 PM 011 | PUMP, 2A ESSENTIAL SER WTR ASMBLY Photos 2bXU1 PA 8-1-12 PM 011 2SX01PA8-1-12 PM 010 C-358 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SX01PA-C Equipment Class: | |||
(5) Horizontal Pumps Equipment | |||
== Description:== | == Description:== | ||
PUMP, 2A SX AUX LUBE OIL PP Project: | PUMP, 2A SX AUX LUBE OIL PP Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 330.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchoraqe | Anchoraqe | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | No of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | : 2. | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | Is the anchorage free of bent, broken, missing or loose hardware? | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Not Applicable | ||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Equipment is mounted to oil reservoir. Well-anchored. | Equipment is mounted to oil reservoir. Well-anchored. | ||
C-359 | Yes C-359 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SX01PA-C Equipment Class: | |||
(5) Horizontal Pumps Equipment | |||
== Description:== | == Description:== | ||
PUMP, 2A SX AUX LUBE OIL PP Interaction Effects | PUMP, 2A SX AUX LUBE OIL PP Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | : 8. | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
Other Adverse Conditions | : 9. | ||
: 11. Have you looked for and found no adverse seismic conditions that could | Do attached lines have adequate flexibility to avoid damage? | ||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by: | : 10. | ||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Yes Yes Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 | |||
.° Philip Gazda 10/1/2012 C-360 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N | ||
Equipment ID No.: | U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | |||
2SXO1PA-C Equipment Class: | |||
(5) Horizontal Pumps Equipment | |||
== Description:== | == Description:== | ||
PUMP, 2A SX AUX LUBE OIL PP Photos 2SX01 PA-C 8-1-12 PM 006 C-361 | PUMP, 2A SX AUX LUBE OIL PP Photos 2SX01 PA-C 8-1-12 PM 006 C-361 | ||
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M | Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SX033 Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Project: | ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Project: | ||
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area): | |||
Auxiliary, 330.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | ||
Anchorage | Anchorage | ||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% | : 1. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | Is anchorage configuration verification required (i.e., is the item one of the 50% | ||
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | of SWEL items requiring such verification)? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | No | ||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: | : 2. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of | Is the anchorage free of bent, broken, missing or loose hardware? | ||
C-362 | Not Applicable | ||
: 3. | |||
Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. | |||
Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. | |||
Is the anchorage configuration consistent with plant documentation? (Note: | |||
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable Not Applicable Not Applicable | |||
: 6. | |||
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-362 | |||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SX033 Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Interaction Effects | ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Interaction Effects | ||
: 7. Are soft targets free from impact by nearby equipment or structures? | : 7. | ||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and | Are soft targets free from impact by nearby equipment or structures? | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | Yes | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of | : 8. | ||
Other Adverse Conditions | Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
: 11. Have you looked for and found no adverse seismic conditions that could | : 9. | ||
Do attached lines have adequate flexibility to avoid damage? | |||
: 10. | |||
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Yes Yes Yes Other Adverse Conditions | |||
: 11. | |||
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Robust, well-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm | Robust, well-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm | ||
/~4~LA( | |||
Evaluated by: | 4d4_ | ||
Evaluated by: | |||
Marlene Delaney Date: | |||
10/1/2012 Philip Gazda 10/1/2012 C-363 | |||
Braidwood Station Unit 2 12Q01 08.1 O-R-002 Rev. 0 Correspondence No.: RS-1 2-159 Sheet 3 of 4 Status: M | Braidwood Station Unit 2 12Q01 08.1 O-R-002 Rev. 0 Correspondence No.: RS-1 2-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SX033 Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Equipment | |||
== Description:== | == Description:== | ||
ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Photos 2SX033 (NP-6695) 8-1-12 PM 020 | ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Photos 2SX033 (NP-6695) 8-1-12 PM 020 2SX033 8-1-12 PM 018 C-364 | ||
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M | Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC) | ||
Equipment ID No.: | Equipment ID No.: | ||
2SX033 Equipment Class: | |||
(8) Motor-Operated and Solenoid-Operated Valves Eauioment Descriotion: | |||
ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY 2SX033 8-1-12 PM 019 C-365}} | |||
Latest revision as of 21:30, 11 January 2025
| ML12339A227 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 11/16/2012 |
| From: | Delaney M Exelon Generation Co, Stevenson & Associates |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| RS-12-159 12Q0108.10-R-002, Rev 0 | |
| Download: ML12339A227 (112) | |
Text
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status:
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
21P08E Equipment Class:
(16) Battery Chargers and Inverters Equipment
Description:
INSTRUMENT BUS 214 INVERTER - DIV. 22 Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used, to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-3391BK Revision D Anchor spacing is 10" at 2 locations while drawing specifies 12". NSWP-S-05 allows 2 diameter relocation which would equal 10" for 1" diameter expansion anchors therefore OK.
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-254
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: M N U Seismic Walkdown Checklist (SWC) '
Equipment ID No.:
21P08E Equipment Class:
(16) Battery Chargers and Inverters Equipment
Description:
INSTRUMENT BUS 214 INVERTER - DIV. 22 Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic block walls.
No bulb guards on lights but they would not impact equipment if they fell. S&L Std E-103 -ok
- 9.
Do attached lines have adequate flexibility to avoid damage?
1.0.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-255
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: M.
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
21P08E Equipment Class:
(16) Bat Equipment
Description:
INSTRU tery Chargers and Inverters IMENT BUS 214 INVERTER - DIV. 22 Photos Zlf-UtSt (NV-bbVb) 1-31-12 U23 21P1::: (NI-5-95) 7-31-12 024 C-256
Braidwood Station Unit 2 12Q0108.1 0-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status:
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
21P08E Equipment Class:
(16) Battery Chargers and Inverters Equipment
Description:
INSTRUMENT BUS 214 INVERTER-DIV. 22 21P08E (NP-6695) 7-31-12 025 21POSE 7-31-12 020 C-257
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
21P08E Equipment Class:
(16) Battery Chargers and Inverters iipment
Description:
INSTRUMENT BUS 214 INVERTER - DIV. 22 21P08E 7-31-12 021 C-258
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
21Y-0606 Equipment Class:
(18) Instruments on Racks Equipment
Description:
RH HX 2A OUT li/P TRANSDUCER Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 364.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoracqe
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Attached to well-anchored rack 2PL86J Yes C-259
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
21Y-0606 Equipment Class:
(18) Instruments on Racks Equipment
Description:
RH HX 2A OUT I/P TRANSDUCER Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems,.ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead fire protection piping and HVAC is well-supported
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-260
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
21Y-0606 Equipment Class:
(18) Instruments on Racks Equipment
Description:
RH HX 2A OUT I/P TRANSDUCER Photos Z IY -bSUb5
-Z-1IZ U4Vd C-261
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
21Y-0607 Equipment Class:
(18) Instruments on Racks Equipment
Description:
RH HX #2B OUT I/P TRANSDUCER Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 364.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
No of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Well-supported rack Yes C-262
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
21Y-0607 Equipment Class:
(18) Instruments on Racks Equipment
Description:
RH HX #2B OUT I/P TRANSDUCER Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic block walls
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-263
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
Photos 21Y-0607 (18) Instruments on Racks RH HX #2B OUT I/P TRANSDUCER 21Y-606 8-2-12 049 21Y-606 8-2-12 050 C-264
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS001C Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
MS ISOL VLV LOOP 2C ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 377.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-265
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M
, N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS001C Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
MS ISOL VLV LOOP 2C ASMBLY Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-266
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS001C Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
MS ISOL VLV LOOP 2C ASMBLY Photos 2MSO301 (AWB - UAMAUEU IULA I ION JOIN I AND WEATHER STRIP) 8-1-12 AM 008 2Mb001U 8-1-12 AM 001 C-267
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
nmant na'qrrinfinn-2MS001C (7) Fluid-Operated Valves MS ISOL VLV LOOP 2C ASMBLY 2MS001C 8-1-12 AM 002 2MS001C 8-1-12 AM 003 C-268
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS018C Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
S/G 2C PORV Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 404.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-269
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS018C Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
S/G 2C PORV Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-270
Braidwood Station Unit 2 12QO108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS018C Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
S/G 2C PORV 2MS018C 8-1-12 AM 004 2MS018C 8-1-12 AM 005 C-271
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M-j N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS018C Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Pirminmcanf 'aarrinfinn.
5qi/
- 92. PC)P\\/
C-272
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status:
- N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS018D Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
S/G 2D PORV ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 401.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of.equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage.
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-273
Braidwood Station Unit 2 12Q0108.10-R-0P2 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS018D Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
S/G 2D PORV ASMBLY Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Valve is robust Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-274
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS018D Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
S/G 2D PORV ASMBLY Photos ZM,-iU1lSL (AVVb - UNIN I-ALLU 05-1--1 AM U1 Z C-275
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2MS018D Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
S/G 2D PORV ASMBLY
= L I I
ý r
I 2MS018D 8-1-12 AM 010 2MS018D 8-1-12 AM 011 C-276
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status:
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PA03J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3)
Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoracie
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes Floor is tiled
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-339 1 C Revision BM Weld exceeds drawing requirement
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-277
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PA03J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3)
Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
No bulb guards but lights wouldn't impact equipment if they fell. S&L Std E-103 -ok
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-278
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PA03J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3)
Photos 2PA03J 7-31-12 035 2PA03J 7-31-12 036 C-279
Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status:
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PA09J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PROTECTION SYSTEM CABINET (SSPS Cab. Train A)
Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes Floor is tiled
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-339 IC Revision BM Weld exceeds drawing requirements
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-280
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: FT] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PAO9J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PROTECTION SYSTEM CABINET (SSPS Cab. Train A)
Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
No bulb guards but lights wouldn't damage equipment if they fell. S&L Std E-103 -ok Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-281
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status:
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PA09J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PROTECTION SYSTEM CABINET (SSPS Cab. Train A)
Photos 2PA 09J (AWB -MSAC TEST PANEL) 7-31-12 039 2PA 09J (AWB -MSAC TEST PANEL) 7-31-12 040 C-282
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PAO9J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PROTECTION SYSTEM CABINET (SSPS Cab. Train A)
-MSAC TEST PANEL) 7-31-12 041 2PAO9J 7-31-12 037 C-283
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PAO9J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PROTECTION SYSTEM CABINET (SSPS Cab. Train A) 2PA09J 7-31-12 038 C-284
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status:
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PA27J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
AUX SAFEGUARD RELAY CABINET (A)
Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraqge
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes Floor is tiled
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-3391C Revision BM Weld exceeds drawing requirements
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-285
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PA27J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
AUX SAFEGUARD RELAY CABINET (A)
Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
No bulb guards on lights but would not damage equipment if they fell. S&L Std E-103 -ok
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?.
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-286
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PA27J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
AUX SAFEGUARD RELAY CABINET (A),
Photos ZI'APZ(J I-L*1-1Z U4Z 2PA27J 7-31-12 043 C-287
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: F N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PA27J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
AUX SAFEGUARD RELAY CABINET (A) 2PA27J 7-31-12 044 C-288
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: r]
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PI-0633 Equipment Class:
(18) Instruments on Racks Equipment
Description:
SFP PMP SUCTION PRESSURE INDICATOR Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
FH, 401.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoracqe
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
No of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
,5. Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Rack mounted to wall Nut at 7:00 location is loose. Two other screws are tight and are more than adequate to support small weight of pressure indicator. No immediate concern. IR 1394916 was written.
Yes C-289
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PI-0633 Equipment Class:
(18) Instruments on Racks Equipment
Description:
SFP PMP SUCTION PRESSURE INDICATOR Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adverselyaffect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-290
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PI-0633 Equipment Class:
(18) Instruments on Racks Equipment
Description:
SFP PMP SUCTION PRESSURE INDICATOR Photos 2PI-0633 7-30-12 PM 001 C-291
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PL07J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
2A DG 1DG01KA CONTROL PANEL Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 401.00 ft, ALL Manufacturer/Model:
-Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Floor is coated
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes Yes Yes Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-292
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PLO7J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
2A DG lDG01KA CONTROL PANEL Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead HVAC well-supported
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-293
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PL07J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
2A DG lDG01KA CONTROL PANEL Photos 2PL07J 7-31-12 095 2PL07J 7-31-12 096 C-294
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PL08J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
2B DG 2DG01KB Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 401.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchora-ge
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation.?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-295
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PL08J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
2B DG 2DG01 KB Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely, to collapse onto the equipment?
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Small hairline crack in wall is not a structural/seismic issue Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 Evaluated by:
Marlene Delaney Date:
10/1/12 Philip Gazda 10/1/12 C-296
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PL08J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
2B DG 2DG01 KB Photos 2PL08J 7-31-12 104 C-297
Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status:
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PM05J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
MAIN CONTROL BOARD Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at.the end of this checklist for documenting other comments.
Anchoraae
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-3391AN Revision U. Additional detailed information from Calculation Detail #8276 Revision B pages 2 to 6 which is input into Structural Calculation 7.16.10.2 (2113/85).
Due to configuration of the panels and the control room, it is not possible to verify all the welds (front/back, interior/exterior) for the control room panels.
Welds that are seen are good, matching the drawings and other inputs without cracks, corrosion, etc. Cabinets opened for inspection.
C-298
Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PM05J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
MAIN CONTROL BOARD
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
See associated area walk-by
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
No structural/seismic issues Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am C-299
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PM05J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
MAIN CONTROL BOARD Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 Photos 2PM05J 7-31-12 045 2PM05J 7-31-12 046 C-300
Braidwood Station Unit 2 1200108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PMO5J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
MAIN CONTROL BOARD 2PM05J 7-31-12 055 C-301
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: L N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PM06J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
MAIN CONTROL BOARD Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-3391AN Revision U. Additional detailed information from Calculation Detail #8276 Revision B pages 7 to 9 which is input into Structural Calculation 7.16.10.2 (2113/85).
Due to configuration of the panels and the control room, it is not possible to venfy all the welds (front/back, interior/exterior) for the control room panels.
Welds that are seen are good, matching the drawings and other inputs without cracks, corrosion, etc.
C-302
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PM06J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
MAIN CONTROL BOARD
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
see associated area walk-by (AWC 13)
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am C-303
Braidwood Station Unit 2 1200108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
2PM06J (20) Instrumentation and Control Panels and Cabinets MAIN CONTROL BOARD Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 Photos
- 10M1 2PM06J 7-31-12 048 2PM06J 7-31-12 049 C-304
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PM06J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
MAIN CONTROL BOARD I
2PM06J 7-31-12 052 2PM06J 7-31-12 053 C-305
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status:
j N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PM07J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
MAIN CONTROL BOARD Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-3391AJ Revision F.
Due to configuration of the panels and the control room, it is not possible to verify all the welds (front/back, interior/exterior) for the control room panels.
Welds that are seen are good, matching the drawings and other inputs without cracks, corrosion, etc. Cabinets were opened to perform verification.
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-306
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PM07J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
MAIN CONTROL BOARD Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
see associated area walk-by
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am C-307
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PM07J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
MAIN CONTROL BOARD Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 Photos 2PM07J 7-31-12 050 C-308
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:. 2PM11J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
MAIN CONTROL BOARD Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-309
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PM11J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
MAIN CONTROL BOARD Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
see associated area walk-by
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-310
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
2PM11J (20) Instrumentation and Control Panels and Cabinets MAIN CONTROL BOARD Photos ZFMl ii t-31-1z u1bi C-311
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PT-0514 Equipment Class:
(18) Instruments on Racks Equipment
Description:
STM GEN LOOP 2A STEAM PRESS PR Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 377.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
I Well-mounted on rack that is anchored with large anchors Yes C-312
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PT-0514 Equipment Class:
(18) Instruments on Racks Equipment
Description:
STM GEN LOOP 2A STEAM PRESS PR Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
.11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-313
Braidwood Station Unit 2 12Q01 08.1 O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PT-0514 Equipment Class:
(18) Instruments on Racks Equipment
Description:
STM GEN LOOP 2A STEAM PRESS PR Photos 2PT- 0514 (AWB) 8-1-12 AM 017 2PT-0514 8-1-12 AM 015 C-314
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PT-0514 Equipment Class:
(18) Instruments on Racks Equipment
Description:
STM GEN LOOP 2A STEAM PRESS PR 2PT-0514 8-1-12 AM 016 C-315
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PT-0546 Equipment Class:
(18) Instruments on Racks Equipment
Description:
STM GEN LOOP 2D STEAM PRESS PR Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 377.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
No of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applica.ble
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Well mounted on rack Rack is welded to embed plate Yes C-316
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PT-0546 Equipment Class:
(18) Instruments on Racks Equipment
Description:
STM GEN LOOP 2D STEAM PRESS PR Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-317
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PT-0546 Equipment Class:
(18) Instruments on Racks Equipment
Description:
STM GEN LOOP 2D STEAM PRESS PR Photos C-318
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PT-0935 Equipment Class:
(18) Instruments on Racks Equipment
Description:
CNMT PRESS XMTTR Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Instrument mounted on rack that is welded to embed plate Yes C-319
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PT-0935 Equipment Class:
(18) Instruments on Racks Equipment
Description:
CNMT PRESS XMTTR Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-320
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PT-0935 Equipment Class:
(18) Instruments on Racks Equipment
Description:
CNMT PRESS XMTTR Photos 21-1 -U9.3b (NF--bb~Jb) US-2-1 Z ~
ZVI
-U!J.S t F-UO t$-Z-I Z UZI C-321
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2PT-0935 Equipment Class:
(18) Instruments on Racks Equipment
Description:
CNMT PRESS XMTTR ZF 1 -0935 U-2-1 2 024 2F1-' 0935 U-2-1 2 025 C-322
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status:
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH01PA Equipment Class:
(6) Vertical Pumps Equipment
Description:
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 346.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoracie
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent,, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing M-1219 Sheet 2 Revision Y Equipment is contaminated so anchor diameter not measured but visual verification performed
- 6.
Based on the above anchorage evaluations, is the anchoragefree of Yes potentially adverse seismic conditions?
C-323
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH01PA Equipment Class:
(6) Vertical Pumps Equipment
Description:
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-324
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH01PA Equipment Class:
(6) Vertical Pumps Equipment
Description:
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY Photos 2RHO1PA 7-30-12 AM 032 21RHO1PA 7-30-12 AM 033 C-325
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH01PA Equipment Class:
(6) Vertical Pumps Equipment
Description:
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY 2RH01 PA 7-30-12 AM 034 ZKHUI VA (-SU-1 2 AM UJb C-326
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH01PA Equipment Class:
(6) Vertical Pumps Equipment
Description:
PUMP,2A RESIDUAL HEAT REMOVAL ASMBLY 2RH01PA 7-30-12 AM 036 C-327
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: MI N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH01PA-A Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
RH PUMP 2A SEAL COOLER Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 346.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
Mounted to skid. Well-anchored.
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
No Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-328
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: [M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RHO1 PA-A Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
RH PUMP 2A SEAL COOLER Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-329
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH01PA-A Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
RH PUMP 2A SEAL COOLER Photos 2RHOI PA-A 7-30-12 AM 030 2RH01 PA-A 7-30-12 AM 031 C-330
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH610 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR PUMP 2A MINFLOW VLV ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 357.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-331
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH610 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR PUMP 2A MINFLOW VLV ASMBLY, Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Nearby block walls are seismic.
Nearby scaffolding is laterally supported with stand-offs on 3 walls. Cannot damage equipment if it were to move in the free direction.
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Valve is a MOV and is robust.
Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Valve class changed from fluid operated valve as indicated on SWEL.
Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-332
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status:
IN U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH610 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR PUMP 2A MINFLOWVLV ASMBLY Photos 2RH610 7-30-12 AM 018 2RH610 7-30-12 AM 019 C-333
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH610 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RHR PUMP 2A MINFLOW VLV ASMBLY 2RH610 8-2-12 002 C-334
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH8716B Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RH HX 2B DISCH CROSSTIE VLV ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 364.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchora-ae
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-335
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH8716B Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RH HX 2B DISCH CROSSTIE VLV ASMBLY Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Weil-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-336
Braidwood Station Unit 2 12Q01 08.1 0-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH8716B Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RH HX 2B DISCH CROSSTIE VLV ASMBLY Photos 2RH8716B 7-30-12 AM 043 2RH8716B 7-30-12 AM 044 C-337
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2RH8716B Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves EauiDment
Description:
RH HX 2B DISCH CROSSTIE VLV ASMBLY C-338
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SI8801A Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
CHG PUMP TO COLD LEG INJ ISOL ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 375.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
No of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-339
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SI8801A Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
CHG PUMP TO COLD LEG INJ ISOL ASMBLY Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Gallery above is well-supported
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by:
Marlene Delaney Date:
10/11/2012 62 "Philip Gazda 10/1/2012 C-340
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SI8801A Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
CHG PUMP TO COLD LEG INJ ISOL ASMBLY ZZ5i6dOIA d5-Z-1Z U15 Z,,.?I$UIA d-Z-1Z U15O C-341
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SI8801A Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
CHG PUMP TO COLD LEG INJ ISOL ASMBLY ZZAMUIA O-Z-1Z UI I C-342
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SI8801B Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 375.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-343
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SI8801B Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead gallety is well-supported
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of
. potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by:
Marlene Delaney Date:
10/1/2012 (7 '
"-Philip Gazda 10/1/2012 C-344
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SI8801B Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
CHG PUMP TO COLD LEGS INST ISOL VLV ASMBLY Photos 2SI8801B 8-2-12 019 C-345
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX004 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CC HX 2 INLT VLV ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 330.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-346
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX004 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CC HX 2 INLT VLV ASMBLY Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Robust valve on well-supported pipe Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-347
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX004 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CC HX 2 INLT VLV ASMBLY Photos 26)WU413-1-1Z FM U15 2ZZXUU46~-1-12 HMU1Th C-348
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX004 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CC HX 2 INLT VLV ASMBLY 2SX004 8-1-12 PM 017 C-349
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX005 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
U-0 CC HX INLET VLV ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 330.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-350
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX005 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
U-0 CC HX INLET VLVASMBLY Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Robust, well-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-351
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status:
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX005 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
U-0 CC HX INLET VLV ASMBLY Photos 2SX005 8-1-12 PM 021 2SX005 8-1-12 PM 022 C-352
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX01AA Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
2A SX PUMP LUBE OIL COOLER Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 330.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
No of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Equipment is an in-line mounted cooler with no anchorage details.
Yes C-353
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX01AA Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
2A SX PUMP LUBE OIL COOLER Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Well-supported IR written on component (tagged) but no impact to seismic safety functions Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-354
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
2SX01AA (21) Tanks and Heat Exchangers 2A SX PUMP LUBE OIL COOLER Photos C-355
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX01PA Equipment Class:
(5) Horizontal Pumps Equipment
Description:
PUMP, 2A ESSENTIAL SER WTR ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 330.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchora-ge
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Well-anchored Yes C-356
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX01PA Equipment Class:
(5) Horizontal Pumps Equipment
Description:
PUMP, 2A ESSENTIAL SER WTR ASMBLY Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-357
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX01PA Equipment Class:
(5) Horizontal Pumps Equipment
Description:
PUMP, 2A ESSENTIAL SER WTR ASMBLY Photos 2bXU1 PA 8-1-12 PM 011 2SX01PA8-1-12 PM 010 C-358
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX01PA-C Equipment Class:
(5) Horizontal Pumps Equipment
Description:
PUMP, 2A SX AUX LUBE OIL PP Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 330.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraqe
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
No of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Equipment is mounted to oil reservoir. Well-anchored.
Yes C-359
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX01PA-C Equipment Class:
(5) Horizontal Pumps Equipment
Description:
PUMP, 2A SX AUX LUBE OIL PP Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm Evaluated by:
Marlene Delaney Date:
10/1/2012
.° Philip Gazda 10/1/2012 C-360
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SXO1PA-C Equipment Class:
(5) Horizontal Pumps Equipment
Description:
PUMP, 2A SX AUX LUBE OIL PP Photos 2SX01 PA-C 8-1-12 PM 006 C-361
Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX033 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Project:
Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 330.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-362
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX033 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Robust, well-supported valve Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 pm
/~4~LA(
4d4_
Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-363
Braidwood Station Unit 2 12Q01 08.1 O-R-002 Rev. 0 Correspondence No.: RS-1 2-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX033 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY Photos 2SX033 (NP-6695) 8-1-12 PM 020 2SX033 8-1-12 PM 018 C-364
Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2SX033 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Eauioment Descriotion:
ESSENTIAL SERVICE WTR PMP 2A CROSSTIE VLV ASMBLY 2SX033 8-1-12 PM 019 C-365