U.S.Nuclear Regulatory Commission Mail and Records section Washington, D.C., 20555 Gentlemen:
Power company U.S.Nuclear Regulatory Commission Mail and Records section Washington, D.C., 20555 Gentlemen:
consumers Power company Enclosed is a copy of the monthly operating data for the Palisades Plant for the month of April, 1975*
Enclosed is a copy of the monthly operating data for the Palisades Plant for the month of April, 1975*
JAM:db cc:
Sincerely, James A. Meineke JAM:db cc: J.G.Keppler, NRC R.L.Haueter R.B.Sewell
J.G.Keppler, NRC R.L.Haueter R.B.Sewell Sincerely, James A. Meineke


I .~
*.I  
*.I   .-.
. -. :__,~
:__,~                                         APPp.JDIX C (0                                                                                     DOCKET NO.
APPp.JDIX C I. ~
UNIT 50-255.
(0 DOCKET NO.
Palisades DATE       5/2/75 COMPLETED BY         DBollnow AVERAGE DAILY UNIT POWER LEVEL MONTH         April   1975 AVERA GE DAILY PO\\iER LEVEL                           AVERAGE DAILY POWER LEVEL.
50-255.
(.MWe-net)                     DAY                   (MWe-nct)
UNIT Palisades DATE 5/2/75 COMPLETED BY DBollnow AVERAGE DAILY UNIT POWER LEVEL MONTH April 1975 A VERA GE DAILY PO\\\\iER LEVEL AVERAGE DAILY POWER LEVEL.
DAY 1                       0                           17*                 550 2                       0                           18     /./
DAY
577
(.MWe-net)
                                                                        /
DAY (MWe-nct) 1 0
3                       4*                           19                 231 4                     117.                         . 20.                 268 5                     162                           21                   216 6                     131                           22                   560 c~* .0
17*
      *._._;   7                     261                           23                   121 8                     350                           24                   501.                                ';.
550 2
9                     388                           25                   266 10                     446                           26                   531 11                     389                           27.                 431 461                           28                   430 12 13                     518                           29                 482 14                     361                           30                 503 t5                   . 501                           31 16                     529 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit powe:r level in ivt\Ve-net for each day in the reporting month.
0 18 577
/./  
/
3 4*
19 231 4
117.  
. 20.
268 5
162 21 216 6
131 22 560 0
c~*.. *._._;
7 261 23 121 8
350 24 501.
9 388 25 266 10 446 26 531 11 389
: 27.
431 12 461 28 430 13 518 29 482 14 361 30 503 t5  
. 501 31 16 529 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit powe:r level in ivt\\Ve-net for each day in the reporting month.
Compute to the nearest whole megawatt.
Compute to the nearest whole megawatt.
* These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum
These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power le\\'cl exceeds the I 00% line (or the restricted power level* line). In such cases, the
(.o dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power le\'cl exceeds the I 00% line (or the restricted power level* line). In such cases, the av:ragc daily unit power ontput sheet should be footnoted to explainthc apparent anomaly . . . . . .
(.o av:ragc daily unit power ontput sheet should be footnoted to explainthc apparent anomaly......  
*L-..~.--..,,~**~ " ~~~-~~&#xa5;<+~-*---~,n ~                                                                               ' '!
*L-.. ~.. --..,,~**~ "" ~~~-~~&#xa5;<+~-*---~,n  
~  


*,.--.o
(
*-~:****
APPENDIX D*
APPENDIX D*
UNIT               _P_a_.:_1_J_ .. s_a_cl_e_s_ __
UNIT _P_a_.:_1_J_  
DATE                       lfJB.y 2, 1975 616-*764..:8913*
.. s_a_cl_e_s __ _
                                                                                                      . COMPLETED BY                       D.Bollnow                     .
DATE lfJB.y 2, 1975 616-*764..:8913*  
DOCKET N0. __5_0_-_2_5_5_ _ __
. COMPLETED BY D.Bollnow DOCKET N0. __ 5_0_-_2_5_5 ___ _
OPERATiNG ST ATUS I. REPORTING PERIOD:                   . 750401                             THROUGH _ _7.J...,,5"-'0::...4..:....~""-'0::____ _ _ _ _ __
OPERATiNG ST A TUS I.
HOURS IN REPORTl'.'\G PERIOD: _ _ _7'-l__,9'-----------.,--------------,7'7"1""r--
REPORTING PERIOD:  
: 2. CURRENTLY AUTHORIZED POWER.LEVEL ('.\1Wth) 220Q_ MAX. DEPENDABLE CAPACITY (MWe-NET) _O_t3_l_!*_ _
. 750401 THROUGH __
: 3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (M\Ve-NET):_--06:...3=0'-                                     1
7.J...,,5"-'0::...4..:....~""-'0::___ ______ _
                                                                                                                                                  ---~---
HOURS IN REPORTl'.'\\G PERIOD: ___ 7'-l__,9'-----------.,--------------,7'7"1""r--
: 4. REASONS FOR RESTRICTION (IF ANY):                 Power Restricted to 2100 .MWT due to low Pr:i.mary Coolant Flow caused by Steam Generator Plugging THIS                                                             CUMULATIVE
: 2.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _R_E_P_ORTING PE_R....:10:...:D'-----=-Y..:..R'-'T:...:O:....D=-A:..:c.TE.o.;.,;...'_ _ _ _              T...:O._D_A_T_E_
CURRENTLY AUTHORIZED POWER.LEVEL ('.\\1Wth) 220Q_ MAX. DEPENDABLE CAPACITY (MWe-NET) _O_t3_l_!* __
: 5. HOURS REACTOR WAS CRITICAL. . . . . . . . . . . . .                   709.5                      739.8                                lG,976.7
: 3.
: 6. REACTOR RESERVE SHUTDOWN HOURS . . . . . . .
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (M\\Ve-NET):_--06:...3=0'-
                                                                                          ,. 0                                  0                                      0
1 ---~---
: 7. HOURS GENERATOR ON LINE.* . . . . . . . . . . . * * .                 657.8                      657.8                                9.978.9
: 4.
: 8. lTNJT RESER VE Sil UTDOWN HOURS . . . . . . . . * *
REASONS FOR RESTRICTION (IF ANY):
* 0                                  0                                    0
Power Restricted to 2100.MWT due to low Pr:i.mary Coolant Flow caused by Steam Generator Plugging THIS CUMULATIVE R_E_P_ORTING PE_R....:10:...:D'-----=-Y..:..R'-'T:...:O:....D=-A:..:c. TE.o.;.,;...' ____
: 9. . GROSS THER'.\1AL ENERGY GENERATED ('.\1WH) . * . * . . * * * * * . * * * * * * * *
T...:O._D_A_T_E_
* 967;.872              . 967,872                              15,081,432 IO.. GROSS ELECTRICAL ENERGY
: 5.
*,.--.o. * .
HOURS REACTOR WAS CRITICAL.............
(  *. .
: 6.
11.
REACTOR RESERVE SHUTDOWN HOURS.......
                    -GENERATED ('.\l\VH) . . . . . . . . . . . . . . . . . . . . .
: 7.
NET ELECTRICAL ENERGY GENERATED (MWH)     ..*.*...***..*..*.*.***.**.*.
HOURS GENERATOR ON LINE.*...........**.
291,04o 266,769 291,04o 266,769 4,795,290 4,520,474
: 8.
*-~:****    12. RL\CTOR AVAILABILITY FACTOR (l) . . . . - . . . .                        98.7%                        25. 7%                                    37 ..6%* .
lTNJT RESER VE Sil UTDOWN HOURS........***
: 13. UNIT A \'AILABILITY FACTOR (2) . . * * . . * . . * .
: 9.  
* 91.5%                        22.8%                                    34.2~  .*
. GROSS THER'.\\1AL ENERGY GENERATED ('.\\1WH).*.*..*****.*********
: 14. l NIT CAPACITY FACTOR (3) . . . . . . . . . . . . * . .
IO..
1                                                                      54.2%                        13.5%                                    '26.2% -
GROSS ELECTRICAL ENERGY
IS. UNIT FORCED OllTAGE RATE (4) . . . . . . * * . * *
: 11.
* 8.6&deg;/o                     77.'?}                                   63.2&deg;/o
: 12.
: 16.         1 S!ll TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
: 13.
: 17. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _ _ _ _ _ _ _ _ _ _ __
: 14.  
IS. UNJTS IN TEST ST:\ TVS (PRIOR TO CO'.\i:l!ERCIAL OPERATION) REPORT THE FOLLOWING:
-GENERATED ('.\\l\\VH).....................
DATE LAST                        DATE FORECAST                      ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (I)    REACTOR A\'AILABILITY FACTOR                                                          x 100 HOURS IN REPORTING PERIOD HOURS GENERA TOR ON LINE t:NIT AVAILABILITY FACTOR                  -----------~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL PO\\'FR GENERATED (3)    UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWc*NET) X HOURS IN RU'ORTIN<.; l'E!UOD f~~
NET ELECTRICAL ENERGY GENERATED (MWH)..*.*...***..*..*.*.***.**.*.
FORCED Ol:TAGE HOURS
RL\\CTOR AVAILABILITY FACTOR (l).... -....
. l L
UNIT A \\'AILABILITY FACTOR (2)..**..*..*.*
(4)     t:NIT FORCEDOL'TAGE RATE                                                     -~-~---------XlOO
l 1NIT CAPACITY FACTOR (3)............*..
(~\.~.>3
UNIT FORCED OllTAGE RATE (4)......**.***
.      ~~
709.5
              .                                                  HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
,. 0 657.8 0
                                                                                ).16*D*l                               .                      .    .
967;.872 291,04o 266,769 98.7%
91.5%
54.2%
8.6&deg;/o 739.8 0
657.8 0
. 967,872 291,04o 266,769
: 25. 7%
22.8%
13.5%
77.'?}
lG,976.7 0
9.978.9 0
15,081,432 4,795,290 4,520,474 37.. 6%*.
34.2~.*
'26.2% -
63.2&deg;/o IS.
: 16.
S!ll1TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
: 17.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ___________
IS.
UNJTS IN TEST ST:\\ TVS (PRIOR TO CO'.\\i:l!ERCIAL OPERATION) REPORT THE FOLLOWING:
(I)
REACTOR A\\'AILABILITY FACTOR t:NIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE  
-----------~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL PO\\\\'FR GENERATED DATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE CAPACITY (MWc*NET) X HOURS IN RU'ORTIN<.; l'E!UOD  
. l f~~ (4) t:NIT FORCEDOL'TAGE RATE
(~\\.~.>3.
FORCED Ol:TAGE HOURS
-~-~---------XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS  
.., ~~ L
).16*D*l
_.:~-*=-~~~7~*~-~~~-=~-~~~-~-
_.:~-*=-~~~7~*~-~~~-=~-~~~-~-


    ~.---                                                                                                                                         I     t.,,.\                                                                                           e:.       .J~*
~.---
J.           0 '-k'"~"""""-"'"'""""...;"'"'";,.~. . . .,,...,. ___.,. . . . . . ._,. . .,. . . . . . . .-.. .~..............,.,~....,. . .,,. . . . *A*P(l-'pi~*-*----*---...- - -....*->=-*"""*,_.....,
I t.,,.\\
                                                                                                                                                                                                    *.*_..._.-**-~-0-C-.K~E....~........N-m-.- ~ 5~0~ *2=0*5:;. .: 5'-*-* _-_~.......<.->'\~*I
e :.  
  ~                                                                                                                                                                                                                                                                                     ~   f j                                                                                                                                     UNIT SHUTDOWNS                                                           UNIT NAME                         Palisades                                 l
.J~*
J.
0 '-k'"~"""""-"'"'""""  
... ;"'"'";,,~............,,..., ___.,................. _,....,
~..............,.,~....,........,,...... *A*P(l-'pi~*-*----*---... ---.... *-> =-*"""*,_....., *.* _..._. -** -~-0-C-.K~E  
.... ~
N-m-. --~~5~0~~*2=0*5:;...::5'-*-** _-_~  
....... <.->'\\~*I  
~  
~
f j
UNIT SHUTDOWNS UNIT NAME Palisades l  
*1.*
*1.*
* DATE                     5-2-75                                     l I
I
!'                                                                                                                                                                                                        COMPLETED BY                           *n.Bollnow                                   t
* DATE 5-2-75 l
                                                                                                                                                                                                                                                                                              ~
COMPLETED BY  
REPORT MONTH                               April 1975                                                                                                                   r NO. DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)                           REASON (1)
*n.Bollnow t
METHOD OF SHUTTING DOWN THE REACTOR (2)                       CORRECTIVg ACTIONS/COMMENTS etI t
REPORT MONTH April 1975 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.
[
DATE S-SCHEDULED (HOURS)
1 3  . 741104 7504o6 F
REASON (1)
F 3662.1 2.6 B
THE REACTOR (2)
A 1
CORRECTIVg ACTIONS/COMMENTS 3
1 Completion of Steam Gen. Repair/Inspection Off-Line to Repair Leaking F.W.Heater Valve Ir r*
. 741104 F
[
3662.1 B
:.... 2    750422           F                                             14.l                             A                                           3               Trip due to E.H. oil Line failure on                                                                       r Turbine control system (1) REASON A*-EQUIPMENT FAILURE:(EXPLAIN)
1 Completion of Steam Gen. Repair/Inspection 1
B- MAlNT. OR TEST C-REFUELING D-REGULATORY RESTRICTION E-Ol'ERATOR TRAINING AND (2) METHOD 1-MANUAL
7504o6 F
* 2-MANUAL SCRAM 3-AUTOMATIC*
2.6 A
SCRAM
1 Off-Line to Repair Leaking F.W.Heater Valve 2
                                                                                                                                                                                                                                                                                        .. l,.
750422 F
f,.
14.l A
LICENSE EXAMINATION                                                                           ~
3 Trip due to E.H. oil Line failure on Turbine control system (1) REASON (2) METHOD A*-EQUIPMENT FAILURE:(EXPLAIN) 1-MANUAL
                                                                                                                      .  .                                                                F-ADMINISTRATIVE G-OPERATIONAL ERROR t,, .
* B-MAlNT. OR TEST 2-MANUAL C-REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC*
E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR
{EXPLAIN)
{EXPLAIN)
H-OTHER (EXPLAIN)                                                                                       ..
H-OTHER (EXPLAIN)  
ri:


==SUMMARY==
==SUMMARY==
Turbine balancing was performed on 1st and 2nd; then unit went up in power in accordance with a
Turbine balancing was performed on 1st and 2nd; then unit went up in power in accordance with a  
                        $team Generator flushing.program. Plant.is running at 80% power with F.W. Heaters #1 and 2 out                                                                                                                                                                           I[
$team Generator flushing.program. Plant.is running at 80% power with F.W. Heaters #1 and 2 out of service which is restrictive* on power..
of service which is restrictive* on power..
* t *
* t
~ r I et t
* r}}
[ I r
r*
[ r
.. l f
~,.
t,,.
r i:
I
[ r}}

Latest revision as of 08:33, 5 January 2025

Monthly Operating Data for April 1975
ML18347A839
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/02/1975
From: Meincke J
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A839 (4)


Text

  • Fiie Cy.

U.S.Nuclear Regulatory Commission Mail and Records section Washington, D.C., 20555 Gentlemen:

consumers Power company Enclosed is a copy of the monthly operating data for the Palisades Plant for the month of April, 1975*

JAM:db cc:

J.G.Keppler, NRC R.L.Haueter R.B.Sewell Sincerely, James A. Meineke

  • .I

. -. :__,~

APPp.JDIX C I. ~

(0 DOCKET NO.

50-255.

UNIT Palisades DATE 5/2/75 COMPLETED BY DBollnow AVERAGE DAILY UNIT POWER LEVEL MONTH April 1975 A VERA GE DAILY PO\\\\iER LEVEL AVERAGE DAILY POWER LEVEL.

DAY

(.MWe-net)

DAY (MWe-nct) 1 0

17*

550 2

0 18 577

/./

/

3 4*

19 231 4

117.

. 20.

268 5

162 21 216 6

131 22 560 0

c~*.. *._._;

7 261 23 121 8

350 24 501.

9 388 25 266 10 446 26 531 11 389

27.

431 12 461 28 430 13 518 29 482 14 361 30 503 t5

. 501 31 16 529 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit powe:r level in ivt\\Ve-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power le\\'cl exceeds the I 00% line (or the restricted power level* line). In such cases, the

(.o av:ragc daily unit power ontput sheet should be footnoted to explainthc apparent anomaly......

  • L-.. ~.. --..,,~**~ "" ~~~-~~¥<+~-*---~,n

~

  • ,.--.o

(

  • -~:****

APPENDIX D*

UNIT _P_a_.:_1_J_

.. s_a_cl_e_s __ _

DATE lfJB.y 2, 1975 616-*764..:8913*

. COMPLETED BY D.Bollnow DOCKET N0. __ 5_0_-_2_5_5 ___ _

OPERATiNG ST A TUS I.

REPORTING PERIOD:

. 750401 THROUGH __

7.J...,,5"-'0::...4..:....~""-'0::___ ______ _

HOURS IN REPORTl'.'\\G PERIOD: ___ 7'-l__,9'-----------.,--------------,7'7"1""r--

2.

CURRENTLY AUTHORIZED POWER.LEVEL ('.\\1Wth) 220Q_ MAX. DEPENDABLE CAPACITY (MWe-NET) _O_t3_l_!* __

3.

LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (M\\Ve-NET):_--06:...3=0'-

1 ---~---

4.

REASONS FOR RESTRICTION (IF ANY):

Power Restricted to 2100.MWT due to low Pr:i.mary Coolant Flow caused by Steam Generator Plugging THIS CUMULATIVE R_E_P_ORTING PE_R....:10:...:D'-----=-Y..:..R'-'T:...:O:....D=-A:..:c. TE.o.;.,;...' ____

T...:O._D_A_T_E_

5.

HOURS REACTOR WAS CRITICAL.............

6.

REACTOR RESERVE SHUTDOWN HOURS.......

7.

HOURS GENERATOR ON LINE.*...........**.

8.

lTNJT RESER VE Sil UTDOWN HOURS........***

9.

. GROSS THER'.\\1AL ENERGY GENERATED ('.\\1WH).*.*..*****.*********

IO..

GROSS ELECTRICAL ENERGY

11.
12.
13.
14.

-GENERATED ('.\\l\\VH).....................

NET ELECTRICAL ENERGY GENERATED (MWH)..*.*...***..*..*.*.***.**.*.

RL\\CTOR AVAILABILITY FACTOR (l).... -....

UNIT A \\'AILABILITY FACTOR (2)..**..*..*.*

l 1NIT CAPACITY FACTOR (3)............*..

UNIT FORCED OllTAGE RATE (4)......**.***

709.5

,. 0 657.8 0

967;.872 291,04o 266,769 98.7%

91.5%

54.2%

8.6°/o 739.8 0

657.8 0

. 967,872 291,04o 266,769

25. 7%

22.8%

13.5%

77.'?}

lG,976.7 0

9.978.9 0

15,081,432 4,795,290 4,520,474 37.. 6%*.

34.2~.*

'26.2% -

63.2°/o IS.

16.

S!ll1TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

17.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ___________

IS.

UNJTS IN TEST ST:\\ TVS (PRIOR TO CO'.\\i:l!ERCIAL OPERATION) REPORT THE FOLLOWING:

(I)

REACTOR A\\'AILABILITY FACTOR t:NIT AVAILABILITY FACTOR (3)

UNIT CAPACITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE


~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL PO\\\\'FR GENERATED DATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE CAPACITY (MWc*NET) X HOURS IN RU'ORTIN<.; l'E!UOD

. l f~~ (4) t:NIT FORCEDOL'TAGE RATE

(~\\.~.>3.

FORCED Ol:TAGE HOURS

-~-~---------XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

.., ~~ L

).16*D*l

_.:~-*=-~~~7~*~-~~~-=~-~~~-~-

~.---

I t.,,.\\

e :.

.J~*

J.

0 '-k'"~"""""-"'"'""""

... ;"'"'";,,~............,,..., ___.,................. _,....,

~..............,.,~....,........,,...... *A*P(l-'pi~*-*----*---... ---.... *-> =-*"""*,_....., *.* _..._. -** -~-0-C-.K~E

.... ~

N-m-. --~~5~0~~*2=0*5:;...::5'-*-** _-_~

....... <.->'\\~*I

~

~

f j

UNIT SHUTDOWNS UNIT NAME Palisades l

  • 1.*

I

  • DATE 5-2-75 l

COMPLETED BY

  • n.Bollnow t

REPORT MONTH April 1975 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.

DATE S-SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVg ACTIONS/COMMENTS 3

. 741104 F

3662.1 B

1 Completion of Steam Gen. Repair/Inspection 1

7504o6 F

2.6 A

1 Off-Line to Repair Leaking F.W.Heater Valve 2

750422 F

14.l A

3 Trip due to E.H. oil Line failure on Turbine control system (1) REASON (2) METHOD A*-EQUIPMENT FAILURE:(EXPLAIN) 1-MANUAL

  • B-MAlNT. OR TEST 2-MANUAL C-REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC*

E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR

{EXPLAIN)

H-OTHER (EXPLAIN)

SUMMARY

Turbine balancing was performed on 1st and 2nd; then unit went up in power in accordance with a

$team Generator flushing.program. Plant.is running at 80% power with F.W. Heaters #1 and 2 out of service which is restrictive* on power..

  • t *

~ r I et t

[ I r

r*

[ r

.. l f

~,.

t,,.

r i:

I

[ r