DA             a       1976 DOCKET NO.       50-270 PREPARED BY       E. D. Blakeman OPERATING STATUS
DA a
: 1. REPORTING PERIOD: December 1               THROUGH. Decamber 31. 1076 GROSS HOURS IN REPORTING PERIOD:                 744.00
1976 DOCKET NO.
: 2. CURRENTLY AUTHOP.IZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):       871
50-270 PREPARED BY E. D. Blakeman OPERATING STATUS 1.
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)                     NONE
REPORTING PERIOD: December 1 THROUGH. Decamber 31. 1076 GROSS HOURS IN REPORTING PERIOD:
: 4. REASONS FOR RESTRICTION (IF ANY)
744.00 2.
This Month     Year to Date           C_umulative
CURRENTLY AUTHOP.IZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):
: 5. NUMBER OF HOURS THE REACTOR WAS CRITICAL                                       744.0             6612.9             8559.1
871 3.
: 6. REACTOR RESERVE SHUTDOWN HOURS             _
POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
: 7. HOURS GENERATOR ON-LINE                   _ 744.0               6404.1             8279.6
NONE 4.
: 8. UNIT RESERVE SHUTDOWN HOURS                                                       9. GROSS THERMAL ENERGY GENERATED (MWH) 1891179                 15365531               19672428
REASONS FOR RESTRICTION (IF ANY)
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                         649350       5231580               6700556
This Month Year to Date C_umulative 5.
: 11. NET ELECTRICAL ENERGY GENERATED (MWH)                                           622223       4967625               6355151
NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 6612.9 8559.1 6.
: 12. REACTOR SERVICE FACTOR                         100.0               75.5               74.5
REACTOR RESERVE SHUTDOWN HOURS
: 13. REACTOR AVAILABILITY FACTOR                     100.0               73.8               72.7
_ 7.
: 14. UNIT SERVICE FACTOR                             100.0               73.1               72.0
HOURS GENERATOR ON-LINE
: 15. UNIT AVAILABILITY FACTOR                       100.0               73.1               72.0
_ 744.0 6404.1 8279.6 8.
: 16. UNIT CAPACITY FACTOR (Using Net                 96.0               65.1               63.4 Capability)
UNIT RESERVE SHUTDOWN HOURS 9.
: 17. UNIT CAPACITY FACTOR (Using Design Mwe)                             94.3               63.9               6'2.3
GROSS THERMAL ENERGY GENERATED (MWH) 1891179 15365531 19672428 10.
: 18. UNIT FORCED OUTAGE RATE                                         23.0               25.0
GROSS ELECTRICAL ENERGY GENERATED (MWH) 649350 5231580 6700556 11.
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
NET ELECTRICAL ENERGY GENERATED (MWH) 622223 4967625 6355151 12.
Refueling, May 3, 1976             5 Weeks
REACTOR SERVICE FACTOR 100.0 75.5 74.5 13.
: 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
REACTOR AVAILABILITY FACTOR 100.0 73.8 72.7 14.
REACTOR SERVICE FACTOR = HOURS REACTOR WAS,CRT_TICAL X 100 UOURS IN REPORTING PERIOD REACTOR AVAILABILI'lY FACTOR = HOURS REACTOR UA3 AVAIIABLE TO OPERATE X 100 Il0URS IN REPORTING PERIOD UNIT SERVICE FACTOR     = HOUPS GEKERATOR ON LINE X 300 HOURS IN REPORTING PERIOD UNIT AVAIIABILITY FACTOR = UOURS UNIT WAS AVAll ABLE TO CPf ERATE X 100 HOURS IN REPukTING PERIOD UNIT CAPACITY FACTOR  = NET ELECTRICAL POWER CE.NERATED 7912180
UNIT SERVICE FACTOR 100.0 73.1 72.0 15.
[HstCapabilityorDesign(Mwe-Net)'.1XHOURSINREP6hT('h PERIOD UNIT FORCED OUTACE RATE r FORCED OUTAGE HOURS                                   X 100 HOURS GENERATOR ON LINE + FORCED OUTAGE HOURS
UNIT AVAILABILITY FACTOR 100.0 73.1 72.0 16.
UNIT CAPACITY FACTOR (Using Net 96.0 65.1 63.4 Capability) 17.
UNIT CAPACITY FACTOR (Using Design Mwe) 94.3 63.9 6'2.3 18.
UNIT FORCED OUTAGE RATE 23.0 25.0 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
Refueling, May 3, 1976 5 Weeks 20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
REACTOR SERVICE FACTOR = HOURS REACTOR WAS,CRT_TICAL X 100 UOURS IN REPORTING PERIOD REACTOR AVAILABILI'lY FACTOR = HOURS REACTOR UA3 AVAIIABLE TO OPERATE X 100 Il0URS IN REPORTING PERIOD UNIT SERVICE FACTOR
= HOUPS GEKERATOR ON LINE X 300 HOURS IN REPORTING PERIOD UNIT AVAIIABILITY FACTOR = UOURS UNIT WAS AVAll ABLE TO CPf ERATE X 100 HOURS IN REPukTING PERIOD7912180
= NET ELECTRICAL POWER CE.NERATED UNIT CAPACITY FACTOR
[HstCapabilityorDesign(Mwe-Net)'.1XHOURSINREP6hT('h PERIOD UNIT FORCED OUTACE RATE r FORCED OUTAGE HOURS X 100 HOURS GENERATOR ON LINE + FORCED OUTAGE HOURS


DdCKET NO. 50-270 UNIT SHUTDOWNS                                                               UNIT NAMii Oconee Unit 2 DATli January 8, 1975 REPORT MONTil _ December 19L5 TYPE                                         METHOD OF F FORCED   DURATION                         SHUTTING DOWN NO. DATE   S-SCHEDULED     (HOURS)     REASON (t)       THE REACTOR (2)                                           CORRECTIVE ACTIONS / COMMENTS (1) REASON                             '(2) M ETilO D A EQUIPMENT I ALLURE (EXPLAIN)                         1-M ANUAl.
DdCKET NO. 50-270 UNIT SHUTDOWNS UNIT NAMii Oconee Unit 2 DATli January 8, 1975 REPORT MONTil _ December 19L5 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO.
B- MAINT. OR TEST.                                     2-M ANUAL C- REI ULLING                                                         SCRAM D-REGULAlORY RESTRICilON                               3 - A UTOM A llc E-OPERATOR TRAINING AND                                               SCRAM LICENSE EXAMINATION l'- A DMINIST R ATIVE G- OPE R ATIONAL I R ROR (LXPLAIN)
DATE S-SCHEDULED (HOURS)
REASON (t)
THE REACTOR (2)
CORRECTIVE ACTIONS / COMMENTS (1) REASON
'(2) M ETilO D A EQUIPMENT I ALLURE (EXPLAIN) 1-M ANUAl.
B-MAINT. OR TEST.
2-M ANUAL C-REI ULLING SCRAM D-REGULAlORY RESTRICilON 3 - A UTOM A llc E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION l'- A DMINIST R ATIVE G-OPE R ATIONAL I R ROR (LXPLAIN)
Il-OlllLR (LXPL AIN)
Il-OlllLR (LXPL AIN)


Line 50: Line 66:
No outages this month.
No outages this month.


DOCKET NO.       50-270 UN:T     oconee Unit 2 DATE January 8, 1976 AVERAGE DAILY UNIT POWER LEVEL MONTH       December 1975 AVERAGE DAILY POWER LEVEL                           AVERAGE DAILY POWER LEVEL DAY                   (MWe-net)                     DAY               (MWe-net)           .
DOCKET NO.
846                         17                   997 1
50-270 UN:T oconee Unit 2 DATE January 8, 1976 AVERAGE DAILY UNIT POWER LEVEL MONTH December 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
846                         18                   822 2
DAY (MWe-net) 1 846 17 997 846 18 822 2
845                         19                   757 3
3 845 19 757 4
842                         20                   R9s 4
842 20 R9s 5
840                         21                   840 5
840 21 840 844 22 R1R 6
844                         22                   R1R 6
7 846 23 AqA 8
AqA 7                     846                         23 844                         24                   838 8
844 24 838 838 842 25 9
842                         25                   838 9
836 834 26 10 837 841 27 11 836 28 835 12 840 29 835 13 834 30 843 14 845 836 31 15 838 16 i
834                         26                 836 10 841                         27                 837 11 836                         28                 835 12 840                         29                   835 13 834                         30                   843 14 836                                               845 15                                                   31 16                       838 i
DAILY UNrr POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
DAILY UNrr POWER LEVEL FORM INSTRUCTIONS
  -    On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 1007c line (or the restricted power lesel line). In such c.ises, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 1007c line (or the restricted power lesel line). In such c.ises, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
i l
i l
l
l
                                                                                                          . . - .}}
.. -.}}

Latest revision as of 21:54, 1 January 2025

Monthly Operating Rept for Dec 1975
ML19317E715
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/08/1976
From: Blakeman E
DUKE POWER CO.
To:
Shared Package
ML19317E710 List:
References
NUDOCS 7912180864
Download: ML19317E715 (3)


Text

_

DA a

1976 DOCKET NO.

50-270 PREPARED BY E. D. Blakeman OPERATING STATUS 1.

REPORTING PERIOD: December 1 THROUGH. Decamber 31. 1076 GROSS HOURS IN REPORTING PERIOD:

744.00 2.

CURRENTLY AUTHOP.IZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):

871 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)

NONE 4.

REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date C_umulative 5.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 6612.9 8559.1 6.

REACTOR RESERVE SHUTDOWN HOURS

_ 7.

HOURS GENERATOR ON-LINE

_ 744.0 6404.1 8279.6 8.

UNIT RESERVE SHUTDOWN HOURS 9.

GROSS THERMAL ENERGY GENERATED (MWH) 1891179 15365531 19672428 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 649350 5231580 6700556 11.

NET ELECTRICAL ENERGY GENERATED (MWH) 622223 4967625 6355151 12.

REACTOR SERVICE FACTOR 100.0 75.5 74.5 13.

REACTOR AVAILABILITY FACTOR 100.0 73.8 72.7 14.

UNIT SERVICE FACTOR 100.0 73.1 72.0 15.

UNIT AVAILABILITY FACTOR 100.0 73.1 72.0 16.

UNIT CAPACITY FACTOR (Using Net 96.0 65.1 63.4 Capability) 17.

UNIT CAPACITY FACTOR (Using Design Mwe) 94.3 63.9 6'2.3 18.

UNIT FORCED OUTAGE RATE 23.0 25.0 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

Refueling, May 3, 1976 5 Weeks 20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS,CRT_TICAL X 100 UOURS IN REPORTING PERIOD REACTOR AVAILABILI'lY FACTOR = HOURS REACTOR UA3 AVAIIABLE TO OPERATE X 100 Il0URS IN REPORTING PERIOD UNIT SERVICE FACTOR

= HOUPS GEKERATOR ON LINE X 300 HOURS IN REPORTING PERIOD UNIT AVAIIABILITY FACTOR = UOURS UNIT WAS AVAll ABLE TO CPf ERATE X 100 HOURS IN REPukTING PERIOD7912180

= NET ELECTRICAL POWER CE.NERATED UNIT CAPACITY FACTOR

[HstCapabilityorDesign(Mwe-Net)'.1XHOURSINREP6hT('h PERIOD UNIT FORCED OUTACE RATE r FORCED OUTAGE HOURS X 100 HOURS GENERATOR ON LINE + FORCED OUTAGE HOURS

DdCKET NO. 50-270 UNIT SHUTDOWNS UNIT NAMii Oconee Unit 2 DATli January 8, 1975 REPORT MONTil _ December 19L5 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO.

DATE S-SCHEDULED (HOURS)

REASON (t)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS (1) REASON

'(2) M ETilO D A EQUIPMENT I ALLURE (EXPLAIN) 1-M ANUAl.

B-MAINT. OR TEST.

2-M ANUAL C-REI ULLING SCRAM D-REGULAlORY RESTRICilON 3 - A UTOM A llc E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION l'- A DMINIST R ATIVE G-OPE R ATIONAL I R ROR (LXPLAIN)

Il-OlllLR (LXPL AIN)

SUMMARY

No outages this month.

DOCKET NO.

50-270 UN:T oconee Unit 2 DATE January 8, 1976 AVERAGE DAILY UNIT POWER LEVEL MONTH December 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 1 846 17 997 846 18 822 2

3 845 19 757 4

842 20 R9s 5

840 21 840 844 22 R1R 6

7 846 23 AqA 8

844 24 838 838 842 25 9

836 834 26 10 837 841 27 11 836 28 835 12 840 29 835 13 834 30 843 14 845 836 31 15 838 16 i

DAILY UNrr POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 1007c line (or the restricted power lesel line). In such c.ises, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

i l

l

.. -.