DA a 1976 DOCKET NO. 50-270 PREPARED BY E. D. Blakeman OPERATING STATUS

1. REPORTING PERIOD: December 1 THROUGH. Decamber 31. 1076 GROSS HOURS IN REPORTING PERIOD: 744.00
2. CURRENTLY AUTHOP.IZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net): 871
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) NONE
4. REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date C_umulative

5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 6612.9 8559.1
6. REACTOR RESERVE SHUTDOWN HOURS _
7. HOURS GENERATOR ON-LINE _ 744.0 6404.1 8279.6
8. UNIT RESERVE SHUTDOWN HOURS 9. GROSS THERMAL ENERGY GENERATED (MWH) 1891179 15365531 19672428
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 649350 5231580 6700556
11. NET ELECTRICAL ENERGY GENERATED (MWH) 622223 4967625 6355151
12. REACTOR SERVICE FACTOR 100.0 75.5 74.5
13. REACTOR AVAILABILITY FACTOR 100.0 73.8 72.7
14. UNIT SERVICE FACTOR 100.0 73.1 72.0
15. UNIT AVAILABILITY FACTOR 100.0 73.1 72.0
16. UNIT CAPACITY FACTOR (Using Net 96.0 65.1 63.4 Capability)
17. UNIT CAPACITY FACTOR (Using Design Mwe) 94.3 63.9 6'2.3
18. UNIT FORCED OUTAGE RATE 23.0 25.0
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

Refueling, May 3, 1976 5 Weeks

20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS,CRT_TICAL X 100 UOURS IN REPORTING PERIOD REACTOR AVAILABILI'lY FACTOR = HOURS REACTOR UA3 AVAIIABLE TO OPERATE X 100 Il0URS IN REPORTING PERIOD UNIT SERVICE FACTOR = HOUPS GEKERATOR ON LINE X 300 HOURS IN REPORTING PERIOD UNIT AVAIIABILITY FACTOR = UOURS UNIT WAS AVAll ABLE TO CPf ERATE X 100 HOURS IN REPukTING PERIOD UNIT CAPACITY FACTOR = NET ELECTRICAL POWER CE.NERATED 7912180

[HstCapabilityorDesign(Mwe-Net)'.1XHOURSINREP6hT('h PERIOD UNIT FORCED OUTACE RATE r FORCED OUTAGE HOURS X 100 HOURS GENERATOR ON LINE + FORCED OUTAGE HOURS

DdCKET NO. 50-270 UNIT SHUTDOWNS UNIT NAMii Oconee Unit 2 DATli January 8, 1975 REPORT MONTil _ December 19L5 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S-SCHEDULED (HOURS) REASON (t) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS (1) REASON '(2) M ETilO D A EQUIPMENT I ALLURE (EXPLAIN) 1-M ANUAl.

B- MAINT. OR TEST. 2-M ANUAL C- REI ULLING SCRAM D-REGULAlORY RESTRICilON 3 - A UTOM A llc E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION l'- A DMINIST R ATIVE G- OPE R ATIONAL I R ROR (LXPLAIN)

Il-OlllLR (LXPL AIN)

SUMMARY

No outages this month.

DOCKET NO. 50-270 UN:T oconee Unit 2 DATE January 8, 1976 AVERAGE DAILY UNIT POWER LEVEL MONTH December 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) .

846 17 997 1

846 18 822 2

845 19 757 3

842 20 R9s 4

840 21 840 5

844 22 R1R 6

AqA 7 846 23 844 24 838 8

842 25 838 9

834 26 836 10 841 27 837 11 836 28 835 12 840 29 835 13 834 30 843 14 836 845 15 31 16 838 i

DAILY UNrr POWER LEVEL FORM INSTRUCTIONS

- On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 1007c line (or the restricted power lesel line). In such c.ises, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.