ML19347A869: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
USDpanmd Eww ARCONNE NATIONAL LABORATORY | USDpanmd Eww ARCONNE NATIONAL LABORATORY 9 00SoudiCAss Arm, ARCpM, fin 60439 Tdgio(312/972-7793 September 26, 1980 Mr. John C. Lehr Environmental Review Coordinator Engineerirg Division i | ||
9 00SoudiCAss Arm, ARCpM, fin 60439 | U.S. Nuclear Regulatory Commission Washingi.on, DC 20555 | ||
Engineerirg Division | |||
==Dear John:== | ==Dear John:== | ||
As we discussed in our telephone conversation on September 25, the Argonne Environmental Review Team will use the unofficial amended ER until we, receive the docketed Amendment No.1. | |||
We will proceed with our review aware that changes in the official amendment may require extra time, effort and cost. | |||
I Sincerely, Vanessa A. Harris Acting Environmental Review Project Leader Division of Environmental Impact Studies VAH:de cc: | |||
Sincerely, Vanessa A. Harris Acting Environmental Review Project Leader Division of Environmental Impact Studies VAH:de cc: | J. E. Carson R. A. Zussman | ||
[O03 5 | [O03 5 | ||
/!O uAsem 8009300H1}} | |||
Latest revision as of 06:41, 24 December 2024
| ML19347A869 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/26/1980 |
| From: | Harris V ARGONNE NATIONAL LABORATORY |
| To: | Lehr J Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8009300442 | |
| Download: ML19347A869 (1) | |
Text
-
USDpanmd Eww ARCONNE NATIONAL LABORATORY 9 00SoudiCAss Arm, ARCpM, fin 60439 Tdgio(312/972-7793 September 26, 1980 Mr. John C. Lehr Environmental Review Coordinator Engineerirg Division i
U.S. Nuclear Regulatory Commission Washingi.on, DC 20555
Dear John:
As we discussed in our telephone conversation on September 25, the Argonne Environmental Review Team will use the unofficial amended ER until we, receive the docketed Amendment No.1.
We will proceed with our review aware that changes in the official amendment may require extra time, effort and cost.
I Sincerely, Vanessa A. Harris Acting Environmental Review Project Leader Division of Environmental Impact Studies VAH:de cc:
J. E. Carson R. A. Zussman
[O03 5
/!O uAsem 8009300H1