ML19340B884: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 23: Line 23:
DPR-50 for Three Mile Island Nuclear Station, Unit 1.                                                    As a part of this request, proposed replacement pages for Appendix A                                                      are also included.
DPR-50 for Three Mile Island Nuclear Station, Unit 1.                                                    As a part of this request, proposed replacement pages for Appendix A                                                      are also included.
METROPOLITAN EDISON COMPANY l
METROPOLITAN EDISON COMPANY l
By
By Director, TMI-1 H. D. Hukill Sworn and subscribed to me this 7                      day of'                                  1AMM 6( 1980
                                                                                                                          ' '
Director, TMI-1 H. D. Hukill Sworn and subscribed to me this 7                      day of'                                  1AMM 6( 1980
                                                                                                                           $!f. Gq <)? ) AJQ) ~                J/
                                                                                                                           $!f. Gq <)? ) AJQ) ~                J/
le
le
Line 31: Line 29:
Nota FAMELA JOY LucF.u.HT, btsry Puli:
Nota FAMELA JOY LucF.u.HT, btsry Puli:
M&te.w,              Br;lic Cnty,  Pa.
M&te.w,              Br;lic Cnty,  Pa.
My Commis: ace Egros Agust 41533
My Commis: ace Egros Agust 41533 180.133 gag g
                                                                                                                                                                ,
180.133 gag g
  - _ _ - - _ - _ _ _ - - _ - _ -                      -_-_____                      _ _ _ _ - _ - _ - - _ - _ _ _ _ _ - _ _ _ .


    .
  .
;
UNITED STATES OF AMERICA
UNITED STATES OF AMERICA
       ,                    NUCLEAR REGULATORY COMMISSION IN THE MATTER OF DOCKET No. 50-289 LICENSE NO. DPR-50 METROPOLITAN EDISON COMPANY This is to certify that a copy of Technical Specification Change Request
       ,                    NUCLEAR REGULATORY COMMISSION IN THE MATTER OF DOCKET No. 50-289 LICENSE NO. DPR-50 METROPOLITAN EDISON COMPANY This is to certify that a copy of Technical Specification Change Request
Line 50: Line 42:
9
9


    .
  .
Three Mile Islaad Nuclear Station, Unit 1 Operating License No. DPR-50 Docket No. 50-289
Three Mile Islaad Nuclear Station, Unit 1 Operating License No. DPR-50 Docket No. 50-289
       , Technical Specification Change-Request No. 60A                        -
       , Technical Specification Change-Request No. 60A                        -
                                                                                '
The licensee requests that the attached revised pages replace pages 3-37, 4-7, 4-39, 4-40, and 4-46 of the existing Technical Specifications, Appendix A.
The licensee requests that the attached revised pages replace pages 3-37, 4-7, 4-39, 4-40, and 4-46 of the existing Technical Specifications, Appendix A.
Reasons for Amended Change Request The original request was to comply.vith the NRC's June 3, 1977 memo requesting a comparison of our design to the Star'f Position. This amendment to TSCR 60 is being submitted to reflect the changes in design resulting from the new criteria in the May 2,1979 and August 8,1979 letter: f rom the NhC.
Reasons for Amended Change Request The original request was to comply.vith the NRC's June 3, 1977 memo requesting a comparison of our design to the Star'f Position. This amendment to TSCR 60 is being submitted to reflect the changes in design resulting from the new criteria in the May 2,1979 and August 8,1979 letter: f rom the NhC.
Line 63: Line 52:
short time transient conditions.
short time transient conditions.
A detailed analysis has been conducted and submitted under TDR 114 Rev. 1.
A detailed analysis has been conducted and submitted under TDR 114 Rev. 1.
The added test requicements assure the functional operability of the loss of voltage relays and demonstrate block loading on loss of offsite power and upon
The added test requicements assure the functional operability of the loss of voltage relays and demonstrate block loading on loss of offsite power and upon tripping and reclosing the diesel generator breaker.
'
tripping and reclosing the diesel generator breaker.
Implementation in order to provid2 the necessary procedures and training, an implementation period of 90 days following the issuance of this amendment is requested.
Implementation in order to provid2 the necessary procedures and training, an implementation period of 90 days following the issuance of this amendment is requested.
Licensee Amendment Fee (10 CFR 170.22)
Licensee Amendment Fee (10 CFR 170.22)
Because this is a modification to a previously submitted change, no fee is required.}}
Because this is a modification to a previously submitted change, no fee is required.}}

Latest revision as of 09:35, 18 February 2020

Tech Specs Change Request 60A Supporting Request for Amend to App a to Ol.Certificate of Svc Encl
ML19340B884
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 11/07/1980
From: Hukill H
METROPOLITAN EDISON CO.
To:
Shared Package
ML19340B881 List:
References
NUDOCS 8011120513
Download: ML19340B884 (3)


Text

-

9 e

.O METROPOLITAN EDISON COMPANY JERSEY CENTRAL POWER & LIGHT COMPANY AND.

PENNSYLVANIA ELECTRIC COMPANY THREE MILE ISLAND NUCLEAR STATION, UNIT 1 Operating License No. DPR-50 Docket No. 50-289 Technical Specification Change Request No. 60A This Technical Specification Change Request is submitted in support of Licensee's request to change Appendix A to Operating License No.

DPR-50 for Three Mile Island Nuclear Station, Unit 1. As a part of this request, proposed replacement pages for Appendix A are also included.

METROPOLITAN EDISON COMPANY l

By Director, TMI-1 H. D. Hukill Sworn and subscribed to me this 7 day of' 1AMM 6( 1980

$!f. Gq <)? ) AJQ) ~ J/

le

'~

Nota FAMELA JOY LucF.u.HT, btsry Puli:

M&te.w, Br;lic Cnty, Pa.

My Commis: ace Egros Agust 41533 180.133 gag g

UNITED STATES OF AMERICA

, NUCLEAR REGULATORY COMMISSION IN THE MATTER OF DOCKET No. 50-289 LICENSE NO. DPR-50 METROPOLITAN EDISON COMPANY This is to certify that a copy of Technical Specification Change Request

> No. 60A to Appendix A of the Operating License for Three Mile Island Nuclear Station Unit 1, has, on the date given below, been filed with the U. S. Nuclear Regulatory Commission and been served on the chief executives of Londonderry Township, Dauphin County, Pennsylvania and Dauphin County, Pennsylvania by deposit in the United States mail,

~

addressed as follows:

Mr, Donald Hoover, Chairman Mr. John E. Minnich, Chairman Board of Supervisors of Board of County Commissioners Londonderry Township of Dauphin County R.D. #1, Geyers Church Road Dauphin County Courthouse Middletown, PA 17057 Harrisburg, PA 17120 METROPOLITAN EDISON COMPANY

/, [

By ,S 4 4

Director, TMI-l H. D. Hukill Dated: November 7, 1980 __

9

Three Mile Islaad Nuclear Station, Unit 1 Operating License No. DPR-50 Docket No. 50-289

, Technical Specification Change-Request No. 60A -

The licensee requests that the attached revised pages replace pages 3-37, 4-7, 4-39, 4-40, and 4-46 of the existing Technical Specifications, Appendix A.

Reasons for Amended Change Request The original request was to comply.vith the NRC's June 3, 1977 memo requesting a comparison of our design to the Star'f Position. This amendment to TSCR 60 is being submitted to reflect the changes in design resulting from the new criteria in the May 2,1979 and August 8,1979 letter: f rom the NhC.

Safety Analysis Justifying Change The Nuclear Regulatory Commission requires a second level of voltage protection for the onsite power system be provided in order to pre ent a sustained degradation of the offsite power system's voltage from causing the failure of redundant safety-related electrical equipment.

These Technical' Specifications assure that the undervoltage relays adequately protect the safety related electrical equipment from loss of capability as a result of sustained degraded voltage from the offsite electrical grid system.

The equipment remains operable on offsite power during normal and degraded grid conditions and transfers.to the onsite source with minimal time delay upon loss of offsite power.

The setpoints for the undervoltage relays and timers have been selected to prevent cpurious transfers to the onsite source during normal system fluctuations or.

short time transient conditions.

A detailed analysis has been conducted and submitted under TDR 114 Rev. 1.

The added test requicements assure the functional operability of the loss of voltage relays and demonstrate block loading on loss of offsite power and upon tripping and reclosing the diesel generator breaker.

Implementation in order to provid2 the necessary procedures and training, an implementation period of 90 days following the issuance of this amendment is requested.

Licensee Amendment Fee (10 CFR 170.22)

Because this is a modification to a previously submitted change, no fee is required.