ML19317H099: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:# '     *
{{#Wiki_filter:# '
                            .,
e H EL PIN G BUILO ARKANSAS O
e                                     H EL PIN G BUILO ARKANSAS                                   '
g ARKANS AS POWER & LIGHT COMPANY STM AVENUE ANQ AtNE STREET
O       .
* AtNE SLUFF. AAKANSAS 71801 e (5011534-1330 March 23,1973 Mr. John G. Davis, Director Directorate of Regulatory Operations - Region II United States Atomic Energy Commission 230 Peachtree Street, N.W. - Suite 818 Atlanta, Georgia 30303
g                                                                   -
ARKANS AS POWER & LIGHT COMPANY STM AVENUE ANQ AtNE STREET
* AtNE SLUFF. AAKANSAS 71801 e (5011534-1330 March 23,1973
.-
      .
Mr. John G. Davis, Director Directorate of Regulatory Operations - Region II United States Atomic Energy Commission 230 Peachtree Street, N.W. - Suite 818 Atlanta, Georgia 30303


==REFERENCE:==
==REFERENCE:==
Arkansas Nuclear One - Unit 1
Arkansas Nuclear One - Unit 1 Site Inspection Report RO:II:VLB 50-313/73-2
                                .                            Site Inspection Report RO:II:VLB               '
50-313/73-2


==Dear Mr. Davis:==
==Dear Mr. Davis:==
We have received the subject inspection report c.onducted by Messrs.
We have received the subject inspection report c.onducted by Messrs.
Sw.n and Conlon on January 16-19, 1973, and forwarded to us with your letter of March 7, 1973. This report has'been reviewed as requested in your letter and does not contain proprietary information.
Sw.n and Conlon on January 16-19, 1973, and forwarded to us with your letter of March 7, 1973. This report has'been reviewed as requested in your letter and does not contain proprietary information.
                                          ,
Yours truly,,
Yours truly, ,
-) r (; /[15 '
                                                  -) r (; /[15 '
--;,r;g 9
                                                        --;,r;g     9 J. D. PHILLIPS Vice President & Chief Engineer JDP: NAM:mb
J. D. PHILLIPS Vice President & Chief Engineer JDP: NAM:mb U.
                                                                                                  -
8004140Sgp TAX P AYING. INVESTQ A QWNEQ MEMSGR MIDDLE SQUTH UTILITIES SYSTEM
U.
8004140Sgp
* TAX P AYING. INVESTQ A QWNEQ             MEMSGR MIDDLE SQUTH UTILITIES SYSTEM


            ''
* _        .
m r.
m r.
                ,
1 i
1 i
'
Letter from Arkansas Power and Light Company 50-313/73-2 APR 2 1973 dated March 23, 1973 DISTRIBUTION:
Letter from Arkansas Power and Light Company
J J. B. Henderson, RO:HQ J. G. Keppler, RO:HQ
;                            dated March 23, 1973 -    50-313/73-2               APR 2 1973
-^ -[p3>RO:dQ (5)
                                                            .
DISTRIBUTION:
J               J. B. Henderson, RO:HQ J. G. Keppler, RO:HQ                             -
                  -^ -[p3>RO:dQ (5)
Directorate of Licensing (13)
Directorate of Licensing (13)
DR Central Files Regulatory Standards (3)
DR Central Files Regulatory Standards (3)
PDR Local PDR NSIC                                                               .
PDR Local PDR NSIC OIS, OR State 9
OIS, OR                                             ,
.3 : -
State
N\\'
                                                .
9
                                                                    .
                                                                        .3 : -
N\'
f t '!n/
f t '!n/
t               -
t O
                                                                      ,;
V
  ,
,- -}}
                                                          .
'
O V
                          .
    ,- -}}

Latest revision as of 21:16, 1 January 2025

Ack Receipt of Insp Rept 50-313/73-02 on 730116-19.No Proprietary Info
ML19317H099
Person / Time
Site: Arkansas Nuclear 
Issue date: 03/23/1973
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To: Jennifer Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19317H100 List:
References
NUDOCS 8004140580
Download: ML19317H099 (2)


Text

  1. '

e H EL PIN G BUILO ARKANSAS O

g ARKANS AS POWER & LIGHT COMPANY STM AVENUE ANQ AtNE STREET

  • AtNE SLUFF. AAKANSAS 71801 e (5011534-1330 March 23,1973 Mr. John G. Davis, Director Directorate of Regulatory Operations - Region II United States Atomic Energy Commission 230 Peachtree Street, N.W. - Suite 818 Atlanta, Georgia 30303

REFERENCE:

Arkansas Nuclear One - Unit 1 Site Inspection Report RO:II:VLB 50-313/73-2

Dear Mr. Davis:

We have received the subject inspection report c.onducted by Messrs.

Sw.n and Conlon on January 16-19, 1973, and forwarded to us with your letter of March 7, 1973. This report has'been reviewed as requested in your letter and does not contain proprietary information.

Yours truly,,

-) r (; /[15 '

--;,r;g 9

J. D. PHILLIPS Vice President & Chief Engineer JDP: NAM:mb U.

8004140Sgp TAX P AYING. INVESTQ A QWNEQ MEMSGR MIDDLE SQUTH UTILITIES SYSTEM

m r.

1 i

Letter from Arkansas Power and Light Company 50-313/73-2 APR 2 1973 dated March 23, 1973 DISTRIBUTION:

J J. B. Henderson, RO:HQ J. G. Keppler, RO:HQ

-^ -[p3>RO:dQ (5)

Directorate of Licensing (13)

DR Central Files Regulatory Standards (3)

PDR Local PDR NSIC OIS, OR State 9

.3 : -

N\\'

f t '!n/

t O

V

,- -