{{#Wiki_filter:BWROG-129, Rev. 0
{{#Wiki_filter:[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-1 Rev. 4.0 3.6 CONTAINMENT SYSTEMS 3.6.4.1
[Secondary] Containment 3.6.4.1 3.6 CONTAINMENT SYSTEMS 3.6.4.1     [Secondary] Containment LCO 3.6.4.1           The [secondary] containment shall be OPERABLE.
[Secondary] Containment LCO 3.6.4.1 The [secondary] containment shall be OPERABLE.  
                      --------------------------------------------NOTE--------------------------------------------
--------------------------------------------NOTE--------------------------------------------
Momentary transients above the [secondary] containment pressure limit are permitted.
Momentary transients above the [secondary] containment pressure limit are permitted.
                      --------------------------------------------------------------------------------------------------
APPLICABILITY:
APPLICABILITY:       MODES 1, 2, and 3, During movement of [recently] irradiated fuel assemblies in the
MODES 1, 2, and 3, During movement of [recently] irradiated fuel assemblies in the
[secondary] containment, During operations with a potential for draining the reactor vessel (OPDRVs).
[secondary] containment, During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS CONDITION                           REQUIRED ACTION                           COMPLETION TIME A. [Secondary] containment         A.1       Restore [secondary]                     4 hours inoperable in MODE 1,                      containment to OPERABLE 2, or 3.                                  status.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. [Secondary] containment inoperable in MODE 1, 2, or 3.
B. Required Action and             B.1       ---------------NOTE--------------
A.1 Restore [secondary]
associated Completion                      LCO 3.0.4.a is not Time of Condition A not                    applicable when entering met.                                      MODE 3.
containment to OPERABLE status.
                                                -------------------------------------
4 hours B. Required Action and associated Completion Time of Condition A not met.
Be in MODE 3.                           12 hours C. [Secondary] containment         C.1       ---------------NOTE--------------
B.1  
inoperable during                          LCO 3.0.3 is not applicable.
---------------NOTE--------------
movement of [recently]                    -------------------------------------
LCO 3.0.4.a is not applicable when entering MODE 3.
irradiated fuel assemblies in the                          Suspend movement of                     Immediately
Be in MODE 3.
[secondary] containment                    [recently] irradiated fuel or during OPDRVs.                          assemblies in the
12 hours C. [Secondary] containment inoperable during movement of [recently]
irradiated fuel assemblies in the
[secondary] containment or during OPDRVs.
C.1  
---------------NOTE--------------
LCO 3.0.3 is not applicable.
Suspend movement of
[recently] irradiated fuel assemblies in the
[secondary] containment.
[secondary] containment.
AND C.2       Initiate action to suspend               Immediately General Electric BWR/4 STS                        3.6.4.1-1                                                Rev. 4.0
AND C.2 Initiate action to suspend Immediately Immediately BWROG-129, Rev. 0


[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-2 Rev. 4.0 CONDITION REQUIRED ACTION COMPLETION TIME OPDRVs.
BWROG-129, Rev. 0
BWROG-129, Rev. 0
[Secondary] Containment 3.6.4.1 CONDITION        REQUIRED ACTION  COMPLETION TIME OPDRVs.
General Electric BWR/4 STS  3.6.4.1-2                    Rev. 4.0


[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-3 Rev. 4.0 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1.1
[ Verify [secondary] containment vacuum is
[0.25] inch of vacuum water gauge.
[ 24 hours OR In accordance with the Surveillance Frequency Control Program ] ]
SR 3.6.4.1.2 Verify all [secondary] containment equipment hatches are closed and sealed.
[ 31 days OR In accordance with the Surveillance Frequency Control Program ]
SR 3.6.4.1.3 Verify one [secondary] containment access door in each access opening is closed, except when the access opening is being used for entry and exit.
[ 31 days OR In accordance with the Surveillance Frequency Control Program ]
BWROG-129, Rev. 0
BWROG-129, Rev. 0
[Secondary] Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                  FREQUENCY SR 3.6.4.1.1      [ Verify [secondary] containment vacuum is            [ 24 hours
[0.25] inch of vacuum water gauge.
OR In accordance with the Surveillance Frequency Control Program ] ]
SR 3.6.4.1.2      Verify all [secondary] containment equipment          [ 31 days hatches are closed and sealed.
OR In accordance with the Surveillance Frequency Control Program ]
SR 3.6.4.1.3      Verify one [secondary] containment access door in    [ 31 days each access opening is closed, except when the access opening is being used for entry and exit.      OR In accordance with the Surveillance Frequency Control Program ]
General Electric BWR/4 STS                3.6.4.1-3                                Rev. 4.0


BWROG-129, Rev. 0
[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-4 Rev. 4.0 SURVEILLANCE REQUIREMENTS (continued)
[Secondary] Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.4.1.4
SURVEILLANCE                                 FREQUENCY SR 3.6.4.1.4     [ Verify [secondary] containment can be drawn down   [ [18] months on a to [0.25] inch of vacuum water gauge in           STAGGERED
[ Verify [secondary] containment can be drawn down to [0.25] inch of vacuum water gauge in
[120] seconds using one standby gas treatment     TEST BASIS for (SGT) subsystem.                                     each subsystem OR In accordance with the Surveillance Frequency Control Program ] ]
[120] seconds using one standby gas treatment (SGT) subsystem.
SR 3.6.4.1.5     Verify the [secondary] containment can be           [ [18] months on a maintained [0.25] inch of vacuum water gauge for   STAGGERED 1 hour using one SGT subsystem at a flow rate       TEST BASIS for
[ [18] months on a STAGGERED TEST BASIS for each subsystem OR In accordance with the Surveillance Frequency Control Program ] ]
[4000] cfm.                                       each SGT subsystem OR In accordance with the Surveillance Frequency Control Program ]
SR 3.6.4.1.5 Verify the [secondary] containment can be maintained [0.25] inch of vacuum water gauge for 1 hour using one SGT subsystem at a flow rate
General Electric BWR/4 STS                3.6.4.1-4                                Rev. 4.0}}
[4000] cfm.
[ [18] months on a STAGGERED TEST BASIS for each SGT subsystem OR In accordance with the Surveillance Frequency Control Program ]
BWROG-129, Rev. 0}}

Latest revision as of 17:56, 10 January 2025

TSTF Handout from 7/10/14 Meeting Draft Secondary Containment TS Markup
ML14196A419
Person / Time
Site: Technical Specifications Task Force
Issue date: 07/07/2014
From: Mann A
- No Known Affiliation
To:
Shared Package
ML14196A409 List:
References
Download: ML14196A419 (4)


Text

[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-1 Rev. 4.0 3.6 CONTAINMENT SYSTEMS 3.6.4.1

[Secondary] Containment LCO 3.6.4.1 The [secondary] containment shall be OPERABLE.


NOTE--------------------------------------------

Momentary transients above the [secondary] containment pressure limit are permitted.

APPLICABILITY:

MODES 1, 2, and 3, During movement of [recently] irradiated fuel assemblies in the

[secondary] containment, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. [Secondary] containment inoperable in MODE 1, 2, or 3.

A.1 Restore [secondary]

containment to OPERABLE status.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B. Required Action and associated Completion Time of Condition A not met.

B.1


NOTE--------------

LCO 3.0.4.a is not applicable when entering MODE 3.

Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. [Secondary] containment inoperable during movement of [recently]

irradiated fuel assemblies in the

[secondary] containment or during OPDRVs.

C.1


NOTE--------------

LCO 3.0.3 is not applicable.

Suspend movement of

[recently] irradiated fuel assemblies in the

[secondary] containment.

AND C.2 Initiate action to suspend Immediately Immediately BWROG-129, Rev. 0

[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-2 Rev. 4.0 CONDITION REQUIRED ACTION COMPLETION TIME OPDRVs.

BWROG-129, Rev. 0

[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-3 Rev. 4.0 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1.1

[ Verify [secondary] containment vacuum is

[0.25] inch of vacuum water gauge.

[ 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OR In accordance with the Surveillance Frequency Control Program ] ]

SR 3.6.4.1.2 Verify all [secondary] containment equipment hatches are closed and sealed.

[ 31 days OR In accordance with the Surveillance Frequency Control Program ]

SR 3.6.4.1.3 Verify one [secondary] containment access door in each access opening is closed, except when the access opening is being used for entry and exit.

[ 31 days OR In accordance with the Surveillance Frequency Control Program ]

BWROG-129, Rev. 0

[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-4 Rev. 4.0 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.4.1.4

[ Verify [secondary] containment can be drawn down to [0.25] inch of vacuum water gauge in

[120] seconds using one standby gas treatment (SGT) subsystem.

[ [18] months on a STAGGERED TEST BASIS for each subsystem OR In accordance with the Surveillance Frequency Control Program ] ]

SR 3.6.4.1.5 Verify the [secondary] containment can be maintained [0.25] inch of vacuum water gauge for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> using one SGT subsystem at a flow rate

[4000] cfm.

[ [18] months on a STAGGERED TEST BASIS for each SGT subsystem OR In accordance with the Surveillance Frequency Control Program ]

BWROG-129, Rev. 0