{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:August 22, 2017  
                            NUCLEAR REGULATORY COMMISSION
                                              REGION IV
                                          1600 E. LAMAR BLVD
                                      ARLINGTON, TX 76011-4511
Mr. Eric Larson, Site Vice President  
                                          August 22, 2017
Entergy Operations, Inc.  
Mr. Eric Larson, Site Vice President
Grand Gulf Nuclear Station  
Entergy Operations, Inc.
P.O. Box 756  
Grand Gulf Nuclear Station
Port Gibson, MS 39150  
P.O. Box 756
Port Gibson, MS 39150
SUBJECT: GRAND GULF NUCLEAR STATION - NRC RADIATION PROTECTION  
SUBJECT: GRAND GULF NUCLEAR STATION - NRC RADIATION PROTECTION
INSPECTION REPORT 05000416/2017012 AND NOTICE OF VIOLATION  
              INSPECTION REPORT 05000416/2017012 AND NOTICE OF VIOLATION
Dear Mr. Larson:
Dear Mr. Larson:  
On July 14, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at
the Grand Gulf Nuclear Station and discussed the results of this inspection with you and other
On July 14, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at  
members of your staff. The results of this inspection are documented in the enclosed report.
the Grand Gulf Nuclear Station and discussed the results of this inspection with you and other  
Based on the results of this inspection, the NRC has identified two issues that were evaluated
members of your staff. The results of this inspection are documented in the enclosed report.  
under the risk significance determination process as having very low safety significance
(Green). The NRC also determined that one violation is associated with these issues.
Based on the results of this inspection, the NRC has identified two issues that were evaluated  
This violation was evaluated in accordance with the NRC Enforcement Policy. The
under the risk significance determination process as having very low safety significance  
(Green). The NRC also determined that one violation is associated with these issues.  
This violation was evaluated in accordance with the NRC Enforcement Policy. The  
current Enforcement Policy is included in the NRCs Web site at http://www.nrc.gov/about-
current Enforcement Policy is included in the NRCs Web site at http://www.nrc.gov/about-
nrc/regulatory/enforcement/enforce-pol.html. The violation is cited in the enclosed Notice of
nrc/regulatory/enforcement/enforce-pol.html. The violation is cited in the enclosed Notice of  
Violation (Notice) and the circumstances surround it are described in detail in the subject
Violation (Notice) and the circumstances surround it are described in detail in the subject  
inspection report. The violation is being cited because this violation did not meet the criteria to
inspection report. The violation is being cited because this violation did not meet the criteria to  
be treated as a non-cited violation because the licensee failed to restore compliance within a
be treated as a non-cited violation because the licensee failed to restore compliance within a  
reasonable period of time after it was identified.
reasonable period of time after it was identified.  
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. If you have additional information that you
You are required to respond to this letter and should follow the instructions specified in the  
believe the NRC should consider, you may provide it in your response to the Notice. The NRC
enclosed Notice when preparing your response. If you have additional information that you  
review of your response will also determine whether further enforcement action is necessary to
believe the NRC should consider, you may provide it in your response to the Notice. The NRC  
ensure your compliance with regulatory requirements.
review of your response will also determine whether further enforcement action is necessary to  
If you disagree with a cross-cutting aspect assignment or a finding not associated with a
ensure your compliance with regulatory requirements.  
regulatory requirement in this report, you should provide a response within 30 days of the date
of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory
If you disagree with a cross-cutting aspect assignment or a finding not associated with a  
Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the
regulatory requirement in this report, you should provide a response within 30 days of the date  
Regional Administrator, Region IV; and the NRC resident inspector at the Grand Gulf Nuclear
of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory  
Station.
Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the  
Regional Administrator, Region IV; and the NRC resident inspector at the Grand Gulf Nuclear  
Station.  
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511


E. Larson                                     2
E. Larson  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
2  
made available for public inspection in the NRC Public Document Room from the NRCs Agency
wide Documents Access and Management System (ADAMS), accessible from the NRC Web
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be  
site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should
made available for public inspection in the NRC Public Document Room from the NRCs Agency  
not include any personal, privacy, or proprietary information so that it can be made available to
wide Documents Access and Management System (ADAMS), accessible from the NRC Web  
the public without redaction.
site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should  
                                              Sincerely,
not include any personal, privacy, or proprietary information so that it can be made available to  
                                              /RA/
the public without redaction.  
                                              Heather J. Gepford, Ph.D., CHP, Branch Chief
                                              Plant Support Branch 1
Sincerely,  
                                              Division of Reactor Safety
Docket No. 50-416
/RA/  
License No. NPF-29
Enclosure:
Inspection Report 05000416/2017012
Heather J. Gepford, Ph.D., CHP, Branch Chief  
w/Attachments:
Plant Support Branch 1
1. Supplemental Information
Division of Reactor Safety
2. Request for Information
Docket No. 50-416  
License No. NPF-29  
Enclosure:  
Inspection Report 05000416/2017012
w/Attachments:  
1. Supplemental Information  
2. Request for Information




  ML17235B265
  ML17235B265
  SUNSI Review         ADAMS:           Non-Publicly Available     Non-Sensitive Keyword:
  SUNSI Review  
  By: HGepford         Yes  No      Publicly Available         Sensitive     NRC-002
ADAMS:  
OFFICE         SHP:PSB2     HP:PSB2       HP:PSB2         SHP:RIII     C:PSB2       C:PSB2
Non-Publicly Available  
NAME           LCarson       NGreene       JODonnell     TGo         HGepford     JKozal
Non-Sensitive  
SIGNATURE     /RA/         /RA/         /RA/           /RA/         /RA/         /RA/
Keyword:
DATE           8/17/17       8/17/17       8/17/17         8/17/17     8/17/17       8/22/17
By: HGepford  
OFFICE         ACES         C:PSB2
Yes     No
  NAME           MHay         HGepford
  Publicly Available  
  SIGNATURE     /RA/         /RA/
Sensitive
  DATE           8/22/17       8/22/17
NRC-002  
                                     
OFFICE  
                U.S. NUCLEAR REGULATORY COMMISSION
SHP:PSB2  
                                    REGION IV
HP:PSB2  
Docket:      05000416
HP:PSB2  
Report:      05000416/2017012
SHP:RIII  
Facility:    Grand Gulf Nuclear Station
C:PSB2  
Dates:      July 10 through July 14, 2017
C:PSB2  
Inspectors: L. Carson II, Sr. Health Physicist
NAME  
            N. Greene, PhD, Health Physicist
LCarson  
            J. ODonnell, CHP, Health Physicist
NGreene  
            T. Go, Health Physicist (RIII)
JODonnell  
            Accompanied by S. Money, Health Physicist
TGo  
Approved By: Heather Gepford, PhD, CHP
HGepford  
            Chief, Plant Support Branch 2
JKozal  
            Division of Reactor Safety
SIGNATURE  
                                                      Enclosure
/RA/  
/RA/  
/RA/  
/RA/  
/RA/  
/RA/  
DATE  
8/17/17  
8/17/17  
8/17/17  
8/17/17  
8/17/17  
8/22/17  
OFFICE  
ACES  
C:PSB2  
   
NAME  
MHay  
HGepford  
   
SIGNATURE  
/RA/  
/RA/  
   
DATE  
8/22/17  
8/22/17  
   


                                      NOTICE OF VIOLATION
Entergy Operations, Inc.                                                    Docket No. 05000416
Grand Gulf Nuclear Station                                                  License No. NPF-29
Enclosure
During an NRC inspection conducted from July 10-14, 2017, a violation of NRC requirements
U.S. NUCLEAR REGULATORY COMMISSION
was identified. In accordance with the NRC Enforcement Policy, the violation is listed below:
        10 CFR 20.1501(c) requires, in part, that the licensee shall ensure that instruments and
REGION IV
        equipment used for quantitative radiation measurements are calibrated periodically for
        the radiation measured.
Docket:
        Contrary to the above, since January 1, 2012, the licensee failed to ensure that
05000416
        instruments and equipment used for quantitative radiation measurements were
Report:
        calibrated periodically for the radiation measured. Specifically, the licensee failed to
05000416/2017012
        properly calibrate the containment/drywell high range radiation monitors and the main
Facility:  
        steam line radiation monitors using industry accepted calibration methods and
Grand Gulf Nuclear Station  
        tolerances.
Dates:
This violation is associated with a Green SDP finding.
July 10 through July 14, 2017
Pursuant to the provisions of 10 CFR 2.201, Entergy Operations, Inc., is hereby required to
Inspectors:
submit a written statement or explanation to the U.S. Nuclear Regulatory Commission,
L. Carson II, Sr. Health Physicist
ATTN: Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional
N. Greene, PhD, Health Physicist
Administrator, Region IV, 1600 E. Lamar Blvd., Arlington, TX 76011, and a copy to the NRC
J. ODonnell, CHP, Health Physicist
Resident Inspector at the Grand Gulf Nuclear Station, within 30 days of the date of the letter
T. Go, Health Physicist (RIII)
transmitting this Notice of Violation (Notice). This reply should be clearly marked as a "Reply to
a Notice of Violation" and should include for the violation: (1) the reason for the violation or, if
Accompanied by S. Money, Health Physicist
contested, the basis for disputing the violation or severity level, (2) the corrective steps that
have been taken and the results achieved, (3) the corrective steps that will be taken, and
Approved By:  
(4) the date when full compliance will be achieved. Your response may reference or include
Heather Gepford, PhD, CHP
previous docketed correspondence if the correspondence adequately addresses the required
Chief, Plant Support Branch 2
response. If an adequate reply is not received within the time specified in this Notice, an order
Division of Reactor Safety
or a Demand for Information may be issued as to why the license should not be modified,
suspended, or revoked, or why such other action as may be proper should not be taken. Where
good cause is shown, consideration will be given to extending the response time.
If you contest this enforcement action, you should also provide a copy of your response with the
basis for your denial, to the Director, Office of Enforcement, United States Nuclear Regulatory
Commission, Washington, DC 20555-0001.
Because your response will be made available electronically for public inspection in the
NRC Public Document Room or from the NRCs document system (ADAMS), accessible from
the NRC Web site at http://www.nrc.gov/reading-rm/adams.html, to the extent possible, it should
not include any personal privacy, proprietary, or safeguards information so that it can be made
available to the public without redaction. If personal privacy or proprietary information is
necessary to provide an acceptable response, then please provide a bracketed copy of your
response that identifies the information that should be protected and a redacted copy of your
response that deletes such information. If you request withholding of such material, you must
specifically identify the portions of your response that you seek to have withheld and provide in
                                                2


detail the bases for your claim of withholding (e.g., explain why the disclosure of information will
create an unwarranted invasion of personal privacy or provide the information required by
10 CFR 2.390(b) to support a request for withholding confidential commercial or financial
2
information). If Safeguards Information is necessary to provide an acceptable response, please
NOTICE OF VIOLATION
provide the level of protection described in 10 CFR 73.21.
In accordance with 10 CFR 19.11, you may be required to post this Notice within two working
Entergy Operations, Inc.
days of receipt.
Docket No. 05000416 
Dated this 22nd day of August 2017
Grand Gulf Nuclear Station 
                                                3
License No. NPF-29
During an NRC inspection conducted from July 10-14, 2017, a violation of NRC requirements
was identified.  In accordance with the NRC Enforcement Policy, the violation is listed below: 
10 CFR 20.1501(c) requires, in part, that the licensee shall ensure that instruments and
equipment used for quantitative radiation measurements are calibrated periodically for
the radiation measured.  
Contrary to the above, since January 1, 2012, the licensee failed to ensure that
instruments and equipment used for quantitative radiation measurements were
calibrated periodically for the radiation measured. Specifically, the licensee failed to
properly calibrate the containment/drywell high range radiation monitors and the main
steam line radiation monitors using industry accepted calibration methods and
tolerances. 
This violation is associated with a Green SDP finding.
Pursuant to the provisions of 10 CFR 2.201, Entergy Operations, Inc., is hereby required to
submit a written statement or explanation to the U.S. Nuclear Regulatory Commission,
ATTN:  Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional
Administrator, Region IV, 1600 E. Lamar Blvd., Arlington, TX 76011, and a copy to the NRC
Resident Inspector at the Grand Gulf Nuclear Station, within 30 days of the date of the letter
transmitting this Notice of Violation (Notice).  This reply should be clearly marked as a "Reply to  
a Notice of Violation" and should include for the violation:  (1) the reason for the violation or, if
contested, the basis for disputing the violation or severity level, (2) the corrective steps that
have been taken and the results achieved, (3) the corrective steps that will be taken, and 
(4) the date when full compliance will be achieved.  Your response may reference or include
previous docketed correspondence if the correspondence adequately addresses the required
response. If an adequate reply is not received within the time specified in this Notice, an order
or a Demand for Information may be issued as to why the license should not be modified,
suspended, or revoked, or why such other action as may be proper should not be taken.  Where
good cause is shown, consideration will be given to extending the response time. 
If you contest this enforcement action, you should also provide a copy of your response with the
basis for your denial, to the Director, Office of Enforcement, United States Nuclear Regulatory
Commission, Washington, DC 20555-0001. 
Because your response will be made available electronically for public inspection in the
NRC Public Document Room or from the NRCs document system (ADAMS), accessible from
the NRC Web site at http://www.nrc.gov/reading-rm/adams.html, to the extent possible, it should
not include any personal privacy, proprietary, or safeguards information so that it can be made
available to the public without redaction.  If personal privacy or proprietary information is
necessary to provide an acceptable response, then please provide a bracketed copy of your
response that identifies the information that should be protected and a redacted copy of your
response that deletes such information. If you request withholding of such material, you must
specifically identify the portions of your response that you seek to have withheld and provide in


                                            SUMMARY
IR 05000416/2017012; 07/10/2017 - 07/14/2017; Grand Gulf Nuclear Station; Radiation
Monitoring Instrumentation (71124.05), Radioactive Gaseous and Liquid Effluent Treatment
3
(71124.06)
detail the bases for your claim of withholding (e.g., explain why the disclosure of information will
Cornerstone: Public Radiation Safety
create an unwarranted invasion of personal privacy or provide the information required by
*      Green. The inspectors identified a violation of 10 CFR 20.1501(c) for the failure
10 CFR 2.390(b) to support a request for withholding confidential commercial or financial
      to properly calibrate installed radiation monitors using industry accepted calibration
information). If Safeguards Information is necessary to provide an acceptable response, please
      methods and tolerances. Specifically, since January 2012, the licensee failed to
provide the level of protection described in 10 CFR 73.21.
      properly calibrate the following radiation monitors: main steam line, containment
      high range, and the drywell high range. This violation was originally entered into
In accordance with 10 CFR 19.11, you may be required to post this Notice within two working
      the licensees corrective action program in March 2015 as Condition
days of receipt.
      Report CR-GGNS-2015-01832. However, in 2017, inspectors determined that
      subsequent to 2015, the licensee failed to implement corrective actions to properly
Dated this 22nd day of August 2017
      calibrate the instruments. The licensee entered this repetitive issue into their corrective
      action process as Condition Report CR-GGN-2017-06826.
      The failure to properly calibrate radiation monitors is a performance deficiency. The
      performance deficiency is more than minor because it is associated with the cornerstone
      attribute of plant instrumentation and adversely affects the cornerstone objective to
      ensure adequate protection of employee health and safety during routine civilian nuclear
      reactor operation and is therefore a finding. Specifically, the failure to properly calibrate
      radiation monitors impacts the licensees ability to assess dose rates. Using Inspection
      Manual Chapter 0609, Appendix C, Occupational Radiation Safety Significance
      Determination Process, dated August 19, 2008, the inspectors determined the finding to
      be of very low safety significance because it was not an as low as reasonably achievable
      (ALARA) issue, there was no overexposure or substantial potential for overexposure,
      and the licensees ability to assess dose was not compromised. This finding has a
      cross-cutting aspect in the resources component of the Problem Identification and
      Resolution area because the licensee did not ensure that effective corrective actions
      were implemented to address issues in a timely manner commensurate with the safety
      significance [P.3]. (Section 2RS5)
*      Green. The inspectors identified a finding associated with the licensees failure to
      operate the gaseous radwaste system within design specifications. These deficiencies
      in design specifications were associated with the off gas charcoal adsorber and vault
      refrigeration components of the gaseous radwaste system, which has impacted the
      systems reliability and efficiency since at least 2007. The design parameters for
      offgas flow rate into the charcoal adsorbers and vault refrigeration temperature were
      30 scfm and 0 degrees Fahrenheit, respectively. In contrast, the gaseous radwaste
      system is being operated with an approximate flow rate is 80 scfm and vault refrigeration
      temperature is 15 degrees Fahrenheit. The licensee has developed a system
      improvement plan to address resolution of these issues during the next scheduled
      outages. This performance deficiency was entered into the licensees corrective action
      program as Condition Report CR-GGN-2017-06875.
                                                4


The failure to operate the offgas gaseous radwaste system within design specifications,
resulting in elevated radiological effluent releases, is a performance deficiency. The
finding is more than minor because it is associated with the plant equipment attribute of
4
the Public Radiation Safety cornerstone and adversely affected the cornerstone
objective to ensure adequate protection of public health and safety from exposure of
SUMMARY
radioactive materials released into the public domain as a result of routine civilian
nuclear plant operation. Using Inspection Manual Chapter 0609, Appendix D, Public
IR 05000416/2017012; 07/10/2017 - 07/14/2017; Grand Gulf Nuclear Station; Radiation
Radiation Safety Significance Determination Process, the finding was determined to be
Monitoring Instrumentation (71124.05), Radioactive Gaseous and Liquid Effluent Treatment
of very low safety significance (Green) because it involved the Effluent Release
(71124.06)
Program, it did not impair the ability to assess dose, and did not exceed the
10 CFR Part 50, Appendix I, or 10 CFR 20.1301(d) limits. The finding has a
Cornerstone:  Public Radiation Safety
cross-cutting aspect in the area of problem identification and resolution, associated with
the resolution component, because the licensee failed to take effective corrective actions
*
in a timely manner to minimize the unreliability and inefficiency of the gaseous radwaste
Green.  The inspectors identified a violation of 10 CFR 20.1501(c) for the failure  
system [P.3]. (Section 2RS6)
to properly calibrate installed radiation monitors using industry accepted calibration
                                        5
methods and tolerances.  Specifically, since January 2012, the licensee failed to
properly calibrate the following radiation monitors:  main steam line, containment
high range, and the drywell high range.  This violation was originally entered into
the licensees corrective action program in March 2015 as Condition 
Report CR-GGNS-2015-01832.  However, in 2017, inspectors determined that
subsequent to 2015, the licensee failed to implement corrective actions to properly
calibrate the instruments.  The licensee entered this repetitive issue into their corrective
action process as Condition Report CR-GGN-2017-06826.
The failure to properly calibrate radiation monitors is a performance deficiency. The  
performance deficiency is more than minor because it is associated with the cornerstone
attribute of plant instrumentation and adversely affects the cornerstone objective to  
ensure adequate protection of employee health and safety during routine civilian nuclear
reactor operation and is therefore a finding. Specifically, the failure to properly calibrate
radiation monitors impacts the licensees ability to assess dose rates.  Using Inspection  
Manual Chapter 0609, Appendix C, Occupational Radiation Safety Significance  
Determination Process, dated August 19, 2008, the inspectors determined the finding to  
be of very low safety significance because it was not an as low as reasonably achievable
(ALARA) issue, there was no overexposure or substantial potential for overexposure,
and the licensees ability to assess dose was not compromised. This finding has a  
cross-cutting aspect in the resources component of the Problem Identification and  
Resolution area because the licensee did not ensure that effective corrective actions  
were implemented to address issues in a timely manner commensurate with the safety
significance [P.3].  (Section 2RS5)
*
Green.  The inspectors identified a finding associated with the licensees failure to  
operate the gaseous radwaste system within design specifications.  These deficiencies
in design specifications were associated with the off gas charcoal adsorber and vault
refrigeration components of the gaseous radwaste system, which has impacted the
systems reliability and efficiency since at least 2007.  The design parameters for
offgas flow rate into the charcoal adsorbers and vault refrigeration temperature were
30 scfm and 0 degrees Fahrenheit, respectively.  In contrast, the gaseous radwaste
system is being operated with an approximate flow rate is 80 scfm and vault refrigeration
temperature is 15 degrees Fahrenheit.  The licensee has developed a system  
improvement plan to address resolution of these issues during the next scheduled
outages. This performance deficiency was entered into the licensees corrective action
program as  Condition Report CR-GGN-2017-06875.  


                                      REPORT DETAILS
2.    RADIATION SAFETY
      Cornerstones: Public Radiation Safety and Occupational Radiation Safety
5
2RS5 Radiation Monitoring Instrumentation (71124.05)
The failure to operate the offgas gaseous radwaste system within design specifications,
  a. Inspection Scope
resulting in elevated radiological effluent releases, is a performance deficiency. The
      The inspectors evaluated the accuracy and operability of the radiation monitoring
finding is more than minor because it is associated with the plant equipment attribute of  
      equipment used by the licensee to monitor areas, materials, and workers to ensure a
the Public Radiation Safety cornerstone and adversely affected the cornerstone
      radiologically safe work environment. This evaluation included equipment used to
objective to ensure adequate protection of public health and safety from exposure of
      monitor radiological conditions related to normal plant operations, anticipated operational
radioactive materials released into the public domain as a result of routine civilian
      occurrences, and conditions resulting from postulated accidents. The inspectors
nuclear plant operation.  Using Inspection Manual Chapter 0609, Appendix D, Public
      interviewed licensee personnel, walked down various portions of the plant, and reviewed
Radiation Safety Significance Determination Process, the finding was determined to be
      licensee performance associated with radiation monitoring instrumentation, as described
of very low safety significance (Green) because it involved the Effluent Release
      below:
Program, it did not impair the ability to assess dose, and did not exceed the
          *  The inspectors performed walk downs and observations of selected plant
10 CFR Part 50, Appendix I, or 10 CFR 20.1301(d) limits.  The finding has a 
              radiation monitoring equipment and instrumentation, including portable survey
cross-cutting aspect in the area of problem identification and resolution, associated with
              instruments, area radiation monitors, continuous air monitors, personnel
the resolution component, because the licensee failed to take effective corrective actions
              contamination monitors, portal monitors, and small article monitors. The
in a timely manner to minimize the unreliability and inefficiency of the gaseous radwaste
              inspectors assessed material condition and operability, evaluated positioning of
system [P.3]. (Section 2RS6)
              instruments relative to the radiation sources or areas they were intended to
              monitor, and verified performance of source checks and calibrations.
          *  The inspectors evaluated the calibration and testing program, including
              laboratory instrumentation, whole body counters, post-accident monitoring
              instrumentation, portal monitors, personnel contamination monitors, small article
              monitors, portable survey instruments, area radiation monitors, electronic
              dosimetry, air samplers, and continuous air monitors.
          *  The inspectors assessed problem identification and resolution for radiation
              monitoring instrumentation. The inspectors reviewed audits, self-assessments,
              and corrective action program documents to verify problems were being
              identified and properly addressed for resolution.
      These activities constitute completion of the three required samples of radiation
      monitoring instrumentation, as defined in Inspection Procedure 71124.05.
  b. Findings
      Introduction. The inspectors identified a violation of 10 CFR 20.1501(c) for the failure to
      properly calibrate installed radiation monitors using industry accepted calibration
      methods and tolerances. Specifically, the main steam line, containment high range, and
      drywell high range radiation monitors have not been properly calibrated since at least
      January 2012. This violation was originally entered into the licensees corrective action
      program in March 2015 as Condition Report CR-GGNS-2015-01832. However, in 2017,
      inspectors determined that the licensee failed to implement appropriate corrective
                                              6


actions to properly calibrate the instruments. The licensee entered this repetitive issue
into their corrective action process as Condition Report CR-GGN-2017-06826.
Description. The failure to properly calibrate the main steam line and
6
containment/drywell high range area radiation monitors was previously identified
REPORT DETAILS
and documented as a non-cited violation during an inspection in March of 2015:
NCV 05000416/2015001-04, Failure to Properly Calibrate Main Steam Line Radiation
2.  
Monitors and Containment/Drywall High Range Radiation Monitors.
RADIATION SAFETY
During this inspection, the inspectors reviewed the revised calibration procedures and
calibration data for main steam line, containment high range, and drywell high range
Cornerstones:  Public Radiation Safety and Occupational Radiation Safety
radiation monitors. The main steam line radiation monitors provide reactor operators
with early indication of gross release of fission products from the fuel. This monitor has
2RS5 Radiation Monitoring Instrumentation (71124.05)
an automatic response function that isolates the reactor water sample line to limit the
release of radioactive materials. The containment high range and drywell high radiation
a.  
monitors provide reactor operators and emergency response organization members
Inspection Scope
information about the radiological conditions inside the containment building and the
drywell. This information is used to make informed decisions about what actions to take
The inspectors evaluated the accuracy and operability of the radiation monitoring
during an accident as well as make emergency declarations. As such, it is important
equipment used by the licensee to monitor areas, materials, and workers to ensure a
that these radiation monitors be properly calibrated. However, it was determined that
radiologically safe work environment. This evaluation included equipment used to  
the improper calibrations did not adversely affect the licensees ability to implement the
monitor radiological conditions related to normal plant operations, anticipated operational
Emergency Plan.
occurrences, and conditions resulting from postulated accidents. The inspectors
Based on their review of the current revisions of the applicable procedures, corrective
interviewed licensee personnel, walked down various portions of the plant, and reviewed
action documents, and calibration data, the inspectors determined that the licensee had
licensee performance associated with radiation monitoring instrumentation, as described
not corrected the calibration method from the previous non-cited violation. The licensee
below: 
procedures did not address the required reproducible source-to-detector geometry or the
characterization of the calibration sources used. Additionally, because the main steam
*
line monitor calibration requires two different sources in the procedure, each source
The inspectors performed walk downs and observations of selected plant
should have been characterized in a reproducible geometry.
radiation monitoring equipment and instrumentation, including portable survey
The licensee revised Procedure 06-IC-1D17-R-1002, Main Steam Line High Radiation
instruments, area radiation monitors, continuous air monitors, personnel
Monitor (PCIS) Calibration, Revision 109, on April 3, 2017. The previous revision (108)
contamination monitors, portal monitors, and small article monitors. The  
was dated December 13, 2011. Section 5.37 of this procedure describes the radiation
inspectors assessed material condition and operability, evaluated positioning of
calibration method. The calibration method, as described in this section, fails to employ
instruments relative to the radiation sources or areas they were intended to
a reproducible geometry or calibrated radiation sources. Further, the calibration method,
monitor, and verified performance of source checks and calibrations.
as described in this section, only addresses calibration of two of the six decades of the
logarithmic monitor.
*
The licensee also revised Procedure 06-IC-1D21-R-1002, Containment/Drywell High
The inspectors evaluated the calibration and testing program, including
Range Area Radiation Monitor Calibration, Revision 108, on April 3, 2017. The
laboratory instrumentation, whole body counters, post-accident monitoring
previous revision (107) was dated September 12, 2011. Section 5.87 describes the
instrumentation, portal monitors, personnel contamination monitors, small article
radiation functional test portion of this procedure. The calibration method described in
monitors, portable survey instruments, area radiation monitors, electronic
this section fails to employ a reproducible geometry or a calibrated radiation source.
dosimetry, air samplers, and continuous air monitors.  
Further, the acceptance criteria in this section are twice that allowed in American
National Standards Institute (ANSI) N323D-2002, American National Standard for
*
Installed Radiation Protection Instrumentation, approved on September 3, 2002. In
The inspectors assessed problem identification and resolution for radiation  
addition, the electronic calibration method in this procedure as allowed by NUREG 0737,
monitoring instrumentation. The inspectors reviewed audits, self-assessments,  
Clarification of TMI Action Plan Requirements, dated November 1980, only addresses
and corrective action program documents to verify problems were being
calibration of three of the seven decades of the logarithmic monitor.
identified and properly addressed for resolution.  
                                          7
These activities constitute completion of the three required samples of radiation
monitoring instrumentation, as defined in Inspection Procedure 71124.05.
b.  
Findings
Introduction. The inspectors identified a violation of 10 CFR 20.1501(c) for the failure to
properly calibrate installed radiation monitors using industry accepted calibration  
methods and tolerances. Specifically, the main steam line, containment high range, and
drywell high range radiation monitors have not been properly calibrated since at least
January 2012. This violation was originally entered into the licensees corrective action
program in March 2015 as Condition Report CR-GGNS-2015-01832.  However, in 2017,  
inspectors determined that the licensee failed to implement appropriate corrective


The inspectors concluded that the licensee had continued to improperly calibrate
these process radiation monitors since the previous inspection in March 2015.
Procedure 06-IC-1D17-R-1002 rocedure is used for all four channels of the main
7
steam line monitors and Procedure 06-IC-1D21-R-1002 is used for both channels of
actions to properly calibrate the instruments. The licensee entered this repetitive issue
the drywell and containment high range radiation monitors. Because both procedures
into their corrective action process as Condition Report CR-GGN-2017-06826.
failed to use appropriate calibration methodologies, the inspectors determined that
none of the containment/drywell high range and main steam line radiation monitors
Description.  The failure to properly calibrate the main steam line and  
had been properly calibrated since at least the date of the procedure revisions,
containment/drywell high range area radiation monitors was previously identified
September 12, 2011, and December 13, 2011, respectively.
and documented as a non-cited violation during an inspection in March of 2015: 
In evaluating the underlying cause of the licensees failure to correct the calibration
NCV 05000416/2015001-04, Failure to Properly Calibrate Main Steam Line Radiation
issue, the inspectors noted the following. On January 20, 2017, a corrective action
Monitors and Containment/Drywall High Range Radiation Monitors.
document (CR-GGN-2017-00612) was initiated identifying a non-conforming condition of
a Condition Adverse to Quality that the calibration procedure for the containment high
During this inspection, the inspectors reviewed the revised calibration procedures and
range and drywell high radiation monitors does not control the source geometry to the
calibration data for main steam line, containment high range, and drywell high range
monitor. The CR further described the required calibration traceability not being
radiation monitors. The main steam line radiation monitors provide reactor operators
maintained. In the self-assessment report of the radiation protection instrument program
with early indication of gross release of fission products from the fuel. This monitor has
(OL-GLO-2017-21) completed on May 23, 2017, the assessment team rated Objective 2,
an automatic response function that isolates the reactor water sample line to limit the
the review of the prior inspection report, as unsatisfactory. This rating was given
release of radioactive materials. The containment high range and drywell high radiation  
because actions related to this issue were not complete after a considerable amount of
monitors provide reactor operators and emergency response organization members
time, which included at least five due date extensions and an extended outage that
information about the radiological conditions inside the containment building and the  
should have allowed completion of the corrective action.
drywell.  This information is used to make informed decisions about what actions to take
Analysis. The failure to properly calibrate radiation monitors is a performance
during an accident as well as make emergency declarations. As such, it is important
deficiency. The performance deficiency is more than minor because it is associated with
that these radiation monitors be properly calibrated.  However, it was determined that
the cornerstone attribute of plant instrumentation and adversely affects the cornerstone
the improper calibrations did not adversely affect the licensees ability to implement the
objective to ensure adequate protection of employee health and safety during routine
Emergency Plan.  
civilian nuclear reactor operation and is therefore a finding. Specifically, the failure to
properly calibrate radiation monitors impacts the licensees ability to assess dose rates.
Based on their review of the current revisions of the applicable procedures, corrective
Using Inspection Manual Chapter 0609, Appendix C, Occupational Radiation Safety
action documents, and calibration data, the inspectors determined that the licensee had
Significance Determination Process, dated August 19, 2008, the inspectors determined
not corrected the calibration method from the previous non-cited violation.  The licensee
the finding to be of very low safety significance because it was not an as low as
procedures did not address the required reproducible source-to-detector geometry or the
reasonably achievable (ALARA) issue, there was no overexposure or substantial
characterization of the calibration sources used.  Additionally, because the main steam
potential for overexposure, and the licensees ability to assess dose was not
line monitor calibration requires two different sources in the procedure, each source
compromised. This finding has a cross-cutting aspect in the area of problem
should have been characterized in a reproducible geometry. 
identification and resolution, associated with the resolution component, because the
licensee did not ensure that effective corrective actions were implemented to address
The licensee revised Procedure 06-IC-1D17-R-1002, Main Steam Line High Radiation
issues in a timely manner commensurate with the safety significance [P.3].
Monitor (PCIS) Calibration, Revision 109, on April 3, 2017.  The previous revision (108)
Enforcement. Title 10 CFR 20.1501(c) requires, in part, that the licensee shall
was dated December 13, 2011.  Section 5.37 of this procedure describes the radiation
ensure that instruments and equipment used for quantitative radiation measurements
calibration method.  The calibration method, as described in this section, fails to employ
are calibrated periodically for the radiation measured. Contrary to the above, since at
a reproducible geometry or calibrated radiation sources. Further, the calibration method,
least January 1, 2012, the licensee failed to ensure that instruments and equipment
as described in this section, only addresses calibration of two of the six decades of the  
used for quantitative radiation measurements were calibrated periodically for the
logarithmic monitor. 
radiation measured. Specifically, the licensee failed to properly calibrate the
containment/drywell high range radiation monitors and the main steam line
The licensee also revised Procedure 06-IC-1D21-R-1002, Containment/Drywell High
radiation monitors using industry accepted calibration methods and tolerances.
Range Area Radiation Monitor Calibration, Revision 108, on April 3, 2017. The
This issue was entered into the licensees corrective action program as Condition
previous revision (107) was dated September 12, 2011.  Section 5.87 describes the  
Report CR-GGN-2017-06826.
radiation functional test portion of this procedure.  The calibration method described in
                                        8
this section fails to employ a reproducible geometry or a calibrated radiation source.
Further, the acceptance criteria in this section are twice that allowed in American
National Standards Institute (ANSI) N323D-2002, American National Standard for  
Installed Radiation Protection Instrumentation, approved on September 3, 2002. In
addition, the electronic calibration method in this procedure as allowed by NUREG 0737,
Clarification of TMI Action Plan Requirements, dated November 1980, only addresses
calibration of three of the seven decades of the logarithmic monitor.  


    This issue was previously identified during an inspection in March of 2015, as
    NCV 05000416/2015001-04 and was treated as a non-cited violation, consistent with
    Section 2.3.2.a of the Enforcement Policy. Since the licensee did not restore
8
    compliance in a reasonable period of time, this violation is being cited, consistent with
The inspectors concluded that the licensee had continued to improperly calibrate
    the NRC Enforcement Policy, Section 2.3.2, which states, in part, that the licensee must
these process radiation monitors since the previous inspection in March 2015
    restore compliance within a reasonable period of time (i.e., in a timeframe
Procedure 06-IC-1D17-R-1002 rocedure is used for all four channels of the main
    commensurate with the significance of the violation) after a violation is identified. A
steam line monitors and Procedure 06-IC-1D21-R-1002 is used for both channels of
    Notice of Violation is attached. VIO 05000416/2017012-01, Failure to Properly
the drywell and containment high range radiation monitors.  Because both procedures
    Calibrate Installed Radiation Monitors Using Industry Accepted Calibration Methods and
failed to use appropriate calibration methodologies, the inspectors determined that
    Tolerances.
none of the containment/drywell high range and main steam line radiation monitors
2RS6 Radioactive Gaseous and Liquid Effluent Treatment (71124.06)
had been properly calibrated since at least the date of the procedure revisions,  
  a. Inspection Scope
September 12, 2011, and December 13, 2011, respectively. 
    The inspectors evaluated whether the licensee maintained gaseous and liquid effluent
    processing systems and properly mitigated, monitored, and evaluated radiological
In evaluating the underlying cause of the licensees failure to correct the calibration
    discharges with respect to public exposure. The inspectors verified that abnormal
issue, the inspectors noted the following. On January 20, 2017, a corrective action
    radioactive gaseous or liquid discharges and conditions, when effluent radiation monitors
document (CR-GGN-2017-00612) was initiated identifying a non-conforming condition of
    are out-of-service, were controlled in accordance with the applicable regulatory
a Condition Adverse to Quality that the calibration procedure for the containment high
    requirements and licensee procedures. The inspectors verified that the licensees
range and drywell high radiation monitors does not control the source geometry to the
    quality control program ensured radioactive effluent sampling and analysis adequately
monitor. The CR further described the required calibration traceability not being
    quantified and evaluated discharges of radioactive materials. The inspectors verified the
maintained.  In the self-assessment report of the radiation protection instrument program 
    adequacy of public dose projections resulting from radioactive effluent discharges. The
(OL-GLO-2017-21) completed on May 23, 2017, the assessment team rated Objective 2,
    inspectors interviewed licensee personnel and reviewed licensee performance in the
the review of the prior inspection report, as unsatisfactory.  This rating was given
    following areas:
because actions related to this issue were not complete after a considerable amount of
          * During walk downs and observations of selected portions of the radioactive
time, which included at least five due date extensions and an extended outage that  
            gaseous and liquid effluent equipment, the inspectors evaluated routine
should have allowed completion of the corrective action. 
            processing and discharge of effluents, including sample collection and analysis.
            The inspectors observed equipment configuration and flow paths of selected
Analysis. The failure to properly calibrate radiation monitors is a performance
            gaseous and liquid discharge system components, effluent monitoring systems,
deficiency. The performance deficiency is more than minor because it is associated with
            filtered ventilation system material condition, and significant changes to effluent
the cornerstone attribute of plant instrumentation and adversely affects the cornerstone
            release points.
objective to ensure adequate protection of employee health and safety during routine
          * Calibration and testing program for process and effluent monitors, including
civilian nuclear reactor operation and is therefore a finding. Specifically, the failure to
            National Institute of Standards and Technology traceability of sources, primary
properly calibrate radiation monitors impacts the licensees ability to assess dose rates. 
            and secondary calibration data, channel calibrations, set-point determination
Using Inspection Manual Chapter 0609, Appendix C, Occupational Radiation Safety
            bases, and surveillance test results.
Significance Determination Process, dated August 19, 2008, the inspectors determined
          * Sampling and analysis controls used to ensure representative sampling and
the finding to be of very low safety significance because it was not an as low as
            appropriate compensatory sampling. Reviews included results of the inter-
reasonably achievable (ALARA) issue, there was no overexposure or substantial
            laboratory comparison program,
potential for overexposure, and the licensees ability to assess dose was not
          *  Instrumentation and equipment, including effluent flow measuring instruments, air
compromisedThis finding has a cross-cutting aspect in the area of problem
            cleaning systems, and post-accident effluent monitoring instruments.
identification and resolution, associated with the resolution component, because the
          *  Dose calculations for effluent releases. The inspectors reviewed a selection of
licensee did not ensure that effective corrective actions were implemented to address
            radioactive liquid and gaseous waste discharge permits and abnormal gaseous
issues in a timely manner commensurate with the safety significance [P.3].  
            or liquid tank discharges, and verified the projected doses were accurate. The
   
                                            9
Enforcement.  Title 10 CFR 20.1501(c) requires, in part, that the licensee shall
ensure that instruments and equipment used for quantitative radiation measurements
are calibrated periodically for the radiation measured. Contrary to the above, since at
least January 1, 2012, the licensee failed to ensure that instruments and equipment
used for quantitative radiation measurements were calibrated periodically for the
radiation measured. Specifically, the licensee failed to properly calibrate the
containment/drywell high range radiation monitors and the main steam line
radiation monitors using industry accepted calibration methods and tolerances. 
This issue was entered into the licensees corrective action program as Condition
Report CR-GGN-2017-06826.  


            inspectors also reviewed 10 CFR Part 61 analyses and methods used to
            determine which isotopes were included in the source term. The inspectors
            reviewed land use census results, offsite dose calculation manual changes, and
9
            significant changes in reported dose values from previous years.
This issue was previously identified during an inspection in March of 2015, as
        *  Problem identification and resolution for radioactive gaseous and liquid effluent
NCV 05000416/2015001-04 and was treated as a non-cited violation, consistent with
            treatment. The inspectors reviewed audits, self-assessments, and corrective
Section 2.3.2.a of the Enforcement Policy. Since the licensee did not restore
            action program documents to verify problems were being identified and properly
compliance in a reasonable period of time, this violation is being cited, consistent with
            addressed for resolution.
the NRC Enforcement Policy, Section 2.3.2, which states, in part, that the licensee must
  These activities constitute completion of the six required samples of radioactive gaseous
restore compliance within a reasonable period of time (i.e., in a timeframe
  and liquid effluent treatment program, as defined in Inspection Procedure 71124.06.
commensurate with the significance of the violation) after a violation is identified.  A
b. Findings
Notice of Violation is attached. VIO 05000416/2017012-01, Failure to Properly
  Introduction. The inspectors identified a Green finding for the licensees failure to
Calibrate Installed Radiation Monitors Using Industry Accepted Calibration Methods and  
  operate their gaseous radwaste system within design specifications, resulting in elevated
Tolerances.  
  radiological effluent releases that were not as low as reasonably achievable. These
  deficiencies in meeting the design specifications/parameters are associated with the
2RS6 Radioactive Gaseous and Liquid Effluent Treatment (71124.06)
  offgas charcoal adsorber and vault refrigeration components of the offgas system, which
  have impacted the systems reliability and efficiency since at least 2007.
a.  
  Description. When reviewing the licensees annual effluent release reports, the
Inspection Scope
  inspectors identified that in calendar year 2013, the licensee had total airborne releases
  of fission and activation gases of 1920 curies (Ci), including a peak release of 1540 Ci
The inspectors evaluated whether the licensee maintained gaseous and liquid effluent
  during the third quarter. The inspectors noted that this annual gaseous release was
processing systems and properly mitigated, monitored, and evaluated radiological
  significantly higher than the previous annual releases of approximately 450 Ci in
discharges with respect to public exposure.  The inspectors verified that abnormal
  calendar years 2010 thru 2012. The licensee stated the primary reason for the elevated
radioactive gaseous or liquid discharges and conditions, when effluent radiation monitors
  activity of gaseous releases was associated with refrigeration equipment issues affecting
are out-of-service, were controlled in accordance with the applicable regulatory
  charcoal adsorption efficiency. Upon further evaluation, NRC inspectors determined that
requirements and licensee procedures. The inspectors verified that the licensees  
  such issues with the charcoal adsorbers and vault refrigeration systems were long-term,
quality control program ensured radioactive effluent sampling and analysis adequately
  ongoing, unresolved deficiencies in the gaseous radwaste system primarily due to
quantified and evaluated discharges of radioactive materials. The inspectors verified the
  numerous condenser in-leakages that remain unrepaired.
adequacy of public dose projections resulting from radioactive effluent discharges. The  
  The Grand Gulf Nuclear Station System Description, Revision 2, for the gaseous
inspectors interviewed licensee personnel and reviewed licensee performance in the  
  radwaste system notes that there are two sets of four charcoal adsorber vessels
following areas:
  arranged in series, totaling eight charcoal adsorber beds. As the offgas flows from the
 
  condenser system via the steam jet air ejectors into the charcoal adsorption system, the
*
  charcoal acts as a medium to delay the flow of krypton and xenon gases to allow them to
During walk downs and observations of selected portions of the radioactive
  decay to radiation levels acceptable for atmospheric release. In addition, the activated
gaseous and liquid effluent equipment, the inspectors evaluated routine
  charcoal adsorbs the radioactive isotopes of iodine removing them for decay.
processing and discharge of effluents, including sample collection and analysis.
  The adsorption of xenon, krypton, and iodine offgas on charcoal depends on gas
The inspectors observed equipment configuration and flow paths of selected
  flowrate, holdup time, mass of charcoal, and the dynamic adsorption coefficient. The
gaseous and liquid discharge system components, effluent monitoring systems,  
  inspectors determined the nominal flowrate for the licensees charcoal system to operate
filtered ventilation system material condition, and significant changes to effluent
  efficiently is specified as 30 scfm, to achieve proper holdup times of offgases. However,
release points.  
  the licensee has been consistently running the system at 80 scfm.
  The Grand Gulf Nuclear Station System Description also states the charcoal adsorbers
*
  must be operated under controlled temperature and humidity conditions, maintaining a
Calibration and testing program for process and effluent monitors, including
  steady state temperature of about 0 degrees Fahrenheit (°F). However, for optimal
National Institute of Standards and Technology traceability of sources, primary
                                            10
and secondary calibration data, channel calibrations, set-point determination
bases, and surveillance test results.
*
Sampling and analysis controls used to ensure representative sampling and
appropriate compensatory sampling.  Reviews included results of the inter-
laboratory comparison program,
*
Instrumentation and equipment, including effluent flow measuring instruments, air
cleaning systems, and post-accident effluent monitoring instruments.  
*
Dose calculations for effluent releases.  The inspectors reviewed a selection of
radioactive liquid and gaseous waste discharge permits and abnormal gaseous
or liquid tank discharges, and verified the projected doses were accurate.  The


performance, a refrigeration temperature of 0 to -40°F is specified. The inspectors
reviewed Figure 10 of Section 4.1.7 of Grand Gulf Nuclear Station System Description,
entitled Comparative Curie Decontamination Factors for 8, 12, and 16 Bed Systems,
10
which illustrated that the charcoal low temperature, eight bed system is designed to
inspectors also reviewed 10 CFR Part 61 analyses and methods used to  
operate at a decontamination factor of 1000 with the specified design parameters
determine which isotopes were included in the source term. The inspectors  
(i.e., 30 scfm, 0ºF). However, the inspectors determined licensees current offgas
reviewed land use census results, offsite dose calculation manual changes, and  
flowrate of approximately 80 scfm and refrigeration temperature of approximately +15°F
significant changes in reported dose values from previous years. 
will achieve a decontamination factor of less than 50.
The licensee performed evaluations, as documented in Apparent Cause
*
Evaluation CR-GGN-2013-0450, and determined that corrective actions were needed to
Problem identification and resolution for radioactive gaseous and liquid effluent
decrease the current elevated offgas flowrate into the charcoal adsorbers from
treatment. The inspectors reviewed audits, self-assessments, and corrective  
approximately 80 scfm, and to reduce the vault refrigeration temperature to within
action program documents to verify problems were being identified and properly
design specifications. The licensee implemented some corrective actions to reduce
addressed for resolution.
condenser in-leakage, resulting in some improvement in the offgas flowrate (reduction
from ~160 scfm to ~80 scfm). However, the offgas flowrates, charcoal adsorber
These activities constitute completion of the six required samples of radioactive gaseous
flowpath, and refrigeration vault operations still remain inconsistent with the design
and liquid effluent treatment program, as defined in Inspection Procedure 71124.06. 
specifications.
Although these deficiencies were ongoing issues, the licensee provided no documented
b.
evaluation to demonstrate that the degraded performance of the offgas system was
Findings
maintaining gaseous releases as low as reasonably achievable, which the Updated Final
Safety Analysis Report states is the primary design objective of the gaseous radwaste
Introduction.  The inspectors identified a Green finding for the licensees failure to  
management system. The NRC inspectors discussed with the licensee that, although
operate their gaseous radwaste system within design specifications, resulting in elevated
the airborne releases may meet the 10 CFR Part 20, Appendix I, limitations, the failure
radiological effluent releases that were not as low as reasonably achievable.  These
to operate the system consistent with design parameters is significantly impacting the
deficiencies in meeting the design specifications/parameters are associated with the  
systems ability to maintain gaseous releases as low as reasonably achievable, as
offgas charcoal adsorber and vault refrigeration components of the offgas system, which
evidenced by the annual effluent reports.
have impacted the systems reliability and efficiency since at least 2007.  
The licensee has developed a system improvement plan entitled, Offgas Long Range
Plan and Concluding Actions, to address how the plant may resolve the issues within
Description.  When reviewing the licensees annual effluent release reports, the  
the next few scheduled outages. This performance deficiency was entered into the
inspectors identified that in calendar year 2013, the licensee had total airborne releases
licensees CAP as Condition Report CR-GGN-2017-06875.
of fission and activation gases of 1920 curies (Ci), including a peak release of 1540 Ci
Analysis. The failure to operate the offgas gaseous radwaste system within design
during the third quarter. The inspectors noted that this annual gaseous release was
specifications, resulting in elevated radiological effluent releases, is a performance
significantly higher than the previous annual releases of approximately 450 Ci in
deficiency. The finding is more than minor because it is associated with the plant
calendar years 2010 thru 2012.  The licensee stated the primary reason for the elevated
equipment attribute of the Public Radiation Safety cornerstone and adversely affected
activity of gaseous releases was associated with refrigeration equipment issues affecting
the cornerstone objective to ensure adequate protection of public health and safety from
charcoal adsorption efficiency. Upon further evaluation, NRC inspectors determined that
exposure of radioactive materials released into the public domain as a result of routine
such issues with the charcoal adsorbers and vault refrigeration systems were long-term,  
civilian nuclear plant operation. Using Inspection Manual Chapter 0609, Appendix D,
ongoing, unresolved deficiencies in the gaseous radwaste system primarily due to
Public Radiation Safety Significance Determination Process, the finding was
numerous condenser in-leakages that remain unrepaired.    
determined to be of very low safety significance (Green) because it involved the
Effluent Release Program, it did not impair the ability to assess dose, and did not
The Grand Gulf Nuclear Station System Description, Revision 2, for the gaseous  
exceed the 10 CFR Part 50, Appendix I, or 10 CFR 20.1301(d) limits. The finding has a
radwaste system notes that there are two sets of four charcoal adsorber vessels
cross-cutting aspect in the area of problem identification and resolution, associated with
arranged in series, totaling eight charcoal adsorber beds. As the offgas flows from the  
the resolution component, because the licensee did not ensure that effective corrective
condenser system via the steam jet air ejectors into the charcoal adsorption system, the
actions were implemented to address issues in a timely manner commensurate with the
charcoal acts as a medium to delay the flow of krypton and xenon gases to allow them to
safety significance [P.3].
decay to radiation levels acceptable for atmospheric release. In addition, the activated
                                        11
charcoal adsorbs the radioactive isotopes of iodine removing them for decay. 
The adsorption of xenon, krypton, and iodine offgas on charcoal depends on gas
flowrate, holdup time, mass of charcoal, and the dynamic adsorption coefficient. The  
inspectors determined the nominal flowrate for the licensees charcoal system to operate
efficiently is specified as 30 scfm, to achieve proper holdup times of offgases.  However,  
the licensee has been consistently running the system at 80 scfm.
The Grand Gulf Nuclear Station System Description also states the charcoal adsorbers
must be operated under controlled temperature and humidity conditions, maintaining a  
steady state temperature of about 0 degrees Fahrenheit (°F). However, for optimal


    Enforcement. The inspectors did not identify a violation of regulatory requirements.
    Although the licensee failed to operate the system within the design specifications, as
    described in the Grand Gulf Nuclear Station System Description, the inspectors
11
    determined this was a self-imposed standard and did not constitute a regulatory
performance, a refrigeration temperature of 0 to -40°F is specified. The inspectors  
    requirement. The issue was entered into the licensees corrective action program as
reviewed Figure 10 of Section 4.1.7 of Grand Gulf Nuclear Station System Description,
    CR-GGN-2017-06875. Finding (FIN) 05000416-2017012-02, Failure to Operate the
entitled Comparative Curie Decontamination Factors for 8, 12, and 16 Bed Systems,
    Gaseous Radwaste System Within Design Specifications.
which illustrated that the charcoal low temperature, eight bed system is designed to  
2RS7 Radiological Environmental Monitoring Program (71124.07)
operate at a decontamination factor of 1000 with the specified design parameters
   a. Inspection Scope
(i.e., 30 scfm, 0ºF).  However, the inspectors determined licensees current offgas
    The inspectors evaluated whether the licensees radiological environmental monitoring
flowrate of approximately 80 scfm and refrigeration temperature of approximately +15°F
    program quantified the impact of radioactive effluent releases to the environment and
will achieve a decontamination factor of less than 50.
    sufficiently validated the integrity of the radioactive gaseous and liquid effluent release
The licensee performed evaluations, as documented in Apparent Cause
    program. The inspectors also verified that the licensee continued to implement the
Evaluation CR-GGN-2013-0450, and determined that corrective actions were needed to
    voluntary NEI/Industry Ground Water Protection Initiative. The inspectors reviewed or
decrease the current elevated offgas flowrate into the charcoal adsorbers from
    observed the following items:
approximately 80 scfm, and to reduce the vault refrigeration temperature to within
        *  The inspectors observed selected air sampling and dosimeter monitoring
design specifications. The licensee implemented some corrective actions to reduce
            stations, sampler station modifications, and the collection and preparation of
condenser in-leakage, resulting in some improvement in the offgas flowrate (reduction
            environmental samples. The inspectors reviewed calibration and maintenance
from ~160 scfm to ~80 scfm). However, the offgas flowrates, charcoal adsorber
            records for selected air samplers, composite water samplers, and environmental
flowpath, and refrigeration vault operations still remain inconsistent with the design
            sample radiation measurement instrumentation, and inter-laboratory comparison
specifications.    
            program results. The inspectors reviewed selected events documented in the
Although these deficiencies were ongoing issues, the licensee provided no documented
            annual environmental monitoring report and significant changes made by the
evaluation to demonstrate that the degraded performance of the offgas system was
            licensee to the offsite dose calculation manual as the result of changes to the
maintaining gaseous releases as low as reasonably achievable, which the Updated Final
            land census. The inspectors evaluated the operability, calibration, and
Safety Analysis Report states is the primary design objective of the gaseous radwaste
            maintenance of meteorological instruments and assessed the meteorological
management system. The NRC inspectors discussed with the licensee that, although
            dispersion and deposition factors. The inspectors verified the licensee had
the airborne releases may meet the 10 CFR Part 20, Appendix I, limitations, the failure
            implemented sampling and monitoring program sufficient to detect leakage from
to operate the system consistent with design parameters is significantly impacting the
            structures, systems, or components with credible mechanism for licensed
systems ability to maintain gaseous releases as low as reasonably achievable, as
            material to reach ground water and reviewed changes to the licensees written
evidenced by the annual effluent reports.   
            program for identifying and controlling contaminated spills/leaks to groundwater.
The licensee has developed a system improvement plan entitled, Offgas Long Range
        *  Groundwater protection initiative (GPI) implementation, including assessment of
Plan and Concluding Actions, to address how the plant may resolve the issues within
            groundwater monitoring results, identified leakage or spill events and entries
the next few scheduled outages.  This performance deficiency was entered into the
            made into 10 CFR 50.75 (g) records, licensee evaluations of the extent of the
licensees CAP as Condition Report CR-GGN-2017-06875.
            contamination and the radiological source term, and reports of events associated
Analysis. The failure to operate the offgas gaseous radwaste system within design
            with spills, leaks, and groundwater monitoring results.
specifications, resulting in elevated radiological effluent releases, is a performance
        *  Problem identification and resolution for the radiological environmental
deficiency. The finding is more than minor because it is associated with the plant
            monitoring program. The inspectors reviewed audits, self-assessments, and
equipment attribute of the Public Radiation Safety cornerstone and adversely affected
            corrective action program documents to verify problems were being identified
the cornerstone objective to ensure adequate protection of public health and safety from  
            and properly addressed for resolution.
exposure of radioactive materials released into the public domain as a result of routine
    These activities constitute completion of the three required samples of radiological
civilian nuclear plant operation.  Using Inspection Manual Chapter 0609, Appendix D,  
    environmental monitoring program, as defined in Inspection Procedure 71124.07.
Public Radiation Safety Significance Determination Process, the finding was
                                              12
determined to be of very low safety significance (Green) because it involved the
Effluent Release Program, it did not impair the ability to assess dose, and did not
exceed the 10 CFR Part 50, Appendix I, or 10 CFR 20.1301(d) limits.  The finding has a
cross-cutting aspect in the area of problem identification and resolution, associated with  
the resolution component, because the licensee did not ensure that effective corrective
actions were implemented to address issues in a timely manner commensurate with the  
safety significance [P.3].


  b. Findings
    No findings were identified.
2RS8  Radioactive Solid Waste Processing and Radioactive Material Handling, Storage,
12
      and Transportation (71124.08)
Enforcement. The inspectors did not identify a violation of regulatory requirements.
  a. Inspection Scope
Although the licensee failed to operate the system within the design specifications, as
    The inspectors evaluated the effectiveness of the licensees programs for processing,
described in the Grand Gulf Nuclear Station System Description, the inspectors
    handling, storage, and transportation of radioactive material. The inspectors interviewed
determined this was a self-imposed standard and did not constitute a regulatory
    licensee personnel and reviewed the following items:
requirement.  The issue was entered into the licensees corrective action program as
        * Radioactive material storage, including waste storage areas including container
CR-GGN-2017-06875.  Finding (FIN) 05000416-2017012-02, Failure to Operate the
            labeling/marking and monitoring containers for deformation or signs of waste
Gaseous Radwaste System Within Design Specifications.
            decomposition.
        *  Radioactive waste system, including walk-downs of the accessible portions of the
2RS7 Radiological Environmental Monitoring Program (71124.07)  
            radioactive waste processing systems and handling equipment. The inspectors
            also reviewed or observed changes made to the radioactive waste processing
a.  
            systems, methods for dewatering and waste stabilization, waste stream mixing
Inspection Scope  
            methodology, and waste processing equipment that was not operational or
            abandoned in place.
The inspectors evaluated whether the licensees radiological environmental monitoring
        *  Waste characterization and classification, including radio-chemical sample
program quantified the impact of radioactive effluent releases to the environment and
            analysis results for radioactive waste streams and use of scaling factors and
sufficiently validated the integrity of the radioactive gaseous and liquid effluent release
            calculations to account for difficult-to-measure radionuclides, and processes for
program. The inspectors also verified that the licensee continued to implement the
            waste classification including use of scaling factors and 10 CFR Part 61
voluntary NEI/Industry Ground Water Protection Initiative.  The inspectors reviewed or
            analyses.
observed the following items:  
        * Shipment preparation, including packaging, surveying, labeling, marking,
            placarding, vehicle checking, driver instructing, and preparation of the disposal
*  
            manifests.
The inspectors observed selected air sampling and dosimeter monitoring  
        *  Shipping records for LSA I, II, III, SCOI, II, Type A, or Type B radioactive material
stations, sampler station modifications, and the collection and preparation of  
            or radioactive waste shipments.
environmental samples. The inspectors reviewed calibration and maintenance
        * Problem identification and resolution for radioactive solid waste processing and
records for selected air samplers, composite water samplers, and environmental
            radioactive material handling, storage, and transportation. The inspectors
sample radiation measurement instrumentation, and inter-laboratory comparison
            reviewed audits, self-assessments, and corrective action program documents to
program results. The inspectors reviewed selected events documented in the
            verify problems were being identified and properly addressed for resolution.
annual environmental monitoring report and significant changes made by the
    These activities constitute completion of the six required samples of radioactive solid
licensee to the offsite dose calculation manual as the result of changes to the  
    waste processing, and radioactive material handling, storage, and transportation
land census.  The inspectors evaluated the operability, calibration, and  
    program, as defined in Inspection Procedure 71124.08.
maintenance of meteorological instruments and assessed the meteorological
  b. Findings
dispersion and deposition factors. The inspectors verified the licensee had
    No findings were identified.
implemented sampling and monitoring program sufficient to detect leakage from
                                            13
structures, systems, or components with credible mechanism for licensed
material to reach ground water and reviewed changes to the licensees written
program for identifying and controlling contaminated spills/leaks to groundwater. 
*  
Groundwater protection initiative (GPI) implementation, including assessment of
groundwater monitoring results, identified leakage or spill events and entries
made into 10 CFR 50.75 (g) records, licensee evaluations of the extent of the
contamination and the radiological source term, and reports of events associated
with spills, leaks, and groundwater monitoring results.
*  
Problem identification and resolution for the radiological environmental
monitoring program. The inspectors reviewed audits, self-assessments, and  
corrective action program documents to verify problems were being identified  
and properly addressed for resolution.  
These activities constitute completion of the three required samples of radiological
environmental monitoring program, as defined in Inspection Procedure 71124.07.  


4.     OTHER ACTIVITIES
4OA6 Meetings, Including Exit
Exit Meeting Summary
13
On July 14, 2017, the inspectors presented the radiation safety inspection results to
b.
Mr. E. Larson, Site Vice President, and other members of the licensee staff. The licensee
Findings
acknowledged the issues presented. The licensee confirmed that any proprietary information
reviewed by the inspectors had been returned or destroyed.
No findings were identified.  
                                              14
2RS8
Radioactive Solid Waste Processing and Radioactive Material Handling, Storage,  
and Transportation (71124.08)
a.
Inspection Scope
The inspectors evaluated the effectiveness of the licensees programs for processing,
handling, storage, and transportation of radioactive material.  The inspectors interviewed
licensee personnel and reviewed the following items:
*
Radioactive material storage, including waste storage areas including container
labeling/marking and monitoring containers for deformation or signs of waste
decomposition.
*
Radioactive waste system, including walk-downs of the accessible portions of the
radioactive waste processing systems and handling equipment.  The inspectors  
also reviewed or observed changes made to the radioactive waste processing
systems, methods for dewatering and waste stabilization, waste stream mixing
methodology, and waste processing equipment that was not operational or
abandoned in place. 
*
Waste characterization and classification, including radio-chemical sample
analysis results for radioactive waste streams and use of scaling factors and
calculations to account for difficult-to-measure radionuclides, and processes for
waste classification including use of scaling factors and 10 CFR Part 61
analyses.  
*
Shipment preparation, including packaging, surveying, labeling, marking,
placarding, vehicle checking, driver instructing, and preparation of the disposal
manifests.
*
Shipping records for LSA I, II, III, SCOI, II, Type A, or Type B radioactive material
or radioactive waste shipments.
*
Problem identification and resolution for radioactive solid waste processing and
radioactive material handling, storage, and transportation. The inspectors
reviewed audits, self-assessments, and corrective action program documents to
verify problems were being identified and properly addressed for resolution.
These activities constitute completion of the six required samples of radioactive solid
waste processing, and radioactive material handling, storage, and transportation
program, as defined in Inspection Procedure 71124.08.
b.
Findings
No findings were identified.


                                SUPPLEMENTAL INFORMATION
                                  KEY POINTS OF CONTACT
Licensee Personnel
14
J. Ashley, Environmental Specialist, Chemistry
4.  
R. Benson, Acting Manager, Radiation Protection
OTHER ACTIVITIES
D. Byers, Manager, System Engineering
R. Gaston, Director, Corporate Licensing
4OA6 Meetings, Including Exit 
M. Giacini, General Manager, Plant Operations
A. Hasanat, Licensing Engineer, Regulatory Assurance
Exit Meeting Summary
J. Hallanbeck, Design Manager, Engineering
E. Larson, Site Vice President
On July 14, 2017, the inspectors presented the radiation safety inspection results to
M. Larson, Supervisor, Radiation Protection
Mr. E. Larson, Site Vice President, and other members of the licensee staff. The licensee
K. Long, Shipper, Radwaste
acknowledged the issues presentedThe licensee confirmed that any proprietary information
J. Reese, Specialist, Chemistry
reviewed by the inspectors had been returned or destroyed.
T. Reeves, Supervisor, Chemistry
   
F. Rosser, Specialist, Radiation Protection
   
P. Stokes, Support Supervisor, Radiation Protection
S. Sweet, Licensing Engineer, Regulatory Assurance
E. Wright, Supervisor, Radiation Protection
J. Underwood, Manager, Chemistry
NRC Personnel
N. Day, Resident Inspector
R. Smith, Acting Senior Resident Inspector
M. Young, Senior Resident Inspector
S. Hedger, Emergency Preparedness Inspector
                    LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened
                                  Failure to Correct Instrument Calibration Process in a Timely
  05000416-2017012-01      VIO
                                  Manner (Section 2RS5)
Opened and Closed
05000416-2017012-02      FIN    Failure to Operate the Gaseous Radwaste System Within Design
                                  Specifications (Section 2RS6)
Closed
None
  Discussed
  None
                                                                            Attachment 1


                            LIST OF DOCUMENTS REVIEWED
Section 2RS5: Radiation Monitoring Instrumentation
Procedures
Number                  Title                                        Revision
Attachment 1
06-IC-1D17-R-1002        Main Steam Line High Radiation Monitor      108, 109
SUPPLEMENTAL INFORMATION
                        (PCIS) Calibration
06-IC-1D21-R-1002        Containment/Drywell High Range Area          107, 108,109
KEY POINTS OF CONTACT 
                        Radiation Monitor Calibration
08-S-07-83              Radiation Protection Instruction Operation  10
Licensee Personnel   
                        and Calibration of the ND-9000 Whole Body
                        Counter
J. Ashley, Environmental Specialist, Chemistry
EN-CY-102                Laboratory Analytical Quality Control        9
R. Benson, Acting Manager, Radiation Protection
EN-FAP-RP-007            Operation of the RP Central Calibration      2
D. Byers, Manager, System Engineering
                        Facility
R. Gaston, Director, Corporate Licensing
EN-MA-105                Control of Measuring and Test Equipment      13
M. Giacini, General Manager, Plant Operations
                        (M&TE)
A. Hasanat, Licensing Engineer, Regulatory Assurance
EN-RP-122                Alpha Monitoring                            9
J. Hallanbeck, Design Manager, Engineering
EN-RP-301                Radiation Protection Instrument Control      10
E. Larson, Site Vice President
EN-RP-305                Source Maintenance                          0
M. Larson, Supervisor, Radiation Protection
EN-RP-317                Central Calibration Facility                0
K. Long, Shipper, Radwaste
EN-RP-317-08            Calibration of Portable Scalers              1
J. Reese, Specialist, Chemistry
EN-RP-317-09            Calibration of Dosimeters                    2
T. Reeves, Supervisor, Chemistry
EN-RP-317-10            Calibration of Portable Dose Rate Instrument 0
F. Rosser, Specialist, Radiation Protection
ODCM                    Offsite Dose Calculation Manual              39
P. Stokes, Support Supervisor, Radiation Protection
Audits and Self-Assessments
S. Sweet, Licensing Engineer, Regulatory Assurance
Number                  Title                                        Date
E. Wright, Supervisor, Radiation Protection  
OL-GLO-2017-21          Self-Assessment of RP Instrumentation        May 23, 2017
J. Underwood, Manager, Chemistry
                        Program
QA-14/15-201 5-GGN-1 QA Audit: Combined Radiation Protection and November 16, 2015
NRC Personnel
                        Radwaste
                                            A1-2
N. Day, Resident Inspector
R. Smith, Acting Senior Resident Inspector
M. Young, Senior Resident Inspector
S. Hedger, Emergency Preparedness Inspector
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED 
Opened
05000416-2017012-01
VIO
Failure to Correct Instrument Calibration Process in a Timely
Manner (Section 2RS5)  
Opened and Closed
05000416-2017012-02
FIN
Failure to Operate the Gaseous Radwaste System Within Design
Specifications (Section 2RS6)
Closed
None
Discussed
None


Condition Reports (CR-GGNS-)
2015-01775          2015-01773          2015-02807      2015-01831  2015-01832
2016-01796          2016-04647          2016-05297      2016-08308  2016-09537
2016-09889          2017-00612          2017-04141      2017-04697  2017-06865
A1-2
2017-06876
LIST OF DOCUMENTS REVIEWED
Installed Radiation Instrument Calibration Records
W/O Number         Title                                           Date
Section 2RS5:  Radiation Monitoring Instrumentation
52628844            Main Steam Line High Radiation Monitor (PCIS)   February 22, 2017
                    Calibration - Channel A
Procedures
52637367            Containment/Drywell High Range Area Radiation   March 16, 2016
Number  
                    Monitor Calibration - Channel A
Title  
Portable Radiation Instrument Calibration Records
Revision
Number              Title                                          Date
06-IC-1D17-R-1002
ASC-001            Calibration Data Sheet: SAC-4                  March 28, 2017
Main Steam Line High Radiation Monitor  
CHP-C-015          Calibration Data Sheet: Model 2000(43-10) Alpha July 10 2017
(PCIS) Calibration
                    Scaler
108, 109
CHP-C-022          Calibration Data Sheet: iSolo Alpha Scaler      April 27, 2017
06-IC-1D21-R-1002
CHP-CS-020          Calibration Data Sheet: iSolo Alpha Scaler      March 23, 2017
Containment/Drywell High Range Area  
CHP-DR-283          Calibration Data Sheet: TelePole                June 13, 2017
Radiation Monitor Calibration
HP-11431            Calibration Data Sheet: RO-2                    June 6, 2017
107, 108,109
HP-CS-004          Calibration Data Sheet: Model BC-4              July 6, 2017
08-S-07-83
HP-DR-563          Calibration Data Sheet: Model 9-3              December 12, 2016
Radiation Protection Instruction Operation
HP-DR-563          Calibration Data Sheet: Ludlum Model-9-3        July 11, 2017
and Calibration of the ND-9000 Whole Body
HP-DS-054          Calibration Data Sheet: Model SAC-4            July 10, 2017
Counter 
RAM-001            Calibration Data Sheet: AMP-100                March 12, 2017
10
Stationary Radiation Instrument Calibration Records
EN-CY-102
Number              Title                                           Date
Laboratory Analytical Quality Control
400-10-17-005      Germanium Detector No. 3 Calibration Package    March 23, 2017
9
400-11-17-005      Germanium Detector No. 4 Calibration Package    March 22, 2017
EN-FAP-RP-007
400-9-17-002        Germanium Detector No. 2 Calibration Package    March 15, 2017
Operation of the RP Central Calibration  
                                              A1-3
Facility
2
EN-MA-105
Control of Measuring and Test Equipment
(M&TE)  
13
EN-RP-122
Alpha Monitoring
9
EN-RP-301
Radiation Protection Instrument Control
10
EN-RP-305
Source Maintenance 
0
EN-RP-317
Central Calibration Facility
0
EN-RP-317-08
Calibration of Portable Scalers 
1
EN-RP-317-09
Calibration of Dosimeters
2
EN-RP-317-10  
Calibration of Portable Dose Rate Instrument 0
ODCM
Offsite Dose Calculation Manual
39
Audits and Self-Assessments
Number
Title  
Date  
OL-GLO-2017-21
Self-Assessment of RP Instrumentation
Program
May 23, 2017  
QA-14/15-201 5-GGN-1 QA Audit: Combined Radiation Protection and
Radwaste
November 16, 2015


Stationary Radiation Instrument Calibration Records
Number             Title                                                   Date
Apex-InVivo        Analysis Report Calibration Check Count of People      July 12, 2017
                  Mover Whole Body Monitor
A1-3
Canberra          Calibration of the Canberra/Nuclear Data People        August 8, 2015
Condition Reports (CR-GGNS-)
                  Mover WBC System at Entergy Grand Gulf Nuclear
                  Station
2015-01775
Other Radiation Protection Instrument Records
2015-01773
Number             Title                                                   Date
2015-02807
CHP-DR-326        Instrument Response Check Failure Review                January 13, 2017
2015-01831
CHP-TEL039        Instrument Response Check Failure Review                May 15, 2017
2015-01832
CHP-TEL044        Instrument Response Check Failure Review                March 1, 2017
2016-01796
HP-11431           Maintenance Data Sheet: Failed Calibration Check        April 10, 2017
2016-04647
Miscellaneous Documents
2016-05297
Number              Title                                                  Date
2016-08308
201512044          Central Radiation Protection Maintenance Data Sheet December 10, 2015
2016-09537
201706-012          Entergy Operations, Inc., Portable Instruments to      June 19, 2017
2016-09889
                    Waterford-3 RP
2017-00612
3751                Laboratory Standard Calibration/Verification Data:     July 9, 2015
2017-04141
                    V-570 Meter
2017-04697
AO-987              Amersham Source Decay Data Sheet                       January 26, 2017
2017-06865
AO-988              Amersham Source Decay Data Sheet                       January 26, 2017
2017-06876
ERIC Report        Instrument Status Report Calibration Needed for        July 11, 2017
                    GGNS
JLS-8254            Source Verification of Source J.L. Shephard Calibrator October 13, 2015
                    S/N SRC-1993003 Model-89 (400) Cs-137 Sealed
                    Sources at Set Positions
MP-141              AEA Technology Source Decay Sheet                      January 26, 2017
Installed Radiation Instrument Calibration Records  
MP-158              AEA Technology Source Decay Sheet                      January 26, 2017
W/O Number  
                                              A1-4
Title  
Date  
52628844
Main Steam Line High Radiation Monitor (PCIS)
Calibration - Channel A
February 22, 2017  
52637367
Containment/Drywell High Range Area Radiation
Monitor Calibration - Channel A
March 16, 2016
Portable Radiation Instrument Calibration Records  
Number  
Title  
Date  
ASC-001
Calibration Data Sheet:  SAC-4
March 28, 2017
CHP-C-015
Calibration Data Sheet:  Model 2000(43-10) Alpha
Scaler 
July 10 2017
CHP-C-022
Calibration Data Sheet:  iSolo Alpha Scaler
April 27, 2017  
CHP-CS-020
Calibration Data Sheet:  iSolo Alpha Scaler
March 23, 2017  
CHP-DR-283
Calibration Data Sheet:  TelePole
June 13, 2017  
HP-11431  
Calibration Data Sheet: RO-2
June 6, 2017
HP-CS-004
Calibration Data Sheet:  Model BC-4
July 6, 2017  
HP-DR-563
Calibration Data Sheet:  Model 9-3
December 12, 2016
HP-DR-563
Calibration Data Sheet: Ludlum Model-9-3
July 11, 2017
HP-DS-054
Calibration Data Sheet:  Model SAC-4
July 10, 2017  
RAM-001
Calibration Data Sheet:  AMP-100
March 12, 2017  
Stationary Radiation Instrument Calibration Records
Number
Title
Date
400-10-17-005
Germanium Detector No. 3 Calibration Package
March 23, 2017
400-11-17-005
Germanium Detector No. 4 Calibration Package
March 22, 2017  
400-9-17-002
Germanium Detector No. 2 Calibration Package
March 15, 2017  


Section 2RS6: Radioactive Gaseous and Liquid Effluent Treatment
Procedures
Number                 Title                                         Revision
04-1-01-N65-1-SU      System Operating Instruction Offgas Vault      033
A1-4
                      Refrigeration
Stationary Radiation Instrument Calibration Records
06-CH-1000-M-0049      Effluent Dose Calculations                    104
Number  
06-CH-1D17-M-0003      Building Ventilation Gaseous Tritium          109
Title  
06-CH-1D17-M-0005      Building Ventilation Exhaust Gaseous Isotopic  109
Date
06-CH-1D17-M-0018      Gaseous Release Points - Particulate Alpha    108
Apex-InVivo
                      Activity
Analysis Report Calibration Check Count of People
06-CH-1D17-W-0017      Gaseous Release Points - Iodines, Tritium and 106
Mover Whole Body Monitor
                      Particulates
July 12, 2017
06-CH-1T48-M-0037      Standby Gas Treatment Exhaust Gaseous Isotopic 107
Canberra
06-CH-SG17-O-0045      Radwaste Release Post-Release Calculations    105
Calibration of the Canberra/Nuclear Data People
06-CH-SG17-P-0041      Radwaste Release Pre-Release Analysis          109
Mover WBC System at Entergy Grand Gulf Nuclear
06-CH-SG17-Q-0044      Radwaste Release Quarterly Composite          103
Station 
08-S-03-10            Chemistry Sampling Program                    052
August 8, 2015
08-S-03-22            Installed Radiation Monitoring System Alarm    114
   
                      Setpoint Determination and Control
Other Radiation Protection Instrument Records
1-S-08-11              Radioactive Discharge Controls                114
Number
EN-CY-108              Monitoring of Nonradioactive Systems          006
Title
Audits and Self-Assessments
Date
Number                 Title                                         Date
CHP-DR-326
LO-GLO-2016-0122      Pre-NRC RETS/ODCM Radiological Effluent        December 4, 2016
Instrument Response Check Failure Review 
                      Occurrences Assessment
January 13, 2017
                      Teledyne Brown Engineering Environmental      April 19, 2017
CHP-TEL039
                      Services
Instrument Response Check Failure Review 
QA-2-6-2015-GGNS-1 GGNS Combined Chemistry Effluent and              October 9, 2015
May 15, 2017
                      Environmental Monitoring (including ODCM
CHP-TEL044
                      and REMP) Program Audit
Instrument Response Check Failure Review 
Condition Reports (CR-GGNS-)
March 1, 2017
2013-00450        2015-06763        2015-06764        2015-06982    2016-02468
HP-11431
2016-02688        2016-07187        2016-08307        2016-08308    2017-00051
Maintenance Data Sheet:  Failed Calibration Check
2017-00193        2017-00204        2017-00264        2017-00290    2017-00336
April 10, 2017
2017-00529        2017-03101        2017-03745        2017-04525    2017-05659
2017-06821        2017-06875
Miscellaneous Documents
                                              A1-5
Number  
Title  
Date  
201512044
Central Radiation Protection Maintenance Data Sheet December 10, 2015
201706-012
Entergy Operations, Inc., Portable Instruments to
Waterford-3 RP
June 19, 2017  
3751
Laboratory Standard Calibration/Verification Data:
V-570 Meter
July 9, 2015  
AO-987
Amersham Source Decay Data Sheet
January 26, 2017
AO-988
Amersham Source Decay Data Sheet 
January 26, 2017
ERIC Report
Instrument Status Report Calibration Needed for
GGNS  
July 11, 2017
JLS-8254
Source Verification of Source J.L. Shephard Calibrator
S/N SRC-1993003 Model-89 (400) Cs-137 Sealed
Sources at Set Positions
October 13, 2015  
MP-141
AEA Technology Source Decay Sheet
January 26, 2017  
MP-158
AEA Technology Source Decay Sheet
January 26, 2017  


10 CFR 50.75(g) Condition Reports (CR-GGNS-)
2015-06763          2015-06764        2016-07187        2017-00336
Release Permits
Liquid Releases
A1-5
2015051              2015094            2016011            2016017        2016022
Section 2RS6:  Radioactive Gaseous and Liquid Effluent Treatment
2016040              2016042            2016044            2016045        2016051
2016073              2017009            2017018
Procedures
In-Place Filter Testing Records
Number
Number              System                          Train  Test          Date
Title
WO 46551718          Standby Gas Treatment            B    DOP & HEPA    June 3, 2017
Revision
WO 52482060          Standby Gas Treatment             A    DOP & HEPA    March 16, 2015
04-1-01-N65-1-SU
WO 52618801          Control Room Air / Standby              DOP & HEPA    October 27, 2016
System Operating Instruction Offgas Vault
                                                      A
Refrigeration
                    Fresh Air
033
WO 52655772          Control Room Air / Standby        B    DOP & HEPA    December 1, 2016
06-CH-1000-M-0049
                    Fresh Air
Effluent Dose Calculations
Miscellaneous Documents
104
Number                 Title                                             Revision
06-CH-1D17-M-0003
                                                                          Date
Building Ventilation Gaseous Tritium
                        2014 Annual Radioactive Effluent Release Report    April 27, 2015
109
                        2015 Annual Radioactive Effluent Release Report    April 14, 2016
06-CH-1D17-M-0005
                        2016 Annual Radioactive Effluent Release Report    April 25, 2017
Building Ventilation Exhaust Gaseous Isotopic
                        Cross Contamination of Service Air System / CR-   February 27, 2017
109
                        GGN-2017-00193
06-CH-1D17-M-0018
                        Grand Gulf Service Air System I.E. Bulletin 80-10  March 29, 2017
Gaseous Release Points - Particulate Alpha
                        Bounding Evaluation for Contamination of a
Activity
                        Nonradioactive System
108
                        Nuclear Independent Oversight Functional Area      May 31, 2016
06-CH-1D17-W-0017
                        Performance Report: Group B
Gaseous Release Points - Iodines, Tritium and
                        Offsite Dose Calculation Manual                    39
Particulates
1000-1-17-002          2016 Radiochemistry INTRALAB Cross-Check          January 23, 2017
106
                        Results
06-CH-1T48-M-0037
GNRO-2016/00039        Supplement to Grand Gulf Nuclear Station 2015      July 20, 2016
Standby Gas Treatment Exhaust Gaseous Isotopic 107
                        Annual Radioactive Effluent Release Report (ARERR)
06-CH-SG17-O-0045
SD N64/N65              Grand Gulf Nuclear Station System Description      2
Radwaste Release Post-Release Calculations
UFSAR Chapter 11        GGN Updated Final Safety Analysis Report          2016-00
105
                                                A1-6
06-CH-SG17-P-0041
Radwaste Release Pre-Release Analysis
109
06-CH-SG17-Q-0044
Radwaste Release Quarterly Composite
103
08-S-03-10
Chemistry Sampling Program
052
08-S-03-22
Installed Radiation Monitoring System Alarm
Setpoint Determination and Control  
114
1-S-08-11
Radioactive Discharge Controls
114
EN-CY-108
Monitoring of Nonradioactive Systems
006
Audits and Self-Assessments
Number  
Title  
Date  
LO-GLO-2016-0122
Pre-NRC RETS/ODCM Radiological Effluent  
Occurrences Assessment
December 4, 2016
Teledyne Brown Engineering Environmental
Services
April 19, 2017
QA-2-6-2015-GGNS-1 GGNS Combined Chemistry Effluent and
Environmental Monitoring (including ODCM
and REMP) Program Audit 
October 9, 2015
Condition Reports (CR-GGNS-)
2013-00450
2015-06763
2015-06764
2015-06982
2016-02468
2016-02688
2016-07187
2016-08307
2016-08308
2017-00051
2017-00193
2017-00204
2017-00264
2017-00290
2017-00336
2017-00529
2017-03101
2017-03745
2017-04525
2017-05659
2017-06821
2017-06875


Section 2RS7: Radiological Environmental Monitoring Program
Procedures
Number                Title                                      Revision
06-EN-S000-V-0001    Surveillance Procedure Radiological        111
A1-6
                      Environmental Sampling
10 CFR 50.75(g) Condition Reports (CR-GGNS-)
06-IC-SC84-SA-1003 Primary Tower Wind Speed/Direction, Air        106
2015-06763
                      Temperature (T/dT) and Relative Humidity
2015-06764
07-S-53-C84-7        Backup Tower Wind/Speed/Direction and Air  0
2016-07187
                      Temperature Calibration
2017-00336
08-S-04-964          Met Data Processing                        2
ODCM                  Offsite Dose Calculation Manual            39
Audits and Self-Assessments
Release Permits
Number                 Title                                      Date
Liquid Releases
LO-GLO-2015-00042      Focused Self-Assessment:                  November 18, 2015
                      Chemistry Groundwater/Environmental
                      Programs
2015                  Environmental Dosimetry Company            February 29, 2016
                      Quality Assurance Status Report
2015051
2015                  Teledyne Brown Engineering:                May 9, 2016
2015094
                      Environmental Services
2016011
                      Quality Assurance Report
2016017
2016                  Environmental Dosimetry Company            March 8, 2017
2016022
                      Quality Assurance Status Report
2016040
2016                   Teledyne Brown Engineering:                April 19, 2017
2016042
                      Environmental Services
2016044
                      Quality Assurance Report
2016045
Condition Reports (CR-GGNS-)
2016051
2015-04675        2015-05753        2015-06263        2015-06763    2016-03213
2016073
2016-03475        2016-03825        2016-05543        2016-07187    2016-07747
2017009
2016-08364        2016-09067        2017-00813        2017-00993    2017-01731
2017018
2017-02633        2017-05447
                                            A1-7
In-Place Filter Testing Records
Number  
System
Train
Test
Date  
WO 46551718
Standby Gas Treatment
B
DOP & HEPA
June 3, 2017
WO 52482060
Standby Gas Treatment
A
DOP & HEPA
March 16, 2015  
WO 52618801
Control Room Air / Standby
Fresh Air
A
DOP & HEPA
October 27, 2016  
WO 52655772
Control Room Air / Standby
Fresh Air
B
DOP & HEPA
December 1, 2016
Miscellaneous Documents
Number
Title
Revision
Date
2014 Annual Radioactive Effluent Release Report  
April 27, 2015
2015 Annual Radioactive Effluent Release Report  
April 14, 2016
2016 Annual Radioactive Effluent Release Report
April 25, 2017  
Cross Contamination of Service Air System / CR-
GGN-2017-00193
February 27, 2017
Grand Gulf Service Air System I.E. Bulletin 80-10
Bounding Evaluation for Contamination of a
Nonradioactive System
March 29, 2017
Nuclear Independent Oversight Functional Area
Performance Report: Group B
May 31, 2016  
Offsite Dose Calculation Manual
39
1000-1-17-002
2016 Radiochemistry INTRALAB Cross-Check
Results
January 23, 2017
GNRO-2016/00039
Supplement to Grand Gulf Nuclear Station 2015
Annual Radioactive Effluent Release Report (ARERR)
July 20, 2016  
SD N64/N65
Grand Gulf Nuclear Station System Description
2
UFSAR Chapter 11
GGN Updated Final Safety Analysis Report
2016-00


REMP Air Sampler Calibration Data
Number       Title                                               Date
CHEM-001    LV-1D - Air Sampler (LOVOL)                          July 21, 2016
CHEM-002    LV-1D - Air Sampler (LOVOL)                          October 20, 2016
A1-7
CHEM-003    LV-1D - Air Sampler (LOVOL)                         July 19, 2016
Section 2RS7:  Radiological Environmental Monitoring Program
Meteorological Instrument Calibration Records
W/O Number          Title                                        Date
Procedures
52652328            Backup Meteorological Tower Instrument        August 29, 2016
Number  
                    Calibration
Title  
                    07-S-53-C84-7
Revision
52692658            Primary Meteorological Tower Instrument      August 2, 2016
06-EN-S000-V-0001
                    Calibrations
Surveillance Procedure Radiological
                    06-IC-SC84-SA-1003
Environmental Sampling
Meteorological Data
111
Number             Title                                         Date
06-IC-SC84-SA-1003 Primary Tower Wind Speed/Direction, Air  
2016                ODCM Annual Average Relative Concentration    March 2017
Temperature (T/dT) and Relative Humidity
                    (/Q) and Relative Deposition (D/Q)
106
2016                Review of Grand Gulf Meteorological Data      March 9, 2017
07-S-53-C84-7  
Groundwater Protection Documents
Backup Tower Wind/Speed/Direction and Air
Number              Title                                        Revision / Date
Temperature Calibration
L71506              Groundwater Monitoring Report - January 2017  February 3, 2017
0
L71974              Groundwater Monitoring Report - February 2017 March 31, 2017
08-S-04-964
L72140              Groundwater Monitoring Report - March 2017    March 31, 2017
Met Data Processing
L72521              Groundwater Monitoring Report - April 2017    May 5, 2017
R06045-0032-002 Groundwater Monitoring Plan                      6
2
Miscellaneous Documents
ODCM
Number              Title                                        Date
Offsite Dose Calculation Manual
2015               Annual Environmental Operating Report        April 19, 2016
39
2016               Annual Environmental Operating Report        April 27, 2017
2016               Land Use Census                              December 16, 2016
Audits and Self-Assessments
2017-044            Licensing Basis Document Change Request      April 27, 2017
Number  
                    (LBDCR)
Title  
                                            A1-8
Date  
LO-GLO-2015-00042
Focused Self-Assessment:
Chemistry Groundwater/Environmental
Programs
November 18, 2015
2015
Environmental Dosimetry Company
Quality Assurance Status Report  
February 29, 2016
2015
Teledyne Brown Engineering: 
Environmental Services
Quality Assurance Report  
May 9, 2016
2016
Environmental Dosimetry Company
Quality Assurance Status Report  
March 8, 2017  
2016
Teledyne Brown Engineering: 
Environmental Services
Quality Assurance Report  
April 19, 2017  
Condition Reports (CR-GGNS-)
2015-04675
2015-05753
2015-06263
2015-06763
2016-03213
2016-03475
2016-03825
2016-05543
2016-07187
2016-07747
2016-08364
2016-09067
2017-00813
2017-00993
2017-01731
2017-02633
2017-05447


Section 2RS8: Radioactive Solid Waste Processing, and Radioactive Material Handling,
Storage, and Transportation
  Procedures
   
  Number                   Title                                       Revision
A1-8
EN-RW-101                Radioactive Waste Management                3
REMP Air Sampler Calibration Data  
EN-RW-102                Radioactive Shipping Procedure              15
Number  
EN-RW-103                Radioactive Waste Tracking Procedure        4
Title  
EN-RW-104                Scaling Factors                            13
Date
EN-RW-105                Process Control Program                    5
CHEM-001
EN-RW-106                Integrated Transportation Security Plan    6
LV-1D - Air Sampler (LOVOL)
  04-S-01-G17-3            Radwaste Filters and Demineralizer          47
July 21, 2016
08-S-06-50              Radwaste Instruction: Loading Radioactive  9
CHEM-002
                          Material
LV-1D - Air Sampler (LOVOL)
08-S-06-71              Radwaste Instruction: Sampling              7
October 20, 2016
                          Procedures for Waste Classification
CHEM-003
07-S-14-428              Operation and Maintenance of the TRI-       0
LV-1D - Air Sampler (LOVOL)
                          NUC Underwater Filtration System
July 19, 2016
  08-S-02-075              Radiation Protection Instruction - Coverage 16
   
                          and Control of Refueling Operations and
Meteorological Instrument Calibration Records
                          Movement of Irradiated Materials
W/O Number
  Audits and Self-Assessments
Title
Number                   Title                                       Date
Date
QA-1 4/15-2015-GGN-1    Combined Radiation Protection and          September 14, 2015
52652328
                          Radwaste
Backup Meteorological Tower Instrument
LO-GLO-2017-00022        Pre-NRC Inspection Module 71124-08          May 24, 2017
Calibration
LO-GLO-2015-00139        10 CFR Part 37 Materials Security Review    January 8, 2016
07-S-53-C84-7
  Condition Reports (CR-HQN-)
August 29, 2016
2015-00747                    2017-00904
52692658
Condition Reports (CR-GGNS-)
Primary Meteorological Tower Instrument
2015-00231        2015-05082        2016-00319          2016-00320      2016-00801
Calibrations
2016-00804        2016-00805        2016-00809          2016-04376      2017-00101
06-IC-SC84-SA-1003 
2017-00106        2017-01568        2017-01625          2017-01644      2017-04789
August 2, 2016
2017-05552        2017-06772        2017-06779
   
                                            A1-9
Meteorological Data
Number
Title
Date
2016
ODCM Annual Average Relative Concentration
(/Q) and Relative Deposition (D/Q)
March 2017
2016
Review of Grand Gulf Meteorological Data 
March 9, 2017
   
Groundwater Protection Documents
Number  
Title  
Revision / Date  
L71506
Groundwater Monitoring Report - January 2017
February 3, 2017
L71974
Groundwater Monitoring Report - February 2017
March 31, 2017
L72140
Groundwater Monitoring Report - March 2017
March 31, 2017
L72521
Groundwater Monitoring Report - April 2017  
May 5, 2017  
R06045-0032-002 Groundwater Monitoring Plan
6
   
Miscellaneous Documents
Number
Title
Date
2015  
Annual Environmental Operating Report
April 19, 2016  
2016  
Annual Environmental Operating Report
April 27, 2017
2016  
Land Use Census
December 16, 2016  
2017-044
Licensing Basis Document Change Request
(LBDCR)
April 27, 2017  


Radioactive Material and Waste Shipments
Number                 Title                                       Date
GGN-2017-0101          CFFF Filters - LSA-II                      January 12, 2017
GGN-2017-0102          CRD-CRDM- LSA-II                            January 13, 2017
A1-9
GGN-2017-0106          CPS Powdex Liner                            January 20, 2017
GGN-2016-0319          WMG Sealands                                March 16, 2016
Section 2RS8:  Radioactive Solid Waste Processing, and Radioactive Material Handling,
GGN-2016-0320          Suppression Pool Filter Liners              March 21, 2016
Storage, and Transportation
GGN-2016-0324          5 Type A GE Boxes                          March 23, 2016
GGN-2015-0801          RWCU-A Liner - Type B                      August 3, 2017
Procedures
GGN-2015-0805          RWCU-A Liner - Type B                      August 3, 2017
GGN-2015-0809          RWCU-A Liner - Type B                      August 16, 2017
Miscellaneous Documents
Number  
Number                 Title                                       Date
Title  
OE-NOE-2016-00          NRC-RIS-2016-11                              November 30, 2016
Revision
2017                    RW/RAM Shipping Log                          January 1, 2017
EN-RW-101
2016                    RW/RAM Shipping Log                          January 1, 2016
Radioactive Waste Management
2015                   RW/RAM Shipping Log                          January 1, 2015
3
UFSAR Chapter 11        GGN Updated Final Safety Analysis Report    2016
EN-RW-102
                        Management Standard No. 36                  April 25, 2017
Radioactive Shipping Procedure
                        Monitoring & Responding to Dose Rates on the April 14, 2016
15
                        Fuel Pools
EN-RW-103
                        2015 Annual Radioactive Effluent Release    April 25, 2017
Radioactive Waste Tracking Procedure
                        Report
4
                        2016 Annual Radioactive Effluent Release    June 13, 2017
EN-RW-104
                        Report
Scaling Factors
                        Radioactive Material Storage Container
13  
                        Tracking Sheets
EN-RW-105
                                            A1-10
Process Control Program
5
EN-RW-106
Integrated Transportation Security Plan
6
04-S-01-G17-3
Radwaste Filters and Demineralizer
47
08-S-06-50
Radwaste Instruction:  Loading Radioactive
Material
9
08-S-06-71
Radwaste Instruction: Sampling
Procedures for Waste Classification
7
07-S-14-428
Operation and Maintenance of the TRI-
NUC Underwater Filtration System
0
08-S-02-075
Radiation Protection Instruction - Coverage
and Control of Refueling Operations and
Movement of Irradiated Materials
16  
Audits and Self-Assessments
Number  
Title  
Date  
QA-1 4/15-2015-GGN-1
Combined Radiation Protection and
Radwaste
September 14, 2015
LO-GLO-2017-00022
Pre-NRC Inspection Module 71124-08
May 24, 2017  
LO-GLO-2015-00139
10 CFR Part 37 Materials Security Review
January 8, 2016  
Condition Reports (CR-HQN-)
2015-00747
2017-00904
Condition Reports (CR-GGNS-)
2015-00231
2015-05082
2016-00319
2016-00320
2016-00801
2016-00804
2016-00805
2016-00809
2016-04376
2017-00101
2017-00106
2017-01568
2017-01625
2017-01644
2017-04789
2017-05552
2017-06772
2017-06779


                            The following items are requested for the
                        Occupational/Public Radiation Safety Inspection
                                  at Grand Gulf Nuclear Station
                                        July 10 to 14, 2017
A1-10  
                                    Integrated Report 2017007
Radioactive Material and Waste Shipments
Inspection areas are listed in the attachments below.
Number
Please provide the requested information on or before June 14, 2017.
Title
Please submit this information using the same lettering system as below. For example, all
Date
contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled
GGN-2017-0101
1- A, applicable organization charts in file/folder 1- B, etc.
CFFF Filters - LSA-II
If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at
January 12, 2017
least 30 days later than the onsite inspection dates, so the inspectors will have access to the
GGN-2017-0102
information while writing the report.
CRD-CRDM- LSA-II
In addition to the corrective action document lists provided for each inspection procedure listed
January 13, 2017  
below, please provide updated lists of corrective action documents at the entrance meeting.
GGN-2017-0106
The dates for these lists should range from the end dates of the original lists to the day of the
CPS Powdex Liner
entrance meeting.
January 20, 2017  
If more than one inspection procedure is to be conducted and the information requests appear
GGN-2016-0319
to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which
WMG Sealands
file the information can be found.
March 16, 2016
If you have any questions or comments, please contact Martin Phalen at (817) 200-1158 or
GGN-2016-0320
martin.phalen@nrc.gov.
Suppression Pool Filter Liners
                        PAPERWORK REDUCTION ACT STATEMENT
March 21, 2016
  This letter does not contain new or amended information collection requirements subject
GGN-2016-0324
    to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
5 Type A GE Boxes
      collection requirements were approved by the Office of Management and Budget,
March 23, 2016
                                  control number 3150-0011.
GGN-2015-0801
                                                                                    Attachment 2
RWCU-A Liner - Type B
August  3, 2017
GGN-2015-0805
RWCU-A Liner - Type B  
August  3, 2017
GGN-2015-0809
RWCU-A Liner - Type B
August 16, 2017
Miscellaneous Documents
Number
Title
Date
OE-NOE-2016-00
NRC-RIS-2016-11
November 30, 2016
2017
RW/RAM Shipping Log
January 1, 2017
2016
RW/RAM Shipping Log
January 1, 2016
2015
RW/RAM Shipping Log
January 1, 2015
UFSAR Chapter 11
GGN Updated Final Safety Analysis Report
2016
Management Standard No. 36
April 25, 2017
Monitoring & Responding to Dose Rates on the  
Fuel Pools
April 14, 2016
2015 Annual Radioactive Effluent Release
Report
April 25, 2017
2016 Annual Radioactive Effluent Release
Report
June 13, 2017
Radioactive Material Storage Container
Tracking Sheets


5. Radiation Monitoring Instrumentation (71124.05)
  Date of Last Inspection:        March 27, 2015
A. List of contacts and telephone numbers for the following areas:
Attachment 2
  1Effluent monitor calibration
The following items are requested for the
  2. Radiation protection instrument calibration
Occupational/Public Radiation Safety Inspection
  3Installed instrument calibrations
at Grand Gulf Nuclear Station
  4Count room and Laboratory instrument calibrations
July 10 to 14, 2017
B. Applicable organization charts
Integrated Report 2017007
C. Copies of audits, self-assessments, vendor or NUPIC audits for contractor support and
  LERs, written since date of last inspection, related to:
Inspection areas are listed in the attachments below.   
  1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey
   
      instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,
Please provide the requested information on or before June 14, 2017.  
      or whole body counters
   
  2. Installed radiation monitors
Please submit this information using the same lettering system as belowFor example, all
D. Procedure index for:
contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled
  1. Calibration, use and operation of continuous air monitors, criticality monitors,
1- A, applicable organization charts in file/folder 1- B, etc.
      portable survey instruments, temporary area radiation monitors, electronic
      dosimeters, teledosimetry, personnel contamination monitors, and whole body
If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at
      counters.
least 30 days later than the onsite inspection dates, so the inspectors will have access to the
  2. Calibration of installed radiation monitors
information while writing the report.  
E. Please provide specific procedures related to the following areas noted below.
  Additional Specific Procedures will be requested by number after the inspector reviews
In addition to the corrective action document lists provided for each inspection procedure listed
  the procedure indexes.
below, please provide updated lists of corrective action documents at the entrance meeting.
  1. Calibration of portable radiation detection instruments (for portable ion chambers)
The dates for these lists should range from the end dates of the original lists to the day of the
  2. Whole body counter calibration
entrance meeting.  
  3. Laboratory instrumentation quality control
F. A summary list of corrective action documents (including corporate and sub-tiered
If more than one inspection procedure is to be conducted and the information requests appear
  systems) written since date of last inspection, related to the following programs:
to be redundant, there is no need to provide duplicate copies.  Enter a note explaining in which
  1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey
file the information can be found.  
      instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,
      whole body counters,
If you have any questions or comments, please contact Martin Phalen at (817) 200-1158 or
  2. Installed radiation monitors,
martin.phalen@nrc.gov.
  3. Effluent radiation monitors
  4. Count room radiation instruments
  NOTE: The lists should indicate the significance level of each issue and the search
            criteria used. Please provide in document formats which are searchable so that
            the inspector can perform word searches.
PAPERWORK REDUCTION ACT STATEMENT
G. Offsite dose calculation manual, technical requirements manual, or licensee controlled
This letter does not contain new or amended information collection requirements subject
  specifications, which lists the effluent monitors and calibration requirements.
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
H. Current calibration data for the whole body counters.
collection requirements were approved by the Office of Management and Budget,
                                            A2-2
control number 3150-0011.  


I. Primary to secondary source calibration correlation for effluent monitors.
J. A list of the point of discharge effluent monitors with the two most recent calibration
  dates and the work order numbers associated with the calibrations.
K. Radiation Monitoring System health report for the previous 12 months
A2-2
                                            A2-3
5.
Radiation Monitoring Instrumentation (71124.05)
Date of Last Inspection:
March 27, 2015
A.  
List of contacts and telephone numbers for the following areas:
1. Effluent monitor calibration
2. Radiation protection instrument calibration
3. Installed instrument calibrations
4. Count room and Laboratory instrument calibrations
B.
Applicable organization charts
C.
Copies of audits, self-assessments, vendor or NUPIC audits for contractor support and
LERs, written since date of last inspection, related to
1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey
instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,
or whole body counters 
2. Installed radiation monitors
D.
Procedure index for:
1. Calibration, use and operation of continuous air monitors, criticality monitors,
portable survey instruments, temporary area radiation monitors, electronic
dosimeters, teledosimetry, personnel contamination monitors, and whole body
counters.
2. Calibration of installed radiation monitors  
E.
Please provide specific procedures related to the following areas noted below. 
Additional Specific Procedures will be requested by number after the inspector reviews
the procedure indexes.
1. Calibration of portable radiation detection instruments (for portable ion chambers)
2. Whole body counter calibration
3. Laboratory instrumentation quality control
F.
A summary list of corrective action documents (including corporate and sub-tiered
systems) written since date of last inspection, related to the following programs:
1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey
instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,
whole body counters, 
2. Installed radiation monitors, 
3. Effluent radiation monitors
4. Count room radiation instruments
NOTE: The lists should indicate the significance level of each issue and the search
criteria used.  Please provide in document formats which are searchable so that
the inspector can perform word searches.
G.
Offsite dose calculation manual, technical requirements manual, or licensee controlled
specifications, which lists the effluent monitors and calibration requirements.  
H.  
Current calibration data for the whole body counters.


6. Radioactive Gaseous and Liquid Effluent Treatment (71124.06)
  Date of Last Inspection:      March 27, 2015
   
A. List of contacts and telephone numbers for the following areas:
   
  1. Radiological effluent control
A2-3  
  2. Engineered safety feature air cleaning systems
I.  
B. Applicable organization charts
Primary to secondary source calibration correlation for effluent monitors.  
C. Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs
J.  
  written since date of last inspection, related to:
A list of the point of discharge effluent monitors with the two most recent calibration
  1. Radioactive effluents
dates and the work order numbers associated with the calibrations.  
  2. Engineered Safety Feature Air cleaning systems
K.  
D. Procedure indexes for the following areas
Radiation Monitoring System health report for the previous 12 months
  1. Radioactive effluents
  2. Engineered Safety Feature Air cleaning systems
E. Please provide specific procedures related to the following areas noted below.
  Additional Specific Procedures will be requested by number after the inspector reviews
  the procedure indexes.
  1. Sampling of radioactive effluents
  2. Sample analysis
  3.  Generating radioactive effluent release permits
  4. Laboratory instrumentation quality control
  5.  In-place testing of HEPA filters and charcoal adsorbers
  6.  New or applicable procedures for effluent programs (e.g., including ground water
      monitoring programs)
F. List of corrective action documents (including corporate and sub-tiered systems) written
  since date of last inspection, associated with:
  1. Radioactive effluents
  2. Effluent radiation monitors
  3. Engineered Safety Feature Air cleaning systems
  NOTE: The lists should indicate the significance level of each issue and the search
            criteria used. Please provide in document formats which are searchable so that
            the inspector can perform word searches.
G. 2015 and 2016 Annual Radioactive Effluent Release Report, or the two most recent
  reports.
H. Current Copy of the Offsite Dose Calculation Manual
I. Copy of the 2015 and 2016 inter-laboratory comparison results for laboratory quality
  control performance of effluent sample analysis, or the two most recent results.
J. Effluent sampling schedule for the week of the inspection
K. New entries into 10 CFR 50.75(g) files since date of last inspection
                                            A2-4


L. Operations department (or other responsible dept.) log records for effluent monitors
  removed from service or out of service
M. Listing or log of liquid and gaseous release permits since date of last inspection
N. A list of the technical specification-required air cleaning systems with the two most
A2-4
  recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal
6.  
  adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers
Radioactive Gaseous and Liquid Effluent Treatment (71124.06)
  associated with the surveillances
Date of Last Inspection:
O. System Health Report for radiation monitoring instrumentation. Also, please provide a
March 27, 2015
  specific list of all effluent radiation monitors that were considered inoperable for 7 days
  or more since November 2011. If applicable, please provide the relative Special Report
A.
  and condition report(s).
List of contacts and telephone numbers for the following areas:
P. A list of all radiation monitors that are considered § 50.65/Maintenance Rule equipment.
1. Radiological effluent control
Q. A list of all significant changes made to the Gaseous and Liquid Effluent Process
2. Engineered safety feature air cleaning systems
  Monitoring System since the last inspection. If applicable, please provide the
B.
  corresponding UFSAR section in which this change was documented.
Applicable organization charts
R. A list of any occurrences in which a non-radioactive system was contaminated by a
C.  
  radioactive system. Please include any relative condition report(s).
Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs
                                              A2-5
written since date of last inspection, related to:
1.  Radioactive effluents
2.  Engineered Safety Feature Air cleaning systems
D.  
Procedure indexes for the following areas
1.  Radioactive effluents
2.  Engineered Safety Feature Air cleaning systems  
E.
Please provide specific procedures related to the following areas noted below. 
Additional Specific Procedures will be requested by number after the inspector reviews
the procedure indexes. 
1. Sampling of radioactive effluents
2. Sample analysis
3. Generating radioactive effluent release permits
4. Laboratory instrumentation quality control
5. In-place testing of HEPA filters and charcoal adsorbers
6. New or applicable procedures for effluent programs (e.g., including ground water
monitoring programs)  
F.
List of corrective action documents (including corporate and sub-tiered systems) written
since date of last inspection, associated with:
1.  Radioactive effluents
2. Effluent radiation monitors
3. Engineered Safety Feature Air cleaning systems
NOTE: The lists should indicate the significance level of each issue and the search
criteria used.  Please provide in document formats which are searchable so that  
the inspector can perform word searches.
G.  
2015 and 2016 Annual Radioactive Effluent Release Report, or the two most recent
reports.  
H.  
Current Copy of the Offsite Dose Calculation Manual
I.  
Copy of the 2015 and 2016 inter-laboratory comparison results for laboratory quality
control performance of effluent sample analysis, or the two most recent results.
J.  
Effluent sampling schedule for the week of the inspection
K.  
New entries into 10 CFR 50.75(g) files since date of last inspection


7. Radiological Environmental Monitoring Program (71124.07)
  Date of Last Inspection:        March 27, 2015
A. List of contacts and telephone numbers for the following areas:
  1. Radiological environmental monitoring
A2-5
  2. Meteorological monitoring
L.  
B. Applicable organization charts
Operations department (or other responsible dept.) log records for effluent monitors
C. Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs
removed from service or out of service
  written since date of last inspection, related to:
M.  
  1. Radiological environmental monitoring program (including contractor environmental
Listing or log of liquid and gaseous release permits since date of last inspection  
      laboratory audits, if used to perform environmental program functions)
N.  
  2. Environmental TLD processing facility
A list of the technical specification-required air cleaning systems with the two most
  3. Meteorological monitoring program
recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal
D. Procedure index for the following areas:
adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers
  1. Radiological environmental monitoring program
associated with the surveillances
  2. Meteorological monitoring program
O.  
E. Please provide specific procedures related to the following areas noted below.
System Health Report for radiation monitoring instrumentation. Also, please provide a
  Additional Specific Procedures will be requested by number after the inspector reviews
specific list of all effluent radiation monitors that were considered inoperable for 7 days
  the procedure indexes.
or more since November 2011If applicable, please provide the relative Special Report
  1Environmental Program Description
and condition report(s).   
  2.  Sampling, collection and preparation of environmental samples
P.  
  3.  Sample analysis (if applicable)
A list of all radiation monitors that are considered § 50.65/Maintenance Rule equipment.
  4Laboratory instrumentation quality control
Q.
  5. Procedures associated with the Offsite Dose Calculation Manual
A list of all significant changes made to the Gaseous and Liquid Effluent Process
  6. Appropriate QA Audit and program procedures, and/or sections of the stations QA
Monitoring System since the last inspection.  If applicable, please provide the  
      manual (which pertain to the REMP)
corresponding UFSAR section in which this change was documented.
F. A summary list of corrective action documents (including corporate and sub-tiered
R.
  systems) written since date of last inspection, related to the following programs:
A list of any occurrences in which a non-radioactive system was contaminated by a
  1. Radiological environmental monitoring
radioactive system. Please include any relative condition report(s).  
  2. Meteorological monitoring
  NOTE: The lists should indicate the significance level of each issue and the search
            criteria used. Please provide in document formats which are searchable so that
            the inspector can perform word searches.
G. Wind Rose data and evaluations used for establishing environmental sampling locations
H. Copies of the 2 most recent calibration packages for the meteorological tower
  instruments
I. Copy of the 2015 and 2016 Annual Radiological Environmental Operating Report and
  Land Use Census, and current revision of the Offsite Dose Calculation Manual, or the
  two most recent reports.
                                            A2-6


J. Copy of the environmental laboratorys inter-laboratory comparison program results for
  2015 and 2016, or the two most recent results, if not included in the annual radiological
  environmental operating report
K. Data from the environmental laboratory documenting the analytical detection sensitivities
A2-6
  for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)
7.
L. Quality Assurance audits (e.g., NUPIC) for contracted services
Radiological Environmental Monitoring Program (71124.07) 
M. Current NEI Groundwater Initiative Plan and status
Date of Last Inspection:
N. Technical requirements manual or licensee controlled specifications which lists the
March 27, 2015
  meteorological instruments calibration requirements
O. A list of Regulatory Guides and/or NUREGs that you are currently committed to relative
A.  
  to the Radiological Environmental Monitoring Program. Please include the revision
List of contacts and telephone numbers for the following areas:
  and/or date for the committed item and where this can be located in your current
1. Radiological environmental monitoring
  licensing basis/UFSAR.
2. Meteorological monitoring
P. If applicable, per NEI 07-07, provide any reports that document any spills/leaks to
B.
  groundwater since the last inspection
Applicable organization charts
                                          A2-7
C.
Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs
written since date of last inspection, related to:
1. Radiological environmental monitoring program (including contractor environmental
laboratory audits, if used to perform environmental program functions)
2. Environmental TLD processing facility
3. Meteorological monitoring program
D.
Procedure index for the following areas:
1. Radiological environmental monitoring program
2. Meteorological monitoring program
E.
Please provide specific procedures related to the following areas noted below. 
Additional Specific Procedures will be requested by number after the inspector reviews
the procedure indexes.
1. Environmental Program Description
2. Sampling, collection and preparation of environmental samples
3. Sample analysis (if applicable) 
4. Laboratory instrumentation quality control
5. Procedures associated with the Offsite Dose Calculation Manual
6. Appropriate QA Audit and program procedures, and/or sections of the stations QA
manual (which pertain to the REMP)
F.
A summary list of corrective action documents (including corporate and sub-tiered
systems) written since date of last inspection, related to the following programs:
1. Radiological environmental monitoring
2. Meteorological monitoring
NOTE: The lists should indicate the significance level of each issue and the search
criteria used. Please provide in document formats which are searchable so that
the inspector can perform word searches.
G.
Wind Rose data and evaluations used for establishing environmental sampling locations
H.
Copies of the 2 most recent calibration packages for the meteorological tower
instruments 
I.  
Copy of the 2015 and 2016 Annual Radiological Environmental Operating Report and
Land Use Census, and current revision of the Offsite Dose Calculation Manual, or the  
two most recent reports.


8. Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,
  and Transportation (71124.08)
  Date of Last Inspection:        March 27, 2015
A. List of contacts and telephone numbers for the following areas:
A2-7
  1. Solid Radioactive waste processing
J.  
  2. Transportation of radioactive material/waste
Copy of the environmental laboratorys inter-laboratory comparison program results for
B. Applicable organization charts (and list of personnel involved in solid radwaste
2015 and 2016, or the two most recent results, if not included in the annual radiological
  processing, transferring, and transportation of radioactive waste/materials)
environmental operating report
C. Copies of audits, department self-assessments, and LERs written since date of last
K.  
  inspection related to:
Data from the environmental laboratory documenting the analytical detection sensitivities
  1. Solid radioactive waste management
for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)
  2. Radioactive material/waste transportation program
L.  
D. Procedure index for the following areas:
Quality Assurance audits (e.g., NUPIC) for contracted services  
  1. Solid radioactive waste management
M.  
  2. Radioactive material/waste transportation
Current NEI Groundwater Initiative Plan and status
E. Please provide specific procedures related to the following areas noted below.
N.   
  Additional Specific Procedures will be requested by number after the inspector reviews
Technical requirements manual or licensee controlled specifications which lists the
  the procedure indexes.
meteorological instruments calibration requirements
  1Process control program
O.  
  2. Solid and liquid radioactive waste processing
A list of Regulatory Guides and/or NUREGs that you are currently committed to relative
  3Radioactive material/waste shipping
to the Radiological Environmental Monitoring Program. Please include the revision
  4.  Methodology used for waste concentration averaging, if applicable
and/or date for the committed item and where this can be located in your current
  5. Waste stream sampling and analysis
licensing basis/UFSAR.  
F. A summary list of corrective action documents (including corporate and sub-tiered
P.  
  systems) written since date of last inspection related to:
If applicable, per NEI 07-07, provide any reports that document any spills/leaks to
  1. Solid radioactive waste
groundwater since the last inspection  
  2. Transportation of radioactive material/waste
  NOTE: The lists should indicate the significance level of each issue and the search
            criteria used. Please provide in document formats which are searchable so that
            the inspector can perform word searches.
G. Copies of training lesson plans for 49 CFR 172, Subpart H, for radwaste processing,
  packaging, and shipping.
H. A summary of radioactive material and radioactive waste shipments made from date of
  last inspection to present
I. Waste stream sample analyses results and resulting scaling factors for 2015 and 2016,
  or the two most recent results.
J. Waste classification reports if performed by vendors (such as for irradiated hardware)
                                            A2-8


K.     A listing of all on-site radwaste storage facilities. Please include a summary or listing of
      the items stored in each facility, including the total amount of radioactivity and the
      highest general area dose rate.
Although it is not necessary to compile the following information, the inspector will also review:
A2-8
L.     Training, and qualifications records of personnel responsible for the conduct of
8.
      radioactive waste processing, package preparation, and shipping
Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,
                                                A2-9
and Transportation (71124.08) 
Date of Last Inspection:
March 27, 2015
A.
List of contacts and telephone numbers for the following areas:
1. Solid Radioactive waste processing
2. Transportation of radioactive material/waste
B.
Applicable organization charts (and list of personnel involved in solid radwaste
processing, transferring, and transportation of radioactive waste/materials)
C.
Copies of audits, department self-assessments, and LERs written since date of last
inspection related to:
1. Solid radioactive waste management
2. Radioactive material/waste transportation program
D.
Procedure index for the following areas:
1. Solid radioactive waste management
2. Radioactive material/waste transportation 
E.
Please provide specific procedures related to the following areas noted below. 
Additional Specific Procedures will be requested by number after the inspector reviews
the procedure indexes. 
1. Process control program
2. Solid and liquid radioactive waste processing 
3. Radioactive material/waste shipping 
4. Methodology used for waste concentration averaging, if applicable
5. Waste stream sampling and analysis
F.
A summary list of corrective action documents (including corporate and sub-tiered
systems) written since date of last inspection related to:
1. Solid radioactive waste
2. Transportation of radioactive material/waste
NOTE: The lists should indicate the significance level of each issue and the search
criteria used.  Please provide in document formats which are searchable so that
the inspector can perform word searches.
G.
Copies of training lesson plans for 49 CFR 172, Subpart H, for radwaste processing,
packaging, and shipping.
H.
A summary of radioactive material and radioactive waste shipments made from date of
last inspection to present
I.
Waste stream sample analyses results and resulting scaling factors for 2015 and 2016,
or the two most recent results.
J.
Waste classification reports if performed by vendors (such as for irradiated hardware)
 
A2-9
K.  
A listing of all on-site radwaste storage facilities. Please include a summary or listing of  
the items stored in each facility, including the total amount of radioactivity and the  
highest general area dose rate.  
Although it is not necessary to compile the following information, the inspector will also review:  
L.  
Training, and qualifications records of personnel responsible for the conduct of  
radioactive waste processing, package preparation, and shipping
}}
}}

Latest revision as of 12:51, 8 January 2025

NRC Radiation Protection Inspection Report 05000416/2017012 and Notice of Violation
ML17235B265
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/22/2017
From: Heather Gepford
Plant Support Branch-1
To: Emily Larson
Entergy Operations
References
IR 2017012
Download: ML17235B265 (36)


See also: IR 05000416/2017012

Text

August 22, 2017

Mr. Eric Larson, Site Vice President

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT: GRAND GULF NUCLEAR STATION - NRC RADIATION PROTECTION

INSPECTION REPORT 05000416/2017012 AND NOTICE OF VIOLATION

Dear Mr. Larson:

On July 14, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at

the Grand Gulf Nuclear Station and discussed the results of this inspection with you and other

members of your staff. The results of this inspection are documented in the enclosed report.

Based on the results of this inspection, the NRC has identified two issues that were evaluated

under the risk significance determination process as having very low safety significance

(Green). The NRC also determined that one violation is associated with these issues.

This violation was evaluated in accordance with the NRC Enforcement Policy. The

current Enforcement Policy is included in the NRCs Web site at http://www.nrc.gov/about-

nrc/regulatory/enforcement/enforce-pol.html. The violation is cited in the enclosed Notice of

Violation (Notice) and the circumstances surround it are described in detail in the subject

inspection report. The violation is being cited because this violation did not meet the criteria to

be treated as a non-cited violation because the licensee failed to restore compliance within a

reasonable period of time after it was identified.

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. If you have additional information that you

believe the NRC should consider, you may provide it in your response to the Notice. The NRC

review of your response will also determine whether further enforcement action is necessary to

ensure your compliance with regulatory requirements.

If you disagree with a cross-cutting aspect assignment or a finding not associated with a

regulatory requirement in this report, you should provide a response within 30 days of the date

of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory

Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the

Regional Administrator, Region IV; and the NRC resident inspector at the Grand Gulf Nuclear

Station.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

E. Larson

2

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

made available for public inspection in the NRC Public Document Room from the NRCs Agency

wide Documents Access and Management System (ADAMS), accessible from the NRC Web

site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should

not include any personal, privacy, or proprietary information so that it can be made available to

the public without redaction.

Sincerely,

/RA/

Heather J. Gepford, Ph.D., CHP, Branch Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No. 50-416

License No. NPF-29

Enclosure:

Inspection Report 05000416/2017012

w/Attachments:

1. Supplemental Information

2. Request for Information

ML17235B265

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: HGepford

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

SHP:PSB2

HP:PSB2

HP:PSB2

SHP:RIII

C:PSB2

C:PSB2

NAME

LCarson

NGreene

JODonnell

TGo

HGepford

JKozal

SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

/RA/

DATE

8/17/17

8/17/17

8/17/17

8/17/17

8/17/17

8/22/17

OFFICE

ACES

C:PSB2

NAME

MHay

HGepford

SIGNATURE

/RA/

/RA/

DATE

8/22/17

8/22/17

Enclosure

U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

Docket:

05000416

Report:

05000416/2017012

Facility:

Grand Gulf Nuclear Station

Dates:

July 10 through July 14, 2017

Inspectors:

L. Carson II, Sr. Health Physicist

N. Greene, PhD, Health Physicist

J. ODonnell, CHP, Health Physicist

T. Go, Health Physicist (RIII)

Accompanied by S. Money, Health Physicist

Approved By:

Heather Gepford, PhD, CHP

Chief, Plant Support Branch 2

Division of Reactor Safety

2

NOTICE OF VIOLATION

Entergy Operations, Inc.

Docket No. 05000416

Grand Gulf Nuclear Station

License No. NPF-29

During an NRC inspection conducted from July 10-14, 2017, a violation of NRC requirements

was identified. In accordance with the NRC Enforcement Policy, the violation is listed below:

10 CFR 20.1501(c) requires, in part, that the licensee shall ensure that instruments and

equipment used for quantitative radiation measurements are calibrated periodically for

the radiation measured.

Contrary to the above, since January 1, 2012, the licensee failed to ensure that

instruments and equipment used for quantitative radiation measurements were

calibrated periodically for the radiation measured. Specifically, the licensee failed to

properly calibrate the containment/drywell high range radiation monitors and the main

steam line radiation monitors using industry accepted calibration methods and

tolerances.

This violation is associated with a Green SDP finding.

Pursuant to the provisions of 10 CFR 2.201, Entergy Operations, Inc., is hereby required to

submit a written statement or explanation to the U.S. Nuclear Regulatory Commission,

ATTN: Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional

Administrator, Region IV, 1600 E. Lamar Blvd., Arlington, TX 76011, and a copy to the NRC

Resident Inspector at the Grand Gulf Nuclear Station, within 30 days of the date of the letter

transmitting this Notice of Violation (Notice). This reply should be clearly marked as a "Reply to

a Notice of Violation" and should include for the violation: (1) the reason for the violation or, if

contested, the basis for disputing the violation or severity level, (2) the corrective steps that

have been taken and the results achieved, (3) the corrective steps that will be taken, and

(4) the date when full compliance will be achieved. Your response may reference or include

previous docketed correspondence if the correspondence adequately addresses the required

response. If an adequate reply is not received within the time specified in this Notice, an order

or a Demand for Information may be issued as to why the license should not be modified,

suspended, or revoked, or why such other action as may be proper should not be taken. Where

good cause is shown, consideration will be given to extending the response time.

If you contest this enforcement action, you should also provide a copy of your response with the

basis for your denial, to the Director, Office of Enforcement, United States Nuclear Regulatory

Commission, Washington, DC 20555-0001.

Because your response will be made available electronically for public inspection in the

NRC Public Document Room or from the NRCs document system (ADAMS), accessible from

the NRC Web site at http://www.nrc.gov/reading-rm/adams.html, to the extent possible, it should

not include any personal privacy, proprietary, or safeguards information so that it can be made

available to the public without redaction. If personal privacy or proprietary information is

necessary to provide an acceptable response, then please provide a bracketed copy of your

response that identifies the information that should be protected and a redacted copy of your

response that deletes such information. If you request withholding of such material, you must

specifically identify the portions of your response that you seek to have withheld and provide in

3

detail the bases for your claim of withholding (e.g., explain why the disclosure of information will

create an unwarranted invasion of personal privacy or provide the information required by

10 CFR 2.390(b) to support a request for withholding confidential commercial or financial

information). If Safeguards Information is necessary to provide an acceptable response, please

provide the level of protection described in 10 CFR 73.21.

In accordance with 10 CFR 19.11, you may be required to post this Notice within two working

days of receipt.

Dated this 22nd day of August 2017

4

SUMMARY

IR 05000416/2017012; 07/10/2017 - 07/14/2017; Grand Gulf Nuclear Station; Radiation

Monitoring Instrumentation (71124.05), Radioactive Gaseous and Liquid Effluent Treatment

(71124.06)

Cornerstone: Public Radiation Safety

Green. The inspectors identified a violation of 10 CFR 20.1501(c) for the failure

to properly calibrate installed radiation monitors using industry accepted calibration

methods and tolerances. Specifically, since January 2012, the licensee failed to

properly calibrate the following radiation monitors: main steam line, containment

high range, and the drywell high range. This violation was originally entered into

the licensees corrective action program in March 2015 as Condition

Report CR-GGNS-2015-01832. However, in 2017, inspectors determined that

subsequent to 2015, the licensee failed to implement corrective actions to properly

calibrate the instruments. The licensee entered this repetitive issue into their corrective

action process as Condition Report CR-GGN-2017-06826.

The failure to properly calibrate radiation monitors is a performance deficiency. The

performance deficiency is more than minor because it is associated with the cornerstone

attribute of plant instrumentation and adversely affects the cornerstone objective to

ensure adequate protection of employee health and safety during routine civilian nuclear

reactor operation and is therefore a finding. Specifically, the failure to properly calibrate

radiation monitors impacts the licensees ability to assess dose rates. Using Inspection

Manual Chapter 0609, Appendix C, Occupational Radiation Safety Significance

Determination Process, dated August 19, 2008, the inspectors determined the finding to

be of very low safety significance because it was not an as low as reasonably achievable

(ALARA) issue, there was no overexposure or substantial potential for overexposure,

and the licensees ability to assess dose was not compromised. This finding has a

cross-cutting aspect in the resources component of the Problem Identification and

Resolution area because the licensee did not ensure that effective corrective actions

were implemented to address issues in a timely manner commensurate with the safety

significance [P.3]. (Section 2RS5)

Green. The inspectors identified a finding associated with the licensees failure to

operate the gaseous radwaste system within design specifications. These deficiencies

in design specifications were associated with the off gas charcoal adsorber and vault

refrigeration components of the gaseous radwaste system, which has impacted the

systems reliability and efficiency since at least 2007. The design parameters for

offgas flow rate into the charcoal adsorbers and vault refrigeration temperature were

30 scfm and 0 degrees Fahrenheit, respectively. In contrast, the gaseous radwaste

system is being operated with an approximate flow rate is 80 scfm and vault refrigeration

temperature is 15 degrees Fahrenheit. The licensee has developed a system

improvement plan to address resolution of these issues during the next scheduled

outages. This performance deficiency was entered into the licensees corrective action

program as Condition Report CR-GGN-2017-06875.

5

The failure to operate the offgas gaseous radwaste system within design specifications,

resulting in elevated radiological effluent releases, is a performance deficiency. The

finding is more than minor because it is associated with the plant equipment attribute of

the Public Radiation Safety cornerstone and adversely affected the cornerstone

objective to ensure adequate protection of public health and safety from exposure of

radioactive materials released into the public domain as a result of routine civilian

nuclear plant operation. Using Inspection Manual Chapter 0609, Appendix D, Public

Radiation Safety Significance Determination Process, the finding was determined to be

of very low safety significance (Green) because it involved the Effluent Release

Program, it did not impair the ability to assess dose, and did not exceed the

10 CFR Part 50, Appendix I, or 10 CFR 20.1301(d) limits. The finding has a

cross-cutting aspect in the area of problem identification and resolution, associated with

the resolution component, because the licensee failed to take effective corrective actions

in a timely manner to minimize the unreliability and inefficiency of the gaseous radwaste

system [P.3]. (Section 2RS6)

6

REPORT DETAILS

2.

RADIATION SAFETY

Cornerstones: Public Radiation Safety and Occupational Radiation Safety

2RS5 Radiation Monitoring Instrumentation (71124.05)

a.

Inspection Scope

The inspectors evaluated the accuracy and operability of the radiation monitoring

equipment used by the licensee to monitor areas, materials, and workers to ensure a

radiologically safe work environment. This evaluation included equipment used to

monitor radiological conditions related to normal plant operations, anticipated operational

occurrences, and conditions resulting from postulated accidents. The inspectors

interviewed licensee personnel, walked down various portions of the plant, and reviewed

licensee performance associated with radiation monitoring instrumentation, as described

below:

The inspectors performed walk downs and observations of selected plant

radiation monitoring equipment and instrumentation, including portable survey

instruments, area radiation monitors, continuous air monitors, personnel

contamination monitors, portal monitors, and small article monitors. The

inspectors assessed material condition and operability, evaluated positioning of

instruments relative to the radiation sources or areas they were intended to

monitor, and verified performance of source checks and calibrations.

The inspectors evaluated the calibration and testing program, including

laboratory instrumentation, whole body counters, post-accident monitoring

instrumentation, portal monitors, personnel contamination monitors, small article

monitors, portable survey instruments, area radiation monitors, electronic

dosimetry, air samplers, and continuous air monitors.

The inspectors assessed problem identification and resolution for radiation

monitoring instrumentation. The inspectors reviewed audits, self-assessments,

and corrective action program documents to verify problems were being

identified and properly addressed for resolution.

These activities constitute completion of the three required samples of radiation

monitoring instrumentation, as defined in Inspection Procedure 71124.05.

b.

Findings

Introduction. The inspectors identified a violation of 10 CFR 20.1501(c) for the failure to

properly calibrate installed radiation monitors using industry accepted calibration

methods and tolerances. Specifically, the main steam line, containment high range, and

drywell high range radiation monitors have not been properly calibrated since at least

January 2012. This violation was originally entered into the licensees corrective action

program in March 2015 as Condition Report CR-GGNS-2015-01832. However, in 2017,

inspectors determined that the licensee failed to implement appropriate corrective

7

actions to properly calibrate the instruments. The licensee entered this repetitive issue

into their corrective action process as Condition Report CR-GGN-2017-06826.

Description. The failure to properly calibrate the main steam line and

containment/drywell high range area radiation monitors was previously identified

and documented as a non-cited violation during an inspection in March of 2015:

NCV 05000416/2015001-04, Failure to Properly Calibrate Main Steam Line Radiation

Monitors and Containment/Drywall High Range Radiation Monitors.

During this inspection, the inspectors reviewed the revised calibration procedures and

calibration data for main steam line, containment high range, and drywell high range

radiation monitors. The main steam line radiation monitors provide reactor operators

with early indication of gross release of fission products from the fuel. This monitor has

an automatic response function that isolates the reactor water sample line to limit the

release of radioactive materials. The containment high range and drywell high radiation

monitors provide reactor operators and emergency response organization members

information about the radiological conditions inside the containment building and the

drywell. This information is used to make informed decisions about what actions to take

during an accident as well as make emergency declarations. As such, it is important

that these radiation monitors be properly calibrated. However, it was determined that

the improper calibrations did not adversely affect the licensees ability to implement the

Emergency Plan.

Based on their review of the current revisions of the applicable procedures, corrective

action documents, and calibration data, the inspectors determined that the licensee had

not corrected the calibration method from the previous non-cited violation. The licensee

procedures did not address the required reproducible source-to-detector geometry or the

characterization of the calibration sources used. Additionally, because the main steam

line monitor calibration requires two different sources in the procedure, each source

should have been characterized in a reproducible geometry.

The licensee revised Procedure 06-IC-1D17-R-1002, Main Steam Line High Radiation

Monitor (PCIS) Calibration, Revision 109, on April 3, 2017. The previous revision (108)

was dated December 13, 2011. Section 5.37 of this procedure describes the radiation

calibration method. The calibration method, as described in this section, fails to employ

a reproducible geometry or calibrated radiation sources. Further, the calibration method,

as described in this section, only addresses calibration of two of the six decades of the

logarithmic monitor.

The licensee also revised Procedure 06-IC-1D21-R-1002, Containment/Drywell High

Range Area Radiation Monitor Calibration, Revision 108, on April 3, 2017. The

previous revision (107) was dated September 12, 2011. Section 5.87 describes the

radiation functional test portion of this procedure. The calibration method described in

this section fails to employ a reproducible geometry or a calibrated radiation source.

Further, the acceptance criteria in this section are twice that allowed in American

National Standards Institute (ANSI) N323D-2002, American National Standard for

Installed Radiation Protection Instrumentation, approved on September 3, 2002. In

addition, the electronic calibration method in this procedure as allowed by NUREG 0737,

Clarification of TMI Action Plan Requirements, dated November 1980, only addresses

calibration of three of the seven decades of the logarithmic monitor.

8

The inspectors concluded that the licensee had continued to improperly calibrate

these process radiation monitors since the previous inspection in March 2015.

Procedure 06-IC-1D17-R-1002 rocedure is used for all four channels of the main

steam line monitors and Procedure 06-IC-1D21-R-1002 is used for both channels of

the drywell and containment high range radiation monitors. Because both procedures

failed to use appropriate calibration methodologies, the inspectors determined that

none of the containment/drywell high range and main steam line radiation monitors

had been properly calibrated since at least the date of the procedure revisions,

September 12, 2011, and December 13, 2011, respectively.

In evaluating the underlying cause of the licensees failure to correct the calibration

issue, the inspectors noted the following. On January 20, 2017, a corrective action

document (CR-GGN-2017-00612) was initiated identifying a non-conforming condition of

a Condition Adverse to Quality that the calibration procedure for the containment high

range and drywell high radiation monitors does not control the source geometry to the

monitor. The CR further described the required calibration traceability not being

maintained. In the self-assessment report of the radiation protection instrument program

(OL-GLO-2017-21) completed on May 23, 2017, the assessment team rated Objective 2,

the review of the prior inspection report, as unsatisfactory. This rating was given

because actions related to this issue were not complete after a considerable amount of

time, which included at least five due date extensions and an extended outage that

should have allowed completion of the corrective action.

Analysis. The failure to properly calibrate radiation monitors is a performance

deficiency. The performance deficiency is more than minor because it is associated with

the cornerstone attribute of plant instrumentation and adversely affects the cornerstone

objective to ensure adequate protection of employee health and safety during routine

civilian nuclear reactor operation and is therefore a finding. Specifically, the failure to

properly calibrate radiation monitors impacts the licensees ability to assess dose rates.

Using Inspection Manual Chapter 0609, Appendix C, Occupational Radiation Safety

Significance Determination Process, dated August 19, 2008, the inspectors determined

the finding to be of very low safety significance because it was not an as low as

reasonably achievable (ALARA) issue, there was no overexposure or substantial

potential for overexposure, and the licensees ability to assess dose was not

compromised. This finding has a cross-cutting aspect in the area of problem

identification and resolution, associated with the resolution component, because the

licensee did not ensure that effective corrective actions were implemented to address

issues in a timely manner commensurate with the safety significance [P.3].

Enforcement. Title 10 CFR 20.1501(c) requires, in part, that the licensee shall

ensure that instruments and equipment used for quantitative radiation measurements

are calibrated periodically for the radiation measured. Contrary to the above, since at

least January 1, 2012, the licensee failed to ensure that instruments and equipment

used for quantitative radiation measurements were calibrated periodically for the

radiation measured. Specifically, the licensee failed to properly calibrate the

containment/drywell high range radiation monitors and the main steam line

radiation monitors using industry accepted calibration methods and tolerances.

This issue was entered into the licensees corrective action program as Condition

Report CR-GGN-2017-06826.

9

This issue was previously identified during an inspection in March of 2015, as

NCV 05000416/2015001-04 and was treated as a non-cited violation, consistent with

Section 2.3.2.a of the Enforcement Policy. Since the licensee did not restore

compliance in a reasonable period of time, this violation is being cited, consistent with

the NRC Enforcement Policy, Section 2.3.2, which states, in part, that the licensee must

restore compliance within a reasonable period of time (i.e., in a timeframe

commensurate with the significance of the violation) after a violation is identified. A

Notice of Violation is attached. VIO 05000416/2017012-01, Failure to Properly

Calibrate Installed Radiation Monitors Using Industry Accepted Calibration Methods and

Tolerances.

2RS6 Radioactive Gaseous and Liquid Effluent Treatment (71124.06)

a.

Inspection Scope

The inspectors evaluated whether the licensee maintained gaseous and liquid effluent

processing systems and properly mitigated, monitored, and evaluated radiological

discharges with respect to public exposure. The inspectors verified that abnormal

radioactive gaseous or liquid discharges and conditions, when effluent radiation monitors

are out-of-service, were controlled in accordance with the applicable regulatory

requirements and licensee procedures. The inspectors verified that the licensees

quality control program ensured radioactive effluent sampling and analysis adequately

quantified and evaluated discharges of radioactive materials. The inspectors verified the

adequacy of public dose projections resulting from radioactive effluent discharges. The

inspectors interviewed licensee personnel and reviewed licensee performance in the

following areas:

During walk downs and observations of selected portions of the radioactive

gaseous and liquid effluent equipment, the inspectors evaluated routine

processing and discharge of effluents, including sample collection and analysis.

The inspectors observed equipment configuration and flow paths of selected

gaseous and liquid discharge system components, effluent monitoring systems,

filtered ventilation system material condition, and significant changes to effluent

release points.

Calibration and testing program for process and effluent monitors, including

National Institute of Standards and Technology traceability of sources, primary

and secondary calibration data, channel calibrations, set-point determination

bases, and surveillance test results.

Sampling and analysis controls used to ensure representative sampling and

appropriate compensatory sampling. Reviews included results of the inter-

laboratory comparison program,

Instrumentation and equipment, including effluent flow measuring instruments, air

cleaning systems, and post-accident effluent monitoring instruments.

Dose calculations for effluent releases. The inspectors reviewed a selection of

radioactive liquid and gaseous waste discharge permits and abnormal gaseous

or liquid tank discharges, and verified the projected doses were accurate. The

10

inspectors also reviewed 10 CFR Part 61 analyses and methods used to

determine which isotopes were included in the source term. The inspectors

reviewed land use census results, offsite dose calculation manual changes, and

significant changes in reported dose values from previous years.

Problem identification and resolution for radioactive gaseous and liquid effluent

treatment. The inspectors reviewed audits, self-assessments, and corrective

action program documents to verify problems were being identified and properly

addressed for resolution.

These activities constitute completion of the six required samples of radioactive gaseous

and liquid effluent treatment program, as defined in Inspection Procedure 71124.06.

b.

Findings

Introduction. The inspectors identified a Green finding for the licensees failure to

operate their gaseous radwaste system within design specifications, resulting in elevated

radiological effluent releases that were not as low as reasonably achievable. These

deficiencies in meeting the design specifications/parameters are associated with the

offgas charcoal adsorber and vault refrigeration components of the offgas system, which

have impacted the systems reliability and efficiency since at least 2007.

Description. When reviewing the licensees annual effluent release reports, the

inspectors identified that in calendar year 2013, the licensee had total airborne releases

of fission and activation gases of 1920 curies (Ci), including a peak release of 1540 Ci

during the third quarter. The inspectors noted that this annual gaseous release was

significantly higher than the previous annual releases of approximately 450 Ci in

calendar years 2010 thru 2012. The licensee stated the primary reason for the elevated

activity of gaseous releases was associated with refrigeration equipment issues affecting

charcoal adsorption efficiency. Upon further evaluation, NRC inspectors determined that

such issues with the charcoal adsorbers and vault refrigeration systems were long-term,

ongoing, unresolved deficiencies in the gaseous radwaste system primarily due to

numerous condenser in-leakages that remain unrepaired.

The Grand Gulf Nuclear Station System Description, Revision 2, for the gaseous

radwaste system notes that there are two sets of four charcoal adsorber vessels

arranged in series, totaling eight charcoal adsorber beds. As the offgas flows from the

condenser system via the steam jet air ejectors into the charcoal adsorption system, the

charcoal acts as a medium to delay the flow of krypton and xenon gases to allow them to

decay to radiation levels acceptable for atmospheric release. In addition, the activated

charcoal adsorbs the radioactive isotopes of iodine removing them for decay.

The adsorption of xenon, krypton, and iodine offgas on charcoal depends on gas

flowrate, holdup time, mass of charcoal, and the dynamic adsorption coefficient. The

inspectors determined the nominal flowrate for the licensees charcoal system to operate

efficiently is specified as 30 scfm, to achieve proper holdup times of offgases. However,

the licensee has been consistently running the system at 80 scfm.

The Grand Gulf Nuclear Station System Description also states the charcoal adsorbers

must be operated under controlled temperature and humidity conditions, maintaining a

steady state temperature of about 0 degrees Fahrenheit (°F). However, for optimal

11

performance, a refrigeration temperature of 0 to -40°F is specified. The inspectors

reviewed Figure 10 of Section 4.1.7 of Grand Gulf Nuclear Station System Description,

entitled Comparative Curie Decontamination Factors for 8, 12, and 16 Bed Systems,

which illustrated that the charcoal low temperature, eight bed system is designed to

operate at a decontamination factor of 1000 with the specified design parameters

(i.e., 30 scfm, 0ºF). However, the inspectors determined licensees current offgas

flowrate of approximately 80 scfm and refrigeration temperature of approximately +15°F

will achieve a decontamination factor of less than 50.

The licensee performed evaluations, as documented in Apparent Cause

Evaluation CR-GGN-2013-0450, and determined that corrective actions were needed to

decrease the current elevated offgas flowrate into the charcoal adsorbers from

approximately 80 scfm, and to reduce the vault refrigeration temperature to within

design specifications. The licensee implemented some corrective actions to reduce

condenser in-leakage, resulting in some improvement in the offgas flowrate (reduction

from ~160 scfm to ~80 scfm). However, the offgas flowrates, charcoal adsorber

flowpath, and refrigeration vault operations still remain inconsistent with the design

specifications.

Although these deficiencies were ongoing issues, the licensee provided no documented

evaluation to demonstrate that the degraded performance of the offgas system was

maintaining gaseous releases as low as reasonably achievable, which the Updated Final

Safety Analysis Report states is the primary design objective of the gaseous radwaste

management system. The NRC inspectors discussed with the licensee that, although

the airborne releases may meet the 10 CFR Part 20, Appendix I, limitations, the failure

to operate the system consistent with design parameters is significantly impacting the

systems ability to maintain gaseous releases as low as reasonably achievable, as

evidenced by the annual effluent reports.

The licensee has developed a system improvement plan entitled, Offgas Long Range

Plan and Concluding Actions, to address how the plant may resolve the issues within

the next few scheduled outages. This performance deficiency was entered into the

licensees CAP as Condition Report CR-GGN-2017-06875.

Analysis. The failure to operate the offgas gaseous radwaste system within design

specifications, resulting in elevated radiological effluent releases, is a performance

deficiency. The finding is more than minor because it is associated with the plant

equipment attribute of the Public Radiation Safety cornerstone and adversely affected

the cornerstone objective to ensure adequate protection of public health and safety from

exposure of radioactive materials released into the public domain as a result of routine

civilian nuclear plant operation. Using Inspection Manual Chapter 0609, Appendix D,

Public Radiation Safety Significance Determination Process, the finding was

determined to be of very low safety significance (Green) because it involved the

Effluent Release Program, it did not impair the ability to assess dose, and did not

exceed the 10 CFR Part 50, Appendix I, or 10 CFR 20.1301(d) limits. The finding has a

cross-cutting aspect in the area of problem identification and resolution, associated with

the resolution component, because the licensee did not ensure that effective corrective

actions were implemented to address issues in a timely manner commensurate with the

safety significance [P.3].

12

Enforcement. The inspectors did not identify a violation of regulatory requirements.

Although the licensee failed to operate the system within the design specifications, as

described in the Grand Gulf Nuclear Station System Description, the inspectors

determined this was a self-imposed standard and did not constitute a regulatory

requirement. The issue was entered into the licensees corrective action program as

CR-GGN-2017-06875. Finding (FIN)05000416-2017012-02, Failure to Operate the

Gaseous Radwaste System Within Design Specifications.

2RS7 Radiological Environmental Monitoring Program (71124.07)

a.

Inspection Scope

The inspectors evaluated whether the licensees radiological environmental monitoring

program quantified the impact of radioactive effluent releases to the environment and

sufficiently validated the integrity of the radioactive gaseous and liquid effluent release

program. The inspectors also verified that the licensee continued to implement the

voluntary NEI/Industry Ground Water Protection Initiative. The inspectors reviewed or

observed the following items:

The inspectors observed selected air sampling and dosimeter monitoring

stations, sampler station modifications, and the collection and preparation of

environmental samples. The inspectors reviewed calibration and maintenance

records for selected air samplers, composite water samplers, and environmental

sample radiation measurement instrumentation, and inter-laboratory comparison

program results. The inspectors reviewed selected events documented in the

annual environmental monitoring report and significant changes made by the

licensee to the offsite dose calculation manual as the result of changes to the

land census. The inspectors evaluated the operability, calibration, and

maintenance of meteorological instruments and assessed the meteorological

dispersion and deposition factors. The inspectors verified the licensee had

implemented sampling and monitoring program sufficient to detect leakage from

structures, systems, or components with credible mechanism for licensed

material to reach ground water and reviewed changes to the licensees written

program for identifying and controlling contaminated spills/leaks to groundwater.

Groundwater protection initiative (GPI) implementation, including assessment of

groundwater monitoring results, identified leakage or spill events and entries

made into 10 CFR 50.75 (g) records, licensee evaluations of the extent of the

contamination and the radiological source term, and reports of events associated

with spills, leaks, and groundwater monitoring results.

Problem identification and resolution for the radiological environmental

monitoring program. The inspectors reviewed audits, self-assessments, and

corrective action program documents to verify problems were being identified

and properly addressed for resolution.

These activities constitute completion of the three required samples of radiological

environmental monitoring program, as defined in Inspection Procedure 71124.07.

13

b.

Findings

No findings were identified.

2RS8

Radioactive Solid Waste Processing and Radioactive Material Handling, Storage,

and Transportation (71124.08)

a.

Inspection Scope

The inspectors evaluated the effectiveness of the licensees programs for processing,

handling, storage, and transportation of radioactive material. The inspectors interviewed

licensee personnel and reviewed the following items:

Radioactive material storage, including waste storage areas including container

labeling/marking and monitoring containers for deformation or signs of waste

decomposition.

Radioactive waste system, including walk-downs of the accessible portions of the

radioactive waste processing systems and handling equipment. The inspectors

also reviewed or observed changes made to the radioactive waste processing

systems, methods for dewatering and waste stabilization, waste stream mixing

methodology, and waste processing equipment that was not operational or

abandoned in place.

Waste characterization and classification, including radio-chemical sample

analysis results for radioactive waste streams and use of scaling factors and

calculations to account for difficult-to-measure radionuclides, and processes for

waste classification including use of scaling factors and 10 CFR Part 61

analyses.

Shipment preparation, including packaging, surveying, labeling, marking,

placarding, vehicle checking, driver instructing, and preparation of the disposal

manifests.

Shipping records for LSA I, II, III, SCOI, II, Type A, or Type B radioactive material

or radioactive waste shipments.

Problem identification and resolution for radioactive solid waste processing and

radioactive material handling, storage, and transportation. The inspectors

reviewed audits, self-assessments, and corrective action program documents to

verify problems were being identified and properly addressed for resolution.

These activities constitute completion of the six required samples of radioactive solid

waste processing, and radioactive material handling, storage, and transportation

program, as defined in Inspection Procedure 71124.08.

b.

Findings

No findings were identified.

14

4.

OTHER ACTIVITIES

4OA6 Meetings, Including Exit

Exit Meeting Summary

On July 14, 2017, the inspectors presented the radiation safety inspection results to

Mr. E. Larson, Site Vice President, and other members of the licensee staff. The licensee

acknowledged the issues presented. The licensee confirmed that any proprietary information

reviewed by the inspectors had been returned or destroyed.

Attachment 1

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

J. Ashley, Environmental Specialist, Chemistry

R. Benson, Acting Manager, Radiation Protection

D. Byers, Manager, System Engineering

R. Gaston, Director, Corporate Licensing

M. Giacini, General Manager, Plant Operations

A. Hasanat, Licensing Engineer, Regulatory Assurance

J. Hallanbeck, Design Manager, Engineering

E. Larson, Site Vice President

M. Larson, Supervisor, Radiation Protection

K. Long, Shipper, Radwaste

J. Reese, Specialist, Chemistry

T. Reeves, Supervisor, Chemistry

F. Rosser, Specialist, Radiation Protection

P. Stokes, Support Supervisor, Radiation Protection

S. Sweet, Licensing Engineer, Regulatory Assurance

E. Wright, Supervisor, Radiation Protection

J. Underwood, Manager, Chemistry

NRC Personnel

N. Day, Resident Inspector

R. Smith, Acting Senior Resident Inspector

M. Young, Senior Resident Inspector

S. Hedger, Emergency Preparedness Inspector

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened 05000416-2017012-01

VIO

Failure to Correct Instrument Calibration Process in a Timely

Manner (Section 2RS5)

Opened and Closed 05000416-2017012-02

FIN

Failure to Operate the Gaseous Radwaste System Within Design

Specifications (Section 2RS6)

Closed

None

Discussed

None

A1-2

LIST OF DOCUMENTS REVIEWED

Section 2RS5: Radiation Monitoring Instrumentation

Procedures

Number

Title

Revision

06-IC-1D17-R-1002

Main Steam Line High Radiation Monitor

(PCIS) Calibration

108, 109

06-IC-1D21-R-1002

Containment/Drywell High Range Area

Radiation Monitor Calibration

107, 108,109

08-S-07-83

Radiation Protection Instruction Operation

and Calibration of the ND-9000 Whole Body

Counter

10

EN-CY-102

Laboratory Analytical Quality Control

9

EN-FAP-RP-007

Operation of the RP Central Calibration

Facility

2

EN-MA-105

Control of Measuring and Test Equipment

(M&TE)

13

EN-RP-122

Alpha Monitoring

9

EN-RP-301

Radiation Protection Instrument Control

10

EN-RP-305

Source Maintenance

0

EN-RP-317

Central Calibration Facility

0

EN-RP-317-08

Calibration of Portable Scalers

1

EN-RP-317-09

Calibration of Dosimeters

2

EN-RP-317-10

Calibration of Portable Dose Rate Instrument 0

ODCM

Offsite Dose Calculation Manual

39

Audits and Self-Assessments

Number

Title

Date

OL-GLO-2017-21

Self-Assessment of RP Instrumentation

Program

May 23, 2017

QA-14/15-201 5-GGN-1 QA Audit: Combined Radiation Protection and

Radwaste

November 16, 2015

A1-3

Condition Reports (CR-GGNS-)

2015-01775

2015-01773

2015-02807

2015-01831

2015-01832

2016-01796

2016-04647

2016-05297

2016-08308

2016-09537

2016-09889

2017-00612

2017-04141

2017-04697

2017-06865

2017-06876

Installed Radiation Instrument Calibration Records

W/O Number

Title

Date

52628844

Main Steam Line High Radiation Monitor (PCIS)

Calibration - Channel A

February 22, 2017

52637367

Containment/Drywell High Range Area Radiation

Monitor Calibration - Channel A

March 16, 2016

Portable Radiation Instrument Calibration Records

Number

Title

Date

ASC-001

Calibration Data Sheet: SAC-4

March 28, 2017

CHP-C-015

Calibration Data Sheet: Model 2000(43-10) Alpha

Scaler

July 10 2017

CHP-C-022

Calibration Data Sheet: iSolo Alpha Scaler

April 27, 2017

CHP-CS-020

Calibration Data Sheet: iSolo Alpha Scaler

March 23, 2017

CHP-DR-283

Calibration Data Sheet: TelePole

June 13, 2017

HP-11431

Calibration Data Sheet: RO-2

June 6, 2017

HP-CS-004

Calibration Data Sheet: Model BC-4

July 6, 2017

HP-DR-563

Calibration Data Sheet: Model 9-3

December 12, 2016

HP-DR-563

Calibration Data Sheet: Ludlum Model-9-3

July 11, 2017

HP-DS-054

Calibration Data Sheet: Model SAC-4

July 10, 2017

RAM-001

Calibration Data Sheet: AMP-100

March 12, 2017

Stationary Radiation Instrument Calibration Records

Number

Title

Date

400-10-17-005

Germanium Detector No. 3 Calibration Package

March 23, 2017

400-11-17-005

Germanium Detector No. 4 Calibration Package

March 22, 2017

400-9-17-002

Germanium Detector No. 2 Calibration Package

March 15, 2017

A1-4

Stationary Radiation Instrument Calibration Records

Number

Title

Date

Apex-InVivo

Analysis Report Calibration Check Count of People

Mover Whole Body Monitor

July 12, 2017

Canberra

Calibration of the Canberra/Nuclear Data People

Mover WBC System at Entergy Grand Gulf Nuclear

Station

August 8, 2015

Other Radiation Protection Instrument Records

Number

Title

Date

CHP-DR-326

Instrument Response Check Failure Review

January 13, 2017

CHP-TEL039

Instrument Response Check Failure Review

May 15, 2017

CHP-TEL044

Instrument Response Check Failure Review

March 1, 2017

HP-11431

Maintenance Data Sheet: Failed Calibration Check

April 10, 2017

Miscellaneous Documents

Number

Title

Date

201512044

Central Radiation Protection Maintenance Data Sheet December 10, 2015

201706-012

Entergy Operations, Inc., Portable Instruments to

Waterford-3 RP

June 19, 2017

3751

Laboratory Standard Calibration/Verification Data:

V-570 Meter

July 9, 2015

AO-987

Amersham Source Decay Data Sheet

January 26, 2017

AO-988

Amersham Source Decay Data Sheet

January 26, 2017

ERIC Report

Instrument Status Report Calibration Needed for

GGNS

July 11, 2017

JLS-8254

Source Verification of Source J.L. Shephard Calibrator

S/N SRC-1993003 Model-89 (400) Cs-137 Sealed

Sources at Set Positions

October 13, 2015

MP-141

AEA Technology Source Decay Sheet

January 26, 2017

MP-158

AEA Technology Source Decay Sheet

January 26, 2017

A1-5

Section 2RS6: Radioactive Gaseous and Liquid Effluent Treatment

Procedures

Number

Title

Revision

04-1-01-N65-1-SU

System Operating Instruction Offgas Vault

Refrigeration

033

06-CH-1000-M-0049

Effluent Dose Calculations

104

06-CH-1D17-M-0003

Building Ventilation Gaseous Tritium

109

06-CH-1D17-M-0005

Building Ventilation Exhaust Gaseous Isotopic

109

06-CH-1D17-M-0018

Gaseous Release Points - Particulate Alpha

Activity

108

06-CH-1D17-W-0017

Gaseous Release Points - Iodines, Tritium and

Particulates

106

06-CH-1T48-M-0037

Standby Gas Treatment Exhaust Gaseous Isotopic 107

06-CH-SG17-O-0045

Radwaste Release Post-Release Calculations

105

06-CH-SG17-P-0041

Radwaste Release Pre-Release Analysis

109

06-CH-SG17-Q-0044

Radwaste Release Quarterly Composite

103

08-S-03-10

Chemistry Sampling Program

052

08-S-03-22

Installed Radiation Monitoring System Alarm

Setpoint Determination and Control

114

1-S-08-11

Radioactive Discharge Controls

114

EN-CY-108

Monitoring of Nonradioactive Systems

006

Audits and Self-Assessments

Number

Title

Date

LO-GLO-2016-0122

Pre-NRC RETS/ODCM Radiological Effluent

Occurrences Assessment

December 4, 2016

Teledyne Brown Engineering Environmental

Services

April 19, 2017

QA-2-6-2015-GGNS-1 GGNS Combined Chemistry Effluent and

Environmental Monitoring (including ODCM

and REMP) Program Audit

October 9, 2015

Condition Reports (CR-GGNS-)

2013-00450

2015-06763

2015-06764

2015-06982

2016-02468

2016-02688

2016-07187

2016-08307

2016-08308

2017-00051

2017-00193

2017-00204

2017-00264

2017-00290

2017-00336

2017-00529

2017-03101

2017-03745

2017-04525

2017-05659

2017-06821

2017-06875

A1-6

10 CFR 50.75(g) Condition Reports (CR-GGNS-)

2015-06763

2015-06764

2016-07187

2017-00336

Release Permits

Liquid Releases

2015051

2015094

2016011

2016017

2016022

2016040

2016042

2016044

2016045

2016051

2016073

2017009

2017018

In-Place Filter Testing Records

Number

System

Train

Test

Date

WO 46551718

Standby Gas Treatment

B

DOP & HEPA

June 3, 2017

WO 52482060

Standby Gas Treatment

A

DOP & HEPA

March 16, 2015

WO 52618801

Control Room Air / Standby

Fresh Air

A

DOP & HEPA

October 27, 2016

WO 52655772

Control Room Air / Standby

Fresh Air

B

DOP & HEPA

December 1, 2016

Miscellaneous Documents

Number

Title

Revision

Date

2014 Annual Radioactive Effluent Release Report

April 27, 2015

2015 Annual Radioactive Effluent Release Report

April 14, 2016

2016 Annual Radioactive Effluent Release Report

April 25, 2017

Cross Contamination of Service Air System / CR-

GGN-2017-00193

February 27, 2017

Grand Gulf Service Air System I.E.Bulletin 80-10

Bounding Evaluation for Contamination of a

Nonradioactive System

March 29, 2017

Nuclear Independent Oversight Functional Area

Performance Report: Group B

May 31, 2016

Offsite Dose Calculation Manual

39

1000-1-17-002

2016 Radiochemistry INTRALAB Cross-Check

Results

January 23, 2017

GNRO-2016/00039

Supplement to Grand Gulf Nuclear Station 2015

Annual Radioactive Effluent Release Report (ARERR)

July 20, 2016

SD N64/N65

Grand Gulf Nuclear Station System Description

2

UFSAR Chapter 11

GGN Updated Final Safety Analysis Report

2016-00

A1-7

Section 2RS7: Radiological Environmental Monitoring Program

Procedures

Number

Title

Revision

06-EN-S000-V-0001

Surveillance Procedure Radiological

Environmental Sampling

111

06-IC-SC84-SA-1003 Primary Tower Wind Speed/Direction, Air

Temperature (T/dT) and Relative Humidity

106

07-S-53-C84-7

Backup Tower Wind/Speed/Direction and Air

Temperature Calibration

0

08-S-04-964

Met Data Processing

2

ODCM

Offsite Dose Calculation Manual

39

Audits and Self-Assessments

Number

Title

Date

LO-GLO-2015-00042

Focused Self-Assessment:

Chemistry Groundwater/Environmental

Programs

November 18, 2015

2015

Environmental Dosimetry Company

Quality Assurance Status Report

February 29, 2016

2015

Teledyne Brown Engineering:

Environmental Services

Quality Assurance Report

May 9, 2016

2016

Environmental Dosimetry Company

Quality Assurance Status Report

March 8, 2017

2016

Teledyne Brown Engineering:

Environmental Services

Quality Assurance Report

April 19, 2017

Condition Reports (CR-GGNS-)

2015-04675

2015-05753

2015-06263

2015-06763

2016-03213

2016-03475

2016-03825

2016-05543

2016-07187

2016-07747

2016-08364

2016-09067

2017-00813

2017-00993

2017-01731

2017-02633

2017-05447

A1-8

REMP Air Sampler Calibration Data

Number

Title

Date

CHEM-001

LV-1D - Air Sampler (LOVOL)

July 21, 2016

CHEM-002

LV-1D - Air Sampler (LOVOL)

October 20, 2016

CHEM-003

LV-1D - Air Sampler (LOVOL)

July 19, 2016

Meteorological Instrument Calibration Records

W/O Number

Title

Date

52652328

Backup Meteorological Tower Instrument

Calibration

07-S-53-C84-7

August 29, 2016

52692658

Primary Meteorological Tower Instrument

Calibrations

06-IC-SC84-SA-1003

August 2, 2016

Meteorological Data

Number

Title

Date

2016

ODCM Annual Average Relative Concentration

(/Q) and Relative Deposition (D/Q)

March 2017

2016

Review of Grand Gulf Meteorological Data

March 9, 2017

Groundwater Protection Documents

Number

Title

Revision / Date

L71506

Groundwater Monitoring Report - January 2017

February 3, 2017

L71974

Groundwater Monitoring Report - February 2017

March 31, 2017

L72140

Groundwater Monitoring Report - March 2017

March 31, 2017

L72521

Groundwater Monitoring Report - April 2017

May 5, 2017

R06045-0032-002 Groundwater Monitoring Plan

6

Miscellaneous Documents

Number

Title

Date

2015

Annual Environmental Operating Report

April 19, 2016

2016

Annual Environmental Operating Report

April 27, 2017

2016

Land Use Census

December 16, 2016

2017-044

Licensing Basis Document Change Request

(LBDCR)

April 27, 2017

A1-9

Section 2RS8: Radioactive Solid Waste Processing, and Radioactive Material Handling,

Storage, and Transportation

Procedures

Number

Title

Revision

EN-RW-101

Radioactive Waste Management

3

EN-RW-102

Radioactive Shipping Procedure

15

EN-RW-103

Radioactive Waste Tracking Procedure

4

EN-RW-104

Scaling Factors

13

EN-RW-105

Process Control Program

5

EN-RW-106

Integrated Transportation Security Plan

6

04-S-01-G17-3

Radwaste Filters and Demineralizer

47

08-S-06-50

Radwaste Instruction: Loading Radioactive

Material

9

08-S-06-71

Radwaste Instruction: Sampling

Procedures for Waste Classification

7

07-S-14-428

Operation and Maintenance of the TRI-

NUC Underwater Filtration System

0

08-S-02-075

Radiation Protection Instruction - Coverage

and Control of Refueling Operations and

Movement of Irradiated Materials

16

Audits and Self-Assessments

Number

Title

Date

QA-1 4/15-2015-GGN-1

Combined Radiation Protection and

Radwaste

September 14, 2015

LO-GLO-2017-00022

Pre-NRC Inspection Module 71124-08

May 24, 2017

LO-GLO-2015-00139

10 CFR Part 37 Materials Security Review

January 8, 2016

Condition Reports (CR-HQN-)

2015-00747

2017-00904

Condition Reports (CR-GGNS-)

2015-00231

2015-05082

2016-00319

2016-00320

2016-00801

2016-00804

2016-00805

2016-00809

2016-04376

2017-00101

2017-00106

2017-01568

2017-01625

2017-01644

2017-04789

2017-05552

2017-06772

2017-06779

A1-10

Radioactive Material and Waste Shipments

Number

Title

Date

GGN-2017-0101

CFFF Filters - LSA-II

January 12, 2017

GGN-2017-0102

CRD-CRDM- LSA-II

January 13, 2017

GGN-2017-0106

CPS Powdex Liner

January 20, 2017

GGN-2016-0319

WMG Sealands

March 16, 2016

GGN-2016-0320

Suppression Pool Filter Liners

March 21, 2016

GGN-2016-0324

5 Type A GE Boxes

March 23, 2016

GGN-2015-0801

RWCU-A Liner - Type B

August 3, 2017

GGN-2015-0805

RWCU-A Liner - Type B

August 3, 2017

GGN-2015-0809

RWCU-A Liner - Type B

August 16, 2017

Miscellaneous Documents

Number

Title

Date

OE-NOE-2016-00

NRC-RIS-2016-11

November 30, 2016

2017

RW/RAM Shipping Log

January 1, 2017

2016

RW/RAM Shipping Log

January 1, 2016

2015

RW/RAM Shipping Log

January 1, 2015

UFSAR Chapter 11

GGN Updated Final Safety Analysis Report

2016

Management Standard No. 36

April 25, 2017

Monitoring & Responding to Dose Rates on the

Fuel Pools

April 14, 2016

2015 Annual Radioactive Effluent Release

Report

April 25, 2017

2016 Annual Radioactive Effluent Release

Report

June 13, 2017

Radioactive Material Storage Container

Tracking Sheets

Attachment 2

The following items are requested for the

Occupational/Public Radiation Safety Inspection

at Grand Gulf Nuclear Station

July 10 to 14, 2017

Integrated Report 2017007

Inspection areas are listed in the attachments below.

Please provide the requested information on or before June 14, 2017.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled

1- A, applicable organization charts in file/folder 1- B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the onsite inspection dates, so the inspectors will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Martin Phalen at (817) 200-1158 or

martin.phalen@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

A2-2

5.

Radiation Monitoring Instrumentation (71124.05)

Date of Last Inspection:

March 27, 2015

A.

List of contacts and telephone numbers for the following areas:

1. Effluent monitor calibration

2. Radiation protection instrument calibration

3. Installed instrument calibrations

4. Count room and Laboratory instrument calibrations

B.

Applicable organization charts

C.

Copies of audits, self-assessments, vendor or NUPIC audits for contractor support and

LERs, written since date of last inspection, related to:

1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey

instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,

or whole body counters

2. Installed radiation monitors

D.

Procedure index for:

1. Calibration, use and operation of continuous air monitors, criticality monitors,

portable survey instruments, temporary area radiation monitors, electronic

dosimeters, teledosimetry, personnel contamination monitors, and whole body

counters.

2. Calibration of installed radiation monitors

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Calibration of portable radiation detection instruments (for portable ion chambers)

2. Whole body counter calibration

3. Laboratory instrumentation quality control

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection, related to the following programs:

1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey

instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,

whole body counters,

2. Installed radiation monitors,

3. Effluent radiation monitors

4. Count room radiation instruments

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

Offsite dose calculation manual, technical requirements manual, or licensee controlled

specifications, which lists the effluent monitors and calibration requirements.

H.

Current calibration data for the whole body counters.

A2-3

I.

Primary to secondary source calibration correlation for effluent monitors.

J.

A list of the point of discharge effluent monitors with the two most recent calibration

dates and the work order numbers associated with the calibrations.

K.

Radiation Monitoring System health report for the previous 12 months

A2-4

6.

Radioactive Gaseous and Liquid Effluent Treatment (71124.06)

Date of Last Inspection:

March 27, 2015

A.

List of contacts and telephone numbers for the following areas:

1. Radiological effluent control

2. Engineered safety feature air cleaning systems

B.

Applicable organization charts

C.

Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since date of last inspection, related to:

1. Radioactive effluents

2. Engineered Safety Feature Air cleaning systems

D.

Procedure indexes for the following areas

1. Radioactive effluents

2. Engineered Safety Feature Air cleaning systems

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Sampling of radioactive effluents

2. Sample analysis

3. Generating radioactive effluent release permits

4. Laboratory instrumentation quality control

5. In-place testing of HEPA filters and charcoal adsorbers

6. New or applicable procedures for effluent programs (e.g., including ground water

monitoring programs)

F.

List of corrective action documents (including corporate and sub-tiered systems) written

since date of last inspection, associated with:

1. Radioactive effluents

2. Effluent radiation monitors

3. Engineered Safety Feature Air cleaning systems

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

2015 and 2016 Annual Radioactive Effluent Release Report, or the two most recent

reports.

H.

Current Copy of the Offsite Dose Calculation Manual

I.

Copy of the 2015 and 2016 inter-laboratory comparison results for laboratory quality

control performance of effluent sample analysis, or the two most recent results.

J.

Effluent sampling schedule for the week of the inspection

K.

New entries into 10 CFR 50.75(g) files since date of last inspection

A2-5

L.

Operations department (or other responsible dept.) log records for effluent monitors

removed from service or out of service

M.

Listing or log of liquid and gaseous release permits since date of last inspection

N.

A list of the technical specification-required air cleaning systems with the two most

recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal

adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers

associated with the surveillances

O.

System Health Report for radiation monitoring instrumentation. Also, please provide a

specific list of all effluent radiation monitors that were considered inoperable for 7 days

or more since November 2011. If applicable, please provide the relative Special Report

and condition report(s).

P.

A list of all radiation monitors that are considered § 50.65/Maintenance Rule equipment.

Q.

A list of all significant changes made to the Gaseous and Liquid Effluent Process

Monitoring System since the last inspection. If applicable, please provide the

corresponding UFSAR section in which this change was documented.

R.

A list of any occurrences in which a non-radioactive system was contaminated by a

radioactive system. Please include any relative condition report(s).

A2-6

7.

Radiological Environmental Monitoring Program (71124.07)

Date of Last Inspection:

March 27, 2015

A.

List of contacts and telephone numbers for the following areas:

1. Radiological environmental monitoring

2. Meteorological monitoring

B.

Applicable organization charts

C.

Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since date of last inspection, related to:

1. Radiological environmental monitoring program (including contractor environmental

laboratory audits, if used to perform environmental program functions)

2. Environmental TLD processing facility

3. Meteorological monitoring program

D.

Procedure index for the following areas:

1. Radiological environmental monitoring program

2. Meteorological monitoring program

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Environmental Program Description

2. Sampling, collection and preparation of environmental samples

3. Sample analysis (if applicable)

4. Laboratory instrumentation quality control

5. Procedures associated with the Offsite Dose Calculation Manual

6. Appropriate QA Audit and program procedures, and/or sections of the stations QA

manual (which pertain to the REMP)

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection, related to the following programs:

1. Radiological environmental monitoring

2. Meteorological monitoring

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

Wind Rose data and evaluations used for establishing environmental sampling locations

H.

Copies of the 2 most recent calibration packages for the meteorological tower

instruments

I.

Copy of the 2015 and 2016 Annual Radiological Environmental Operating Report and

Land Use Census, and current revision of the Offsite Dose Calculation Manual, or the

two most recent reports.

A2-7

J.

Copy of the environmental laboratorys inter-laboratory comparison program results for

2015 and 2016, or the two most recent results, if not included in the annual radiological

environmental operating report

K.

Data from the environmental laboratory documenting the analytical detection sensitivities

for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)

L.

Quality Assurance audits (e.g., NUPIC) for contracted services

M.

Current NEI Groundwater Initiative Plan and status

N.

Technical requirements manual or licensee controlled specifications which lists the

meteorological instruments calibration requirements

O.

A list of Regulatory Guides and/or NUREGs that you are currently committed to relative

to the Radiological Environmental Monitoring Program. Please include the revision

and/or date for the committed item and where this can be located in your current

licensing basis/UFSAR.

P.

If applicable, per NEI 07-07, provide any reports that document any spills/leaks to

groundwater since the last inspection

A2-8

8.

Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,

and Transportation (71124.08)

Date of Last Inspection:

March 27, 2015

A.

List of contacts and telephone numbers for the following areas:

1. Solid Radioactive waste processing

2. Transportation of radioactive material/waste

B.

Applicable organization charts (and list of personnel involved in solid radwaste

processing, transferring, and transportation of radioactive waste/materials)

C.

Copies of audits, department self-assessments, and LERs written since date of last

inspection related to:

1. Solid radioactive waste management

2. Radioactive material/waste transportation program

D.

Procedure index for the following areas:

1. Solid radioactive waste management

2. Radioactive material/waste transportation

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Process control program

2. Solid and liquid radioactive waste processing

3. Radioactive material/waste shipping

4. Methodology used for waste concentration averaging, if applicable

5. Waste stream sampling and analysis

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection related to:

1. Solid radioactive waste

2. Transportation of radioactive material/waste

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

Copies of training lesson plans for 49 CFR 172, Subpart H, for radwaste processing,

packaging, and shipping.

H.

A summary of radioactive material and radioactive waste shipments made from date of

last inspection to present

I.

Waste stream sample analyses results and resulting scaling factors for 2015 and 2016,

or the two most recent results.

J.

Waste classification reports if performed by vendors (such as for irradiated hardware)

A2-9

K.

A listing of all on-site radwaste storage facilities. Please include a summary or listing of

the items stored in each facility, including the total amount of radioactivity and the

highest general area dose rate.

Although it is not necessary to compile the following information, the inspector will also review:

L.

Training, and qualifications records of personnel responsible for the conduct of

radioactive waste processing, package preparation, and shipping