ML18227B063: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML18227B063
| number = ML18227B063
| issue date = 03/04/1978
| issue date = 03/04/1978
| title = 03/04/1978 Letter Operating Status Reports of February 1978
| title = Letter Operating Status Reports of February 1978
| author name = Schmidt A
| author name = Schmidt A
| author affiliation = Florida Power & Light Co
| author affiliation = Florida Power & Light Co
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:REGULATORY INFORMATION DlSTRIBUTION SYSTEM (RID DISTRIBUTION FOR INCOMING MATERIAL                       0-2   251/335 REC:                            ORG: SCHMIDT A D                DOCDATE: 03/04/78 NRC                            FL PWR  8c LIGHT              DATE RCVD: 03/14/78 DOCTYPE: LETTER     NOTARIZED: NO                                 COPIES RECEIVED
{{#Wiki_filter:REC:
NRC REGULATORY INFORMATION DlSTRIBUTION SYSTEM DISTRIBUTION FOR INCOMING MATERIAL ORG:
SCHMIDT A D FL PWR 8c LIGHT (RID 0-2 251/335 DOCDATE: 03/04/78 DATE RCVD: 03/14/78 DOCTYPE:
LETTER NOTARIZED:
NO


==SUBJECT:==
==SUBJECT:==
LTR 1    ENCL 1 MONTHLY OPERATING REPORTS FOR THE MONTH OF FEBRUARY.
MONTHLY OPERATING REPORTS FOR THE MONTH OF FEBRUARY.
PLANT NAME: TURKEY PT 03                               REVIEWER INITIAL:   XRS TURKEY PT N3                                DISTRIBUTER   INITIAL:P4 ST LUCIE Ol DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS +444%4<<+<<<+4%<++
COPIES RECEIVED LTR 1
ENCL 1
PLANT NAME: TURKEY PT 03 TURKEY PT N3 ST LUCIE Ol REVIEWER INITIAL:
XRS DISTRIBUTER INITIAL:P4 DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS +444%4<<+<<<+4%<++
MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.
MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.
(DISTRIBUTlON CODE A003)
(DISTRIBUTlON CODE A003)
FOR ACTION:     BR CHIEF SCHWENCER++W/2 ENCL INTERNAL:              FILE4+W/ENCL             NRC PDR4+W/ENCL
FOR ACTION:
                                        /2   ENCL EXTERNAL:        LPDR~S MIAMII FL4 +W/ENCL T ICE< W/ENCL NSI C++W/ENCL BNL(NATLAB)++W/ENCL ACRS CAT B++W/0 ENCL DISTRIBUTION:     LTR 10     ENCL 10                   CONTROL NBR:  780740142 SIZE: 1P+3P+bP THE END
INTERNAL:
EXTERNAL:
BR CHIEF SCHWENCER++W/2 ENCL FILE4+W/ENCL /2 ENCL LPDR~S MIAMII FL4 +W/ENCL T ICE< W/ENCL NSI C++W/ENCL BNL(NATLAB)++W/ENCL ACRS CAT B++W/0 ENCL NRC PDR4+W/ENCL DISTRIBUTION:
LTR 10 ENCL 10 SIZE:
1P+3P+bP THE END CONTROL NBR:
780740142


0 t
0 t


Ql llgg~
Qlllgg~
                                                                      ~<4~
~<4~
FLORIDA POWER tk LIGHT COMPANY March 4, l978 a)
FLORIDAPOWER tk LIGHTCOMPANY March 4, l978 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D.
                                                      'QgEtpg               -~
C.
AR'gq Office of  Management  Information                      <<4@v~' )g      e~
20555 a)
and Program Controls                                      ROJQQQ~~~
'QgEtpg -~
U. S. Nuclear Regulatory Commission                          l@g~
<<4@v~'
4 Washington, D. C. 20555                            Gp Gentlemen:
e~
Attached are the February, l978, Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
AR'gq
Very truly yours, Vice President Power Resources VTC/DDC
)g ROJQQQ~~~
                                                                          )
l@g~
cc:   Mr. James P. O'Reilly                                                     P" Robert Lowenstein, Esquire 80740l4Z P EOPLE... SERVING P EOP LE
Gp 4
Gentlemen:
Attached are the February, l978, Operating Status Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. l.
Very truly yours, Vice President Power Resources VTC/DDC cc:
Mr. James P. O'Reilly Robert Lowenstein, Esquire
)
P" 80740l4Z P EOPLE... SERVING P EOP LE


AVERAGE DAILY UiVIT POWER LEVEL DOCKET iVO. 50 250 Turkey Point UNIT   Unit No. 3 DATE   March   4 1978 COMPLETED BY     V. T. Chilson TELEPHONE     (305) 552-3824 MONTH FEBRUARY i 1978 DAY AVERAGE DAILY POWER LEVEL               DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                      (MWe-Net) 17             ll 2,                                           18             127 19            400 20            638 21             680 22             683 23 687 25             686 10                                           26 27             681 12                                           28             675 13 15 16                                         NOTE:     Average     daily power greater than 666 MNe due to cooler condenser cooling water.
AVERAGE DAILY UiVIT POWER LEVEL DOCKET iVO.
50 250 Turkey Point UNIT Unit No.
3 DATE March 4
1978 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 MONTH FEBRUARYi 1978 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 ll 2,
18 19 20 127 400 638 21 680 22 683 23 687 25 686 10 26 27 681 12 28 675 13 15 16 NOTE:
Average daily power greater than 666 MNe due to cooler condenser cooling water.


OPERATING DATA REPORT DOCKET NC.
OPERATING DATAREPORT DOCKET NC.
D4TE Mnn.4         1978 CDhfPLETED BY     Yp~bilnon TELEPHONE CRLB 'i5?=3824 OPERATING STATUS
D4TE Mnn.4 1978 CDhfPLETED BY Yp~bilnon TELEPHONE CRLB 'i5?=3824 OPERATING STATUS 760 700
: l. Unit Name               Turkey Point Unit No. 3                     Notes  -  Urd;t No. 3 operated Februar      1978                        at  approximately      100X    R.P..
: l. Unit Name Turkey Point Unit No.
: g. Reporting period:                                                   after    the unit was returned
3
: g. Reporting period:
Februar 1978
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):
760                  to serviceifollowing comple-
: 4. Nameplate Rating (Gross MWe):
: 4. Nameplate Rating (Gross MWe):                                       tion of scheduled refueling,
: 5. Design Electrical Rating (Net hEPIWe):
: 5. Design Electrical Rating (Net hEPIWe):                             maintenance, .inspections,and
: 6. Maximum Dependable Capacity (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):               700          tests, except for the outage.
: 7. Maximum Dependable Capacity (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since-Last Report, Give Reasons:
Notes -
: 9. Power Level To which Restricted,   IfAny (Net MWe):           NONE
Urd;t No.
: 10. Reasons For Restrictions, If Any:
3 operated at approximately 100X R.P..
This Month         Yr.-to-Date           Cumulative 4
after the unit was returned to serviceifollowing comple-tion of scheduled refueling, maintenance,
: 12. Number Of Hours Reactor Was Critical                                         343.8          35 569.7
.inspections,and
: 13. Reactor Reserve Shutdown Hours
: tests, except for the outage.
                                                                                    -'0-            ill;1 14, Hours Generator On-Line                                                     265.4          34 351.8
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since-Last Report, Give Reasons:
: 15. Unit Reserve Shutdown Hours                                                                                                                                   521 921    '7        85.0
: 9. Power Level To which Restricted, IfAny (Net MWe):
                                                                    -'52 16, Gross Thermal Energy Generated (MWH)                                                             296 113
: 10. Reasons For Restrictions, IfAny:
: 17. Gross Electrical Energy Generated (MWH)                                                     21 452 87
NONE This Month Yr.-to-Date Cumulative 4
: 18. Net Electrical Energy Generated (MWH)                 154 909                     669     20'99'19
343.8 35 569.7
: 19. Unit Service Factor                                                                               74.8
-'0-ill;1 265.4 34 351.8 85.0 521 921 '7 296 113 21 452 87 20'99'19 74.8 7.0 63.8 2.8
: 20. Unit Availability Factor                                39.5                                       7  .0
: 12. Number Of Hours Reactor Was Critical
: 21. Unit Capacity Factor (Using hMDC Net)                   34.6
: 13. Reactor Reserve Shutdown Hours 14, Hours Generator On-Line
: 22. Unit Capacity   Factor (Using DER Net)                 33.3       .          15.6               63.8 23, Unit Forced Outage Rate                                   1.4                   1.4                 2.8
: 15. Unit Reserve Shutdown Hours 16, Gross Thermal Energy Generated (MWH)
: 17. Gross Electrical Energy Generated (MWH)
: 18. Net Electrical Energy Generated (MWH) 154 909 -'52 669
: 19. Unit Service Factor
: 20. Unit AvailabilityFactor 39.5
: 21. Unit Capacity Factor (Using hMDC Net) 34.6
: 22. Unit Capacity Factor (Using DER Net) 33.3 15.6 23, Unit Forced Outage Rate 1.4 1.4
: 24. Shutdowns Scheduled Over Next 6 Months {Type. Date. and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months {Type. Date. and Duration of Each):
Steam   Generator Tube Inspection Program               - August 17 September         11, 1978
Steam Generator Tube Inspection Program - August 17 September 11, 1978
: 25. IfShut Down At End Of Report Period, Estimated Date of Startup:             N/A
: 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
: 26. Units ln Test Status {Prior to Commercial Operation):                     Forecast             Achieved INITIAL CRITICALITY INITIALELECTRICITY COiblhlIERCIAL OPERATION (4)/77 I
: 26. Units ln Test Status {Priorto Commercial Operation):
N/A Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COiblhlIERCIALOPERATION (4)/77 I


DOCKET NO.
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH   FEBRUARY     1978 ri                                       c c '>   Licensee
REPORT MONTH FEBRUARY 1978 No.
                                                                                    ~m C                    Cause h. Corrective 5                                        O No.          Date                      .J Q
Date ri 5
cU          Event                  Q E~
.JQ c '>
Action to Rcport  e                O                    Prevent Rccurrcnce 28       77-11-23   S     402. 9       C               N/A       N/A         N/A     Unit No. 3 was removed from service for. scheduled refueling, maintenance, and inspections.       (Continued from previous month)         (Nuclear and non-nuclear systems)
c U
CB    PUMP XX    Outage was extended to repair mechani (B)      cal seal on reactor coolant pumps.
Licensee Event Rcport e c~m OC QE~
(Nuclear system) 78-02-18             3.7                       N/A       H/A'ENERA Unit             was removed-from service to (A)      balance the generator exciter. (Non-nuclear system)
O Cause h. Corrective Action to Prevent Rccurrcnce 28 77-11-23 S
I                                                                   3                                  4 F: Forced         Reason:                                          ' Method:                            Exhibit G - Instructions S: Scheduled       A-Equipment Failure (Explain)                       -Manual                            for Preparation of Data B.Maintcnancc or Test                             2-Manual Scram.                    Entry Sheets for Liccnsec C-Refueling                                       3-Automatic Scratn.                Event Report (LER) File (NUREG-D-Regulatory Restriction                           4-Other (Explain)                ~  0 I 61)
402. 9 C
E-Operator Training'icense Examination F.Administrative G.Operational Error (Explain)                                                         Exhibit I Satnc Source
N/A N/A CB N/A PUMPXX (B)
                                                                                                                      ~
Unit No.
<<)/>7)                I I-Other (Explain)
3 was removed from service for. scheduled refueling, maintenance, and inspections.
(Continued from previous month)
(Nuclear and non-nuclear systems)
Outage was extended to repair mechani cal seal on reactor coolant pumps.
(Nuclear system) 78-02-18 3.7 N/A H/A'ENERA (A)
Unit was removed-from service to balance the generator exciter.
(Non-nuclear system)
I F: Forced S: Scheduled
<<)/>7)
Reason:
A-Equipment Failure (Explain)
B.Maintcnancc or Test C-Refueling D-Regulatory Restriction E-Operator Training'icense Examination F.Administrative G.Operational Error (Explain)
I I-Other (Explain) 3 Method:
-Manual 2-Manual Scram.
3-Automatic Scratn.
4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Liccnsec Event Report (LER) File (NUREG-
~ 0 I61)
Exhibit I ~ Satnc Source


AVER'AGE DAILY UNIT POWER LEVEL DOCKET NO. 50 Turkey Point UNIT
AVER'AGE DAILY UNIT POWER LEVEL DOCKET NO. 50 Turkey Point UNIT DATE a
                                                                ..
II COMPLETED BY V..
DATE a II
h '
                                                                        '
MONTH FEBRUARY, 1978 DAY AVERAGE DAILY POWER.LEVEL (M!Ve-Net) 666 660 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 18 3
COMPLETED BY   V       h MONTH FEBRUARY, 1978 DAY AVERAGE DAILY POWER .LEVEL              DAY AVERAGE DAILY POWER LEVEL (M!Ve-Net)                                     (MWe-Net) 666                              17 660                              18 3           654 651                             20 661                             21 668                             22 671                               23 671                               24 662                               25 10          659.                             26 660                               27 12          659                               28 13          654 390.
10 12 13 654 651 661 668 671 671 662 659.
15 16                                           NOTE:. Average   daily power greater than 666 NWe due to cooler condenser cooling water.
660 659 654 390.
20 21 22 23 24 25 26 27 28 15 16 NOTE:.
Average daily power greater than 666 NWe due to cooler condenser cooling water.


OPERATING DATA REPORT DArE  8~~8 DOCKET NO. liLL253 COMPLETED IIY V.T-       Chilson TELEPHONE (3305         ,'i2-3624 OPERATING STATUS
OPERATING DATAREPORT DOCKET NO. liLL253 DArE8~~8 COMPLETED IIY V.T-Chilson TELEPHONE (3305
: 1. Umt Name:               Turke     Point Unit No.     4              Notes  - Unit No. 4 operated Pebruay, 1978                                  at approximately 100% R.P.
,'i2-3624 OPERATING STATUS 760 700 666
: g. Reporting period:                                                       until. the unit 2200                                          was removed
: 1. Umt Name:
: 3. Licensed Thermal Power (MWt):                                           from. service to perform
Turke Point Unit No.
: 4. Nameplate Rating (Gross MWe):                   760 693                    steam generator tube inspec-
4
: g. Reporting period:
: Pebruay, 1978
: 3. Licensed Thermal Power (MWt):
2200
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):
: 5. Design Electrical Rating (Net MWe):
700 tion and repairs...
693
: 6. Maximum Dependable Capacity (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):                   666
: 7. Maximum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
Notes - Unit No.
: 9. Power Level To Which Restricted,   IfAny (Net MWe):               NONE
4 operated at approximately 100% R.P.
: 10. Reasons For Restrictions, If Any:
until. the unit was removed from. service to perform steam generator tube inspec-tion and repairs...
This Month             Yr:to-Date           Cumuhtive
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 11. Houri In Reporting Period                             672.                   1  416.0        39 625..0 0'3.
: 9. Power Level To Which Restricted, IfAny (Net MWe):
0 2.
: 10. Reasons For Restrictions, IfAny:
Reactor Reserve Shutdown Hours                                                       0          138.8
NONE This Month Yr:to-Date Cumuhtive 39 625..0 1 416.0 0 2.
: 14. Hours Generator On-l.ine                               327.7                 1  060.6        27 18
0 138.8 1 060.6 27 18 57. 404.906 2 319 238 740 370 18 564 295 74.9 68.6 74.9 68.6 74.6 71.7 64.1 3.2
: 15. Unit Reserve Shutdown Hours                                                                                                           '6.
: 11. Houri In Reporting Period 672.
Gross Thermal Energy Generated (MWH)                                         2  319 238      57. 404 .906 I'7. Gross Electrical Energy Generated (MWH)                                         740 370      18 564 295
0'3.
Reactor Reserve Shutdown Hours
: 14. Hours Generator On-l.ine 327.7
: 15. Unit Reserve Shutdown Hours
'6.
Gross Thermal Energy Generated (MWH)
I'7. Gross Electrical Energy Generated (MWH)
: 18. Net Electrical Energy Generated (MWH)
: 18. Net Electrical Energy Generated (MWH)
: 19. Unit Service Factor                                     48.8                     74.9            68.6
: 19. Unit Service Factor 48.8
: 20. Unit Availability Factor                                48.8                     74.9            68.6
: 20. Unit AvailabilityFactor 48.8
: 21. Unit Capacity Factor (Using 4%IDC Net)                   48. 0:                   74.6
: 21. Unit Capacity Factor (Using 4%IDC Net)
: 22. Unit. Capacity Factor (Using DER Net)                                             71.7            64.1
: 48. 0:
: 23. Unit Forced Outage Rate                                                                         3.2
: 22. Unit.Capacity Factor (Using DER Net)
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration     of Each):
: 23. Unit Forced Outage Rate
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:           March      8, 1978
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 26. Units In Test Status (Prior to Commercial Operation):                         Forecast             Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (4)/77 )
: 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):
March 8, 1978 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (4)/77 )
 
UNITSIIUTDOWNS ANDPOWER REDUCTIONS REPORT MONTH FEBRUARY 1978 r
DOCKET NO.
~0 251 UNITNAME Turke Point Unit No.
4 COMPLETED BY No.
Date BK d
C I 0
IA tJ A>>
4P
~CA $Q Licensee Event Rcport 8 O
Eo 0
Cause &Correct tve Action to Prevent Recurrence 78-02-14 S
344.3 A
Steam Ghnemator Inspection Program Report-Feb.
1978 (Transmitted March 1, 19f8 CB HTEXCH (F)
Unit No.
4 was removed from service to perform steam generator tube inspection and repair leaks.
(Nuclea system)
I F: Forced S: Scheduled
('>/77)
Reason:
A-Equipmcnt Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training k, Liccnsc Examination F-Administrative G-Operational Error (Explain)
II-Other (Explain) 3 Method:
I-Manual 2.Manual Scram.
3-Autonmtic Scram.
4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data
~ Entry Sheets for Licensee
'vent Report (LER) File (NUREG-016I )
5 Exhibit I - Satnc Source


r DOCKET NO.         ~0      251 UNIT SIIUTDOWNS AND POWER REDUCTIONS                                                Point Unit No.
AVERAGE DAILY UNIT POWER LEVEL
UNITNAME Turke                            4 1978           COMPLETED BY REPORT MONTH FEBRUARY C I      A>>        Licensee                                  Cause    & Correct tve 0        4P O
~,cP DOCKET NO.
No.           Date                      IA                  Event                                          Action to dBK                                                  0Eo tJ
50 335 UNIT St. Lucie Unit No.
                                                ~CA $        Rcport 8                                  Prevent Recurrence Q
1 DATE March 4
78-02-14  S    344.3        A            Steam            CB      HTEXCH    Unit No. 4 was removed from service Ghnemator                    (F)  to perform steam generator tube Inspection                        inspection and repair leaks. (Nuclea Program                            system)
1978 COMPLETED BY V. T. Chilson 305 552-3824 MONTH FEBRUARYI 1 978 DAY AVERAGE DAILY POWER.LEVEL (Kfe-Net)
Report-Feb. 1978 (Transmitted March 1, 19f8 I                                                                    3                              4 F: Forced        Reason:                                          Method:                            Exhibit G - Instructions S: Scheduled      A-Equipmcnt Failure (Explain)                     I-Manual                          for Preparation of Data B-Maintenance or Test                            2.Manual Scram.                 ~
DAY AVERAGE DAILY POWER LEVEL (HWe-Net) 10 12 13 14 15 16 728 743 738 772 787.
Entry Sheets for Licensee C-Refueling                                      3-Autonmtic Scram.              'vent    Report (LER) File (NUREG-D-Regulatory Restriction                          4-Other (Explain)                  016I )
781 795 748 547 793.
E-Operator Training k, Liccnsc Examination F-Administrative                                                              5 G-Operational Error (Explain)                                                        Exhibit I - Satnc Source
795 797 795 794 792 791 17 18 19 20 21 22 23 24 25 26 27 28 NOTE:
('>/77)              II-Other (Explain)
7 3
77
'8 78 770 785 791 795 Average daily power greater than 777 MWe due to cooler condenser cooling water.


AVERAGE DAILY UNIT POWER LEVEL                          ' ~,cP DOCKET NO. 50  335 St. Lucie UNIT    Unit No. 1 DATE    March  4  1978 COMPLETED BY    V. T. Chilson 305  552-3824 MONTH  FEBRUARY I 1 978 DAY AVERAGE DAILY POWER .LEVEL              DAY AVERAGE DAILY POWER LEVEL (Kfe-Net)                                    (HWe-Net) 728                            17            7 3 743                            18            77
jib
                                                              '8 738                            19 772                            20 787.                            21 781                            22 795                            23 748                            24            78 547                            25            770 10          793.                            26            785 795                            27            791 12          797                            28            795 13          795 14          794 15          792 16          791                            NOTE:    Average    daily power greater than 777 MWe due to cooler condenser cooling water.


jib j     i
j i
        ~ ~
~
OPERATING DATA REPORT DOCKET NO.
~
DgTE ~Mar 4       .78
OPERATING DATAREPORT DOCKET NO.
                                                                                                          '~hilson COMPLETED BY      Z TELEPHONE       ~~-3824 OPERATING STATUS St; Lucie Unit No.                        Notes  Unit No. 1 operated
DgTE
: 1. Unit Name:                                           1 Februa        1978                        at approximately 100% R.P.
~Mar 4.78 COMPLETED BY Z '~hilson TELEPHONE ~~-3824 OPERATING STATUS
: p. Reporting period:                                                   except for load reduction=
: 1. Unit Name:
                                                    . 2560
St; Lucie Unit No. 1
: 3. Licensed Thermal Power (MWt):                                       of Feb. 8-9, 1978..
: p. Reporting period:
Februa 1978
: 3. Licensed Thermal Power (MWt):
. 2560
: 4. Nameplate Rating (Gross MWe):
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):                 822
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):                   777
: 7. Maximum Dependable Capacity (Net MWe):
822 777 Notes Unit No. 1 operated at approximately 100% R.P.
except for load reduction=
of Feb. 8-9, 1978..
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
, '. Power Level To Which Restricted,
,'. Power Level To Which Restricted, lfAny (Net MWe):
: 10. Reasons For Restrictions, If Any:
: 10. Reasons For Restrictions, IfAny:
lf Any (Net MWe):            NONE This Month         Yr.-to-Date           Cumulative
NONE This Month Yr.-to-Date Cumulative 1 416.0 I 339.5
: 11. Hours In Reporting Period                                               1 416.0
'-0-'
: 12. Number Of Hours Reactor Was Critical                                     I 339.5
325.4 1 002 8
                                                                                    '-0-'
93.6 93.6 91.1
9 2
: 11. Hours In Reporting Period
: 13. Reactor Reserve Shutdown Hours                                                                 101.5
: 12. Number Of Hours Reactor Was Critical
: 14. Hours Generator On. Line                                                   325.4            9  007.'2
: 13. Reactor Reserve Shutdown Hours
: 15. Unit Reserve Shutdown pours                                                                                                                                 21.0 1 002 8
: 14. Hours Generator On.Line
: 19. Unit Service Factor                                     100. 0               93.6                86.3
: 15. Unit Reserve Shutdown pours 19. Unit Service Factor 100. 0
: 20. Unit Availability Factor                                                    93.6                86. 3
: 20. Unit AvailabilityFactor
: 21. Unit Capacity Factor (Using MDC Net)                   99.5                 91.1
: 21. Unit Capacity Factor (Using MDC Net) 99.5
: 22. Unit Capacity Factor (Using DER Net)
: 22. Unit Capacity Factor (Using DER Net)
: 23. Unit Forced Outage Rate
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):
Refuelin maintenance and ins ections A                     ril 1 June 10       .1978 I
Refuelin maintenance and ins ections A ril 1 June 10
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
.1978 9
N/A
2 101.5 9 007.'2 21.0 86.3
: 26. Units ln Test Status (Prior to Commercial Operation):                   Forecast               Achieved INITIALCRITICALITY INlTIA1. ELECTRICITY COillMERCIALOPERATION (i>/77)
: 86. 3 I
: 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units ln Test Status (Prior to Commercial Operation):
N/A Forecast Achieved INITIALCRITICALITY INlTIA1. ELECTRICITY COillMERCIALOPERATION (i>/77)


~ ~
~
~
OJ
OJ


a UNIT SHUTDOWNS AND POWER REDUCTIONS                                                      No. 1 COMPLETED BY REPORT MONTII FEBRUARY. 1978 lP~
UNITSHUTDOWNS ANDPOWER REDUCTIONS a
I I C         Licensee                0 Cause  & Corrective oIA 0 NI I.        Date            P            7    g   CC     Event                                          Action to a-aK          V
No. 1 REPORT MONTII FEBRUARY. 1978 COMPLETED BY NII.
                                                ~ Ch         Rcport 4F E p3 0
Date PaK a-I I o
CJ Prevent Recurrence 78-02-08                                           N/A       HH     PUMPXX"   Load reduction to clean steam gener-(B)      ator feedwater     pump suction strainers.
IA 7V lP~
(Non-nuclear system) 4 F: Forced         Reason:                                             Method:                          Exhibit G - Instructions .
C 0 g CC
S: Schcduicd        A-Equipment Failure (Explain)                       I-Manual                        for Preparation uf Data B-Maintenance or Test                               2-Manual Scram.                  Entry Sheets I'or Licensee C-Refueling                                         3-Automatic Scram.              Event Rcport (LER) File (NUREG.
~ Ch Licensee Event Rcport 4F 0
D-Regulatory Restriction                           4-Other (Explain)                0 I 61)
E p3 0
E-Operator Training &. License Examination F.Administ rat ive G-Operational Error (Explain)                                                         Exhibit I - Sante Source
CJ Cause &Corrective Action to Prevent Recurrence 78-02-08 N/A HH PUMPXX" (B)
{'t/77)                I I.Other (Explain)
Load reduction to clean steam gener-ator feedwater pump suction strainers.
(Non-nuclear system)
F: Forced S: Schcduicd
{'t/77)
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training &. License Examination F.Administ rat ive G-Operational Error (Explain)
II.Other (Explain)
Method:
I-Manual 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain) 4 Exhibit G - Instructions for Preparation uf Data Entry Sheets I'or Licensee Event Rcport (LER) File (NUREG.
0 I61)
Exhibit I - Sante Source


C ~
C
      ~ t-<i ~
~ ~t-<i
~
C ut}}
C ut}}

Latest revision as of 14:41, 5 January 2025

Letter Operating Status Reports of February 1978
ML18227B063
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 03/04/1978
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227B063 (16)


Text

REC:

NRC REGULATORY INFORMATION DlSTRIBUTION SYSTEM DISTRIBUTION FOR INCOMING MATERIAL ORG:

SCHMIDT A D FL PWR 8c LIGHT (RID 0-2 251/335 DOCDATE: 03/04/78 DATE RCVD: 03/14/78 DOCTYPE:

LETTER NOTARIZED:

NO

SUBJECT:

MONTHLY OPERATING REPORTS FOR THE MONTH OF FEBRUARY.

COPIES RECEIVED LTR 1

ENCL 1

PLANT NAME: TURKEY PT 03 TURKEY PT N3 ST LUCIE Ol REVIEWER INITIAL:

XRS DISTRIBUTER INITIAL:P4 DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS +444%4<<+<<<+4%<++

MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.

(DISTRIBUTlON CODE A003)

FOR ACTION:

INTERNAL:

EXTERNAL:

BR CHIEF SCHWENCER++W/2 ENCL FILE4+W/ENCL /2 ENCL LPDR~S MIAMII FL4 +W/ENCL T ICE< W/ENCL NSI C++W/ENCL BNL(NATLAB)++W/ENCL ACRS CAT B++W/0 ENCL NRC PDR4+W/ENCL DISTRIBUTION:

LTR 10 ENCL 10 SIZE:

1P+3P+bP THE END CONTROL NBR:

780740142

0 t

Qlllgg~

~<4~

FLORIDAPOWER tk LIGHTCOMPANY March 4, l978 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D.

C.

20555 a)

'QgEtpg -~

<<4@v~'

e~

AR'gq

)g ROJQQQ~~~

l@g~

Gp 4

Gentlemen:

Attached are the February, l978, Operating Status Reports for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No. l.

Very truly yours, Vice President Power Resources VTC/DDC cc:

Mr. James P. O'Reilly Robert Lowenstein, Esquire

)

P" 80740l4Z P EOPLE... SERVING P EOP LE

AVERAGE DAILY UiVIT POWER LEVEL DOCKET iVO.

50 250 Turkey Point UNIT Unit No.

3 DATE March 4

1978 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 MONTH FEBRUARYi 1978 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 ll 2,

18 19 20 127 400 638 21 680 22 683 23 687 25 686 10 26 27 681 12 28 675 13 15 16 NOTE:

Average daily power greater than 666 MNe due to cooler condenser cooling water.

OPERATING DATAREPORT DOCKET NC.

D4TE Mnn.4 1978 CDhfPLETED BY Yp~bilnon TELEPHONE CRLB 'i5?=3824 OPERATING STATUS 760 700

l. Unit Name Turkey Point Unit No.

3

g. Reporting period:

Februar 1978

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net hEPIWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

Notes -

Urd;t No.

3 operated at approximately 100X R.P..

after the unit was returned to serviceifollowing comple-tion of scheduled refueling, maintenance,

.inspections,and

tests, except for the outage.
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since-Last Report, Give Reasons:
9. Power Level To which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

NONE This Month Yr.-to-Date Cumulative 4

343.8 35 569.7

-'0-ill;1 265.4 34 351.8 85.0 521 921 '7 296 113 21 452 87 20'99'19 74.8 7.0 63.8 2.8

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 14, Hours Generator On-Line
15. Unit Reserve Shutdown Hours 16, Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) 154 909 -'52 669
19. Unit Service Factor
20. Unit AvailabilityFactor 39.5
21. Unit Capacity Factor (Using hMDC Net) 34.6
22. Unit Capacity Factor (Using DER Net) 33.3 15.6 23, Unit Forced Outage Rate 1.4 1.4
24. Shutdowns Scheduled Over Next 6 Months {Type. Date. and Duration of Each):

Steam Generator Tube Inspection Program - August 17 September 11, 1978

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units ln Test Status {Priorto Commercial Operation):

N/A Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COiblhlIERCIALOPERATION (4)/77 I

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

REPORT MONTH FEBRUARY 1978 No.

Date ri 5

.JQ c '>

c U

Licensee Event Rcport e c~m OC QE~

O Cause h. Corrective Action to Prevent Rccurrcnce 28 77-11-23 S

402. 9 C

N/A N/A CB N/A PUMPXX (B)

Unit No.

3 was removed from service for. scheduled refueling, maintenance, and inspections.

(Continued from previous month)

(Nuclear and non-nuclear systems)

Outage was extended to repair mechani cal seal on reactor coolant pumps.

(Nuclear system) 78-02-18 3.7 N/A H/A'ENERA (A)

Unit was removed-from service to balance the generator exciter.

(Non-nuclear system)

I F: Forced S: Scheduled

<<)/>7)

Reason:

A-Equipment Failure (Explain)

B.Maintcnancc or Test C-Refueling D-Regulatory Restriction E-Operator Training'icense Examination F.Administrative G.Operational Error (Explain)

I I-Other (Explain) 3 Method:

-Manual 2-Manual Scram.

3-Automatic Scratn.

4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Liccnsec Event Report (LER) File (NUREG-

~ 0 I61)

Exhibit I ~ Satnc Source

AVER'AGE DAILY UNIT POWER LEVEL DOCKET NO. 50 Turkey Point UNIT DATE a

II COMPLETED BY V..

h '

MONTH FEBRUARY, 1978 DAY AVERAGE DAILY POWER.LEVEL (M!Ve-Net) 666 660 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 18 3

10 12 13 654 651 661 668 671 671 662 659.

660 659 654 390.

20 21 22 23 24 25 26 27 28 15 16 NOTE:.

Average daily power greater than 666 NWe due to cooler condenser cooling water.

OPERATING DATAREPORT DOCKET NO. liLL253 DArE8~~8 COMPLETED IIY V.T-Chilson TELEPHONE (3305

,'i2-3624 OPERATING STATUS 760 700 666

1. Umt Name:

Turke Point Unit No.

4

g. Reporting period:
Pebruay, 1978
3. Licensed Thermal Power (MWt):

2200

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

693

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

Notes - Unit No.

4 operated at approximately 100% R.P.

until. the unit was removed from. service to perform steam generator tube inspec-tion and repairs...

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

NONE This Month Yr:to-Date Cumuhtive 39 625..0 1 416.0 0 2.

0 138.8 1 060.6 27 18 57. 404.906 2 319 238 740 370 18 564 295 74.9 68.6 74.9 68.6 74.6 71.7 64.1 3.2

11. Houri In Reporting Period 672.

0'3.

Reactor Reserve Shutdown Hours

14. Hours Generator On-l.ine 327.7
15. Unit Reserve Shutdown Hours

'6.

Gross Thermal Energy Generated (MWH)

I'7. Gross Electrical Energy Generated (MWH)

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 48.8
20. Unit AvailabilityFactor 48.8
21. Unit Capacity Factor (Using 4%IDC Net)
48. 0:
22. Unit.Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

March 8, 1978 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (4)/77 )

UNITSIIUTDOWNS ANDPOWER REDUCTIONS REPORT MONTH FEBRUARY 1978 r

DOCKET NO.

~0 251 UNITNAME Turke Point Unit No.

4 COMPLETED BY No.

Date BK d

C I 0

IA tJ A>>

4P

~CA $Q Licensee Event Rcport 8 O

Eo 0

Cause &Correct tve Action to Prevent Recurrence 78-02-14 S

344.3 A

Steam Ghnemator Inspection Program Report-Feb.

1978 (Transmitted March 1, 19f8 CB HTEXCH (F)

Unit No.

4 was removed from service to perform steam generator tube inspection and repair leaks.

(Nuclea system)

I F: Forced S: Scheduled

('>/77)

Reason:

A-Equipmcnt Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training k, Liccnsc Examination F-Administrative G-Operational Error (Explain)

II-Other (Explain) 3 Method:

I-Manual 2.Manual Scram.

3-Autonmtic Scram.

4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data

~ Entry Sheets for Licensee

'vent Report (LER) File (NUREG-016I )

5 Exhibit I - Satnc Source

AVERAGE DAILY UNIT POWER LEVEL

~,cP DOCKET NO.

50 335 UNIT St. Lucie Unit No.

1 DATE March 4

1978 COMPLETED BY V. T. Chilson 305 552-3824 MONTH FEBRUARYI 1 978 DAY AVERAGE DAILY POWER.LEVEL (Kfe-Net)

DAY AVERAGE DAILY POWER LEVEL (HWe-Net) 10 12 13 14 15 16 728 743 738 772 787.

781 795 748 547 793.

795 797 795 794 792 791 17 18 19 20 21 22 23 24 25 26 27 28 NOTE:

7 3

77

'8 78 770 785 791 795 Average daily power greater than 777 MWe due to cooler condenser cooling water.

jib

j i

~

~

OPERATING DATAREPORT DOCKET NO.

DgTE

~Mar 4.78 COMPLETED BY Z '~hilson TELEPHONE ~~-3824 OPERATING STATUS

1. Unit Name:

St; Lucie Unit No. 1

p. Reporting period:

Februa 1978

3. Licensed Thermal Power (MWt):

. 2560

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

822 777 Notes Unit No. 1 operated at approximately 100% R.P.

except for load reduction=

of Feb. 8-9, 1978..

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

,'. Power Level To Which Restricted, lfAny (Net MWe):

10. Reasons For Restrictions, IfAny:

NONE This Month Yr.-to-Date Cumulative 1 416.0 I 339.5

'-0-'

325.4 1 002 8

93.6 93.6 91.1

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line
15. Unit Reserve Shutdown pours 19. Unit Service Factor 100. 0
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net) 99.5
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):

Refuelin maintenance and ins ections A ril 1 June 10

.1978 9

2 101.5 9 007.'2 21.0 86.3

86. 3 I
25. IfShut Down At End Of Report Period. Estimated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation):

N/A Forecast Achieved INITIALCRITICALITY INlTIA1. ELECTRICITY COillMERCIALOPERATION (i>/77)

~

~

OJ

UNITSHUTDOWNS ANDPOWER REDUCTIONS a

No. 1 REPORT MONTII FEBRUARY. 1978 COMPLETED BY NII.

Date PaK a-I I o

IA 7V lP~

C 0 g CC

~ Ch Licensee Event Rcport 4F 0

E p3 0

CJ Cause &Corrective Action to Prevent Recurrence 78-02-08 N/A HH PUMPXX" (B)

Load reduction to clean steam gener-ator feedwater pump suction strainers.

(Non-nuclear system)

F: Forced S: Schcduicd

{'t/77)

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training &. License Examination F.Administ rat ive G-Operational Error (Explain)

II.Other (Explain)

Method:

I-Manual 2-Manual Scram.

3-Automatic Scram.

4-Other (Explain) 4 Exhibit G - Instructions for Preparation uf Data Entry Sheets I'or Licensee Event Rcport (LER) File (NUREG.

0 I61)

Exhibit I - Sante Source

C

~ ~t-<i

~

C ut