ML16091A342: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 04/01/2016 | | issue date = 04/01/2016 | ||
| title = EN-16-005, Issuance of Confirmatory Order - Entergy Operations, Inc., Waterford Steam Electric Station, Unit 3 (EA- 15-100) | | title = EN-16-005, Issuance of Confirmatory Order - Entergy Operations, Inc., Waterford Steam Electric Station, Unit 3 (EA- 15-100) | ||
| author name = Hilton N | | author name = Hilton N | ||
| author affiliation = NRC/OE | | author affiliation = NRC/OE | ||
| addressee name = | | addressee name = | ||
Line 9: | Line 9: | ||
| docket = 05000382 | | docket = 05000382 | ||
| license number = | | license number = | ||
| contact person = Arrighi R | | contact person = Arrighi R | ||
| case reference number = EA-15-100 | | case reference number = EA-15-100 | ||
| document report number = EN-16-005 | | document report number = EN-16-005 | ||
| document type = Enforcement Notification | | document type = Enforcement Notification | ||
| page count = 2 | | page count = 2 | ||
| project = | |||
| stage = Approval | |||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:April 1, 2016 EN 16-005 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Entergy Operations, Inc. EA-15-100 Waterford Steam Electric Station, Unit 3 Docket No.: 05000382 | |||
==Subject:== | |||
ISSUANCE OF CONFIRMATORY ORDER This is to inform the Commission that a publicly available Confirmatory Order will be issued on or about April 6, 2016, to Entergy Operations, Inc. (licensee) confirming commitments reached as part of an alternative dispute resolution (ADR) settlement agreement addressing violations identified through an investigation at Waterford Steam Electric Station, Unit 3 (Waterford). | |||
The violations involved seven individuals at Waterford who deliberately failed to conduct compensatory hourly fire watch inspections and falsified their fire watch tour logs, and a licensee supervisor who deliberately failed to identify and take corrective actions when provided with information of suspected wrongdoing by fire watch individuals, contrary to the requirements in Title 10 of the Code of Federal Regulations (10 CFR) 50.48, Fire protection and 50.9, Complete and accuracy of information. In addition, a licensee manager deliberately provided incomplete and inaccurate information to an access authorization reviewing official regarding the trustworthiness and reliability of a contract fire watch individual, contrary to the requirements in 10 CFR 73.56, Personnel access authorization requirements for nuclear power plants and 50.9, Complete and accuracy of information. | |||
In a letter dated December 14, 2015, the U. S. Nuclear Regulatory Commission (NRC) provided the licensee with the results of the investigation, and offered the opportunity to attend a Predecisional Enforcement Conference, or to request ADR with the NRC. | |||
In response to the NRC letter, the licensee requested ADR. An ADR mediation session was held on February 19, 2016, and a preliminary settlement agreement was reached. The settlement actions include, but are not limited to: (1) conducting an Entergy Nuclear Fleet common causes evaluation, and, if general industry insights are identified, sharing them at an industry forum, (2) revising or issuing fleet-wide procedures to enhance Entergys management and oversight of supplemental workers, (3) provide the common requirements for fire watch programs, and (4) provide a process to address requests for the reinstatement of unescorted access authorization (UAA) for workers whose UAA has been temporarily suspended. | |||
It should be noted that the licensee has been specifically informed of, and agrees to, this enforcement action. The schedule of issuance and notification is: | |||
Mailing of Notice April 6, 2016 Telephone Notification of Licensee April 6, 2016 The State of Louisiana will be notified. | |||
CONTACTS: Gladys Figueroa, OE, (301) 415-1203 Nick Hilton, OE, (301) 415-3055 ELECTRONIC DISTRIBUTION: EN-16-005, April 6, 2016 | |||
Regional Offices Chairman Burns EDO OCFO RI RII Comm. Svinicki DEDR OIS RIII RIV Comm. Ostendorff DEDMRT RES Comm. Baran OE ACRS SECY OGC NRO MAIL OCA NRR NMSS ADAMS OPA OI OE Staff OIP OIG NSIR OPS CENTER Electronic DISTRIBUTION: | |||
PHolahan, OE NHilton, OE OE R/F EN binder ADAMS Accession Number: ML16091A342 OFFICE OE/EB: ES OE/EB: BC NAME RArrighi NHilton DATE 3/31/2016 4/01/2016 OFFICIAL RECORD COPY | |||
April 1, 2016 EN 16-005 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Entergy Operations, Inc. EA-15-100 Waterford Steam Electric Station, Unit 3 Docket No.: 05000382 | |||
==Subject:== | |||
ISSUANCE OF CONFIRMATORY ORDER This is to inform the Commission that a publicly available Confirmatory Order will be issued on or about April 6, 2016, to Entergy Operations, Inc. (licensee) confirming commitments reached as part of an alternative dispute resolution (ADR) settlement agreement addressing violations identified through an investigation at Waterford Steam Electric Station, Unit 3 (Waterford). | |||
The violations involved seven individuals at Waterford who deliberately failed to conduct compensatory hourly fire watch inspections and falsified their fire watch tour logs, and a licensee supervisor who deliberately failed to identify and take corrective actions when provided with information of suspected wrongdoing by fire watch individuals, contrary to the requirements in Title 10 of the Code of Federal Regulations (10 CFR) 50.48, Fire protection and 50.9, Complete and accuracy of information. In addition, a licensee manager deliberately provided incomplete and inaccurate information to an access authorization reviewing official regarding the trustworthiness and reliability of a contract fire watch individual, contrary to the requirements in 10 CFR 73.56, Personnel access authorization requirements for nuclear power plants and 50.9, Complete and accuracy of information. | |||
In a letter dated December 14, 2015, the U. S. Nuclear Regulatory Commission (NRC) provided the licensee with the results of the investigation, and offered the opportunity to attend a Predecisional Enforcement Conference, or to request ADR with the NRC. | |||
In response to the NRC letter, the licensee requested ADR. An ADR mediation session was held on February 19, 2016, and a preliminary settlement agreement was reached. The settlement actions include, but are not limited to: (1) conducting an Entergy Nuclear Fleet common causes evaluation, and, if general industry insights are identified, sharing them at an industry forum, (2) revising or issuing fleet-wide procedures to enhance Entergys management and oversight of supplemental workers, (3) provide the common requirements for fire watch programs, and (4) provide a process to address requests for the reinstatement of unescorted access authorization (UAA) for workers whose UAA has been temporarily suspended. | |||
It should be noted that the licensee has been specifically informed of, and agrees to, this enforcement action. The schedule of issuance and notification is: | |||
Mailing of Notice April 6, 2016 Telephone Notification of Licensee April 6, 2016 The State of Louisiana will be notified. | |||
CONTACTS: Gladys Figueroa, OE, (301) 415-1203 Nick Hilton, OE, (301) 415-3055 ELECTRONIC DISTRIBUTION: EN-16-005, April 6, 2016 | |||
Regional Offices Chairman Burns EDO OCFO RI RII Comm. Svinicki DEDR OIS RIII RIV Comm. Ostendorff DEDMRT RES Comm. Baran OE ACRS SECY OGC NRO MAIL OCA NRR NMSS ADAMS OPA OI OE Staff OIP OIG NSIR OPS CENTER Electronic DISTRIBUTION: | |||
PHolahan, OE NHilton, OE OE R/F EN binder ADAMS Accession Number: ML16091A342 OFFICE OE/EB: ES OE/EB: BC NAME RArrighi NHilton DATE 3/31/2016 4/01/2016 OFFICIAL RECORD COPY}} |
Latest revision as of 21:18, 30 October 2019
ML16091A342 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 04/01/2016 |
From: | Nick Hilton NRC/OE |
To: | |
Arrighi R | |
References | |
EA-15-100 EN-16-005 | |
Download: ML16091A342 (2) | |
Text
April 1, 2016 EN 16-005 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Entergy Operations, Inc. EA-15-100 Waterford Steam Electric Station, Unit 3 Docket No.: 05000382
Subject:
ISSUANCE OF CONFIRMATORY ORDER This is to inform the Commission that a publicly available Confirmatory Order will be issued on or about April 6, 2016, to Entergy Operations, Inc. (licensee) confirming commitments reached as part of an alternative dispute resolution (ADR) settlement agreement addressing violations identified through an investigation at Waterford Steam Electric Station, Unit 3 (Waterford).
The violations involved seven individuals at Waterford who deliberately failed to conduct compensatory hourly fire watch inspections and falsified their fire watch tour logs, and a licensee supervisor who deliberately failed to identify and take corrective actions when provided with information of suspected wrongdoing by fire watch individuals, contrary to the requirements in Title 10 of the Code of Federal Regulations (10 CFR) 50.48, Fire protection and 50.9, Complete and accuracy of information. In addition, a licensee manager deliberately provided incomplete and inaccurate information to an access authorization reviewing official regarding the trustworthiness and reliability of a contract fire watch individual, contrary to the requirements in 10 CFR 73.56, Personnel access authorization requirements for nuclear power plants and 50.9, Complete and accuracy of information.
In a letter dated December 14, 2015, the U. S. Nuclear Regulatory Commission (NRC) provided the licensee with the results of the investigation, and offered the opportunity to attend a Predecisional Enforcement Conference, or to request ADR with the NRC.
In response to the NRC letter, the licensee requested ADR. An ADR mediation session was held on February 19, 2016, and a preliminary settlement agreement was reached. The settlement actions include, but are not limited to: (1) conducting an Entergy Nuclear Fleet common causes evaluation, and, if general industry insights are identified, sharing them at an industry forum, (2) revising or issuing fleet-wide procedures to enhance Entergys management and oversight of supplemental workers, (3) provide the common requirements for fire watch programs, and (4) provide a process to address requests for the reinstatement of unescorted access authorization (UAA) for workers whose UAA has been temporarily suspended.
It should be noted that the licensee has been specifically informed of, and agrees to, this enforcement action. The schedule of issuance and notification is:
Mailing of Notice April 6, 2016 Telephone Notification of Licensee April 6, 2016 The State of Louisiana will be notified.
CONTACTS: Gladys Figueroa, OE, (301) 415-1203 Nick Hilton, OE, (301) 415-3055 ELECTRONIC DISTRIBUTION: EN-16-005, April 6, 2016
Regional Offices Chairman Burns EDO OCFO RI RII Comm. Svinicki DEDR OIS RIII RIV Comm. Ostendorff DEDMRT RES Comm. Baran OE ACRS SECY OGC NRO MAIL OCA NRR NMSS ADAMS OPA OI OE Staff OIP OIG NSIR OPS CENTER Electronic DISTRIBUTION:
PHolahan, OE NHilton, OE OE R/F EN binder ADAMS Accession Number: ML16091A342 OFFICE OE/EB: ES OE/EB: BC NAME RArrighi NHilton DATE 3/31/2016 4/01/2016 OFFICIAL RECORD COPY
April 1, 2016 EN 16-005 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Entergy Operations, Inc. EA-15-100 Waterford Steam Electric Station, Unit 3 Docket No.: 05000382
Subject:
ISSUANCE OF CONFIRMATORY ORDER This is to inform the Commission that a publicly available Confirmatory Order will be issued on or about April 6, 2016, to Entergy Operations, Inc. (licensee) confirming commitments reached as part of an alternative dispute resolution (ADR) settlement agreement addressing violations identified through an investigation at Waterford Steam Electric Station, Unit 3 (Waterford).
The violations involved seven individuals at Waterford who deliberately failed to conduct compensatory hourly fire watch inspections and falsified their fire watch tour logs, and a licensee supervisor who deliberately failed to identify and take corrective actions when provided with information of suspected wrongdoing by fire watch individuals, contrary to the requirements in Title 10 of the Code of Federal Regulations (10 CFR) 50.48, Fire protection and 50.9, Complete and accuracy of information. In addition, a licensee manager deliberately provided incomplete and inaccurate information to an access authorization reviewing official regarding the trustworthiness and reliability of a contract fire watch individual, contrary to the requirements in 10 CFR 73.56, Personnel access authorization requirements for nuclear power plants and 50.9, Complete and accuracy of information.
In a letter dated December 14, 2015, the U. S. Nuclear Regulatory Commission (NRC) provided the licensee with the results of the investigation, and offered the opportunity to attend a Predecisional Enforcement Conference, or to request ADR with the NRC.
In response to the NRC letter, the licensee requested ADR. An ADR mediation session was held on February 19, 2016, and a preliminary settlement agreement was reached. The settlement actions include, but are not limited to: (1) conducting an Entergy Nuclear Fleet common causes evaluation, and, if general industry insights are identified, sharing them at an industry forum, (2) revising or issuing fleet-wide procedures to enhance Entergys management and oversight of supplemental workers, (3) provide the common requirements for fire watch programs, and (4) provide a process to address requests for the reinstatement of unescorted access authorization (UAA) for workers whose UAA has been temporarily suspended.
It should be noted that the licensee has been specifically informed of, and agrees to, this enforcement action. The schedule of issuance and notification is:
Mailing of Notice April 6, 2016 Telephone Notification of Licensee April 6, 2016 The State of Louisiana will be notified.
CONTACTS: Gladys Figueroa, OE, (301) 415-1203 Nick Hilton, OE, (301) 415-3055 ELECTRONIC DISTRIBUTION: EN-16-005, April 6, 2016
Regional Offices Chairman Burns EDO OCFO RI RII Comm. Svinicki DEDR OIS RIII RIV Comm. Ostendorff DEDMRT RES Comm. Baran OE ACRS SECY OGC NRO MAIL OCA NRR NMSS ADAMS OPA OI OE Staff OIP OIG NSIR OPS CENTER Electronic DISTRIBUTION:
PHolahan, OE NHilton, OE OE R/F EN binder ADAMS Accession Number: ML16091A342 OFFICE OE/EB: ES OE/EB: BC NAME RArrighi NHilton DATE 3/31/2016 4/01/2016 OFFICIAL RECORD COPY