{{#Wiki_filter:November 16, 2018 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852
 
==SUBJECT:==
FINAL SAFETY EVALUATIONS OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-564, REVISION 2, SAFETY LIMIT MCPR, USING THE CONSOLIDATED LINE ITEM IMPROVEMENT PROCESS (CAC NO. MG0161, EPID L-2017-PMP-0007)
 
==Dear Members of the Technical Specifications Task Force:==
 
By letter dated May 29, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18149A320), the Technical Specifications Task Force (TSTF) submitted to the U.S. Nuclear Regulatory Commission (NRC) for review and approval Traveler TSTF-564, Revision 1, Safety Limit MCPR [Minimum Critical Power Ratio].
By letter dated October 3, 2018 (ADAMS Package Accession No. ML18207A380), an NRC draft safety evaluation (SE) and draft model SE of Traveler TSTF-564 were provided for your review and comments. By letter dated October 24, 2018 (ADAMS Accession No. ML18297A361), you commented on the SEs and provided Traveler TSTF-564, Revision 2. The NRC staffs final traveler SE and final model SE are provided in Enclosures 1 and 2, respectively, to this letter.
The traveler was submitted as part of the consolidated line item improvement process (CLIIP).
Traveler TSTF-564, Revision 2, is approved as a CLIIP traveler.
Traveler TSTF-564, Revision 2, is applicable to boiling-water reactor nuclear power plants. The proposed change revises Revision 4 of the Standard Technical Specifications (STS), Volumes 1 and 2 of NUREG-1433, Standard Technical Specifications, General Electric Plants BWR/4, and NUREG-1434, Standard Technical Specifications, General Electric Plants BWR/6. Volume 1 of these NUREGs can be accessed in ADAMS under Accession Nos. ML12104A192 and ML12104A195, respectively. Volume 2 of these NUREGs can be accessed in ADAMS under Accession Nos. ML12104A193 and ML12104A196, respectively.
Our SEs apply only to material provided in the subject traveler. When a licensee submits a license amendment request (LAR) to adopt the traveler, the NRC staffs review will ensure that the material presented applies to the specific plant involved. We do not intend to repeat a technical review of the material provided in the traveler. Licensees are responsible for reviewing the NRC staffs SEs and the applicable technical justifications, providing any necessary plant-specific information, and assessing the completeness and accuracy of their LARs. The NRC will process each LAR to adopt this traveler according to applicable NRC rules and procedures.
 
Traveler TSTF-564, Revision 2, does not prevent licensees from requesting an alternate approach or proposing changes other than those in the traveler. However, significant changes from the approach recommended or the inclusion of additional changes in the LAR will require additional NRC staff review, increase the time and resources needed for the review, and/or result in non-acceptance of the LAR. Licensees desiring significant or additional changes should instead submit an LAR that does not claim to adopt TSTF-564, Revision 2.
If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov.
Sincerely,
                                            /RA/
Victor G. Cusumano, Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753
 
==Enclosures:==
: 1. Final Traveler SE
: 2. Final Model SE
: 3. Disposition of Comments cc: See next page
 
Package: ML18299A048, Cover letter: ML18299A054, Final traveler SE: ML18299A069, Final model SE: ML18299A076, Comment table:
ML18299A083
*concurred via e-mail                                        NRR-106 OFFICE    NRR/DSS/SNPB/BC*          NRR/DSS/SRXB/BC*        NRR/DORL/LSPB/LA*
NAME      RLukes (SKrepel for)      JWhitman                JBurkhardt DATE      6/28/2018                9/8/2018                8/13/2018 OFFICE    NRR/DORL/LPL3/BC*        OGC (NLO)*              NRR/DSS/STSB/PM*
NAME      DWrona                    KGamin                  MHoncharik DATE      9/7/2018                  11/7/2018                11/8/2018 OFFICE    NRR/DSS/STSB*            NRR/DSS/STSB/BC NAME      ARussell                  VCusumano DATE      11/8/2018                  11/16/2018 Technical Specifications Task Force    Project No. 753 cc:
Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Email: jmiksa@entergy.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com Ryan M. Joyce Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-274-EC Birmingham, AL 35243 Email: rmjoyce@southernco.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 Email: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 42 Inverness Center Parkway / Bin B237 Birmingham, AL 35242 Email: wasparkm@southernco.com}}

Latest revision as of 16:05, 2 February 2020

Cover Letter for Final SEs of TSTF-564, Revision 2, Safety Limit MCPR
ML18299A054
Person / Time
Site: Technical Specifications Task Force
Issue date: 11/16/2018
From: Victor Cusumano
NRC/NRR/DSS/STSB
To:
Technical Specifications Task Force
Honcharik MC
Shared Package
ML18299A048 List:
References
CAC MG0161, EPID L-2017-PMP-0007, TSTF-564
Download: ML18299A054 (4)


Text

November 16, 2018 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852

SUBJECT:

FINAL SAFETY EVALUATIONS OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-564, REVISION 2, SAFETY LIMIT MCPR, USING THE CONSOLIDATED LINE ITEM IMPROVEMENT PROCESS (CAC NO. MG0161, EPID L-2017-PMP-0007)

Dear Members of the Technical Specifications Task Force:

By letter dated May 29, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18149A320), the Technical Specifications Task Force (TSTF) submitted to the U.S. Nuclear Regulatory Commission (NRC) for review and approval Traveler TSTF-564, Revision 1, Safety Limit MCPR [Minimum Critical Power Ratio].

By letter dated October 3, 2018 (ADAMS Package Accession No. ML18207A380), an NRC draft safety evaluation (SE) and draft model SE of Traveler TSTF-564 were provided for your review and comments. By letter dated October 24, 2018 (ADAMS Accession No. ML18297A361), you commented on the SEs and provided Traveler TSTF-564, Revision 2. The NRC staffs final traveler SE and final model SE are provided in Enclosures 1 and 2, respectively, to this letter.

The traveler was submitted as part of the consolidated line item improvement process (CLIIP).

Traveler TSTF-564, Revision 2, is approved as a CLIIP traveler.

Traveler TSTF-564, Revision 2, is applicable to boiling-water reactor nuclear power plants. The proposed change revises Revision 4 of the Standard Technical Specifications (STS), Volumes 1 and 2 of NUREG-1433, Standard Technical Specifications, General Electric Plants BWR/4, and NUREG-1434, Standard Technical Specifications, General Electric Plants BWR/6. Volume 1 of these NUREGs can be accessed in ADAMS under Accession Nos. ML12104A192 and ML12104A195, respectively. Volume 2 of these NUREGs can be accessed in ADAMS under Accession Nos. ML12104A193 and ML12104A196, respectively.

Our SEs apply only to material provided in the subject traveler. When a licensee submits a license amendment request (LAR) to adopt the traveler, the NRC staffs review will ensure that the material presented applies to the specific plant involved. We do not intend to repeat a technical review of the material provided in the traveler. Licensees are responsible for reviewing the NRC staffs SEs and the applicable technical justifications, providing any necessary plant-specific information, and assessing the completeness and accuracy of their LARs. The NRC will process each LAR to adopt this traveler according to applicable NRC rules and procedures.

Traveler TSTF-564, Revision 2, does not prevent licensees from requesting an alternate approach or proposing changes other than those in the traveler. However, significant changes from the approach recommended or the inclusion of additional changes in the LAR will require additional NRC staff review, increase the time and resources needed for the review, and/or result in non-acceptance of the LAR. Licensees desiring significant or additional changes should instead submit an LAR that does not claim to adopt TSTF-564, Revision 2.

If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov.

Sincerely,

/RA/

Victor G. Cusumano, Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753

Enclosures:

1. Final Traveler SE
2. Final Model SE
3. Disposition of Comments cc: See next page

Package: ML18299A048, Cover letter: ML18299A054, Final traveler SE: ML18299A069, Final model SE: ML18299A076, Comment table:

ML18299A083

  • concurred via e-mail NRR-106 OFFICE NRR/DSS/SNPB/BC* NRR/DSS/SRXB/BC* NRR/DORL/LSPB/LA*

NAME RLukes (SKrepel for) JWhitman JBurkhardt DATE 6/28/2018 9/8/2018 8/13/2018 OFFICE NRR/DORL/LPL3/BC* OGC (NLO)* NRR/DSS/STSB/PM*

NAME DWrona KGamin MHoncharik DATE 9/7/2018 11/7/2018 11/8/2018 OFFICE NRR/DSS/STSB* NRR/DSS/STSB/BC NAME ARussell VCusumano DATE 11/8/2018 11/16/2018 Technical Specifications Task Force Project No. 753 cc:

Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.

Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Email: jmiksa@entergy.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com Ryan M. Joyce Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-274-EC Birmingham, AL 35243 Email: rmjoyce@southernco.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 Email: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 42 Inverness Center Parkway / Bin B237 Birmingham, AL 35242 Email: wasparkm@southernco.com