PNP 2012-049, Response to NRC Request for Information Re Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway En teigy                                                        7642000 Anthony J. Vitale Site Vice President PNP 2012-049 June 8,2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
 
==SUBJECT:==
Response to NRC Request for Information (RFI) Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Palisades Nuclear Plant Docket 50-255 License No. DPR-20
 
==References:==
: 1. NRC letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 (ADAMS Accession Number ML12053A340)
: 2. NRC Letter, Prioritization of Response Due Dates for Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated May 11, 2012 (ADAMS Accession Number ML12097A509)
: 3. NRC letter to Nuclear Energy Institute, Endorsement of Nuclear Energy Institute (NEI) 12-07, Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features, dated May31, 2012 (ADAMS Accession Number ML12144A142)
 
==Dear Sir or Madam:==
 
On March 12, 2012, the NRC issued Reference ito all power reactor licensees.
Enclosures 2 and 4 of Reference 1 contain specific requested actions, requested information, and required responses associated with Recommendations 2.1 and 2.3 for flooding evaluations and walkdowns. This letter provides the Entergy Nuclear
 
PNP 2012-049 Page 2 Operations, Inc. (ENO) 90-day response to Reference 1 for Palisades Nuclear Plant (PNP).
Recommendation 2.1: Flooding The response date for the PNP flood hazard evaluation was identified in Reference 2 as March 12, 2015, which corresponds to three years from the date of Reference 1.
ENO plans to meet the requested date for the other required responses in Enclosure 2 of Reference 1. Specifically, an approach for developing an Integrated Assessment for PNP will be submitted 60 days after the NRC endorses the Integrated Assessment Guidance. In addition, an Integrated Assessment report for PNP, if it is necessary, will be submitted two years after the flood evaluation is submitted.
Recommendation 2.3: Flooding For flooding Recommendation 2.3 (walkdowns), Enclosure 4 of Reference 1 states that each licensee is to confirm that it will use the NRC-endorsed flooding walkdown procedure or provide a description of the process it will use. ENO confirms that it will use the flooding walkdown procedure (NEI 12-07, Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features) endorsed by Reference 3 as the basis for the flooding walkdowns at PNP.
ENO plans to comply with the response timeline in Enclosure 4 of Reference 1.
Specifically, ENO will submit a report documenting the results of its flooding design basis walkdowns at PNP by November 27, 2012, which corresponds to 180 days after NRC endorsement of the generic guidance.
The commitments contained in this submittal are summarized in Attachment 1.
I declare under penalty of perjury that the foregoing is true and correct. Executed on June 8, 2012.
Since rel
 
==Attachment:==
: 1.        List of Regulatory Commitments cc:    Director of Office of Nuclear Regulation Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USN RC
 
Attachment 1 to PNP 201 2-049 List of Regulatory Commitments One Page Follows
 
List of Regulatory Commitments The following table identifies those actions committed to by Entergy Nuclear Operations, Inc.
(ENO) in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE (Check One)                SCHEDULED COMMITMENT                                                      COMPLETION ONE-                                  DATE TIME        CONTINUING            (If Required)
ACTION      COMPLIANCE Submit flood hazard evaluation to the NRC.                                    X                          March 12,2015 An approach for developing an                                          60 days after NRC Integrated Assessment for                  x                          endorsement of Palisades Nuclear Plant (PNP) will                                      the Integrated be submitted.                                                          Assessment Guidance An Integrated Assessment report for PNP, if it is necessary, will be        X                          March 12, 2017 submitted two years after the                                          (if necessary) flood evaluation is completed.
ENO will use the flooding walkdown procedure (Nuclear                X                          November 27, Energy Institute 12-07,                                                2012 Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features) endorsed by Reference 3 as the basis for the flooding walkdowns and plans to comply with the response timefine in Enclosure 4 of Reference 1 by submitting a report documenting the results of iwflooding design basis walkdowns at PNP 180 days after NRC endorsement of the generic guidance.}}

Latest revision as of 03:28, 12 November 2019

Response to NRC Request for Information Re Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML12163A533
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/08/2012
From: Vitale A
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
PNP 2012-049
Download: ML12163A533 (4)


Text

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway En teigy 7642000 Anthony J. Vitale Site Vice President PNP 2012-049 June 8,2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

Response to NRC Request for Information (RFI) Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Palisades Nuclear Plant Docket 50-255 License No. DPR-20

References:

1. NRC letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 (ADAMS Accession Number ML12053A340)
2. NRC Letter, Prioritization of Response Due Dates for Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated May 11, 2012 (ADAMS Accession Number ML12097A509)
3. NRC letter to Nuclear Energy Institute, Endorsement of Nuclear Energy Institute (NEI) 12-07, Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features, dated May31, 2012 (ADAMS Accession Number ML12144A142)

Dear Sir or Madam:

On March 12, 2012, the NRC issued Reference ito all power reactor licensees.

Enclosures 2 and 4 of Reference 1 contain specific requested actions, requested information, and required responses associated with Recommendations 2.1 and 2.3 for flooding evaluations and walkdowns. This letter provides the Entergy Nuclear

PNP 2012-049 Page 2 Operations, Inc. (ENO) 90-day response to Reference 1 for Palisades Nuclear Plant (PNP).

Recommendation 2.1: Flooding The response date for the PNP flood hazard evaluation was identified in Reference 2 as March 12, 2015, which corresponds to three years from the date of Reference 1.

ENO plans to meet the requested date for the other required responses in Enclosure 2 of Reference 1. Specifically, an approach for developing an Integrated Assessment for PNP will be submitted 60 days after the NRC endorses the Integrated Assessment Guidance. In addition, an Integrated Assessment report for PNP, if it is necessary, will be submitted two years after the flood evaluation is submitted.

Recommendation 2.3: Flooding For flooding Recommendation 2.3 (walkdowns), Enclosure 4 of Reference 1 states that each licensee is to confirm that it will use the NRC-endorsed flooding walkdown procedure or provide a description of the process it will use. ENO confirms that it will use the flooding walkdown procedure (NEI 12-07, Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features) endorsed by Reference 3 as the basis for the flooding walkdowns at PNP.

ENO plans to comply with the response timeline in Enclosure 4 of Reference 1.

Specifically, ENO will submit a report documenting the results of its flooding design basis walkdowns at PNP by November 27, 2012, which corresponds to 180 days after NRC endorsement of the generic guidance.

The commitments contained in this submittal are summarized in Attachment 1.

I declare under penalty of perjury that the foregoing is true and correct. Executed on June 8, 2012.

Since rel

Attachment:

1. List of Regulatory Commitments cc: Director of Office of Nuclear Regulation Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USN RC

Attachment 1 to PNP 201 2-049 List of Regulatory Commitments One Page Follows

List of Regulatory Commitments The following table identifies those actions committed to by Entergy Nuclear Operations, Inc.

(ENO) in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE (Check One) SCHEDULED COMMITMENT COMPLETION ONE- DATE TIME CONTINUING (If Required)

ACTION COMPLIANCE Submit flood hazard evaluation to the NRC. X March 12,2015 An approach for developing an 60 days after NRC Integrated Assessment for x endorsement of Palisades Nuclear Plant (PNP) will the Integrated be submitted. Assessment Guidance An Integrated Assessment report for PNP, if it is necessary, will be X March 12, 2017 submitted two years after the (if necessary) flood evaluation is completed.

ENO will use the flooding walkdown procedure (Nuclear X November 27, Energy Institute 12-07, 2012 Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features) endorsed by Reference 3 as the basis for the flooding walkdowns and plans to comply with the response timefine in Enclosure 4 of Reference 1 by submitting a report documenting the results of iwflooding design basis walkdowns at PNP 180 days after NRC endorsement of the generic guidance.