ML18017B076: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 6: Line 6:
| number = ML18017B077
| number = ML18017B077
| issue date = 05/12/1980
| issue date = 05/12/1980
| title = Forwards Interim Deficiency Rept Re Omission of Reinforcing Steel in Unit 1 Containment Bldg Exterior Wall.Corrective Action Will Be Completed 800630 & Final Rept Will Be Submitted
| title = Interim Deficiency Rept Re Omission of Addl Reinforcing Steel in Unit 1 Containment Bldg Exterior Wall.Work & Technical Procedures Revised to Include Design Drawings for Exterior Wall.Corrective Action to Be Completed by 800630
| author name =  
| author name =  
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 14:47, 6 March 2020

Forwards Interim Deficiency Rept Re Omission of Reinforcing Steel in Unit 1 Containment Bldg Exterior Wall.Corrective Action Will Be Completed 800630 & Final Rept Will Be Submitted
Date released: 08/31/2018 Download: ML18017B076


Interim Deficiency Rept Re Omission of Addl Reinforcing Steel in Unit 1 Containment Bldg Exterior Wall.Work & Technical Procedures Revised to Include Design Drawings for Exterior Wall.Corrective Action to Be Completed by 800630
ML18017B077
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/12/1980
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18017B077 (4)
Forwards Interim Deficiency Rept Re Omission of Reinforcing Steel in Unit 1 Containment Bldg Exterior Wall.Corrective Action Will Be Completed 800630 & Final Rept Will Be Submitted
ML18017B075
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/13/1980
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18017B075 (4)