LIC-12-0113, Submittal of Revision 18 and 19 to the Fort Calhoun Station (Fcs), Unit 1, Physical Security Plan (PSP): Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:SAFEGUARDS INFORMATION Omaha Public Power District 444 South 16 h Street Mall Omaha, NE 68102-2247 August 2, 2012 LIC-12-0113 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
{{#Wiki_filter:SAFEGUARDS INFORMATION OmahaPublic Power District 444 South 16 h Street Mall Omaha, NE 68102-2247 August 2, 2012 LIC-12-0113 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001


==References:==
==References:==
: 1. Docket No. 50-285 2. NEI 03-12, "Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan," Revision 7, dated October 2011  
: 1. Docket No. 50-285
: 2. NEI 03-12, "Security Plan, Training and Qualification Plan,     and Safeguards Contingency Plan," Revision 7, dated October 2011


==SUBJECT:==
==SUBJECT:==
Submittal of Revision 18 and 19 to the Fort Calhoun Station (FCS), Unit No. 1, Physical Security Plan (PSP)The Omaha Public Power District (OPPD) hereby provides the U. S. Nuclear Regulatory Commission (NRC) with a copy of Revision 18 and 19 to the FCS PSP. These changes reflect the NRC endorsed NEI 03-12, Revision 7, template (Reference 2).Revision 18 of the PSP issued in October 2010 incorporated administrative and formatting changes. Failure to submit this revision has been documented in the FCS corrective action program.Revision 19 of the PSP issued in August.2012 incorporates changes to Section 1.1, Section 11.1, Owner Controlled Area Barriers, 11.1.1, Protection Against a Vehicle Bomb for the Large DBT, Section 14.4, Search, Section 14.4.4, PA Vehicle Search, Section 15.1, Illumination, Figure 2 and 3, OCA Layout, Appendix A, Glossary of Terms and Acronyms, Appendix B, Section 3.1 Duty Training, Appendix B, Task 23, Appendix C, Event 21, Appendix C, Section 4.1.2, Security Chain/Delegation of Authority, and Appendix C, Section 7.0, FCS Scenario.
Submittal of Revision 18 and 19 to the Fort Calhoun Station (FCS), Unit No. 1, Physical Security Plan (PSP)
These changes were made to reflect site specific clarifications, utilizing the NEI 03-12, Revision 7 template, and following NRC guidance.
The Omaha Public Power District (OPPD) hereby provides the U. S. Nuclear Regulatory Commission (NRC) with a copy of Revision 18 and 19 to the FCS PSP. These changes reflect the NRC endorsed NEI 03-12, Revision 7, template (Reference 2).
These changes do not degrade or impact the defensive strategy.
Revision 18 of the PSP issued in October 2010 incorporated administrative and formatting changes. Failure to submit this revision has been documented in the FCS corrective action program.
Also included with this submittal is Enclosure 4, a deviation table delineating the changes to the FCS PSP which deviate from the NEI 03-12 Revision 7, template as well as the reasons for the deviations.
Revision 19 of the PSP issued in August.2012 incorporates changes to Section 1.1, Section 11.1, Owner Controlled Area Barriers, 11.1.1, Protection Against a Vehicle Bomb for the Large DBT, Section 14.4, Search, Section 14.4.4, PA Vehicle Search, Section 15.1, Illumination, Figure 2 and 3, OCA Layout, Appendix A, Glossary of Terms and Acronyms, Appendix B, Section 3.1 Duty Training, Appendix B, Task 23, Appendix C, Event 21, Appendix C, Section 4.1.2, Security Chain/Delegationof Authority, and Appendix C, Section 7.0, FCS Scenario. These changes were made to reflect site specific clarifications, utilizing the NEI 03-12, Revision 7 template, and following NRC guidance. These changes do not degrade or impact the defensive strategy. Also included with this submittal is Enclosure 4, a deviation table delineating the changes to the FCS PSP which deviate from the NEI 03-12 Revision 7, template as well as the reasons for the deviations.
SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information.
SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information. Decontrolled When Separated From Enclosure ZS. o
Decontrolled When Separated From Enclosure ZS. o SAFEGUARDS INFORMATION U. S. Nuclear Regulatory Commission LIC-1 2-0113 Page 2 The Revisions 18 and 19 changes were evaluated in accordance with 10 CFR 50.54(p) and do not reduce the effectiveness of the FCS PSP.The enclosed compact disks (CDs) contain safeguards information and must be controlled in accordance with 10 CFR 73.21. Please return the attached Safeguards Information Receipt Acknowledgement (Form SDF-62) at your earliest convenience.
 
SAFEGUARDS INFORMATION U. S. Nuclear Regulatory Commission LIC-1 2-0113 Page 2 The Revisions 18 and 19 changes were evaluated in accordance with 10 CFR 50.54(p) and do not reduce the effectiveness of the FCS PSP.
The enclosed compact disks (CDs) contain safeguards information and must be controlled in accordance with 10 CFR 73.21. Please return the attached Safeguards Information Receipt Acknowledgement (Form SDF-62) at your earliest convenience.
This letter contains no NRC commitments.
This letter contains no NRC commitments.
If you should have any questions or require additional information regarding this submittal, please contact Mr. Ronald Undajon at (402) 533-6584.Sincerely, Division Manager -Nuclear Performance Improvement  
If you should have any questions or require additional information regarding this submittal, please contact Mr. Ronald Undajon at (402) 533-6584.
& Support JRG/brh  
Sincerely, Division Manager - Nuclear Performance Improvement & Support JRG/brh


==Attachment:==
==Attachment:==
 
Form SDF-62
Form SDF-62  


==Enclosures:==
==Enclosures:==
 
: 1. FCS Physical Security Plan R 18 (CD - Safeguards Information)
1.2.3.4.FCS Physical Security Plan R 18 (CD -Safeguards Information)
: 2. Deviation Table (Security Related Information-Withhold under 10 CFR 2.390; Table Included on Enclosure 1 CD)
Deviation Table (Security Related Information-Withhold under 10 CFR 2.390; Table Included on Enclosure 1 CD)FCS Physical Security Plan R 19 (CD -Safeguards Information)
: 3. FCS Physical Security Plan R 19 (CD - Safeguards Information)
Deviation Table (Security Related Information-Withhold under 10 CFR 2.390; Table Included on Enclosure 3 CD)c: E. E. Collins, NRC Regional Administrator, Region IV L. E. Wilkins, NRC Project Manager (w/o attachment or enclosures)
: 4. Deviation Table (Security Related Information-Withhold under 10 CFR 2.390; Table Included on Enclosure 3 CD) c: E. E. Collins, NRC Regional Administrator, Region IV L. E. Wilkins, NRC Project Manager (w/o attachment or enclosures)
J. C. Kirkland, NRC Senior Resident Inspector (w/o attachment or enclosures)
J. C. Kirkland, NRC Senior Resident Inspector (w/o attachment or enclosures)
SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information.
SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information. Decontrolled When Separated From Enclosure}}
Decontrolled When Separated From Enclosure}}

Latest revision as of 01:07, 12 November 2019

Submittal of Revision 18 and 19 to the Fort Calhoun Station (Fcs), Unit 1, Physical Security Plan (PSP)
ML12219A232
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/02/2012
From: Goodell J
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-12-0113
Download: ML12219A232 (2)


Text

SAFEGUARDS INFORMATION OmahaPublic Power District 444 South 16 h Street Mall Omaha, NE 68102-2247 August 2, 2012 LIC-12-0113 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

References:

1. Docket No. 50-285
2. NEI 03-12, "Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan," Revision 7, dated October 2011

SUBJECT:

Submittal of Revision 18 and 19 to the Fort Calhoun Station (FCS), Unit No. 1, Physical Security Plan (PSP)

The Omaha Public Power District (OPPD) hereby provides the U. S. Nuclear Regulatory Commission (NRC) with a copy of Revision 18 and 19 to the FCS PSP. These changes reflect the NRC endorsed NEI 03-12, Revision 7, template (Reference 2).

Revision 18 of the PSP issued in October 2010 incorporated administrative and formatting changes. Failure to submit this revision has been documented in the FCS corrective action program.

Revision 19 of the PSP issued in August.2012 incorporates changes to Section 1.1, Section 11.1, Owner Controlled Area Barriers, 11.1.1, Protection Against a Vehicle Bomb for the Large DBT, Section 14.4, Search, Section 14.4.4, PA Vehicle Search, Section 15.1, Illumination, Figure 2 and 3, OCA Layout, Appendix A, Glossary of Terms and Acronyms, Appendix B, Section 3.1 Duty Training, Appendix B, Task 23, Appendix C, Event 21, Appendix C, Section 4.1.2, Security Chain/Delegationof Authority, and Appendix C, Section 7.0, FCS Scenario. These changes were made to reflect site specific clarifications, utilizing the NEI 03-12, Revision 7 template, and following NRC guidance. These changes do not degrade or impact the defensive strategy. Also included with this submittal is Enclosure 4, a deviation table delineating the changes to the FCS PSP which deviate from the NEI 03-12 Revision 7, template as well as the reasons for the deviations.

SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information. Decontrolled When Separated From Enclosure ZS. o

SAFEGUARDS INFORMATION U. S. Nuclear Regulatory Commission LIC-1 2-0113 Page 2 The Revisions 18 and 19 changes were evaluated in accordance with 10 CFR 50.54(p) and do not reduce the effectiveness of the FCS PSP.

The enclosed compact disks (CDs) contain safeguards information and must be controlled in accordance with 10 CFR 73.21. Please return the attached Safeguards Information Receipt Acknowledgement (Form SDF-62) at your earliest convenience.

This letter contains no NRC commitments.

If you should have any questions or require additional information regarding this submittal, please contact Mr. Ronald Undajon at (402) 533-6584.

Sincerely, Division Manager - Nuclear Performance Improvement & Support JRG/brh

Attachment:

Form SDF-62

Enclosures:

1. FCS Physical Security Plan R 18 (CD - Safeguards Information)
2. Deviation Table (Security Related Information-Withhold under 10 CFR 2.390; Table Included on Enclosure 1 CD)
3. FCS Physical Security Plan R 19 (CD - Safeguards Information)
4. Deviation Table (Security Related Information-Withhold under 10 CFR 2.390; Table Included on Enclosure 3 CD) c: E. E. Collins, NRC Regional Administrator, Region IV L. E. Wilkins, NRC Project Manager (w/o attachment or enclosures)

J. C. Kirkland, NRC Senior Resident Inspector (w/o attachment or enclosures)

SAFEGUARDS INFORMATION Enclosure Contains Safeguards Information. Decontrolled When Separated From Enclosure