05000341/FIN-2008002-03: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{finding
{{finding
| title = Failure To Perform A Proper Engineering Evaluation On Replacing The Torus-To-Reactor Building Vacuum Breaker Differential Pressure Switches
| title = Failure to Perform a Proper Engineering Evaluation on Replacing the TORUS-TO-REACTOR Building Vacuum Breaker Differential Pressure Switches
 
| docket = 05000341
| docket = 05000341
| inspection report = IR 05000341/2008002
| inspection report = IR 05000341/2008002

Latest revision as of 23:04, 29 May 2018

03
Site: Fermi DTE Energy icon.png
Report IR 05000341/2008002 Section 1R15
Date counted Mar 31, 2008 (2008Q1)
Type: NCV: Green
cornerstone Barrier Integrity
Identified by: Self-revealing
Inspection Procedure: IP 71111.15
Inspectors (proximate) T Steadham
M Phalen
R Morris
C Lipa
CCA H.7, Documentation
INPO aspect WP.3
'