05000341/FIN-2008002-03: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
{{finding | {{finding | ||
| title = Failure | | title = Failure to Perform a Proper Engineering Evaluation on Replacing the TORUS-TO-REACTOR Building Vacuum Breaker Differential Pressure Switches | ||
| docket = 05000341 | | docket = 05000341 | ||
| inspection report = IR 05000341/2008002 | | inspection report = IR 05000341/2008002 |
Latest revision as of 23:04, 29 May 2018
Site: | Fermi ![]() |
---|---|
Report | IR 05000341/2008002 Section 1R15 |
Date counted | Mar 31, 2008 (2008Q1) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.15 |
Inspectors (proximate) | T Steadham M Phalen R Morris C Lipa |
CCA | H.7, Documentation |
INPO aspect | WP.3 |
' | |