ML101260200: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML101260200
| number = ML101260200
| issue date = 09/03/2008
| issue date = 09/03/2008
| title = Rensselaer Polytechnic Institute, E-mail Response to RAI Regarding Financial Qualifications for the RPI Reactor License Renewal
| title = E-mail Response to RAI Regarding Financial Qualifications for the RPI Reactor License Renewal
| author name = Winters G C
| author name = Winters G
| author affiliation = NRC/NRR/DPR/PRTA
| author affiliation = NRC/NRR/DPR/PRTA
| addressee name = Kennedy W B
| addressee name = Kennedy W
| addressee affiliation = NRC/NRR/DPR
| addressee affiliation = NRC/NRR/DPR
| docket = 05000225
| docket = 05000225
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:From:Glenn Winters [gwinter2@nycap.rr.com]Sent:Wednesday, September 03, 2008 1:29 PM To:Kennedy, William
{{#Wiki_filter:From: Glenn Winters [gwinter2@nycap.rr.com]
Sent: Wednesday, September 03, 2008 1:29 PM To:   Kennedy, William


==Subject:==
==Subject:==
Fw: Supplemental information for RAIs regarding RCF license  
Fw: Supplemental information for RAIs regarding RCF license renewal Hi Duke, Here is part of the response that you asked for. Since the request came by e-mail. I assume an e-mail response is acceptable. Please let me know otherwise. Basil is working on the second question.
 
Glenn
renewal Hi Duke, Here is part of the response that you asked for. Since the request came by e-mail. I assume an  
----- Original Message -----
 
e-mail response is acceptable. Please let me know otherwise. Basil is  
 
working on the second  
 
question.Glenn----- Original Message -----
 
From: "Caracappa, Peter F." <caracp3@rpi.edu>
From: "Caracappa, Peter F." <caracp3@rpi.edu>
To: "Glenn Winters" <gwinter2@nycap.rr.com>
To: "Glenn Winters" <gwinter2@nycap.rr.com>
Sent: Thursday, August 28, 2008 8:55 PM
Sent: Thursday, August 28, 2008 8:55 PM


==Subject:==
==Subject:==
RE: Supplemental information for RAIs regarding RCF license  
RE: Supplemental information for RAIs regarding RCF license renewal I looked at our response and we did say that we would update the values annually based upon current rates. Looking at the OSU response, I am guessing that they want just a little more detail. I suggest the following by way of response.
 
renewal I looked at our response and we did say that we would update the values annually based upon  
 
current rates. Looking at the OSU response, I am guessing that they  
 
want just a little more  
 
detail. I suggest the following by way of response.
--------
--------
Our decommissioning cost estimate consists of four elements:
Our decommissioning cost estimate consists of four elements:
(1) Labor costs
(1) Labor costs (2) Disposal costs (3) Equipment and supplies (4) Contingency Labor costs are determined by estimating hours required of each category of worker (supervisor, technician, etc) and the prevailing labor rate for that category of worker. Characterization and decommissioning times are included in this estimate.
Disposal costs are determined by estimating total disposal volume multiplied by the volumetric cost.
Equipment and supplies costs are determined from current retail prices.
A 25% contingency is added to the sum of the first three cost estimates to account for uncertainties in cost estimates and other miscellaneous costs.
The decommissioning cost estimate will be reviewed annually. The labor costs will be adjusted by inflating the labor rate for each category of worker based upon changes in the local prevailing wages. Disposal costs will be adjusted based upon current volumetric cost rates. Costs for equipment and supplies will be inflated by changes in the consumer price


(2)  Disposal costs
index.
 
--------
(3)  Equipment and supplies
 
(4)  Contingency Labor costs are determined by estimating hours required of each category of worker (supervisor, technician, etc) and the prevailing labor rate for that category of
 
worker. Characterization and
 
decommissioning times are included in this estimate.
Disposal costs are determined by estimating total disposal volume multiplied by the volumetric
 
cost.Equipment and supplies costs are determined from current retail prices.
 
A 25% contingency is added to the sum of the first three cost estimates to account for
 
uncertainties in cost estimates and other miscellaneous costs.
The decommissioning cost estimate will be reviewed annually. The labor costs will be adjusted
 
by inflating the labor rate for each category of worker based upon
 
changes in the local prevailing
 
wages. Disposal costs will be adjusted based upon current volumetric
 
cost rates. Costs for
 
equipment and supplies will be inflated by changes in the consumer price index.--------
Hope that will take care of it.
Hope that will take care of it.
--Peter
--Peter
-----Original Message-----
-----Original Message-----
From: Glenn Winters [mailto:gwinter2@nycap.rr.com]
From: Glenn Winters [mailto:gwinter2@nycap.rr.com]
 
Sent: Sunday, August 17, 2008 6:20 PM To: Caracappa, Peter F.
Sent: Sunday, August 17, 2008 6:20 PM
 
To: Caracappa, Peter F.
 
Cc: Stewart, Basil A.
Cc: Stewart, Basil A.


==Subject:==
==Subject:==
Fw: Supplemental information for RAIs regarding RCF license  
Fw: Supplemental information for RAIs regarding RCF license renewal
 
: Peter, I think the item on updating the decommissioning costs is yours.
renewal Peter, I think the item on updating the decommissioning costs is yours.
Glenn
 
----- Original Message -----
Glenn----- Original Message -----
 
From: "William Kennedy" <William.Kennedy@nrc.gov>
From: "William Kennedy" <William.Kennedy@nrc.gov>
To: <stewab2@rpi.edu>
To: <stewab2@rpi.edu>
Cc: "Glenn Winters" <gwinter2@nycap.rr.com>; "Ronald Uleck"
Cc: "Glenn Winters" <gwinter2@nycap.rr.com>; "Ronald Uleck"
<Ronald.Uleck@nrc.gov>; "Daniel Hughes" <Daniel.Hughes@nrc.gov>
<Ronald.Uleck@nrc.gov>; "Daniel Hughes" <Daniel.Hughes@nrc.gov>
Sent: Friday, August 15, 2008 3:11 PM
Sent: Friday, August 15, 2008 3:11 PM


==Subject:==
==Subject:==
Supplemental information for RAIs regarding RCF license renewal Mr. Stewart,           We have finished reviewing your response to the RAIs regarding financial qualifications  
Supplemental information for RAIs regarding RCF license renewal Mr. Stewart, We have finished reviewing your response to the RAIs regarding financial qualifications and decommissioning. Your response to RAI 4.(c) did not include an example of how the decommissioning cost estimate will be updated periodically. Please supplement your response dated July 21, 2008, with an example of how the decommissioning cost estimate will be updated periodically. Pages 1 and 2 of the enclosure to Ohio State University's response to RAIs provide an example (ADAMS Accession No. ML080650352).
 
Your response to RAI 5 also requires supplementation. The response mentioned self-liquidity, which is not a means for assuring decommissioning funding.
and decommissioning. Your response to RAI
The financial reviewer suggested that you read 10 CFR Part 30, Appendix E for information about the self-guarantee test, and NUREG-1757, Appendix A.14 for information regarding self-guarantees and the documentation that needs to be provided.
 
Please do not hesitate to contact me if you have any questions regarding this matter.
4.(c) did not include an example of how the decommissioning cost estimate will
 
be updated  
 
periodically. Please supplement your response dated July 21, 2008, with
 
an example of how the  
 
decommissioning cost estimate will be updated periodically. Pages 1 and 2 of the enclosure to Ohio State University's
 
response to RAIs provide an example (ADAMS Accession No. ML080650352).
Your response to RAI 5 also requires supplementation. The  
 
response mentioned self-
 
liquidity, which is not a means for assuring decommissioning funding.
 
The financial reviewer  
 
suggested that you read 10 CFR Part 30, Appendix E for information about
 
the self-guarantee  
 
test, and NUREG-1757, Appendix A.14 for information regarding self-
 
guarantees and the  
 
documentation that needs to be provided.
 
Please do not hesitate to contact me if you have any  
 
questions regarding this matter.
 
Additionally, Mr. Ronald Uleck (Ronald.Uleck@nrc.gov
Additionally, Mr. Ronald Uleck (Ronald.Uleck@nrc.gov
<mailto:Ronald.Uleck@nrc.gov> or (301) 415-3741) may be able to better answer questions regarding the specifics of your


<mailto:Ronald.Uleck@nrc.gov> or
response.
 
Thank you.
(301) 415-3741) may be able to better answer questions regarding the
Duke Kennedy William B. Kennedy Project Engineer U.S. NRC (301) 415-2784


specifics of your response.Thank you.
E-mail Properties Mail Envelope Properties   (085ED4CA15B84ED1BB295E1F6151B89E)
Duke Kennedy
 
William B. Kennedy Project Engineer
 
U.S. NRC (301) 415-2784
 
E-mail Properties Mail Envelope Properties (085ED4CA15B84ED1BB295E1F6151B89E)


==Subject:==
==Subject:==
Fw: Supplemental information for RAIs regarding RCF license renewal Sent Date:5/3/2010 9:51:04 AM Received Date:9/3/2008 1:29:15 PM From:Glenn WintersCreated By: gwinter2@nycap.rr.com
Fw: Supplemental information for RAIs regarding RCF license renewal Sent Date: 5/3/2010 9:51:04 AM Received Date:   9/3/2008 1:29:15 PM From:       Glenn Winters Created By:       gwinter2@nycap.rr.com Recipients:
 
Recipients:
William.Kennedy@nrc.gov (Kennedy, William)
William.Kennedy@nrc.gov (Kennedy, William)
Tracking Status: None Post Office:
Tracking Status: None Post Office:
acerad993ba82bFilesSizeDate & TimeMESSAGE32535/3/2010 Options Expiration Date:
acerad993ba82b Files      Size  Date & Time MESSAGE    3253  5/3/2010 Options Expiration Date:
Priority:olImportanceNormal ReplyRequested:True Return Notification:False Sensitivity: olNormal Recipients received:}}
Priority:               olImportanceNormal ReplyRequested:   True Return Notification:   False Sensitivity:     olNormal Recipients received:}}

Latest revision as of 19:41, 13 November 2019

E-mail Response to RAI Regarding Financial Qualifications for the RPI Reactor License Renewal
ML101260200
Person / Time
Site: Rensselaer Polytechnic Institute
Issue date: 09/03/2008
From: Winters G
Research and Test Reactors Licensing Branch
To: William Kennedy
Division of Policy and Rulemaking
Kennedy W, NRR/ADRA/DPR/PRT, 415-2784
References
TAC ME1591
Download: ML101260200 (1)


Text

From: Glenn Winters [gwinter2@nycap.rr.com]

Sent: Wednesday, September 03, 2008 1:29 PM To: Kennedy, William

Subject:

Fw: Supplemental information for RAIs regarding RCF license renewal Hi Duke, Here is part of the response that you asked for. Since the request came by e-mail. I assume an e-mail response is acceptable. Please let me know otherwise. Basil is working on the second question.

Glenn


Original Message -----

From: "Caracappa, Peter F." <caracp3@rpi.edu>

To: "Glenn Winters" <gwinter2@nycap.rr.com>

Sent: Thursday, August 28, 2008 8:55 PM

Subject:

RE: Supplemental information for RAIs regarding RCF license renewal I looked at our response and we did say that we would update the values annually based upon current rates. Looking at the OSU response, I am guessing that they want just a little more detail. I suggest the following by way of response.


Our decommissioning cost estimate consists of four elements:

(1) Labor costs (2) Disposal costs (3) Equipment and supplies (4) Contingency Labor costs are determined by estimating hours required of each category of worker (supervisor, technician, etc) and the prevailing labor rate for that category of worker. Characterization and decommissioning times are included in this estimate.

Disposal costs are determined by estimating total disposal volume multiplied by the volumetric cost.

Equipment and supplies costs are determined from current retail prices.

A 25% contingency is added to the sum of the first three cost estimates to account for uncertainties in cost estimates and other miscellaneous costs.

The decommissioning cost estimate will be reviewed annually. The labor costs will be adjusted by inflating the labor rate for each category of worker based upon changes in the local prevailing wages. Disposal costs will be adjusted based upon current volumetric cost rates. Costs for equipment and supplies will be inflated by changes in the consumer price

index.


Hope that will take care of it.

--Peter


Original Message-----

From: Glenn Winters [1]

Sent: Sunday, August 17, 2008 6:20 PM To: Caracappa, Peter F.

Cc: Stewart, Basil A.

Subject:

Fw: Supplemental information for RAIs regarding RCF license renewal

Peter, I think the item on updating the decommissioning costs is yours.

Glenn


Original Message -----

From: "William Kennedy" <William.Kennedy@nrc.gov>

To: <stewab2@rpi.edu>

Cc: "Glenn Winters" <gwinter2@nycap.rr.com>; "Ronald Uleck"

<Ronald.Uleck@nrc.gov>; "Daniel Hughes" <Daniel.Hughes@nrc.gov>

Sent: Friday, August 15, 2008 3:11 PM

Subject:

Supplemental information for RAIs regarding RCF license renewal Mr. Stewart, We have finished reviewing your response to the RAIs regarding financial qualifications and decommissioning. Your response to RAI 4.(c) did not include an example of how the decommissioning cost estimate will be updated periodically. Please supplement your response dated July 21, 2008, with an example of how the decommissioning cost estimate will be updated periodically. Pages 1 and 2 of the enclosure to Ohio State University's response to RAIs provide an example (ADAMS Accession No. ML080650352).

Your response to RAI 5 also requires supplementation. The response mentioned self-liquidity, which is not a means for assuring decommissioning funding.

The financial reviewer suggested that you read 10 CFR Part 30, Appendix E for information about the self-guarantee test, and NUREG-1757, Appendix A.14 for information regarding self-guarantees and the documentation that needs to be provided.

Please do not hesitate to contact me if you have any questions regarding this matter.

Additionally, Mr. Ronald Uleck (Ronald.Uleck@nrc.gov

<mailto:Ronald.Uleck@nrc.gov> or (301) 415-3741) may be able to better answer questions regarding the specifics of your

response.

Thank you.

Duke Kennedy William B. Kennedy Project Engineer U.S. NRC (301) 415-2784

E-mail Properties Mail Envelope Properties (085ED4CA15B84ED1BB295E1F6151B89E)

Subject:

Fw: Supplemental information for RAIs regarding RCF license renewal Sent Date: 5/3/2010 9:51:04 AM Received Date: 9/3/2008 1:29:15 PM From: Glenn Winters Created By: gwinter2@nycap.rr.com Recipients:

William.Kennedy@nrc.gov (Kennedy, William)

Tracking Status: None Post Office:

acerad993ba82b Files Size Date & Time MESSAGE 3253 5/3/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: True Return Notification: False Sensitivity: olNormal Recipients received: