| number = ML18304A279
| issue date = 10/31/2018
| title = Ltr. 10/31/18 Quad Cities Nuclear Power Station, Units 1 & 2 - Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests and Experiments) Baseline Inspection; Inspection Report 05000254/2019010; 05000265/2019010 (D
| author name = Shaikh A
| author affiliation = NRC/RGN-III/DRS/EB3
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000254, 05000265
| license number = DPR-029, DPR-030
| contact person =
| document report number = IR 2019010
| document type = Inspection Report Correspondence
| page count = 7
}}
See also: [[see also::IR 05000254/2019010]]
 
=Text=
{{#Wiki_filter:October 31, 2018
Mr. Bryan C. Hanson
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2INFORMATION
            REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF
            CHANGES, TESTS AND EXPERIMENTS) BASELINE INSPECTION;
            INSPECTION REPORT 05000254/2019010; 05000265/2019010
Dear Mr. Hanson:
On January 14, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin a Title 10 of
the Code of Federal Regulation, Part 50.59, (Evaluation of Changes, Tests and Experiments),
baseline inspection at the Quad Cities Nuclear Power Station, Units 1 and 2. This inspection
will be performed in accordance with the NRC baseline Inspection Procedure 71111.17T. The
onsite portions of the inspection will take place on January 14-18, 2019.
Experience has shown that these baseline inspections are extremely resource intensive, both
for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on
the site and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. These documents have been divided into three groups.
    *  The first group of information is necessary to ensure that the inspection team is
        adequately prepared for the inspection. This information should be made available
        via compact disc and delivered to the regional office no later than December 3, 2018.
        The inspection team will review this information and, by December 10, 2018 will
        request specific items that should be provided for review in the regional office by
        December 31, 2018.
    *  The second group of requested documents contains additional items that the team will
        review, or need access to, during the inspection. Certain documents contained within
        Group II (i.e., Item (1)), will be requested for review in the regional office prior to the
        inspection by December 31, 2018, as identified above. The remaining documents
        should be available by the first day of the onsite inspection, January 14, 2019.
    *  The third group lists information necessary to aid the inspection team in tracking issues
        identified as a result of the inspection. It is requested that this information be provided to
        the lead inspector as the information is generated during the inspection. It is important
        that all of these documents are up to date and complete in order to minimize the number
        of additional documents requested during the preparation and/or the onsite portions of
        the inspection.
 
B. Hanson                                      -2-
The lead inspector for this inspection is Atif Shaikh. We understand that our regulatory contact
for this inspection is Rachel Luebbe of your organization. If there are any questions about the
inspection or the material requested, please contact the lead inspector at 630-829-9824 or via
e-mail at Atif.Shaikh@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
Exemptions, Requests for Withholding.
                                                Sincerely,
                                                /RA/
                                                Atif Shaikh, Senior Inspector
                                                Engineering Branch 3
                                                Division of Reactor Safety
Docket Nos. 50-254, 50-265; 72-053
License Nos. DPR-29; DPR-30
Enclosure:
Document Request for 10 CFR 50.59
  Baseline Inspection
cc: Distribution via LISTSERV
 
B. Hanson                                  -3-
Letter to Bryan C. Hanson from Atif Shaikh dated October 31, 2018.
SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2INFORMATION
            REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF
            CHANGES, TESTS AND EXPERIMENTS) BASELINE INSPECTION;
            INSPECTION REPORT 05000254/2019010; 05000265/2019010
DISTRIBUTION:
Christopher Cook
RidsNrrDorlLpl3
RidsNrrPMQuadCities Resource
RidsNrrDirsIrib Resource
Steven West
Darrell Roberts
Jamnes Cameron
Allan Barker
DRPIII
DRSIII
ADAMS Accession Number: ML18304A279
OFFICE RIII
NAME        AShaikh:cl
DATE        10/31/18
                                OFFICIAL RECORD COPY
 
              DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION
Inspection Report:                05000254/2019010; 05000265/2019010
Inspection Dates:                January 14-18, 2019
Inspection Procedure:            Inspection Procedure 71111.17T, Evaluations of Changes,
                                  Tests and Experiments
Lead Inspector:                  Atif Shaikh
                                  630-829-9824
                                  Atif.Shaikh@nrc.gov
I.    Information Requested for In-Office Preparation Week
      The following information is requested by December 3, 2018, or sooner, to facilitate the
      selection of specific items that will be reviewed during the onsite inspection week. The
      inspection team will select specific items from the information requested below and
      submit a list to your staff by December 10, 2018. We will request that certain items be
      made available to the regional office prior to the inspection by December 31, 2018. We
      request that the remaining items selected from the lists be available and ready for review
      on the first day of inspection. All requested information should identify the associated
      system and cover the time frame from the receipt of information for the last 50.59
      inspection to the present.
      The required information identified below should be provided on compact disc (CD)
      or uploaded to accessible links. Please provide three copies of each CD submitted
      (i.e., one for each inspector, if applicable). The preferred file format is a searchable pdf
      file. The CDs should be indexed and hyper-linked to facilitate ease of use, if possible. If
      you have any questions regarding this information, please call the inspection team
      leader as soon as possible.
      (1)      List of all Title 10 of the Code of Federal Regulations (CFR), Part 50.59
                completed evaluations involving: (a) calculations, (b) procedure revisions,
                (c) changes to the facility (modifications), (d) non-routine operating
                configurations, or (e) departures in methods of analyses. This list should
                include 50.59 evaluations for the following:
                a. Changes that have been made under the provisions of 10 CFR 50.59 that
                    have been updated in accordance with 10 CFR 50.71(e)(4) since the last
                    50.59 inspection;
                b. Modifications that are field work complete; and
                                                                                          Enclosure
 
    DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION
      c. Changes to calculations (or initiation of new calculations) that have been
          issued. The list should contain the number and title of each document, a brief
          description of the change, and the corresponding number and type of the
          affected document (i.e., the modification or procedure to which the evaluation
          applies). The list should NOT include any evaluations in which prior
          U.S. Nuclear Regulatory Commission approval was sought and obtained.
(2)  A list of all 10 CFR 50.59 changes that have been screened out as not requiring
      a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes
      to the facility (modifications); (d) non-routine operating configurations; or
      (e) departures in methods of analyses.
      The list should contain the number and title of each document, a brief description
      of the change, and the corresponding number and type of the affected document
      (i.e., the modification or procedure to which the evaluation applies).
(3)  A list of any modifications, procedure revisions, or Updated Final Safety Analysis
      Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not
      apply.
(4)  A list of calculation changes that have been issued for use.
(5)  A list of corrective action documents (open and closed) that address
      10 CFR 50.59 issues, concerns, or processes. These documents should also
      include the associated corrective action documents and the 50.59 change
      implementation.
      The list should contain the number, title and revision (or date) of each document,
      the affected system and corresponding documentation (if applicable), and should
      be sorted in order of significance.
(6)  Copies of procedures addressing the following: modifications, design changes,
      set point changes, equivalency evaluations or suitability analyses, commercial
      grade dedications, post-modification testing, 10 CFR 50.59 evaluations and
      screenings, and UFSAR updates.
(7)  UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide
      copies of the complete submittal.
(8)  Copy of the UFSAR change log or a synopsis of the changes. This should
      include all of the changes made to the UFSAR that were incorporated in the last
      10 CFR 50.71(e)(4) submittal.
(9)  Electronic copy of the UFSAR and Bases, and technical specifications, if
      available.
(10)  Name(s) and phone numbers for the regulatory and technical contacts.
(11)  Current management and engineering organizational chart.
                                          2
 
        DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION
II. Information Requested to be Available Prior to Inspection. Requests will be Made
    for Specific Item (1) Documents by December 10, 2018, for Availability of
    Requested Item (1) Documents in Regional Office by December 31, 2018, and
    Items (2), (3) and (4) Documents on First Day of Inspection (January 14, 2019)
    (1)    Copies of all selected items from Section I. This includes copies of
          associated documents such as calculations, post-modification test packages,
          10 CFR 50.59 evaluations or screenings, and any corrective action documents.
    (2)    Copies of these documents do not need to be solely available to the inspection
          team as long as the inspectors have easy and unrestrained access to them.
          a. UFSAR, if not previously provided;
          b. Original Final Safety Analysis Report Volumes;
          c. Original Safety Evaluation Report and Supplements;
          d. Final Safety Analysis Report Question and Answers;
          e. Quality Assurance Plan;
          f.  Technical Specifications, if not previously provided;
          g. Latest Probabilistic Risk Assessment Report;
          h. Vendor Manuals; and
          i.  The latest 10 CFR 50.59 UFSAR Update Submittal.
    (3)    Please ensure that other supporting documents for the selected items have been
          located and are readily retrievable as the inspection team will likely be requesting
          these documents during the inspection. Examples of supporting documents are:
          a. Drawings supporting the modifications;
          b. Procedures affected by the modifications; and
          c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
    (4)    Assessment and Corrective Actions:
          a. The most recent 50.59 Quality Assurance audit and/or self-assessment; and
          b. Corrective action documents (e.g., condition reports, including status of
                corrective actions) generate as a result of the most recent 50.59 Quality
                Assurance audit and/or self-assessment.
                                              3
 
            DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION
III.    Information Requested to be provided throughout the inspection
        (1)    Copies of any corrective action documents generated as a result of the
              inspection teams questions or queries during this inspection.
        (2)    Copies of the list of questions submitted by the inspection team members and
              the status/resolution of the information requested (provide daily during the
              inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection
team leader.
                                                  4
}}

Latest revision as of 11:29, 20 October 2019

Ltr. 10/31/18 Quad Cities Nuclear Power Station, Units 1 & 2 - Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests and Experiments) Baseline Inspection; Inspection Report 05000254/2019010; 05000265/2019010 (D
ML18304A279
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 10/31/2018
From: Atif Shaikh
Engineering Branch 3
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2019010
Download: ML18304A279 (7)


See also: IR 05000254/2019010

Text

October 31, 2018

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2INFORMATION

REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF

CHANGES, TESTS AND EXPERIMENTS) BASELINE INSPECTION;

INSPECTION REPORT 05000254/2019010; 05000265/2019010

Dear Mr. Hanson:

On January 14, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin a Title 10 of

the Code of Federal Regulation, Part 50.59, (Evaluation of Changes, Tests and Experiments),

baseline inspection at the Quad Cities Nuclear Power Station, Units 1 and 2. This inspection

will be performed in accordance with the NRC baseline Inspection Procedure 71111.17T. The

onsite portions of the inspection will take place on January 14-18, 2019.

Experience has shown that these baseline inspections are extremely resource intensive, both

for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on

the site and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into three groups.

  • The first group of information is necessary to ensure that the inspection team is

adequately prepared for the inspection. This information should be made available

via compact disc and delivered to the regional office no later than December 3, 2018.

The inspection team will review this information and, by December 10, 2018 will

request specific items that should be provided for review in the regional office by

December 31, 2018.

  • The second group of requested documents contains additional items that the team will

review, or need access to, during the inspection. Certain documents contained within

Group II (i.e., Item (1)), will be requested for review in the regional office prior to the

inspection by December 31, 2018, as identified above. The remaining documents

should be available by the first day of the onsite inspection, January 14, 2019.

  • The third group lists information necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to

the lead inspector as the information is generated during the inspection. It is important

that all of these documents are up to date and complete in order to minimize the number

of additional documents requested during the preparation and/or the onsite portions of

the inspection.

B. Hanson -2-

The lead inspector for this inspection is Atif Shaikh. We understand that our regulatory contact

for this inspection is Rachel Luebbe of your organization. If there are any questions about the

inspection or the material requested, please contact the lead inspector at 630-829-9824 or via

e-mail at Atif.Shaikh@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

/RA/

Atif Shaikh, Senior Inspector

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-254, 50-265;72-053

License Nos. DPR-29; DPR-30

Enclosure:

Document Request for 10 CFR 50.59

Baseline Inspection

cc: Distribution via LISTSERV

B. Hanson -3-

Letter to Bryan C. Hanson from Atif Shaikh dated October 31, 2018.

SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2INFORMATION

REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF

CHANGES, TESTS AND EXPERIMENTS) BASELINE INSPECTION;

INSPECTION REPORT 05000254/2019010; 05000265/2019010

DISTRIBUTION:

Christopher Cook

RidsNrrDorlLpl3

RidsNrrPMQuadCities Resource

RidsNrrDirsIrib Resource

Steven West

Darrell Roberts

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML18304A279

OFFICE RIII

NAME AShaikh:cl

DATE 10/31/18

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION

Inspection Report: 05000254/2019010; 05000265/2019010

Inspection Dates: January 14-18, 2019

Inspection Procedure: Inspection Procedure 71111.17T, Evaluations of Changes,

Tests and Experiments

Lead Inspector: Atif Shaikh

630-829-9824

Atif.Shaikh@nrc.gov

I. Information Requested for In-Office Preparation Week

The following information is requested by December 3, 2018, or sooner, to facilitate the

selection of specific items that will be reviewed during the onsite inspection week. The

inspection team will select specific items from the information requested below and

submit a list to your staff by December 10, 2018. We will request that certain items be

made available to the regional office prior to the inspection by December 31, 2018. We

request that the remaining items selected from the lists be available and ready for review

on the first day of inspection. All requested information should identify the associated

system and cover the time frame from the receipt of information for the last 50.59

inspection to the present.

The required information identified below should be provided on compact disc (CD)

or uploaded to accessible links. Please provide three copies of each CD submitted

(i.e., one for each inspector, if applicable). The preferred file format is a searchable pdf

file. The CDs should be indexed and hyper-linked to facilitate ease of use, if possible. If

you have any questions regarding this information, please call the inspection team

leader as soon as possible.

(1) List of all Title 10 of the Code of Federal Regulations (CFR), Part 50.59

completed evaluations involving: (a) calculations, (b) procedure revisions,

(c) changes to the facility (modifications), (d) non-routine operating

configurations, or (e) departures in methods of analyses. This list should

include 50.59 evaluations for the following:

a. Changes that have been made under the provisions of 10 CFR 50.59 that

have been updated in accordance with 10 CFR 50.71(e)(4) since the last

50.59 inspection;

b. Modifications that are field work complete; and

Enclosure

DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION

c. Changes to calculations (or initiation of new calculations) that have been

issued. The list should contain the number and title of each document, a brief

description of the change, and the corresponding number and type of the

affected document (i.e., the modification or procedure to which the evaluation

applies). The list should NOT include any evaluations in which prior

U.S. Nuclear Regulatory Commission approval was sought and obtained.

(2) A list of all 10 CFR 50.59 changes that have been screened out as not requiring

a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes

to the facility (modifications); (d) non-routine operating configurations; or

(e) departures in methods of analyses.

The list should contain the number and title of each document, a brief description

of the change, and the corresponding number and type of the affected document

(i.e., the modification or procedure to which the evaluation applies).

(3) A list of any modifications, procedure revisions, or Updated Final Safety Analysis

Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not

apply.

(4) A list of calculation changes that have been issued for use.

(5) A list of corrective action documents (open and closed) that address

10 CFR 50.59 issues, concerns, or processes. These documents should also

include the associated corrective action documents and the 50.59 change

implementation.

The list should contain the number, title and revision (or date) of each document,

the affected system and corresponding documentation (if applicable), and should

be sorted in order of significance.

(6) Copies of procedures addressing the following: modifications, design changes,

set point changes, equivalency evaluations or suitability analyses, commercial

grade dedications, post-modification testing, 10 CFR 50.59 evaluations and

screenings, and UFSAR updates.

(7) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide

copies of the complete submittal.

(8) Copy of the UFSAR change log or a synopsis of the changes. This should

include all of the changes made to the UFSAR that were incorporated in the last

10 CFR 50.71(e)(4) submittal.

(9) Electronic copy of the UFSAR and Bases, and technical specifications, if

available.

(10) Name(s) and phone numbers for the regulatory and technical contacts.

(11) Current management and engineering organizational chart.

2

DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION

II. Information Requested to be Available Prior to Inspection. Requests will be Made

for Specific Item (1) Documents by December 10, 2018, for Availability of

Requested Item (1) Documents in Regional Office by December 31, 2018, and

Items (2), (3) and (4) Documents on First Day of Inspection (January 14, 2019)

(1) Copies of all selected items from Section I. This includes copies of

associated documents such as calculations, post-modification test packages,

10 CFR 50.59 evaluations or screenings, and any corrective action documents.

(2) Copies of these documents do not need to be solely available to the inspection

team as long as the inspectors have easy and unrestrained access to them.

a. UFSAR, if not previously provided;

b. Original Final Safety Analysis Report Volumes;

c. Original Safety Evaluation Report and Supplements;

d. Final Safety Analysis Report Question and Answers;

e. Quality Assurance Plan;

f. Technical Specifications, if not previously provided;

g. Latest Probabilistic Risk Assessment Report;

h. Vendor Manuals; and

i. The latest 10 CFR 50.59 UFSAR Update Submittal.

(3) Please ensure that other supporting documents for the selected items have been

located and are readily retrievable as the inspection team will likely be requesting

these documents during the inspection. Examples of supporting documents are:

a. Drawings supporting the modifications;

b. Procedures affected by the modifications; and

c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

(4) Assessment and Corrective Actions:

a. The most recent 50.59 Quality Assurance audit and/or self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generate as a result of the most recent 50.59 Quality

Assurance audit and/or self-assessment.

3

DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION

III. Information Requested to be provided throughout the inspection

(1) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during this inspection.

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provide daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection