| title = Ltr. 10/31/18 Quad Cities Nuclear Power Station, Units 1 & 2 - Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests and Experiments) Baseline Inspection; Inspection Report 05000254/2019010; 05000265/2019010 (D | |||
| author name = Shaikh A | |||
| author affiliation = NRC/RGN-III/DRS/EB3 | |||
| addressee name = Hanson B | |||
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | |||
| docket = 05000254, 05000265 | |||
| license number = DPR-029, DPR-030 | |||
| contact person = | |||
| document report number = IR 2019010 | |||
| document type = Inspection Report Correspondence | |||
| page count = 7 | |||
}} | |||
See also: [[see also::IR 05000254/2019010]] | |||
=Text= | |||
{{#Wiki_filter:October 31, 2018 | |||
Mr. Bryan C. Hanson | |||
Senior VP, Exelon Generation Company, LLC | |||
President and CNO, Exelon Nuclear | |||
4300 Winfield Road | |||
Warrenville, IL 60555 | |||
SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2INFORMATION | |||
REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF | |||
CHANGES, TESTS AND EXPERIMENTS) BASELINE INSPECTION; | |||
INSPECTION REPORT 05000254/2019010; 05000265/2019010 | |||
Dear Mr. Hanson: | |||
On January 14, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin a Title 10 of | |||
the Code of Federal Regulation, Part 50.59, (Evaluation of Changes, Tests and Experiments), | |||
baseline inspection at the Quad Cities Nuclear Power Station, Units 1 and 2. This inspection | |||
will be performed in accordance with the NRC baseline Inspection Procedure 71111.17T. The | |||
onsite portions of the inspection will take place on January 14-18, 2019. | |||
Experience has shown that these baseline inspections are extremely resource intensive, both | |||
for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on | |||
the site and to ensure a productive inspection for both parties, we have enclosed a request for | |||
documents needed for the inspection. These documents have been divided into three groups. | |||
* The first group of information is necessary to ensure that the inspection team is | |||
adequately prepared for the inspection. This information should be made available | |||
via compact disc and delivered to the regional office no later than December 3, 2018. | |||
The inspection team will review this information and, by December 10, 2018 will | |||
request specific items that should be provided for review in the regional office by | |||
December 31, 2018. | |||
* The second group of requested documents contains additional items that the team will | |||
review, or need access to, during the inspection. Certain documents contained within | |||
Group II (i.e., Item (1)), will be requested for review in the regional office prior to the | |||
inspection by December 31, 2018, as identified above. The remaining documents | |||
should be available by the first day of the onsite inspection, January 14, 2019. | |||
* The third group lists information necessary to aid the inspection team in tracking issues | |||
identified as a result of the inspection. It is requested that this information be provided to | |||
the lead inspector as the information is generated during the inspection. It is important | |||
that all of these documents are up to date and complete in order to minimize the number | |||
of additional documents requested during the preparation and/or the onsite portions of | |||
the inspection. | |||
B. Hanson -2- | |||
The lead inspector for this inspection is Atif Shaikh. We understand that our regulatory contact | |||
for this inspection is Rachel Luebbe of your organization. If there are any questions about the | |||
inspection or the material requested, please contact the lead inspector at 630-829-9824 or via | |||
e-mail at Atif.Shaikh@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject | |||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection requirements were approved by the Office of Management and Budget, Control | |||
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to | |||
respond to, a request for information or an information collection requirement unless the | |||
requesting document displays a currently valid Office of Management and Budget Control | |||
Number. | |||
This letter and its enclosure will be made available for public inspection and copying at | |||
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in | |||
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, | |||
Exemptions, Requests for Withholding. | |||
Sincerely, | |||
/RA/ | |||
Atif Shaikh, Senior Inspector | |||
Engineering Branch 3 | |||
Division of Reactor Safety | |||
Docket Nos. 50-254, 50-265; 72-053 | |||
License Nos. DPR-29; DPR-30 | |||
Enclosure: | |||
Document Request for 10 CFR 50.59 | |||
Baseline Inspection | |||
cc: Distribution via LISTSERV | |||
B. Hanson -3- | |||
Letter to Bryan C. Hanson from Atif Shaikh dated October 31, 2018. | |||
SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2INFORMATION | |||
REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF | |||
CHANGES, TESTS AND EXPERIMENTS) BASELINE INSPECTION; | |||
INSPECTION REPORT 05000254/2019010; 05000265/2019010 | |||
DISTRIBUTION: | |||
Christopher Cook | |||
RidsNrrDorlLpl3 | |||
RidsNrrPMQuadCities Resource | |||
RidsNrrDirsIrib Resource | |||
Steven West | |||
Darrell Roberts | |||
Jamnes Cameron | |||
Allan Barker | |||
DRPIII | |||
DRSIII | |||
ADAMS Accession Number: ML18304A279 | |||
OFFICE RIII | |||
NAME AShaikh:cl | |||
DATE 10/31/18 | |||
OFFICIAL RECORD COPY | |||
DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION | |||
Inspection Report: 05000254/2019010; 05000265/2019010 | |||
Inspection Dates: January 14-18, 2019 | |||
Inspection Procedure: Inspection Procedure 71111.17T, Evaluations of Changes, | |||
Tests and Experiments | |||
Lead Inspector: Atif Shaikh | |||
630-829-9824 | |||
Atif.Shaikh@nrc.gov | |||
I. Information Requested for In-Office Preparation Week | |||
The following information is requested by December 3, 2018, or sooner, to facilitate the | |||
selection of specific items that will be reviewed during the onsite inspection week. The | |||
inspection team will select specific items from the information requested below and | |||
submit a list to your staff by December 10, 2018. We will request that certain items be | |||
made available to the regional office prior to the inspection by December 31, 2018. We | |||
request that the remaining items selected from the lists be available and ready for review | |||
on the first day of inspection. All requested information should identify the associated | |||
system and cover the time frame from the receipt of information for the last 50.59 | |||
inspection to the present. | |||
The required information identified below should be provided on compact disc (CD) | |||
or uploaded to accessible links. Please provide three copies of each CD submitted | |||
(i.e., one for each inspector, if applicable). The preferred file format is a searchable pdf | |||
file. The CDs should be indexed and hyper-linked to facilitate ease of use, if possible. If | |||
you have any questions regarding this information, please call the inspection team | |||
leader as soon as possible. | |||
(1) List of all Title 10 of the Code of Federal Regulations (CFR), Part 50.59 | |||
completed evaluations involving: (a) calculations, (b) procedure revisions, | |||
(c) changes to the facility (modifications), (d) non-routine operating | |||
configurations, or (e) departures in methods of analyses. This list should | |||
include 50.59 evaluations for the following: | |||
a. Changes that have been made under the provisions of 10 CFR 50.59 that | |||
have been updated in accordance with 10 CFR 50.71(e)(4) since the last | |||
50.59 inspection; | |||
b. Modifications that are field work complete; and | |||
Enclosure | |||
DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION | |||
c. Changes to calculations (or initiation of new calculations) that have been | |||
issued. The list should contain the number and title of each document, a brief | |||
description of the change, and the corresponding number and type of the | |||
affected document (i.e., the modification or procedure to which the evaluation | |||
applies). The list should NOT include any evaluations in which prior | |||
U.S. Nuclear Regulatory Commission approval was sought and obtained. | |||
(2) A list of all 10 CFR 50.59 changes that have been screened out as not requiring | |||
a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes | |||
to the facility (modifications); (d) non-routine operating configurations; or | |||
(e) departures in methods of analyses. | |||
The list should contain the number and title of each document, a brief description | |||
of the change, and the corresponding number and type of the affected document | |||
(i.e., the modification or procedure to which the evaluation applies). | |||
(3) A list of any modifications, procedure revisions, or Updated Final Safety Analysis | |||
Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not | |||
apply. | |||
(4) A list of calculation changes that have been issued for use. | |||
(5) A list of corrective action documents (open and closed) that address | |||
10 CFR 50.59 issues, concerns, or processes. These documents should also | |||
include the associated corrective action documents and the 50.59 change | |||
implementation. | |||
The list should contain the number, title and revision (or date) of each document, | |||
the affected system and corresponding documentation (if applicable), and should | |||
be sorted in order of significance. | |||
(6) Copies of procedures addressing the following: modifications, design changes, | |||
set point changes, equivalency evaluations or suitability analyses, commercial | |||
grade dedications, post-modification testing, 10 CFR 50.59 evaluations and | |||
screenings, and UFSAR updates. | |||
(7) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide | |||
copies of the complete submittal. | |||
(8) Copy of the UFSAR change log or a synopsis of the changes. This should | |||
include all of the changes made to the UFSAR that were incorporated in the last | |||
10 CFR 50.71(e)(4) submittal. | |||
(9) Electronic copy of the UFSAR and Bases, and technical specifications, if | |||
available. | |||
(10) Name(s) and phone numbers for the regulatory and technical contacts. | |||
(11) Current management and engineering organizational chart. | |||
2 | |||
DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION | |||
II. Information Requested to be Available Prior to Inspection. Requests will be Made | |||
for Specific Item (1) Documents by December 10, 2018, for Availability of | |||
Requested Item (1) Documents in Regional Office by December 31, 2018, and | |||
Items (2), (3) and (4) Documents on First Day of Inspection (January 14, 2019) | |||
(1) Copies of all selected items from Section I. This includes copies of | |||
associated documents such as calculations, post-modification test packages, | |||
10 CFR 50.59 evaluations or screenings, and any corrective action documents. | |||
(2) Copies of these documents do not need to be solely available to the inspection | |||
team as long as the inspectors have easy and unrestrained access to them. | |||
a. UFSAR, if not previously provided; | |||
b. Original Final Safety Analysis Report Volumes; | |||
c. Original Safety Evaluation Report and Supplements; | |||
d. Final Safety Analysis Report Question and Answers; | |||
e. Quality Assurance Plan; | |||
f. Technical Specifications, if not previously provided; | |||
g. Latest Probabilistic Risk Assessment Report; | |||
h. Vendor Manuals; and | |||
i. The latest 10 CFR 50.59 UFSAR Update Submittal. | |||
(3) Please ensure that other supporting documents for the selected items have been | |||
located and are readily retrievable as the inspection team will likely be requesting | |||
these documents during the inspection. Examples of supporting documents are: | |||
a. Drawings supporting the modifications; | |||
b. Procedures affected by the modifications; and | |||
c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation. | |||
(4) Assessment and Corrective Actions: | |||
a. The most recent 50.59 Quality Assurance audit and/or self-assessment; and | |||
b. Corrective action documents (e.g., condition reports, including status of | |||
corrective actions) generate as a result of the most recent 50.59 Quality | |||
Assurance audit and/or self-assessment. | |||
3 | |||
DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION | |||
III. Information Requested to be provided throughout the inspection | |||
(1) Copies of any corrective action documents generated as a result of the | |||
inspection teams questions or queries during this inspection. | |||
(2) Copies of the list of questions submitted by the inspection team members and | |||
the status/resolution of the information requested (provide daily during the | |||
inspection to each inspection team member). | |||
If you have any questions regarding the information requested, please contact the inspection | |||
team leader. | |||
4 | |||
}} |
Latest revision as of 11:29, 20 October 2019
ML18304A279 | |
Person / Time | |
---|---|
Site: | Quad Cities |
Issue date: | 10/31/2018 |
From: | Atif Shaikh Engineering Branch 3 |
To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
References | |
IR 2019010 | |
Download: ML18304A279 (7) | |
See also: IR 05000254/2019010
Text
October 31, 2018
Mr. Bryan C. Hanson
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2INFORMATION
REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF
CHANGES, TESTS AND EXPERIMENTS) BASELINE INSPECTION;
INSPECTION REPORT 05000254/2019010; 05000265/2019010
Dear Mr. Hanson:
On January 14, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin a Title 10 of
the Code of Federal Regulation, Part 50.59, (Evaluation of Changes, Tests and Experiments),
baseline inspection at the Quad Cities Nuclear Power Station, Units 1 and 2. This inspection
will be performed in accordance with the NRC baseline Inspection Procedure 71111.17T. The
onsite portions of the inspection will take place on January 14-18, 2019.
Experience has shown that these baseline inspections are extremely resource intensive, both
for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on
the site and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. These documents have been divided into three groups.
- The first group of information is necessary to ensure that the inspection team is
adequately prepared for the inspection. This information should be made available
via compact disc and delivered to the regional office no later than December 3, 2018.
The inspection team will review this information and, by December 10, 2018 will
request specific items that should be provided for review in the regional office by
December 31, 2018.
- The second group of requested documents contains additional items that the team will
review, or need access to, during the inspection. Certain documents contained within
Group II (i.e., Item (1)), will be requested for review in the regional office prior to the
inspection by December 31, 2018, as identified above. The remaining documents
should be available by the first day of the onsite inspection, January 14, 2019.
- The third group lists information necessary to aid the inspection team in tracking issues
identified as a result of the inspection. It is requested that this information be provided to
the lead inspector as the information is generated during the inspection. It is important
that all of these documents are up to date and complete in order to minimize the number
of additional documents requested during the preparation and/or the onsite portions of
the inspection.
B. Hanson -2-
The lead inspector for this inspection is Atif Shaikh. We understand that our regulatory contact
for this inspection is Rachel Luebbe of your organization. If there are any questions about the
inspection or the material requested, please contact the lead inspector at 630-829-9824 or via
e-mail at Atif.Shaikh@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
Exemptions, Requests for Withholding.
Sincerely,
/RA/
Atif Shaikh, Senior Inspector
Engineering Branch 3
Division of Reactor Safety
Docket Nos. 50-254, 50-265;72-053
Enclosure:
Document Request for 10 CFR 50.59
Baseline Inspection
cc: Distribution via LISTSERV
B. Hanson -3-
Letter to Bryan C. Hanson from Atif Shaikh dated October 31, 2018.
SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2INFORMATION
REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF
CHANGES, TESTS AND EXPERIMENTS) BASELINE INSPECTION;
INSPECTION REPORT 05000254/2019010; 05000265/2019010
DISTRIBUTION:
RidsNrrDorlLpl3
RidsNrrPMQuadCities Resource
RidsNrrDirsIrib Resource
DRPIII
DRSIII
ADAMS Accession Number: ML18304A279
OFFICE RIII
NAME AShaikh:cl
DATE 10/31/18
OFFICIAL RECORD COPY
DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION
Inspection Report: 05000254/2019010; 05000265/2019010
Inspection Dates: January 14-18, 2019
Inspection Procedure: Inspection Procedure 71111.17T, Evaluations of Changes,
Tests and Experiments
Lead Inspector: Atif Shaikh
630-829-9824
Atif.Shaikh@nrc.gov
I. Information Requested for In-Office Preparation Week
The following information is requested by December 3, 2018, or sooner, to facilitate the
selection of specific items that will be reviewed during the onsite inspection week. The
inspection team will select specific items from the information requested below and
submit a list to your staff by December 10, 2018. We will request that certain items be
made available to the regional office prior to the inspection by December 31, 2018. We
request that the remaining items selected from the lists be available and ready for review
on the first day of inspection. All requested information should identify the associated
system and cover the time frame from the receipt of information for the last 50.59
inspection to the present.
The required information identified below should be provided on compact disc (CD)
or uploaded to accessible links. Please provide three copies of each CD submitted
(i.e., one for each inspector, if applicable). The preferred file format is a searchable pdf
file. The CDs should be indexed and hyper-linked to facilitate ease of use, if possible. If
you have any questions regarding this information, please call the inspection team
leader as soon as possible.
(1) List of all Title 10 of the Code of Federal Regulations (CFR), Part 50.59
completed evaluations involving: (a) calculations, (b) procedure revisions,
(c) changes to the facility (modifications), (d) non-routine operating
configurations, or (e) departures in methods of analyses. This list should
include 50.59 evaluations for the following:
a. Changes that have been made under the provisions of 10 CFR 50.59 that
have been updated in accordance with 10 CFR 50.71(e)(4) since the last
50.59 inspection;
b. Modifications that are field work complete; and
Enclosure
DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION
c. Changes to calculations (or initiation of new calculations) that have been
issued. The list should contain the number and title of each document, a brief
description of the change, and the corresponding number and type of the
affected document (i.e., the modification or procedure to which the evaluation
applies). The list should NOT include any evaluations in which prior
U.S. Nuclear Regulatory Commission approval was sought and obtained.
(2) A list of all 10 CFR 50.59 changes that have been screened out as not requiring
a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes
to the facility (modifications); (d) non-routine operating configurations; or
(e) departures in methods of analyses.
The list should contain the number and title of each document, a brief description
of the change, and the corresponding number and type of the affected document
(i.e., the modification or procedure to which the evaluation applies).
(3) A list of any modifications, procedure revisions, or Updated Final Safety Analysis
Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not
apply.
(4) A list of calculation changes that have been issued for use.
(5) A list of corrective action documents (open and closed) that address
10 CFR 50.59 issues, concerns, or processes. These documents should also
include the associated corrective action documents and the 50.59 change
implementation.
The list should contain the number, title and revision (or date) of each document,
the affected system and corresponding documentation (if applicable), and should
be sorted in order of significance.
(6) Copies of procedures addressing the following: modifications, design changes,
set point changes, equivalency evaluations or suitability analyses, commercial
grade dedications, post-modification testing, 10 CFR 50.59 evaluations and
screenings, and UFSAR updates.
(7) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide
copies of the complete submittal.
(8) Copy of the UFSAR change log or a synopsis of the changes. This should
include all of the changes made to the UFSAR that were incorporated in the last
10 CFR 50.71(e)(4) submittal.
(9) Electronic copy of the UFSAR and Bases, and technical specifications, if
available.
(10) Name(s) and phone numbers for the regulatory and technical contacts.
(11) Current management and engineering organizational chart.
2
DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION
II. Information Requested to be Available Prior to Inspection. Requests will be Made
for Specific Item (1) Documents by December 10, 2018, for Availability of
Requested Item (1) Documents in Regional Office by December 31, 2018, and
Items (2), (3) and (4) Documents on First Day of Inspection (January 14, 2019)
(1) Copies of all selected items from Section I. This includes copies of
associated documents such as calculations, post-modification test packages,
10 CFR 50.59 evaluations or screenings, and any corrective action documents.
(2) Copies of these documents do not need to be solely available to the inspection
team as long as the inspectors have easy and unrestrained access to them.
a. UFSAR, if not previously provided;
b. Original Final Safety Analysis Report Volumes;
c. Original Safety Evaluation Report and Supplements;
d. Final Safety Analysis Report Question and Answers;
e. Quality Assurance Plan;
f. Technical Specifications, if not previously provided;
g. Latest Probabilistic Risk Assessment Report;
h. Vendor Manuals; and
i. The latest 10 CFR 50.59 UFSAR Update Submittal.
(3) Please ensure that other supporting documents for the selected items have been
located and are readily retrievable as the inspection team will likely be requesting
these documents during the inspection. Examples of supporting documents are:
a. Drawings supporting the modifications;
b. Procedures affected by the modifications; and
c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
(4) Assessment and Corrective Actions:
a. The most recent 50.59 Quality Assurance audit and/or self-assessment; and
b. Corrective action documents (e.g., condition reports, including status of
corrective actions) generate as a result of the most recent 50.59 Quality
Assurance audit and/or self-assessment.
3
DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION
III. Information Requested to be provided throughout the inspection
(1) Copies of any corrective action documents generated as a result of the
inspection teams questions or queries during this inspection.
(2) Copies of the list of questions submitted by the inspection team members and
the status/resolution of the information requested (provide daily during the
inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection
team leader.
4