ML060060018: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML060060018
| number = ML060060018
| issue date = 01/03/2006
| issue date = 01/03/2006
| title = Millstone, Units 2, Tech Spec Page for Amendment 290 Regarding Changes to Technical Specification Surveillance Requirement for Trisodium Phosphate
| title = Tech Spec Page for Amendment 290 Regarding Changes to Technical Specification Surveillance Requirement for Trisodium Phosphate
| author name =  
| author name =  
| author affiliation = NRC/NRR/ADRO/DORL
| author affiliation = NRC/NRR/ADRO/DORL
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:MGENCY CORE COOLING SYSTEMS TRISQpU 2SPHATEIISP LIMITNG CONDIMON FOR OPERATION 3.5.5 The TSP baskets shall contain 282 ft 3 of active TSP.AppAlIABLMD MODES 1, 2, and3 AMTON: With the quantity of TSP less than required, restore the TSP quantity within 72 hours, or f be in MODE 3 within the next 6 hours and MODE 4 within the following 6 hours.SURVEILLANCE REQURMESNTS 4.5.5.1 Verify that the TSP baskets contain 282 t 3 of TSP at least once per 18 months.4.5.52 Verify that a sample from the TSP baskets provides adequate pH adjustment of borated water at least once per 18 months.MILLSTONE  
{{#Wiki_filter:MGENCY CORE COOLING SYSTEMS TRISQpU           2SPHATEIISP LIMITNG CONDIMON FOR OPERATION 3.5.5       The TSP baskets shall contain 282 ft3 of active TSP.
-UNIT 2 3J4 5-9 Amendment No. 245 , 290}}
AppAlIABLMD             MODES 1,2, and3 AMTON:
With the quantity of TSP less than required, restore the TSP quantity within 72 hours, or f be in MODE 3 within the next 6 hours and MODE 4 within the following 6 hours.
SURVEILLANCE REQURMESNTS 4.5.5.1     Verify that the TSP baskets contain 282 t3 of TSP at least once per 18 months.
4.5.52     Verify that a sample from the TSP baskets provides adequate pH adjustment of borated water at least once per 18 months.
MILLSTONE -UNIT 2                         3J4 5-9                           Amendment No. 245, 290}}

Latest revision as of 23:23, 23 November 2019

Tech Spec Page for Amendment 290 Regarding Changes to Technical Specification Surveillance Requirement for Trisodium Phosphate
ML060060018
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/03/2006
From:
Plant Licensing Branch III-2
To:
References
TAC MC6257
Download: ML060060018 (1)


Text

MGENCY CORE COOLING SYSTEMS TRISQpU 2SPHATEIISP LIMITNG CONDIMON FOR OPERATION 3.5.5 The TSP baskets shall contain 282 ft3 of active TSP.

AppAlIABLMD MODES 1,2, and3 AMTON:

With the quantity of TSP less than required, restore the TSP quantity within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or f be in MODE 3 within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 4 within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQURMESNTS 4.5.5.1 Verify that the TSP baskets contain 282 t3 of TSP at least once per 18 months.

4.5.52 Verify that a sample from the TSP baskets provides adequate pH adjustment of borated water at least once per 18 months.

MILLSTONE -UNIT 2 3J4 5-9 Amendment No. 245, 290