ML18003A653: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
| number = ML18003A654
| number = ML18003A654
| issue date = 09/04/1979
| issue date = 09/04/1979
| title = Forwards Interim Rept Re Deficiencies in Procurement, Fabrication & Insp of Engineered Plates for Concrete Embedment & Support of safety-related Loads.Final Rept to Be Submitted by 791102
| title = Interim Rept Re Deficiencies in Procurement,Fabrication & Insp of Engineered Plates for Concrete Embedment & Support of safety-related Loads.Caused by Misinterpretation of Design Documents by Site & Vendor Personnel
| author name =  
| author name =  
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
Line 22: Line 22:
| issue date = 09/05/1979
| issue date = 09/05/1979
| title = Forwards Interim Rept Re Deficiencies in Procurement, Fabrication & Insp of Engineered Plates for Concrete Embedment & Support of safety-related Loads.Final Rept to Be Submitted by 791102
| title = Forwards Interim Rept Re Deficiencies in Procurement, Fabrication & Insp of Engineered Plates for Concrete Embedment & Support of safety-related Loads.Final Rept to Be Submitted by 791102
| author name = CHIANGI N J
| author name = Chiangi N
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = OREILLY J P
| addressee name = OREILLY J P

Latest revision as of 18:40, 6 March 2020

Forwards Interim Rept Re Deficiencies in Procurement, Fabrication & Insp of Engineered Plates for Concrete Embedment & Support of safety-related Loads.Final Rept to Be Submitted by 791102
Date released: 08/31/2018 Download: ML18003A653


Interim Rept Re Deficiencies in Procurement,Fabrication & Insp of Engineered Plates for Concrete Embedment & Support of safety-related Loads.Caused by Misinterpretation of Design Documents by Site & Vendor Personnel
ML18003A654
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/04/1979
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18003A654 (5)
Forwards Interim Rept Re Deficiencies in Procurement, Fabrication & Insp of Engineered Plates for Concrete Embedment & Support of safety-related Loads.Final Rept to Be Submitted by 791102
ML18003A652
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/05/1979
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18003A652 (3)