ML18003A294: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18003A294
| number = ML18003A294
| title = Forwards Final Deficiency Rept on Deletion of Bond Breaker & Void at Base of Containment Liner Wall
| title = Forwards Final Deficiency Rept on Deletion of Bond Breaker & Void at Base of Containment Liner Wall
| release date = 08/31/2018
| package contents = {{Adams package content
| package contents = {{Adams package content
| number = ML18003A295
| number = ML18003A295
| issue date = 11/22/1978
| issue date = 11/22/1978
| title = Forwards Final Deficiency Rept on Deletion of Bond Breaker & Void at Base of Containment Liner Wall
| title = Final Deficiency on Rept Deletion of Bond Breaker & Void at Base of Containment Liner Wall.Drawing Corrected Before Constr of Liner
| author name =  
| author name =  
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
Line 21: Line 22:
| issue date = 11/28/1978
| issue date = 11/28/1978
| title = Forwards Final Deficiency Rept on Deletion of Bond Breaker & Void at Base of Containment Liner Wall
| title = Forwards Final Deficiency Rept on Deletion of Bond Breaker & Void at Base of Containment Liner Wall
| author name = CHIANGI N J
| author name = Chiangi N
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = OREILLY J P
| addressee name = OREILLY J P

Latest revision as of 18:46, 6 March 2020

Forwards Final Deficiency Rept on Deletion of Bond Breaker & Void at Base of Containment Liner Wall
Date released: 08/31/2018 Download: ML18003A294


Final Deficiency on Rept Deletion of Bond Breaker & Void at Base of Containment Liner Wall.Drawing Corrected Before Constr of Liner
ML18003A295
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/22/1978
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18003A295 (2)
Forwards Final Deficiency Rept on Deletion of Bond Breaker & Void at Base of Containment Liner Wall
ML18003A293
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/28/1978
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18003A293 (4)