ML18016A210: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18016A210
| number = ML18016A210
| title = Forwards LER 96-008-02 Re Reactor Trip Due to Failure of Switchyard Breaker Disconnect Switch.Rev Repts Addl Info Pertaining to Problems Encountered W/Normal Svc Water Sys Following 960425 Reactor Trip
| title = Forwards LER 96-008-02 Re Reactor Trip Due to Failure of Switchyard Breaker Disconnect Switch.Rev Repts Addl Info Pertaining to Problems Encountered W/Normal Svc Water Sys Following 960425 Reactor Trip
| release date = 08/31/2018
| package contents = {{Adams package content
| package contents = {{Adams package content
| number = ML18016A211
| number = ML18016A211
| issue date = 10/14/1997
| issue date = 10/14/1997
| title = Forwards LER 96-008-02 Re Reactor Trip Due to Failure of Switchyard Breaker Disconnect Switch.Rev Repts Addl Info Pertaining to Problems Encountered W/Normal Svc Water Sys Following 960425 Reactor Trip
| title = LER 96-008-02:on 960425,turbine Trip/Reactor Trip Occurred. Caused by High Resistance Connection Resulting from a Phase Switch Jaw & Blade Contacts.Failed a Phase Disconnect Switch on Breaker 52-7 Replaced
| author name = VERRILLI M
| author name = Verrilli M
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 21: Line 22:
| issue date = 10/14/1997
| issue date = 10/14/1997
| title = Forwards LER 96-008-02 Re Reactor Trip Due to Failure of Switchyard Breaker Disconnect Switch.Rev Repts Addl Info Pertaining to Problems Encountered W/Normal Svc Water Sys Following 960425 Reactor Trip
| title = Forwards LER 96-008-02 Re Reactor Trip Due to Failure of Switchyard Breaker Disconnect Switch.Rev Repts Addl Info Pertaining to Problems Encountered W/Normal Svc Water Sys Following 960425 Reactor Trip
| author name = DONAHUE J W
| author name = Donahue J
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Latest revision as of 15:31, 6 March 2020

Forwards LER 96-008-02 Re Reactor Trip Due to Failure of Switchyard Breaker Disconnect Switch.Rev Repts Addl Info Pertaining to Problems Encountered W/Normal Svc Water Sys Following 960425 Reactor Trip
Date released: 08/31/2018 Download: ML18016A210


LER 96-008-02:on 960425,turbine Trip/Reactor Trip Occurred. Caused by High Resistance Connection Resulting from a Phase Switch Jaw & Blade Contacts.Failed a Phase Disconnect Switch on Breaker 52-7 Replaced
ML18016A211
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/14/1997
From: Verrilli M
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18016A211 (6)
Forwards LER 96-008-02 Re Reactor Trip Due to Failure of Switchyard Breaker Disconnect Switch.Rev Repts Addl Info Pertaining to Problems Encountered W/Normal Svc Water Sys Following 960425 Reactor Trip
ML18016A209
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/14/1997
From: Donahue J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18016A209 (2)