ML18016A210

From kanterella
Jump to navigation Jump to search
Forwards LER 96-008-02 Re Reactor Trip Due to Failure of Switchyard Breaker Disconnect Switch.Rev Repts Addl Info Pertaining to Problems Encountered W/Normal Svc Water Sys Following 960425 Reactor Trip
Date released: 08/31/2018 Download: ML18016A210


LER 96-008-02:on 960425,turbine Trip/Reactor Trip Occurred. Caused by High Resistance Connection Resulting from a Phase Switch Jaw & Blade Contacts.Failed a Phase Disconnect Switch on Breaker 52-7 Replaced
ML18016A211
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/14/1997
From: Verrilli M
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18016A211 (6)
Forwards LER 96-008-02 Re Reactor Trip Due to Failure of Switchyard Breaker Disconnect Switch.Rev Repts Addl Info Pertaining to Problems Encountered W/Normal Svc Water Sys Following 960425 Reactor Trip
ML18016A209
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/14/1997
From: Donahue J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18016A209 (2)