{{#Wiki_filter:Revision 1 June 1980 U.S. NUCLEAR REGULATORY  
{{#Wiki_filter:Revision 1 June 1980
COMMISSION
                              U.S. NUCLEAR REGULATORY COMMISSION
REGULATORY  
                            REGULATORY GUIDE
GUIDE OFFICE OF STANDARDS  
                            OFFICE OF STANDARDS DEVELOPMENT
DEVELOPMENT  
                                                            REGULATORY GUIDE 5.57 (Task SG 908-4)
REGULATORY  
                                    SHIPPING AND RECEIVING CONTROL OF STRATEGIC
GUIDE 5.57 (Task SG 908-4) SHIPPING AND RECEIVING  
                                                      SPECIAL NUCLEAR MATERIAL
CONTROL OF STRATEGIC  
SPECIAL NUCLEAR MATERIAL  


==A. INTRODUCTION==
==A. INTRODUCTION==
Requirements for the physical protection of special nuclear material (SNM) at licensee facilities and in transit and of plants in which SNM is used are specified in 10 CFR Part 73, "Physical Protection of Plants and Materials," and are the subject of various regulatory guides issued or under development.
5.10      Selection and Use of Pressure-Sensitive Seals on Containers for Onsite Storage of Special Requirements for the physical protection of special Nuclear Material.


Section 73.20 of 10 CFR Part 73 provides the general performance objective and requirements for each licensee who is authorized to operate a fuel repro cessing plant pursuant to 10 CFR Part 50, possesses or uses formula quantities of strategic special nuclear material (SSNM) at any site or contiguous sites subject to control by the licensee, is authorized to transport or deliver to a carrier for transportation pursuant to 10 CFR Part 70 formula quantities of SSNM, takes delivery of formula quantities of SSNM free on board (f.o.b.) the point at which it is delivered to a carrier for transportation, or imports or exports formula quantities of SSNM. Section 73.25 requires specific performance capabilities for physical protection of SSNM in transit. Section 73.45 requires specific performance capabilities for fixed site physical protection systems. This guide is applicable to the shipping and receiving control of SSNM subject to § § 73.20, 73.25, and 73.45.  Other regulations are also pertinent to shipping and receiving control. Section 70.58, "Fundamental Nuclear Material Controls," requires licensees to establish, maintain, and follow detailed fundamental material control and accounting procedures, including procedures for shipping and receiving special nuclear material (SNM). Certain material control and accounting procedures related specifi cally to the protection of SSNM from theft during shipping and receiving and related to preventing the misuse of shipments to disguise a diversion are discussed in this guide.  Additional guidance on fundamental material controls and accounting is included in the following regulatory guides: Lines indicate substantive changes from June 1976 versio
nuclear material (SNM) at licensee facilities and in transit and of plants in which SNM is used are specified in 10 CFR                       5.12      General Use of Locks in the Protection and Part 73, "Physical Protection of Plants and Materials," and Control of Facilities and Special Nuclear are the subject of various regulatory guides issued or under Materials.


====n. USNRC REGULATORY ====
*r    development. Section 73.20 of 10 CFR Part 73 provides the general performance objective and requirements for                          5.13      Conduct of Nuclear Material Physical Inven each licensee who is authorized to operate a fuel repro tories (In particular, Section C.2.b.(l), Re cessing plant pursuant to 10 CFR Part 50, possesses or ceipts, Shipments, and Other Removals).
GUIDES Regulatory Guides are issued to describe and make available to the public methods acceptable to the NRC staff of implementing specific parts of the Commission's regulations, to delineate tech niques used by the staff in evaluating specific problems or postu lated accidents or to provide guidance to applicants.
      uses formula quantities of strategic special nuclear material (SSNM) at any site or contiguous sites subject to control by
                                                                                      5.15      Security Seals for the Protection and Control the licensee, is authorized to transport or deliver to a carrier of Special Nuclear Material.


Regulatory Guides are noi substitutes for regulations, and compliance with them is not required.
for transportation pursuant to 10 CFR Part 70 formula quantities of SSNM, takes delivery of formula quantities of                    5.45      Standard Format and Content for the Special SSNM free on board (f.o.b.) the point at which it is delivered                            Nuclear Material Control and Accounting Sec to a carrier for transportation, or imports or exports tion of a Special Nuclear Material License formula quantities of SSNM. Section 73.25 requires specific Application.


Methods and solutions different from those set out in the guides will be acceptable if they provide a basis for the findings requisite to the issuance or continuance of a permit or license by the Commission.
performance capabilities for physical protection of SSNM
    in transit. Section 73.45 requires specific performance                          5.47      Control and Accountability of Plutonium in capabilities for fixed site physical protection systems. This Waste Material.


Comments and suggestions for improvements in these guides are encouraged at all times, and guides will be revised, as appropriate, to accommodate comments and to reflect new information or experience.
guide is applicable to the shipping and receiving control of SSNM subject to § § 73.20, 73.25, and 73.45.


This guide was revised as a result of substantive com ments received from the public and additional staff review.5.10 Selection and Use of Pressure-Sensitive Seals on Containers for Onsite Storage of Special Nuclear Material.
5.51      Management Review of Nuclear Material Control and Accounting Systems.


5.12 General Use of Locks in the Protection and Control of Facilities and Special Nuclear Materials.
Other regulations are also pertinent to shipping and receiving control. Section 70.58, "Fundamental Nuclear                      Section 70.57 and paragraph (f) of § 70.58 require that Material Controls," requires licensees to establish, maintain,            the licensee's measurement control program for SNM include and follow detailed fundamental material control and                    a means for the control and evaluation of measurement bias, accounting procedures, including procedures for shipping                random errors, and limits on systematic errors for all parts and receiving special nuclear material (SNM). Certain                    of the measurement process, including scales, balances, material control and accounting procedures related specifi volume measurements, analytical quality control, nondestruc cally to the protection of SSNM from theft during shipping trive assay, and sampling. Certain measurements made in con and receiving and related to preventing the misuse of junction with shipping and receiving are used as part of the shipments to disguise a diversion are discussed in this guide.


5.13 Conduct of Nuclear Material Physical Inven tories (In particular, Section C.2.b.(l), Re ceipts, Shipments, and Other Removals).
material accountability program and are subject to § 70.57.
5.15 Security Seals for the Protection and Control of Special Nuclear Material.


5.45 Standard Format and Content for the Special Nuclear Material Control and Accounting Sec tion of a Special Nuclear Material License Application.
Additional guidance on fundamental material controls and Specific guidance on measurements and measurement control accounting is included in the following regulatory guides:
                                                                              are provided in the following regulatory guides:
                                                                                      5.4      Standard Analytical Methods for the Mea surement of Uranium Tetrafluoride (UF 4 )
          Lines indicate substantive changes from June 1976 version.


5.47 Control and Accountability of Plutonium in Waste Material.
and Uranium Hexafluoride (UF 6 ).
                    USNRC  REGULATORY GUIDES                              Comments should be sent to the Secretary of the          Commission, Regulatory Guides are issued to describe and make available to the      U.S. Nuclear Regulatory Commission, Washington,          D.C. 20555, public methods acceptable to the NRC staff of implementing              Attention: Docketing and Service Branch.


5.51 Management Review of Nuclear Material Control and Accounting Systems.
specific parts of the Commission's regulations, to delineate tech niques used by the staff in evaluating specific problems or postu        The guides are issued in the following ten broad divisions:
  lated accidents or to provide guidance to applicants. Regulatory Guides are noi substitutes for regulations, and compliance with          1. Power Reactors                    6. Products them is not required. Methods and solutions different from those set    2. Research and Test Reactors        7. Transportation out in the guides will be acceptable if they provide a basis for the    3. Fuels and Materials Facilities    8. Occupational Health findings requisite to the issuance or continuance of a permit or        4. Environmental and Siting          9. Antitrust and Financial Review license by the Commission.                                              5. Materials and Plant Protection  10. General Copies of issued guides may be purchased at the current Government Comments and suggestions for improvements in these guides are encouraged at all times, and guides will be revised, as appropriate,    Printing Office price. A subscription service for future guides in spe to accommodate comments and to reflect new information or                cific divisions is available through the Government Printing Office.


Section 70.57 and paragraph (f) of § 70.58 require that the licensee's measurement control program for SNM include a means for the control and evaluation of measurement bias, random errors, and limits on systematic errors for all parts of the measurement process, including scales, balances, volume measurements, analytical quality control, nondestruc trive assay, and sampling.
experience. This guide was revised as a result of substantive com        Information on the subscription service and current GPO prices may ments received from the public and additional staff review.              be obtained by writing the U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention: Publications Sales Manager.


Certain measurements made in con junction with shipping and receiving are used as part of the material accountability program and are subject to § 70.57. Specific guidance on measurements and measurement control are provided in the following regulatory guides: 5.4 Standard Analytical Methods for the Mea surement of Uranium Tetrafluoride (UF 4) and Uranium Hexafluoride (UF 6).Comments should be sent to the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention:
5.5      Standard Methods for Chemical, Mass Spec            the licensees' facilities and while in transit and (2) the timely, trometric, and Spectrochemical Analysis of          accurate, and independent identification and measurement Nuclear-Grade Uranium Dioxide Powders              of the SSNM by both shipper and receiver to determine and and Pellets.                                       evaluate any shipper-receiver differences. These measure ments are necessary to (1) detect loss or theft of SSNM
Docketing and Service Branch.  The guides are issued in the following ten broad divisions:
                                                                                                                                      I
1. Power Reactors 6. Products 2. Research and Test Reactors
      5.6      Standard Methods for Chemical, Mass Spec            being transferred between licensees, (2) detect and permit trometric, and Spectrochemical Analysis of          correction of clerical or handling errors, (3) detect falsifica Nuclear-Grade Plutonium Dioxide Powders            tion or errors in the shipment source data, (4) provide and Pellets and Nuclear-Grade Mixed Oxides          assurance that measurement bias is detected and corrected,
                ([U,Pul )02*                                        and (5) detect and prevent the transfer of "inventory difference" (ID) from one licensee to another.


===7. Transportation ===
5.11    Nondestructive Assay of Special Nuclear Material Contained in Scrap and Waste.                 The application of tamper-indicating seals to each item or container by the shipper immediately after sampling or
3. Fuels and Materials Facilities
      5.21    Nondestructive Uranium-235 Enrichment              assay, checks on those seals before shipment, and the Assay by Gamma-Ray Spectrometry.                   prompt verification of the seals by the receiver can help ensure the integrity of the material measure
8. Occupational Health 4. Environmental and Siting 9. Antitrust and Financial Review 5. Materials and Plant Protection
10. General Copies of issued guides may be purchased at the current Government Printing Office price. A subscription service for future guides in spe cific divisions is available through the Government Printing Office.  Information on the subscription service and current GPO prices may be obtained by writing the U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention:
Publications Sales Manager.*r
5.5 Standard Methods for Chemical, Mass Spec trometric, and Spectrochemical Analysis of Nuclear-Grade Uranium Dioxide Powders and Pellets.


5.6 Standard Methods for Chemical, Mass Spec trometric, and Spectrochemical Analysis of Nuclear-Grade Plutonium Dioxide Powders and Pellets and Nuclear-Grade Mixed Oxides ([U,Pul )02* 5.11 Nondestructive Assay of Special Nuclear Material Contained in Scrap and Waste. 5.21 Nondestructive Uranium-235 Enrichment Assay by Gamma-Ray Spectrometry.
====d. Additional====
      5.34      Nondestructive Assay of Plutonium in Scrap          receiving checks made immediately after receipt can deter by Spontaneous Fission Detection.                  mine if loss, theft, or substitution of SSNM may have occurred during transfer and can detect packaging and
      5.53      Qualification, Calibration, and Error Esti          clerical mistakes. These checks can include counting and mation Methods for Nondestructive Assay.            identifying the containers; identifying and weighing the containers or items received; comparing the results with the Licensees who transfer and receive SNM are required              same information on a bill of lading, DOE/NRC Form-741, under § 70.54 to complete DOE/NRC Form-741, "Nuclear                "Nuclear Material Transaction Report," or other appropriate Material Transaction Report," and submit a copy to the              document supplied by the shipper; and, to the extent U.S. Department of Energy (DOE), Oak Ridge, Tennessee.               possible, performing an overcheck of each container by In addition, paragraph 70.42(c) requires that, before trans          nondestructive analysis to provide a gross verification of the ferring SNM, the person making the shipment verify that              SSNM content.


5.34 Nondestructive Assay of Plutonium in Scrap by Spontaneous Fission Detection.
the recipient is authorized to receive the type, form, and quantity of SNM to be transferred. Paragraph 70.42(d) out                After these initial checks have been made, prompt quan titative verification of the contents of each container will pro lines the methods to be used to make this verification.


5.53 Qualification, Calibration, and Error Esti mation Methods for Nondestructive Assay.  Licensees who transfer and receive SNM are required under § 70.54 to complete DOE/NRC Form-741, "Nuclear Material Transaction Report," and submit a copy to the U.S. Department of Energy (DOE), Oak Ridge, Tennessee.
vide early assurance that the contents of the packages received Paragraph 70.58(g)(2) requires that procedures be estab          are identical to those shipped. Written procedures that call for performing these verifications within specific time limits lished to review and evaluate shipper-receiver differences on an individual container or lot basis, a shipment basis, and a        after shipment can help ensure that DOE/NRC Form-741 is filed in a timely fashion. In addition, the validity of boththe cumulative basis for shipments of like material. Guidelines are contained in Regulatory Guide 5.28, "Evaluation of                shipper and receiver measurements is dependent on the existence of a program of standardization and calibration Shipper-Receiver Differences in the Transfer of Special Nuclear Materials." Any loss of SNM (other than normal                and control of measurement equipment and procedures.


In addition, paragraph
operating loss) must, under § 70.52, be reported immedi Prior coordination between the carrier and receiver can ately to the Director of the appropriate NRC Inspection and Enforcement Regional Office (listed in Appendix A to            ensure that SSNM will be delivered to the receiver's facility Part 73) by telephone, telegram, mailgram, or facsimile.              at a time when trained personnel are available to properly handle the material received. This procedure will eliminate This guide and the guides referenced above describe pro          the possibility of material arriving at times when proper cedures acceptable to the NRC staff for complying with              receiving checks or adequate physical security cannot be the Commission's regulations regarding the control of                provided.
70.42(c) requires that, before trans ferring SNM, the person making the shipment verify that the recipient is authorized to receive the type, form, and quantity of SNM to be transferred.


Paragraph
SSNM during preparation for shipment and receipt by a licensee. Safety-related requirements for packaging and                 Appropriate procedures that identify employees who are transporting SNM are specified in 10 CFR Part 71, "Packag           authorized to ship SSNM and the responsibilities of the ing of Radioactive Material for Transport and Transporta             various organizational components that have cognizance of tion of Radioactive Material Under Certain Conditions,"             the shipment will ensure that all aspects of the shipment are and in the applicable portions of the regulations appropriate       coordinated adequately. The following organizational to the mode of transportation in Title 49 of the Code of             components are listed with typical responsibilities as related Federal Regulations. These requirements are not included             to the shipment:
70.42(d) out lines the methods to be used to make this verification.
in the scope of this guide.
 
Paragraph
70.58(g)(2)
requires that procedures be estab lished to review and evaluate shipper-receiver differences on an individual container or lot basis, a shipment basis, and a cumulative basis for shipments of like material.
 
Guidelines are contained in Regulatory Guide 5.28, "Evaluation of Shipper-Receiver Differences in the Transfer of Special Nuclear Materials." Any loss of SNM (other than normal operating loss) must, under § 70.52, be reported immedi ately to the Director of the appropriate NRC Inspection and Enforcement Regional Office (listed in Appendix A to Part 73) by telephone, telegram, mailgram, or facsimile.
 
This guide and the guides referenced above describe pro cedures acceptable to the NRC staff for complying with the Commission's regulations regarding the control of SSNM during preparation for shipment and receipt by a licensee.
 
Safety-related requirements for packaging and transporting SNM are specified in 10 CFR Part 71, "Packag ing of Radioactive Material for Transport and Transporta tion of Radioactive Material Under Certain Conditions," and in the applicable portions of the regulations appropriate to the mode of transportation in Title 49 of the Code of Federal Regulations.
 
These requirements are not included in the scope of this guide.


==B. DISCUSSION==
==B. DISCUSSION==
Adequate control of SSNM during transfer between licensees includes (1) physical protection of the material at the licensees'
1. Organizational component that fabricates or assembles material:
facilities and while in transit and (2) the timely, accurate, and independent identification and measurement of the SSNM by both shipper and receiver to determine and evaluate any shipper-receiver differences.
    Adequate control of SSNM during transfer between licensees includes (1) physical protection of the material at               a. Determine   the correct weights of the SSNM,
 
                                                            5.57-2
These measure ments are necessary to (1) detect loss or theft of SSNM being transferred between licensees, (2) detect and permit correction of clerical or handling errors, (3) detect falsifica tion or errors in the shipment source data, (4) provide assurance that measurement bias is detected and corrected, and (5) detect and prevent the transfer of "inventory difference" (ID) from one licensee to another.
 
The application of tamper-indicating seals to each item or container by the shipper immediately after sampling or assay, checks on those seals before shipment, and the prompt verification of the seals by the receiver can help ensure the integrity of the material measured.
 
Additional receiving checks made immediately after receipt can deter mine if loss, theft, or substitution of SSNM may have occurred during transfer and can detect packaging and clerical mistakes.
 
These checks can include counting and identifying the containers;
identifying and weighing the containers or items received;
comparing the results with the same information on a bill of lading, DOE/NRC Form-741, "Nuclear Material Transaction Report," or other appropriate document supplied by the shipper; and, to the extent possible, performing an overcheck of each container by nondestructive analysis to provide a gross verification of the SSNM content.
 
After these initial checks have been made, prompt quan titative verification of the contents of each container will pro vide early assurance that the contents of the packages received are identical to those shipped. Written procedures that call for performing these verifications within specific time limits after shipment can help ensure that DOE/NRC Form-741 is filed in a timely fashion. In addition, the validity of boththe shipper and receiver measurements is dependent on the existence of a program of standardization and calibration and control of measurement equipment and procedures.
 
Prior coordination between the carrier and receiver can ensure that SSNM will be delivered to the receiver's facility at a time when trained personnel are available to properly handle the material received.
 
This procedure will eliminate the possibility of material arriving at times when proper receiving checks or adequate physical security cannot be provided.
 
Appropriate procedures that identify employees who are authorized to ship SSNM and the responsibilities of the various organizational components that have cognizance of the shipment will ensure that all aspects of the shipment are coordinated adequately.
 
The following organizational components are listed with typical responsibilities as related to the shipment:
1. Organizational component that fabricates or assembles material:
a. Determine the correct weights of the SSNM, 5.57-2 I
b. Tamper-seal and document the contents of the containers, c. Obtain appropriate analysis of the SSNM, d. Ensure product specifications, e. Package material properly or provide guidance on packaging as required.
 
2. Shipping and receiving control: a. Prepare shipping forms, b. Ensure proper packaging, c. Check integrity and seal numbers of tamper-safed containers and identification numbers on such items as sealed fuel pins, d. Verify seal integrity and number of receipts, e. Check weight of items and containers.
 
3. Security:
a. Accompany package to shipping area when appro priate, b. Be cognizant of the storage areas while shipment is in them, c. Guard shipment while it is being loaded, d. Coordinate security plans and arrangements with the dispatcher of the material, e. Obtain signed receipts and pass them on to the appropriate departments.
 
4. Traffic (dispatcher):
a. Make carrier arrangements, b. Coordinate shipments and ensure that delivery is at a time when the proper personnel are available to properly handle the material received, c. Prepare bill of lading and other formal shipping papers, d. Notify receivers when shipments will be made and approximate time of scheduled arrival.
 
5. Nuclear materials control: a. Ensure that the receiver is authorized to receive the shipment of SSNM, b. Approve all SSNM shipping memos, c. Prepare and transmit DOE/NRC Form-741, d. Transmit information for computer records, if used, e. Arrange transfer of material to shipping area, f. Post shipping transactions to control records, g. Investigate and reconcile shipper-receiver differences.
 
To document the transfer of SSNM containing
1 gram or more of contained uranium-235, uranium-233, or plutonium, DOE/NRC Form-741 is initiated on the day the material is shipped and distributed promptly by the shipper. Normally, the licensee receiving SSNM is required to independently measure its element and isotopic content and complete and distribute DOE/NRC Form-741 within 10 days of receipt of the material.
 
However, if receipt measurements cannot be completed within 10 days, a licensee may prepare and distribute NRC Form-284, "Nuclear Material Transfer Report," or use DOE/NRC Form-741 as a temporary receipt record after performing an initial receiving check to verify that the items, containers, and gross quantities shipped have been received.
 
In such cases, the receiver is then required to complete the measurements and report them on DOE/NRC Form-741 within 30 days of receipt of the shipment.
 
If the material received is scrap or irradiated material that may take longer than 30 days to measure, DOE/NRC Form-741 is completed and distributed to indicate temporary acceptance of the shipper's values; at a later date, the receiver prepares and distributes a "corrected copy" of DOE/NRC Form-741 that reports the receiver's own measurements.


1 There are no requirements for ship ments of nuclear wastes to burial grounds to be measured independently by the receiver.
b. Tamper-seal and document the contents of the              be completed within 10 days, a licensee may prepare and containers,                                              distribute NRC Form-284, "Nuclear Material Transfer c. Obtain appropriate analysis of the SSNM,                    Report," or use DOE/NRC Form-741 as a temporary d. Ensure product specifications,                            receipt record after performing an initial receiving check to e. Package material properly or provide guidance on          verify that the items, containers, and gross quantities packaging as required.                                  shipped have been received. In such cases, the receiver is then required to complete the measurements and report
    2. Shipping and receiving control:                                them on DOE/NRC Form-741 within 30 days of receipt of the shipment. If the material received is scrap or irradiated a. Prepare shipping forms,                                    material that may take longer than 30 days to measure, b. Ensure proper packaging,                                  DOE/NRC Form-741 is completed and distributed to c. Check integrity and seal numbers of tamper-safed          indicate temporary acceptance of the shipper's values; at a containers and identification numbers on such            later date, the receiver prepares and distributes a "corrected items as sealed fuel pins,                                copy" of DOE/NRC Form-741 that reports the receiver's d. Verify seal integrity and number of receipts,              own measurements. 1 There are no requirements for ship e. Check weight of items and containers.                      ments of nuclear wastes to burial grounds to be measured independently by the receiver. DOE and its prime contractors
    3. Security:                                                      complete DOE/NRC Form-741 in accordance with DOE
                                                                      manual chapters.


DOE and its prime contractors complete DOE/NRC Form-741 in accordance with DOE manual chapters.
a. Accompany package to shipping area when appro priate,                                                                   


C. REGULATORY  
==C. REGULATORY POSITION==
POSITION Procedures should be provided to ensure that records reflect accurately the quantity and form of material shipped and received, to protect against the deliberate falsification of information on shipments or receipts to conceal diversion of SSNM, and to protect against the use of waste shipments or shipments of quantities not subject to § 73.25 as a means for unauthorized removal of SSNM from a licensee's facility.
b. Be cognizant of the storage areas while shipment is in them,                                                      Procedures should be provided to ensure that records c. Guard shipment while it is being loaded,                  reflect accurately the quantity and form of material shipped d. Coordinate security plans and arrangements with          and received, to protect against the deliberate falsification the dispatcher of the material,                          of information on shipments or receipts to conceal diversion e. Obtain signed receipts and pass them on to the            of SSNM, and to protect against the use of waste shipments appropriate departments.                                or shipments of quantities not subject to § 73.25 as a means for unauthorized removal of SSNM from a licensee's
    4. Traffic (dispatcher):                                          facility. The following procedures are acceptable to the NRC staff.


The following procedures are acceptable to the NRC staff.
a. Make carrier arrangements, b. Coordinate shipments and ensure that delivery is            1. PRESHIPMENT CONTROLS ON WASTE
            at a time when the proper personnel are available to properly handle the material received,                    a. Nondestructive assay (NDA) measurements for account c. Prepare bill of lading and other formal shipping          ability purposes should be made using one of the following papers,                                                  procedures or an alternative procedure that provides equiv d. Notify receivers when shipments will be made and          alent protection against falsification of accountability mea approximate time of scheduled arrival.                    surements:
    5. Nuclear materials control:                                              (1) Measurements should be performed by two indi viduals working and recording as a team and who do not a. Ensure that the receiver is authorized to receive          have access to material processing and storage areas, the shipment of SSNM,
      b. Approve all SSNM shipping memos,                                    (2) Measurements should be performed by three indi c. Prepare and transmit DOE/NRC Form-741,                      viduals working and recording as a team, or d. Transmit information for computer records, if used,                                                            (3) Arrangements should be made for independent e. Arrange transfer of material to shipping area,              verification of the accountability measurements by a party f. Post shipping transactions to control records,              other than the licensee.


===1. PRESHIPMENT ===
g. Investigate and reconcile shipper-receiver differences.
CONTROLS ON WASTE a. Nondestructive assay (NDA) measurements for account ability purposes should be made using one of the following procedures or an alternative procedure that provides equiv alent protection against falsification of accountability mea surements:
(1) Measurements should be performed by two indi viduals working and recording as a team and who do not have access to material processing and storage areas, (2) Measurements should be performed by three indi viduals working and recording as a team, or (3) Arrangements should be made for independent verification of the accountability measurements by a party other than the licensee.


b. Tamper-safing controls at the time of accountability measurements should include one of the following:  
b. Tamper-safing controls at the time of accountability To document the transfer of SSNM containing 1 gram or              measurements should include one of the following:
1 Section 70.54 and the written instructions entitled "Instructions to NRC and Agreement State Licensees for Reporting Nuclear Mate rial Transfers on DOE/NRC Form-741 -Nuclear Material Transaction Report," U.S. Nuclear Regulatory Commission.
more of contained uranium-235, uranium-233, or plutonium, DOE/NRC Form-741 is initiated on the day the material is shipped and distributed promptly by the shipper. Normally,                1 Section 70.54 and the written instructions entitled
                                                                                                                                "Instructions the licensee receiving SSNM is required to independently              to NRC and Agreement State Licensees for Reporting Nuclear Mate measure its element and isotopic content and complete and            rial Transfers on DOE/NRC Form-741 - Nuclear Material Transaction Report," U.S. Nuclear Regulatory Commission. Copies of the latter distribute DOE/NRC Form-741 within 10 days of receipt                may be obtained from the Division of Safeguards, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commis of the material. However, if receipt measurements cannot              sion, Washington, D.C. 20555.


Copies of the latter may be obtained from the Division of Safeguards, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commis sion, Washington, D.C. 20555.5.57-3  
5.57-3
(1) If the containers being measured are already tamper-safed, individuals performing the measurement should confirm the seal identification and integrity, or (2) Containers should be sealed at the time of NDA measurement and each member of the team should attest in writing to the nature of the contents of the container and the seal identification.


c. Prior to removal of a waste container from a material access area (MAA), an overcheck should be performed to ensure that the container is not being used as a means for concealment and unauthorized removal of SSNM from an MAA. Controls should also be placed on packaging of smaller containers that are sealed and subsequently combined in larger containers prior to final sealing and removal from an MAA. Teams performing functions for a. and b. above may simultaneously perform the functions described below.  Acceptable procedures are: (1) For each stage in sequential packaging, containers should be filled and sealed by two individuals working and recording as a team and who do not have access to material processing and storage areas. Each individual should attest in writing to the nature of the contents of the container and the seal identification.
(1) If the containers being measured are already                C.1.c. above should be provided to protect against conceal tamper-safed, individuals performing the measurement                    ment and unauthorized removal of SSNM.


At any stage in sequential packaging, the team filling the large container should include at least one individual who was not involved in filling the smaller containers, (2) Same as (1), except that, if any individual involved in filling and sealing the containers has access to material, three-man teams should be used, (3) Intermediate packaging may be performed by two man teams if the final package receives an NDA overcheck
should confirm the seal identification and integrity, or
1 using a segmented scanner with a transmission source or neutron counter, as appropriate, capable of detecting con cealed SSNM and gamma ray or neutron absorbers of suffi cient density to preclude accurate NDA measurement, or (4) Intermediate packaging may be performed by two man teams if the final sealed package is retained in the MAA until the next material balance is closed. The package may be released if the inventory difference is less than the limit of error which in turn is less than 1/10 of a formula quantity as defined in paragraph
        (2) Containers should be sealed at the time of NDA
73.2(bb).
measurement and each member of the team should attest in b. If an independent accountability measurement is not required to be made by the receiver and reported within
If the inventory difference for the period is greater than its limit of error, the containers should be unsealed and the contents verified in accordance with Regulatory Position C. 1 .c.(1) or (2) or left sealed and the contents verified in accordance with Regulatory Posi tion C. 1.c.(3) as a part of the investigation of the excessive inventory difference.
                                                                        30 days, NDA overchecks on accountability measurements I
writing to the nature of the contents of the container and              should be provided by the shipper or controls such as those the seal identification.                                                discussed in Regulatory Position C.1.a. should be provided.


If the limit of error is greater than 1/10 of a formula quantity, verification should be performed in accordance with Regulatory Position C. 1.c.(1), (2), or (3) before the package is released.
c. Prior to removal of a waste container from a material          3. ADDITIONAL SHIPPING CONTROLS
access area (MAA), an overcheck should be performed to ensure that the container is not being used as a means for                  a. Before shipping SSNM, the licensee should ensure concealment and unauthorized removal of SSNM from                      that the intended receiver is authorized to receive the type, an MAA. Controls should also be placed on packaging of                 form, and quantity of SSNM to be transferred in accordance smaller containers that are sealed and subsequently combined            with § 70.42. This does not include forecasting the receiver's in larger containers prior to final sealing and removal from            inventory at the time the shipment arrives.


===2. OVERCHECKS ===
an MAA. Teams performing functions for a. and b. above may simultaneously perform the functions described below.                  b. The shipper should establish and maintain written Acceptable procedures are:                                              procedures that identify employees who are authorized to initiate shipment of SSNM and identify the responsibilities
ON PRODUCT, SAMPLES, AND SCRAP a. For shipments that are not subject to the in-transit physical protection requirements of § § 73.20 and 73.25, overchecks such as those discussed in Regulatory Position C.1.c. above should be provided to protect against conceal ment and unauthorized removal of SSNM. b. If an independent accountability measurement is not required to be made by the receiver and reported within 30 days, NDA overchecks on accountability measurements should be provided by the shipper or controls such as those discussed in Regulatory Position C.1.a. should be provided.
          (1) For each stage in sequential packaging, containers        of the various departments that should have cognizance should be filled and sealed by two individuals working and              of the shipment in accordance with paragraphs 70.58(b)(3)
recording as a team and who do not have access to material              and 73.45(e)(2)(i).
processing and storage areas. Each individual should attest in writing to the nature of the contents of the container                  c. Written procedures should be established and main and the seal identification. At any stage in sequential                tained to assign to specific organizational components the packaging, the team filling the large container should                 responsibility for packaging the shipment and ensuring that include at least one individual who was not involved in                it is packaged and transported in accordance with the filling the smaller containers,                                        provisions of 10 CFR Parts 70, 71, and 73 and other applicable regulations.


===3. ADDITIONAL ===
(2) Same as (1), except that, if any individual involved in filling and sealing the containers has access to material,              d. Organizational components responsible for the shipment three-man teams should be used,                                       within the plant and in transit should have a set of written procedures that cover both normal and emergency conditions
SHIPPING CONTROLS a. Before shipping SSNM, the licensee should ensure that the intended receiver is authorized to receive the type, form, and quantity of SSNM to be transferred in accordance with § 70.42. This does not include forecasting the receiver's inventory at the time the shipment arrives.
          (3) Intermediate packaging may be performed by two            in accordance with paragraphs 70.58(b)(3), 73.25(d), and man teams if the final package receives an NDA overcheck                73.45(g).
1 using a segmented scanner with a transmission source or neutron counter, as appropriate, capable of detecting con                  e. The shipper should notify the consignee of the cealed SSNM and gamma ray or neutron absorbers of suffi                pertinent details of the shipment as described in § 73.27.


b. The shipper should establish and maintain written procedures that identify employees who are authorized to initiate shipment of SSNM and identify the responsibilities of the various departments that should have cognizance of the shipment in accordance with paragraphs
cient density to preclude accurate NDA measurement, or f. The shipper should initiate and distribute a Nuclear
70.58(b)(3)
          (4) Intermediate packaging may be performed by two              Material Transaction Report (DOE/NRC Form-741) in man teams if the final sealed package is retained in the MAA            accordance with § 70.54 and the printed instructions for until the next material balance is closed. The package may              completing the form.
and 73.45(e)(2)(i). 
c. Written procedures should be established and main tained to assign to specific organizational components the responsibility for packaging the shipment and ensuring that it is packaged and transported in accordance with the provisions of 10 CFR Parts 70, 71, and 73 and other applicable regulations.


d. Organizational components responsible for the shipment within the plant and in transit should have a set of written procedures that cover both normal and emergency conditions in accordance with paragraphs
be released if the inventory difference is less than the limit of error which in turn is less than 1/10 of a formula quantity              g. In accordance with paragraph 73.45(e)(2)(ii), the as defined in paragraph 73.2(bb). If the inventory difference          shipping group should, as a minimum, check the items and for the period is greater than its limit of error, the containers      tamper-safing tag information and the tag quantities against should be unsealed and the contents verified in accordance              the information on the transfer forms. Each tamper-indicating with Regulatory Position C. 1.c.(1) or (2) or left sealed and          device should be checked. It is also desirable that the the contents verified in accordance with Regulatory Posi                shipping group make a gross weighing of each item.
70.58(b)(3), 73.25(d), and 73.45(g). 
e. The shipper should notify the consignee of the pertinent details of the shipment as described in § 73.27.  f. The shipper should initiate and distribute a Nuclear Material Transaction Report (DOE/NRC Form-741)
in accordance with § 70.54 and the printed instructions for completing the form.  g. In accordance with paragraph  
73.45(e)(2)(ii), the shipping group should, as a minimum, check the items and tamper-safing tag information and the tag quantities against the information on the transfer forms. Each tamper-indicating device should be checked. It is also desirable that the shipping group make a gross weighing of each item.  h. Shipper-receiver differences, the quantity difference between the amount of SSNM stated by the shipper as having been shipped and the amount received as measured by the receiver, should be reviewed and evaluated in accord ance with paragraph
70.58(g). 
4. RECEIPTS a. A licensee should accept receipt of only those types and quantities of SSNM authorized by his license. If other 5.57-4 I
material is delivered to the facility, the licensee should notify the shipper immediately so that appropriate arrange ments can be made for the disposition of the material and the continuous maintenance of adequate physical protec tion.  b. Arrangements should be made to deliver the material to the receiver at a time when personnel are available to properly handle the material in accordance with paragraph
73.25(b)(1)(i).
It is the responsibility of shipper, receiver, and carrier to ensure that trained personnel are available to properly handle deliveries of SNM. If it appears to the shipper or carrier that the shipment may arrive at a time other than that for which arrangements were made, the shipper or carrier should immediately inform the receiver so that the receiver can have trained personnel available when the shipment arrives. If the shipment fails to arrive at the scheduled time, the receiving licensee should notify the shipper in accordance with paragraph
73.71(b) so that a prompt investigation can be initiated.


c. The identification and integrity of the shipper's tamper-safing devices on each item or container should be verified in accordance with paragraph
tion C. 1.c.(3) as a part of the investigation of the excessive inventory difference. If the limit of error is greater than                h. Shipper-receiver differences, the quantity difference
7 3.25(c)(4).
  1/10 of a formula quantity, verification should be performed          between the amount of SSNM stated by the shipper as in accordance with Regulatory Position C. 1.c.(1), (2), or (3)         having been shipped and the amount received as measured before the package is released.                                         by the receiver, should be reviewed and evaluated in accord ance with paragraph 70.58(g).
The piece count and identification and gross weight of the items or containers received should be checked against the bill of lading, DOE/NRC Form-74 1, or other appropriate shipping document to provide assurance that the shipment was received intact. To the extent possible, an overcheck determination by NDA or other appropriate means should be made to provide a prompt estimate of the SSNM content of each item or container.
  2. OVERCHECKS ON PRODUCT, SAMPLES, AND SCRAP


After the initial receiving checks have been performed, the material should be sent to an area where the contents of the containers or items can be verified quantitatively in accordance with paragraph
===4. RECEIPTS===
70.5 8(e).  Written procedures should be established and maintained for verifying the receipts within specific time limits so that DOE/NRC Form-741 can be filed within the time required by § 70.54. d. If any of the tamper-safing devices have been disturbed in a way that may indicate an attempt to render the device inoperable or if the device has been damaged accidentally, the following actions should be taken: (1) The affected containers should be resealed immediately by the receiver with another tamper-safing device, and the resealing should be witnessed and attested to by the personnel delivering the containers.
      a. For shipments that are not subject to the in-transit physical protection requirements of § § 73.20 and 73.25,                  a. A licensee should accept receipt of only those types overchecks such as those discussed in Regulatory Position              and quantities of SSNM authorized by his licens


(2) After resealing, containers with damaged seals should be isolated until the licensee can inspect the containers to determine if a loss of SSNM has occurred.
====e. If other====
                                                                  5.57-4


This should be accomplished in accordance with the procedures described in (3) and (4).  (3) If a gross weight or NDA overcheck, as appropriate, indicates that the contents of any container appear to have been removed, the Director of the NRC Inspection and Enforcement (IE) Regional Office listed in Appendix A to 10 CFR Part 73 should be notified immediately in accordance with § 73.71. The shipper should also be notified as soon as possible.
material is delivered to the facility, the licensee should notify the shipper immediately so that appropriate arrange            possible. Both IE and the shipper should be given the option ments can be made for the disposition of the material                of witnessing a quantitative assessment of the container's and       contents. The contents of the container should be quantita the continuous maintenance of adequate physical protec tively assessed as soon as possible. If the shipper and IE elect tion.


Both IE and the shipper should be given the option of witnessing a quantitative assessment of the container's contents.
not to witness the measurement, the assessment should be witnessed and attested to by personnel from at least two b. Arrangements should be made to deliver the material to the receiver at a time when personnel are available                different groups within the receiver's organization.


The contents of the container should be quantita tively assessed as soon as possible.
to properly handle the material in accordance with paragraph
    73.25(b)(1)(i). It is the responsibility of shipper, receiver,                (4) If the contents of the containers appear to be in and carrier to ensure that trained personnel are available            order, the shipper should be notified and given the option to      of witnessing a quantitative assessment (weighing and properly handle deliveries of SNM. If it appears to the      sampling) of the containers contents within 48 hours shipper or carrier that the shipment may arrive at a time other than that for which arrangements were made,                    following receipt of the shipment. If the shipper does the                                                                  not shipper or carrier should immediately inform the receiver              respond to this offer, the contents of the container should so      be assessed as soon as possible, but in no case later than that the receiver can have trained personnel available when the shipment arrives. If the shipment fails to arrive at              48 hours after receipt.


If the shipper and IE elect not to witness the measurement, the assessment should be witnessed and attested to by personnel from at least two different groups within the receiver's organization.
the scheduled time, the receiving licensee should notify the              (5) The shipper or IE should be given the results of shipper in accordance with paragraph 73.71(b) so that a    the quantitative assessment immediately if either did not prompt investigation can be initiated.


(4) If the contents of the containers appear to be in order, the shipper should be notified and given the option of witnessing a quantitative assessment (weighing and sampling)
witness the assessment.
of the containers contents within 48 hours following receipt of the shipment.


If the shipper does not respond to this offer, the contents of the container should be assessed as soon as possible, but in no case later than 48 hours after receipt.
c. The identification and integrity of the shipper's tamper-safing devices on each item or container should                    e. Within the time specified in the instructions for the be    preparation of DOE/NRC Form-741, the receiver should verified in accordance with paragraph 7 3 .25(c)(4).
                                                                The      make an accurate, precise, and independent measurement piece count and identification and gross weight of the items or containers received should be checked against the bill            of the SSNM content of the material received. This measure of    ment should be in accordance with a program for acceptable lading, DOE/NRC Form-74 1, or other appropriate shipping document to provide assurance that the shipment                        measurement quality as required by paragraph 70.58(f).
                                                                was received intact. To the extent possible, an overcheck determination by NDA or other appropriate means should                      f. The difference between the amount of SSNM stated by be made to provide a prompt estimate of the SSNM content              the shipper as having been shipped and the amount received of each item or container. After the initial receiving checks        as measured by the receiver should be reviewed and evaluated have been performed, the material should be sent to an                in accordance with paragraph 7 0.58(g). All measurement dis area      crepancies should be reported to the nuclear material con where the contents of the containers or items can be    trol manager or alternate, who should personally verify the verified quantitatively in accordance with paragraph 70.5
                                                              8(e).    discrepancy in the presence of the employee who discovered Written procedures should be established and maintained for verifying the receipts within specific time limits so              them. Written procedures should quantitatively define what that      constitutes a discrepancy for each type of SSNM received.


(5) The shipper or IE should be given the results of the quantitative assessment immediately if either did not witness the assessment.
DOE/NRC Form-741 can be filed within the time required Appropriate action should be taken to reconcile those shipper by § 70.54.


e. Within the time specified in the instructions for the preparation of DOE/NRC Form-741, the receiver should make an accurate, precise, and independent measurement of the SSNM content of the material received.
receiver differences that are statistically significant at the d. If any of the tamper-safing devices have been disturbed        95% confidence level, except for shipments that involve in a way that may indicate an attempt to render the device            differences of 50 grams or less of U-235 or plutonium. When inoperable or if the device has been damaged accidentally,            a discrepancy is identified, the nuclear material manager the following actions should be taken:                                should resolve the discrepancy with the shipper. If the discrepancy cannot be resolved, the appropriate NRC
            (1) The affected containers should be resealed              Inspection and Enforcement Regional Office should be immediately by the receiver with another tamper-safing                notified by telephone, telegram, mailgram, or facsimile.


This measure ment should be in accordance with a program for acceptable measurement quality as required by paragraph
device, and the resealing should be witnessed and attested            Additional guidance on shipper-receiver differences is to by the personnel delivering the containers.                        contained in Regulatory Guide 5.28.
70.58(f). 
f. The difference between the amount of SSNM stated by the shipper as having been shipped and the amount received as measured by the receiver should be reviewed and evaluated in accordance with paragraph
7 0.58(g). All measurement dis crepancies should be reported to the nuclear material con trol manager or alternate, who should personally verify the discrepancy in the presence of the employee who discovered them. Written procedures should quantitatively define what constitutes a discrepancy for each type of SSNM received.


Appropriate action should be taken to reconcile those shipper receiver differences that are statistically significant at the 95% confidence level, except for shipments that involve differences of 50 grams or less of U-235 or plutonium.
(2) After resealing, containers with damaged seals                g. Within 10 days of receipt of material, the receiver should be isolated until the licensee can inspect the containers      should complete and distribute the DOE/NRC Form-741 to determine if a loss of SSNM has occurred. This should              prepared by the shipper in accordance with § 70.54. When be    receipt measurements cannot be completed within this accomplished in accordance with the procedures described
                                                                        10-day period, the receiver should complete a temporary in (3) and (4).
                                                                      receipt in one of the following two ways: (1) as indicated
          (3) If a gross weight or NDA overcheck, as appropriate,    in the instructions for reporting nuclear material transfers indicates that the contents of any container appear to have            on DOE/NRC Form-741, complete blocks "Date Received been removed, the Director of the NRC Inspection and                  or Correction Entered" and "Signature of Authorized Enforcement (IE) Regional Office listed in Appendix A                  Official and Date Signed" of the form, note on the form to    whether the containers, boxes, or cases reported as shipped
10 CFR Part 73 should be notified immediately in accordance with § 73.71. The shipper should also be notified as soon              were received, and mark on the form "Nuclear Material as    Transfer Receipt" or (2) if authorized in the license,
                                                                5.57-5


When a discrepancy is identified, the nuclear material manager should resolve the discrepancy with the shipper. If the discrepancy cannot be resolved, the appropriate NRC Inspection and Enforcement Regional Office should be notified by telephone, telegram, mailgram, or facsimile.
prepare NRC Form-284, "Nuclear Material Transfer Re                completed and reported within 30 days of receipt of material and if a temporary receipt has been filed on NRC
port," as a temporary receipt. In either case, a copy of the Form-284 or DOE/NRC Form-741, the licensee should original DOE/NRC Form-741 issued by the shipper should complete DOE/NRC Form-741 accepting the shipper's then be completed and distributed within 30 days of weights and file a corrected copy to report his or her own I
receipt to show the receiver's measurements. However, if measurements at a later date.


Additional guidance on shipper-receiver differences is contained in Regulatory Guide 5.28.  g. Within 10 days of receipt of material, the receiver should complete and distribute the DOE/NRC Form-741 prepared by the shipper in accordance with § 70.54. When receipt measurements cannot be completed within this 10-day period, the receiver should complete a temporary receipt in one of the following two ways: (1) as indicated in the instructions for reporting nuclear material transfers on DOE/NRC Form-741, complete blocks "Date Received or Correction Entered" and "Signature of Authorized Official and Date Signed" of the form, note on the form whether the containers, boxes, or cases reported as shipped were received, and mark on the form "Nuclear Material Transfer Receipt" or (2) if authorized in the license, 5.57-5 prepare NRC Form-284, "Nuclear Material Transfer Re port," as a temporary receipt. In either case, a copy of the original DOE/NRC Form-741 issued by the shipper should then be completed and distributed within 30 days of receipt to show the receiver's measurements.
measurements of scrap and irradiated material cannot be
                                                            5.57-6


However, if measurements of scrap and irradiated material cannot be completed and reported within 30 days of receipt of material and if a temporary receipt has been filed on NRC Form-284 or DOE/NRC Form-741, the licensee should complete DOE/NRC Form-741 accepting the shipper's weights and file a corrected copy to report his or her own measurements at a later date.5.57-6 I
VALUE/IMPACT STATEMENT
VALUE/IMPACT  
    A separate value/impact analysis has not been prepared       amendments was made available in the Commission's Public for the revision to this regulatory guide. The changes were     Document Room, 1717 H Street NW., Washington, D.C.,
STATEMENT A separate value/impact analysis has not been prepared for the revision to this regulatory guide. The changes were made to make the guide consistent with the upgraded physical protection amendments to the regulations pub lished in the Federal Register November 28, 1979 (44 FR 68184). A value/impact analysis prepared for the proposed amendments was made available in the Commission's Public Document Room, 1717 H Street NW., Washington, D.C., at the time the proposed amendments were published.
made to make the guide consistent with the upgraded             at the time the proposed amendments were published. This physical protection amendments to the regulations pub           analysis is appropriate for the final amendments as well as lished in the Federal Register November 28, 1979 (44 FR         for the regulatory guide revisions appropriate to those
68184). A value/impact analysis prepared for the proposed       amendments.


This analysis is appropriate for the final amendments as well as for the regulatory guide revisions appropriate to those amendments.
5.57-7


5.57-7 UNITED STATES NUCLEAR REGULATORY  
UNITED STATES
COMMISSION  
NUCLEAR REGULATORY COMMISSION
WASHINGTON, D. C. 20555 OFFICIAL BUSINESS PENALTY FOR PRIVATE USE, $300 POSTAGE AND FEES PAID U.S. NUCLEAR REGULATORY  
    WASHINGTON, D. C. 20555     POSTAGE AND FEES PAID
COMMISSION}}
                                U.S. NUCLEAR REGULATORY
      OFFICIAL BUSINESS
                                        COMMISSION
  PENALTY FOR PRIVATE USE, $300}}


{{RG-Nav}}
{{RG-Nav}}

Latest revision as of 11:44, 28 March 2020

(Revision 1), Shipping and Receiving Control of Strategic Special Nuclear Material
ML003739260
Person / Time
Issue date: 06/30/1980
From:
Office of Nuclear Regulatory Research
To:
References
RG-5.57 Rev 1
Download: ML003739260 (8)


Revision 1 June 1980

U.S. NUCLEAR REGULATORY COMMISSION

REGULATORY GUIDE

OFFICE OF STANDARDS DEVELOPMENT

REGULATORY GUIDE 5.57 (Task SG 908-4)

SHIPPING AND RECEIVING CONTROL OF STRATEGIC

SPECIAL NUCLEAR MATERIAL

A. INTRODUCTION

5.10 Selection and Use of Pressure-Sensitive Seals on Containers for Onsite Storage of Special Requirements for the physical protection of special Nuclear Material.

nuclear material (SNM) at licensee facilities and in transit and of plants in which SNM is used are specified in 10 CFR 5.12 General Use of Locks in the Protection and Part 73, "Physical Protection of Plants and Materials," and Control of Facilities and Special Nuclear are the subject of various regulatory guides issued or under Materials.

  • r development. Section 73.20 of 10 CFR Part 73 provides the general performance objective and requirements for 5.13 Conduct of Nuclear Material Physical Inven each licensee who is authorized to operate a fuel repro tories (In particular, Section C.2.b.(l), Re cessing plant pursuant to 10 CFR Part 50, possesses or ceipts, Shipments, and Other Removals).

uses formula quantities of strategic special nuclear material (SSNM) at any site or contiguous sites subject to control by

5.15 Security Seals for the Protection and Control the licensee, is authorized to transport or deliver to a carrier of Special Nuclear Material.

for transportation pursuant to 10 CFR Part 70 formula quantities of SSNM, takes delivery of formula quantities of 5.45 Standard Format and Content for the Special SSNM free on board (f.o.b.) the point at which it is delivered Nuclear Material Control and Accounting Sec to a carrier for transportation, or imports or exports tion of a Special Nuclear Material License formula quantities of SSNM. Section 73.25 requires specific Application.

performance capabilities for physical protection of SSNM

in transit. Section 73.45 requires specific performance 5.47 Control and Accountability of Plutonium in capabilities for fixed site physical protection systems. This Waste Material.

guide is applicable to the shipping and receiving control of SSNM subject to § § 73.20, 73.25, and 73.45.

5.51 Management Review of Nuclear Material Control and Accounting Systems.

Other regulations are also pertinent to shipping and receiving control. Section 70.58, "Fundamental Nuclear Section 70.57 and paragraph (f) of § 70.58 require that Material Controls," requires licensees to establish, maintain, the licensee's measurement control program for SNM include and follow detailed fundamental material control and a means for the control and evaluation of measurement bias, accounting procedures, including procedures for shipping random errors, and limits on systematic errors for all parts and receiving special nuclear material (SNM). Certain of the measurement process, including scales, balances, material control and accounting procedures related specifi volume measurements, analytical quality control, nondestruc cally to the protection of SSNM from theft during shipping trive assay, and sampling. Certain measurements made in con and receiving and related to preventing the misuse of junction with shipping and receiving are used as part of the shipments to disguise a diversion are discussed in this guide.

material accountability program and are subject to § 70.57.

Additional guidance on fundamental material controls and Specific guidance on measurements and measurement control accounting is included in the following regulatory guides:

are provided in the following regulatory guides:

5.4 Standard Analytical Methods for the Mea surement of Uranium Tetrafluoride (UF 4 )

Lines indicate substantive changes from June 1976 version.

and Uranium Hexafluoride (UF 6 ).

USNRC REGULATORY GUIDES Comments should be sent to the Secretary of the Commission, Regulatory Guides are issued to describe and make available to the U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, public methods acceptable to the NRC staff of implementing Attention: Docketing and Service Branch.

specific parts of the Commission's regulations, to delineate tech niques used by the staff in evaluating specific problems or postu The guides are issued in the following ten broad divisions:

lated accidents or to provide guidance to applicants. Regulatory Guides are noi substitutes for regulations, and compliance with 1. Power Reactors 6. Products them is not required. Methods and solutions different from those set 2. Research and Test Reactors 7. Transportation out in the guides will be acceptable if they provide a basis for the 3. Fuels and Materials Facilities 8. Occupational Health findings requisite to the issuance or continuance of a permit or 4. Environmental and Siting 9. Antitrust and Financial Review license by the Commission. 5. Materials and Plant Protection 10. General Copies of issued guides may be purchased at the current Government Comments and suggestions for improvements in these guides are encouraged at all times, and guides will be revised, as appropriate, Printing Office price. A subscription service for future guides in spe to accommodate comments and to reflect new information or cific divisions is available through the Government Printing Office.

experience. This guide was revised as a result of substantive com Information on the subscription service and current GPO prices may ments received from the public and additional staff review. be obtained by writing the U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention: Publications Sales Manager.

5.5 Standard Methods for Chemical, Mass Spec the licensees' facilities and while in transit and (2) the timely, trometric, and Spectrochemical Analysis of accurate, and independent identification and measurement Nuclear-Grade Uranium Dioxide Powders of the SSNM by both shipper and receiver to determine and and Pellets. evaluate any shipper-receiver differences. These measure ments are necessary to (1) detect loss or theft of SSNM

I

5.6 Standard Methods for Chemical, Mass Spec being transferred between licensees, (2) detect and permit trometric, and Spectrochemical Analysis of correction of clerical or handling errors, (3) detect falsifica Nuclear-Grade Plutonium Dioxide Powders tion or errors in the shipment source data, (4) provide and Pellets and Nuclear-Grade Mixed Oxides assurance that measurement bias is detected and corrected,

([U,Pul )02* and (5) detect and prevent the transfer of "inventory difference" (ID) from one licensee to another.

5.11 Nondestructive Assay of Special Nuclear Material Contained in Scrap and Waste. The application of tamper-indicating seals to each item or container by the shipper immediately after sampling or

5.21 Nondestructive Uranium-235 Enrichment assay, checks on those seals before shipment, and the Assay by Gamma-Ray Spectrometry. prompt verification of the seals by the receiver can help ensure the integrity of the material measure

d. Additional

5.34 Nondestructive Assay of Plutonium in Scrap receiving checks made immediately after receipt can deter by Spontaneous Fission Detection. mine if loss, theft, or substitution of SSNM may have occurred during transfer and can detect packaging and

5.53 Qualification, Calibration, and Error Esti clerical mistakes. These checks can include counting and mation Methods for Nondestructive Assay. identifying the containers; identifying and weighing the containers or items received; comparing the results with the Licensees who transfer and receive SNM are required same information on a bill of lading, DOE/NRC Form-741, under § 70.54 to complete DOE/NRC Form-741, "Nuclear "Nuclear Material Transaction Report," or other appropriate Material Transaction Report," and submit a copy to the document supplied by the shipper; and, to the extent U.S. Department of Energy (DOE), Oak Ridge, Tennessee. possible, performing an overcheck of each container by In addition, paragraph 70.42(c) requires that, before trans nondestructive analysis to provide a gross verification of the ferring SNM, the person making the shipment verify that SSNM content.

the recipient is authorized to receive the type, form, and quantity of SNM to be transferred. Paragraph 70.42(d) out After these initial checks have been made, prompt quan titative verification of the contents of each container will pro lines the methods to be used to make this verification.

vide early assurance that the contents of the packages received Paragraph 70.58(g)(2) requires that procedures be estab are identical to those shipped. Written procedures that call for performing these verifications within specific time limits lished to review and evaluate shipper-receiver differences on an individual container or lot basis, a shipment basis, and a after shipment can help ensure that DOE/NRC Form-741 is filed in a timely fashion. In addition, the validity of boththe cumulative basis for shipments of like material. Guidelines are contained in Regulatory Guide 5.28, "Evaluation of shipper and receiver measurements is dependent on the existence of a program of standardization and calibration Shipper-Receiver Differences in the Transfer of Special Nuclear Materials." Any loss of SNM (other than normal and control of measurement equipment and procedures.

operating loss) must, under § 70.52, be reported immedi Prior coordination between the carrier and receiver can ately to the Director of the appropriate NRC Inspection and Enforcement Regional Office (listed in Appendix A to ensure that SSNM will be delivered to the receiver's facility Part 73) by telephone, telegram, mailgram, or facsimile. at a time when trained personnel are available to properly handle the material received. This procedure will eliminate This guide and the guides referenced above describe pro the possibility of material arriving at times when proper cedures acceptable to the NRC staff for complying with receiving checks or adequate physical security cannot be the Commission's regulations regarding the control of provided.

SSNM during preparation for shipment and receipt by a licensee. Safety-related requirements for packaging and Appropriate procedures that identify employees who are transporting SNM are specified in 10 CFR Part 71, "Packag authorized to ship SSNM and the responsibilities of the ing of Radioactive Material for Transport and Transporta various organizational components that have cognizance of tion of Radioactive Material Under Certain Conditions," the shipment will ensure that all aspects of the shipment are and in the applicable portions of the regulations appropriate coordinated adequately. The following organizational to the mode of transportation in Title 49 of the Code of components are listed with typical responsibilities as related Federal Regulations. These requirements are not included to the shipment:

in the scope of this guide.

B. DISCUSSION

1. Organizational component that fabricates or assembles material:

Adequate control of SSNM during transfer between licensees includes (1) physical protection of the material at a. Determine the correct weights of the SSNM,

5.57-2

b. Tamper-seal and document the contents of the be completed within 10 days, a licensee may prepare and containers, distribute NRC Form-284, "Nuclear Material Transfer c. Obtain appropriate analysis of the SSNM, Report," or use DOE/NRC Form-741 as a temporary d. Ensure product specifications, receipt record after performing an initial receiving check to e. Package material properly or provide guidance on verify that the items, containers, and gross quantities packaging as required. shipped have been received. In such cases, the receiver is then required to complete the measurements and report

2. Shipping and receiving control: them on DOE/NRC Form-741 within 30 days of receipt of the shipment. If the material received is scrap or irradiated a. Prepare shipping forms, material that may take longer than 30 days to measure, b. Ensure proper packaging, DOE/NRC Form-741 is completed and distributed to c. Check integrity and seal numbers of tamper-safed indicate temporary acceptance of the shipper's values; at a containers and identification numbers on such later date, the receiver prepares and distributes a "corrected items as sealed fuel pins, copy" of DOE/NRC Form-741 that reports the receiver's d. Verify seal integrity and number of receipts, own measurements. 1 There are no requirements for ship e. Check weight of items and containers. ments of nuclear wastes to burial grounds to be measured independently by the receiver. DOE and its prime contractors

3. Security: complete DOE/NRC Form-741 in accordance with DOE

manual chapters.

a. Accompany package to shipping area when appro priate,

C. REGULATORY POSITION

b. Be cognizant of the storage areas while shipment is in them, Procedures should be provided to ensure that records c. Guard shipment while it is being loaded, reflect accurately the quantity and form of material shipped d. Coordinate security plans and arrangements with and received, to protect against the deliberate falsification the dispatcher of the material, of information on shipments or receipts to conceal diversion e. Obtain signed receipts and pass them on to the of SSNM, and to protect against the use of waste shipments appropriate departments. or shipments of quantities not subject to § 73.25 as a means for unauthorized removal of SSNM from a licensee's

4. Traffic (dispatcher): facility. The following procedures are acceptable to the NRC staff.

a. Make carrier arrangements, b. Coordinate shipments and ensure that delivery is 1. PRESHIPMENT CONTROLS ON WASTE

at a time when the proper personnel are available to properly handle the material received, a. Nondestructive assay (NDA) measurements for account c. Prepare bill of lading and other formal shipping ability purposes should be made using one of the following papers, procedures or an alternative procedure that provides equiv d. Notify receivers when shipments will be made and alent protection against falsification of accountability mea approximate time of scheduled arrival. surements:

5. Nuclear materials control: (1) Measurements should be performed by two indi viduals working and recording as a team and who do not a. Ensure that the receiver is authorized to receive have access to material processing and storage areas, the shipment of SSNM,

b. Approve all SSNM shipping memos, (2) Measurements should be performed by three indi c. Prepare and transmit DOE/NRC Form-741, viduals working and recording as a team, or d. Transmit information for computer records, if used, (3) Arrangements should be made for independent e. Arrange transfer of material to shipping area, verification of the accountability measurements by a party f. Post shipping transactions to control records, other than the licensee.

g. Investigate and reconcile shipper-receiver differences.

b. Tamper-safing controls at the time of accountability To document the transfer of SSNM containing 1 gram or measurements should include one of the following:

more of contained uranium-235, uranium-233, or plutonium, DOE/NRC Form-741 is initiated on the day the material is shipped and distributed promptly by the shipper. Normally, 1 Section 70.54 and the written instructions entitled

"Instructions the licensee receiving SSNM is required to independently to NRC and Agreement State Licensees for Reporting Nuclear Mate measure its element and isotopic content and complete and rial Transfers on DOE/NRC Form-741 - Nuclear Material Transaction Report," U.S. Nuclear Regulatory Commission. Copies of the latter distribute DOE/NRC Form-741 within 10 days of receipt may be obtained from the Division of Safeguards, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commis of the material. However, if receipt measurements cannot sion, Washington, D.C. 20555.

5.57-3

(1) If the containers being measured are already C.1.c. above should be provided to protect against conceal tamper-safed, individuals performing the measurement ment and unauthorized removal of SSNM.

should confirm the seal identification and integrity, or

(2) Containers should be sealed at the time of NDA

measurement and each member of the team should attest in b. If an independent accountability measurement is not required to be made by the receiver and reported within

30 days, NDA overchecks on accountability measurements I

writing to the nature of the contents of the container and should be provided by the shipper or controls such as those the seal identification. discussed in Regulatory Position C.1.a. should be provided.

c. Prior to removal of a waste container from a material 3. ADDITIONAL SHIPPING CONTROLS

access area (MAA), an overcheck should be performed to ensure that the container is not being used as a means for a. Before shipping SSNM, the licensee should ensure concealment and unauthorized removal of SSNM from that the intended receiver is authorized to receive the type, an MAA. Controls should also be placed on packaging of form, and quantity of SSNM to be transferred in accordance smaller containers that are sealed and subsequently combined with § 70.42. This does not include forecasting the receiver's in larger containers prior to final sealing and removal from inventory at the time the shipment arrives.

an MAA. Teams performing functions for a. and b. above may simultaneously perform the functions described below. b. The shipper should establish and maintain written Acceptable procedures are: procedures that identify employees who are authorized to initiate shipment of SSNM and identify the responsibilities

(1) For each stage in sequential packaging, containers of the various departments that should have cognizance should be filled and sealed by two individuals working and of the shipment in accordance with paragraphs 70.58(b)(3)

recording as a team and who do not have access to material and 73.45(e)(2)(i).

processing and storage areas. Each individual should attest in writing to the nature of the contents of the container c. Written procedures should be established and main and the seal identification. At any stage in sequential tained to assign to specific organizational components the packaging, the team filling the large container should responsibility for packaging the shipment and ensuring that include at least one individual who was not involved in it is packaged and transported in accordance with the filling the smaller containers, provisions of 10 CFR Parts 70, 71, and 73 and other applicable regulations.

(2) Same as (1), except that, if any individual involved in filling and sealing the containers has access to material, d. Organizational components responsible for the shipment three-man teams should be used, within the plant and in transit should have a set of written procedures that cover both normal and emergency conditions

(3) Intermediate packaging may be performed by two in accordance with paragraphs 70.58(b)(3), 73.25(d), and man teams if the final package receives an NDA overcheck 73.45(g).

1 using a segmented scanner with a transmission source or neutron counter, as appropriate, capable of detecting con e. The shipper should notify the consignee of the cealed SSNM and gamma ray or neutron absorbers of suffi pertinent details of the shipment as described in § 73.27.

cient density to preclude accurate NDA measurement, or f. The shipper should initiate and distribute a Nuclear

(4) Intermediate packaging may be performed by two Material Transaction Report (DOE/NRC Form-741) in man teams if the final sealed package is retained in the MAA accordance with § 70.54 and the printed instructions for until the next material balance is closed. The package may completing the form.

be released if the inventory difference is less than the limit of error which in turn is less than 1/10 of a formula quantity g. In accordance with paragraph 73.45(e)(2)(ii), the as defined in paragraph 73.2(bb). If the inventory difference shipping group should, as a minimum, check the items and for the period is greater than its limit of error, the containers tamper-safing tag information and the tag quantities against should be unsealed and the contents verified in accordance the information on the transfer forms. Each tamper-indicating with Regulatory Position C. 1.c.(1) or (2) or left sealed and device should be checked. It is also desirable that the the contents verified in accordance with Regulatory Posi shipping group make a gross weighing of each item.

tion C. 1.c.(3) as a part of the investigation of the excessive inventory difference. If the limit of error is greater than h. Shipper-receiver differences, the quantity difference

1/10 of a formula quantity, verification should be performed between the amount of SSNM stated by the shipper as in accordance with Regulatory Position C. 1.c.(1), (2), or (3) having been shipped and the amount received as measured before the package is released. by the receiver, should be reviewed and evaluated in accord ance with paragraph 70.58(g).

2. OVERCHECKS ON PRODUCT, SAMPLES, AND SCRAP

4. RECEIPTS

a. For shipments that are not subject to the in-transit physical protection requirements of § § 73.20 and 73.25, a. A licensee should accept receipt of only those types overchecks such as those discussed in Regulatory Position and quantities of SSNM authorized by his licens

e. If other

5.57-4

material is delivered to the facility, the licensee should notify the shipper immediately so that appropriate arrange possible. Both IE and the shipper should be given the option ments can be made for the disposition of the material of witnessing a quantitative assessment of the container's and contents. The contents of the container should be quantita the continuous maintenance of adequate physical protec tively assessed as soon as possible. If the shipper and IE elect tion.

not to witness the measurement, the assessment should be witnessed and attested to by personnel from at least two b. Arrangements should be made to deliver the material to the receiver at a time when personnel are available different groups within the receiver's organization.

to properly handle the material in accordance with paragraph

73.25(b)(1)(i). It is the responsibility of shipper, receiver, (4) If the contents of the containers appear to be in and carrier to ensure that trained personnel are available order, the shipper should be notified and given the option to of witnessing a quantitative assessment (weighing and properly handle deliveries of SNM. If it appears to the sampling) of the containers contents within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> shipper or carrier that the shipment may arrive at a time other than that for which arrangements were made, following receipt of the shipment. If the shipper does the not shipper or carrier should immediately inform the receiver respond to this offer, the contents of the container should so be assessed as soon as possible, but in no case later than that the receiver can have trained personnel available when the shipment arrives. If the shipment fails to arrive at 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after receipt.

the scheduled time, the receiving licensee should notify the (5) The shipper or IE should be given the results of shipper in accordance with paragraph 73.71(b) so that a the quantitative assessment immediately if either did not prompt investigation can be initiated.

witness the assessment.

c. The identification and integrity of the shipper's tamper-safing devices on each item or container should e. Within the time specified in the instructions for the be preparation of DOE/NRC Form-741, the receiver should verified in accordance with paragraph 7 3 .25(c)(4).

The make an accurate, precise, and independent measurement piece count and identification and gross weight of the items or containers received should be checked against the bill of the SSNM content of the material received. This measure of ment should be in accordance with a program for acceptable lading, DOE/NRC Form-74 1, or other appropriate shipping document to provide assurance that the shipment measurement quality as required by paragraph 70.58(f).

was received intact. To the extent possible, an overcheck determination by NDA or other appropriate means should f. The difference between the amount of SSNM stated by be made to provide a prompt estimate of the SSNM content the shipper as having been shipped and the amount received of each item or container. After the initial receiving checks as measured by the receiver should be reviewed and evaluated have been performed, the material should be sent to an in accordance with paragraph 7 0.58(g). All measurement dis area crepancies should be reported to the nuclear material con where the contents of the containers or items can be trol manager or alternate, who should personally verify the verified quantitatively in accordance with paragraph 70.5

8(e). discrepancy in the presence of the employee who discovered Written procedures should be established and maintained for verifying the receipts within specific time limits so them. Written procedures should quantitatively define what that constitutes a discrepancy for each type of SSNM received.

DOE/NRC Form-741 can be filed within the time required Appropriate action should be taken to reconcile those shipper by § 70.54.

receiver differences that are statistically significant at the d. If any of the tamper-safing devices have been disturbed 95% confidence level, except for shipments that involve in a way that may indicate an attempt to render the device differences of 50 grams or less of U-235 or plutonium. When inoperable or if the device has been damaged accidentally, a discrepancy is identified, the nuclear material manager the following actions should be taken: should resolve the discrepancy with the shipper. If the discrepancy cannot be resolved, the appropriate NRC

(1) The affected containers should be resealed Inspection and Enforcement Regional Office should be immediately by the receiver with another tamper-safing notified by telephone, telegram, mailgram, or facsimile.

device, and the resealing should be witnessed and attested Additional guidance on shipper-receiver differences is to by the personnel delivering the containers. contained in Regulatory Guide 5.28.

(2) After resealing, containers with damaged seals g. Within 10 days of receipt of material, the receiver should be isolated until the licensee can inspect the containers should complete and distribute the DOE/NRC Form-741 to determine if a loss of SSNM has occurred. This should prepared by the shipper in accordance with § 70.54. When be receipt measurements cannot be completed within this accomplished in accordance with the procedures described

10-day period, the receiver should complete a temporary in (3) and (4).

receipt in one of the following two ways: (1) as indicated

(3) If a gross weight or NDA overcheck, as appropriate, in the instructions for reporting nuclear material transfers indicates that the contents of any container appear to have on DOE/NRC Form-741, complete blocks "Date Received been removed, the Director of the NRC Inspection and or Correction Entered" and "Signature of Authorized Enforcement (IE) Regional Office listed in Appendix A Official and Date Signed" of the form, note on the form to whether the containers, boxes, or cases reported as shipped

10 CFR Part 73 should be notified immediately in accordance with § 73.71. The shipper should also be notified as soon were received, and mark on the form "Nuclear Material as Transfer Receipt" or (2) if authorized in the license,

5.57-5

prepare NRC Form-284, "Nuclear Material Transfer Re completed and reported within 30 days of receipt of material and if a temporary receipt has been filed on NRC

port," as a temporary receipt. In either case, a copy of the Form-284 or DOE/NRC Form-741, the licensee should original DOE/NRC Form-741 issued by the shipper should complete DOE/NRC Form-741 accepting the shipper's then be completed and distributed within 30 days of weights and file a corrected copy to report his or her own I

receipt to show the receiver's measurements. However, if measurements at a later date.

measurements of scrap and irradiated material cannot be

5.57-6

VALUE/IMPACT STATEMENT

A separate value/impact analysis has not been prepared amendments was made available in the Commission's Public for the revision to this regulatory guide. The changes were Document Room, 1717 H Street NW., Washington, D.C.,

made to make the guide consistent with the upgraded at the time the proposed amendments were published. This physical protection amendments to the regulations pub analysis is appropriate for the final amendments as well as lished in the Federal Register November 28, 1979 (44 FR for the regulatory guide revisions appropriate to those

68184). A value/impact analysis prepared for the proposed amendments.