NRC Generic Letter 1984-10: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 04/26/1984 | | issue date = 04/26/1984 | ||
| title = NRC Generic Letter 1984-010: Administration of Operating Tests Prior to Initial Criticality (10 CFR 55.25) | | title = NRC Generic Letter 1984-010: Administration of Operating Tests Prior to Initial Criticality (10 CFR 55.25) | ||
| author name = Eisnehut D | | author name = Eisnehut D | ||
| author affiliation = NRC/NRR | | author affiliation = NRC/NRR | ||
| addressee name = | | addressee name = | ||
Line 14: | Line 14: | ||
| page count = 3 | | page count = 3 | ||
}} | }} | ||
{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:, XNUCLEAR | ||
COMMISSION | UNITED STATES | ||
WASHINGTON, D. C. 2555 April 26, 1984 TO ALL APPLICANTS | REGULATORY COMMISSION Co OTJda, WASHINGTON, D. C. 2555 April 26, 1984 TO ALL APPLICANTS FOR AN OPERATING LICENSE | ||
FOR AN OPERATING | Gentlemen: | ||
Subject: Administration of Operating Tests Prior to Initial Criticality | |||
(10 CFR §55.25) (Generic Letter No. 84-10) | |||
if they meet the conditions discussed below pending completion of NRC rulemaking effort identified below | This letter is to inform you that all applicants for Reactor Operator (RO) and Senior Reactor Operator (SRO) licenses at facilities prior to initial criti- cality who have not had extensive actual operating experience at a comparable facility must obtain an exemption to 10 CFR §55.25(b) if they meet the conditions discussed below pending completion of NRC rulemaking effort identified below. | ||
They determined that additional rule-making action was required to clarify the Commission position that satisfactory completion of NRC-approved training programs could be substituted for experience requirements. | On April 13, 1984, the Commission met to consider the existing staff practice of allowing satisfactory completion of an approved cold license training program as meeting the 10 CFR §55.25(b) requirement for extensive actual operating experience at a comparable facility. They determined that additional rule- making action was required to clarify the Commission position that satisfactory completion of NRC-approved training programs could be substituted for experience requirements. They directed the Office of the General Counsel to initiate a rulemaking to make 10 CFR §55.25(b) fully consistent with current staff practice. | ||
They also affirmed that operator licenses in effect will remain valid. | |||
The program must have included: (a)nuclear fundamentals, including ten reactor startups at a nuclear reactor, (b) observation training on shift at a comparable operating reactor, (c)training on a simulator and (d) training on actual system design of the candidate's plant | For future operator licensing actions pending Commission action on the revised rule, the Commission authorized the staff to grant exemptions to the requirements of §55.25(b) for those individuals who have completed an approved cold license training program for their facility. The program must have included: (a) | ||
nuclear fundamentals, including ten reactor startups at a nuclear reactor, (b) observation training on shift at a comparable operating reactor, (c) | |||
training on a simulator and (d) training on actual system design of the candidate's plant. | |||
The necessary exemption will be granted as part of the issuance of the operator's license, provided that our records clearly indicate satisfactory completion of a program containing the above elements. | No specific exemption request is needed for individuals who have completed a cold license training program that includes all elements. The necessary exemption will be granted as part of the issuance of the operator's license, provided that our records clearly indicate satisfactory completion of a program containing the above elements. Accordingly, until 10 CFR §55.25(b) is modified as discussed above, applicants should identify those cold license candidates who satisfy the foregoing criteria. for candidates whose application is presently before the Commission, a list of those who satisfy the criteria should be furnished promptly to avoid unnecessary delays. For future candidates, this information should be provided along with the individual applications. | ||
Specific exemption requests for individuals who have completed cold license training programs that did not include all elements identified above are necessary and shall be evaluated on a case-by-case basis in accordance with I | |||
8404260428 | |||
)f | |||
-2- the provision of 10 CFR §55.7. If you have any questions concerning this matter, please contact Don Beckham, Chief, Operator Licensing Branch, | |||
(301) 492-4868. | |||
This request has been approved by OMB Clearance Number 3150-0018, which expires February 28, 1987. | |||
Darrell G. Eisenhut, Director F Division of Licensing Office of Nuclear Reactor Regulation | |||
*SEE PREVIOUS CONCURRENC | *SEE PREVIOUS CONCURRENC | ||
*OLB/DHFS | *OLB/DHFS *DD.DHFS tr | ||
*DD.DHFS *D/DHFS5 | *D/DHFS5 *(ELD1 *ORB/DL g ut REaton WRussell HThompson EChristenbury GHolahan GM.X mcs Eisenh | ||
AND APPLICANTS | 4/17/84 4/17/84 4/17/84 4/17/84 4/17/84 4/ -&84 1Z | ||
FOR AN OPERATING | 4 j78 4 | ||
10 CFR §55.25)This letter is to inform you that all applicants for Reactor Operator (RO)and Senior Reac r Operator (SRO) licenses at facilities prior to initial criticality who h ye not had extensive actual operating experience at a comparable facilit must be granted an exemption to 10 CFR §55.25(b) | r ALL POWER REACTOR LICENSEES AND APPLICANTS FOR AN OPERATING LICENSE | ||
pending completion of NRC rueraking effort identified below.On April 13, 1984, the ommission met to consider the existing staff practice of allowing satisfactory completion of an approved cold license training program as meeting the 10 FR §55.25(b) | Gent en: | ||
requirement for extensive actual operating experience at a c parable facility. | Subject: Administration of Operating Tests Prior to Initial Criticality | ||
10 CFR §55.25) | |||
This letter is to inform you that all applicants for Reactor Operator (RO) | |||
and Senior Reac r Operator (SRO) licenses at facilities prior to initial criticality who h ye not had extensive actual operating experience at a comparable facilit must be granted an exemption to 10 CFR §55.25(b) pending completion of NRC rueraking effort identified below. | |||
On April 13, 1984, the ommission met to consider the existing staff practice of allowing satisfactory completion of an approved cold license training program as meeting the 10 FR §55.25(b) requirement for extensive actual operating experience at a c parable facility. They determined that additional rulemaking action as required to clarify the Commission position that satisfactory completion o NRC approved training programs could be substituted for experience requl ments. They directed the Office of the General Counsel to initiate a rule king to make 10 CFR §55.25(b) fully consistent with current staff practi . They also affirmed that operator licenses in effect will remain valid. | |||
For future licensing actions pending Comm sion action on the revised rule, the Comnission authorized the staff to gran exemptions to the requirements of §55.25(b) for those individuals who have mpleted an approved cold license training program for their facility, he program must have included: | |||
(a) nuclear fundamentals, including ten reactiv ty manipulations at a nuclear reactor, (b) observation training on shift at a mparable operating reactor, (c) training on a simulator and (d) training on ac ual system design of the candidate's plant. For candidates who are eligible to be licensed based on the completion of a training program (e.g., cold li cse candidates and instant SRO's at operating plants) an exemption must b granted. | |||
No specific exemption request is needed for individuals o have completed a cold license training program that includes all elements. xemption requests for individuals who have completed cold license training pro rams that did not include all elements identified above must be specificall requested and shall be evaluated on a case-by-case basis in accordance with e provision of 10 CFR §55.7. If you have any questions concerning this mat r, please contact Don Beckham, Chief, Operator Licensing Branch or Ed Chris enbury, Office of the Executive Legal Director. | |||
for | |||
Darrell G. Eisenhj t Dire-tor DW/OPERATING TESTj/TE~ Division of Licaf__ng _ _\ | |||
TESTj/TE~ | DD/DHFS' D E R | ||
Division of Licaf__ng | OBIf!f f DU/DL D/DL | ||
_ _\DD/DHFS' D E OBIf!f | SURNAUT | ||
SURAME | |||
RE-tn | |||
................ WRussell iI' ..... ,..................... .......... IHThompso. | |||
..................... EChri | |||
..... | ........ .................. GHoiWan stenbry ........... RPurpie | ||
.......... | .......... ........... | ||
..................... | .h.. RP'--'-e..... | ||
... | DEisenhut | ||
.......... .................... | |||
.......... | .D'~ -'nhut | ||
.......... | 0AT4 411 /84 4 /,rq 8 4 4/i6\/84 4/1f)/84 4/\1/84 4/ /84 4/ /84 | ||
.......... | _ _ .. .1 _._ _._ . .... __.............. ................ | ||
. | __.. .................... .................... | ||
0AT4 411 /84 4/,rq 8 4 4/i6\/84 4/1f)/84 4/\1/84 4/ /84 4/ / | NRC FORM 318 (10/801 NRCM 0240 OFFICIAL RECORD COPY * US. GPO 1983-400-247}} | ||
.................... | |||
.................... | |||
NRC FORM 318 (10/801 NRCM 0240 OFFICIAL RECORD COPY | |||
* US. GPO 1983-400-247}} | |||
{{GL-Nav}} | {{GL-Nav}} |
Latest revision as of 02:43, 24 November 2019
, XNUCLEAR
UNITED STATES
REGULATORY COMMISSION Co OTJda, WASHINGTON, D. C. 2555 April 26, 1984 TO ALL APPLICANTS FOR AN OPERATING LICENSE
Gentlemen:
Subject: Administration of Operating Tests Prior to Initial Criticality
(10 CFR §55.25) (Generic Letter No. 84-10)
This letter is to inform you that all applicants for Reactor Operator (RO) and Senior Reactor Operator (SRO) licenses at facilities prior to initial criti- cality who have not had extensive actual operating experience at a comparable facility must obtain an exemption to 10 CFR §55.25(b) if they meet the conditions discussed below pending completion of NRC rulemaking effort identified below.
On April 13, 1984, the Commission met to consider the existing staff practice of allowing satisfactory completion of an approved cold license training program as meeting the 10 CFR §55.25(b) requirement for extensive actual operating experience at a comparable facility. They determined that additional rule- making action was required to clarify the Commission position that satisfactory completion of NRC-approved training programs could be substituted for experience requirements. They directed the Office of the General Counsel to initiate a rulemaking to make 10 CFR §55.25(b) fully consistent with current staff practice.
They also affirmed that operator licenses in effect will remain valid.
For future operator licensing actions pending Commission action on the revised rule, the Commission authorized the staff to grant exemptions to the requirements of §55.25(b) for those individuals who have completed an approved cold license training program for their facility. The program must have included: (a)
nuclear fundamentals, including ten reactor startups at a nuclear reactor, (b) observation training on shift at a comparable operating reactor, (c)
training on a simulator and (d) training on actual system design of the candidate's plant.
No specific exemption request is needed for individuals who have completed a cold license training program that includes all elements. The necessary exemption will be granted as part of the issuance of the operator's license, provided that our records clearly indicate satisfactory completion of a program containing the above elements. Accordingly, until 10 CFR §55.25(b) is modified as discussed above, applicants should identify those cold license candidates who satisfy the foregoing criteria. for candidates whose application is presently before the Commission, a list of those who satisfy the criteria should be furnished promptly to avoid unnecessary delays. For future candidates, this information should be provided along with the individual applications.
Specific exemption requests for individuals who have completed cold license training programs that did not include all elements identified above are necessary and shall be evaluated on a case-by-case basis in accordance with I
8404260428
)f
-2- the provision of 10 CFR §55.7. If you have any questions concerning this matter, please contact Don Beckham, Chief, Operator Licensing Branch,
(301) 492-4868.
This request has been approved by OMB Clearance Number 3150-0018, which expires February 28, 1987.
Darrell G. Eisenhut, Director F Division of Licensing Office of Nuclear Reactor Regulation
- SEE PREVIOUS CONCURRENC
- OLB/DHFS *DD.DHFS tr
- D/DHFS5 *(ELD1 *ORB/DL g ut REaton WRussell HThompson EChristenbury GHolahan GM.X mcs Eisenh
4/17/84 4/17/84 4/17/84 4/17/84 4/17/84 4/ -&84 1Z
4 j78 4
r ALL POWER REACTOR LICENSEES AND APPLICANTS FOR AN OPERATING LICENSE
Gent en:
Subject: Administration of Operating Tests Prior to Initial Criticality
10 CFR §55.25)
This letter is to inform you that all applicants for Reactor Operator (RO)
and Senior Reac r Operator (SRO) licenses at facilities prior to initial criticality who h ye not had extensive actual operating experience at a comparable facilit must be granted an exemption to 10 CFR §55.25(b) pending completion of NRC rueraking effort identified below.
On April 13, 1984, the ommission met to consider the existing staff practice of allowing satisfactory completion of an approved cold license training program as meeting the 10 FR §55.25(b) requirement for extensive actual operating experience at a c parable facility. They determined that additional rulemaking action as required to clarify the Commission position that satisfactory completion o NRC approved training programs could be substituted for experience requl ments. They directed the Office of the General Counsel to initiate a rule king to make 10 CFR §55.25(b) fully consistent with current staff practi . They also affirmed that operator licenses in effect will remain valid.
For future licensing actions pending Comm sion action on the revised rule, the Comnission authorized the staff to gran exemptions to the requirements of §55.25(b) for those individuals who have mpleted an approved cold license training program for their facility, he program must have included:
(a) nuclear fundamentals, including ten reactiv ty manipulations at a nuclear reactor, (b) observation training on shift at a mparable operating reactor, (c) training on a simulator and (d) training on ac ual system design of the candidate's plant. For candidates who are eligible to be licensed based on the completion of a training program (e.g., cold li cse candidates and instant SRO's at operating plants) an exemption must b granted.
No specific exemption request is needed for individuals o have completed a cold license training program that includes all elements. xemption requests for individuals who have completed cold license training pro rams that did not include all elements identified above must be specificall requested and shall be evaluated on a case-by-case basis in accordance with e provision of 10 CFR §55.7. If you have any questions concerning this mat r, please contact Don Beckham, Chief, Operator Licensing Branch or Ed Chris enbury, Office of the Executive Legal Director.
Darrell G. Eisenhj t Dire-tor DW/OPERATING TESTj/TE~ Division of Licaf__ng _ _\
DD/DHFS' D E R
OBIf!f f DU/DL D/DL
SURNAUT
SURAME
RE-tn
................ WRussell iI' ..... ,..................... .......... IHThompso.
..................... EChri
........ .................. GHoiWan stenbry ........... RPurpie
.......... ...........
.h.. RP'--'-e.....
DEisenhut
.......... ....................
.D'~ -'nhut
0AT4 411 /84 4 /,rq 8 4 4/i6\/84 4/1f)/84 4/\1/84 4/ /84 4/ /84
_ _ .. .1 _._ _._ . .... __.............. ................
__.. .................... ....................
NRC FORM 318 (10/801 NRCM 0240 OFFICIAL RECORD COPY * US. GPO 1983-400-247