RIS 2004-07, Release of Final Standard (RS)-002, Processing Applications for Early Site Permits.: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 05/19/2004
| issue date = 05/19/2004
| title = Release of Final Standard (RS)-002, Processing Applications for Early Site Permits.
| title = Release of Final Standard (RS)-002, Processing Applications for Early Site Permits.
| author name = Beckner W D
| author name = Beckner W
| author affiliation = NRC/NRR/DIPM/IROB
| author affiliation = NRC/NRR/DIPM/IROB
| addressee name =  
| addressee name =  
Line 15: Line 15:
| page count = 6
| page count = 6
}}
}}
{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONOFFICE OF NUCLEAR REACTOR REGULATIONWASHINGTON, DC 20555-0001May 19, 2004NRC REGULATORY ISSUE SUMMARY 2004-07RELEASE OF FINAL REVIEW STANDARD (RS)-002, "PROCESSING APPLICATIONS FOR EARLY SITE PERMITS"
{{#Wiki_filter:UNITED STATES
                            NUCLEAR REGULATORY COMMISSION
                        OFFICE OF NUCLEAR REACTOR REGULATION
                                WASHINGTON, DC 20555-0001 May 19, 2004 NRC REGULATORY ISSUE SUMMARY 2004-07 RELEASE OF FINAL REVIEW STANDARD (RS)-002, PROCESSING APPLICATIONS FOR EARLY SITE PERMITS


==ADDRESSEES==
==ADDRESSEES==
All holders of operating licenses for nuclear power reactors, all applicants for early site permits(ESPs), and all prospective vendors of nuclear power plants in the United States.
All holders of operating licenses for nuclear power reactors, all applicants for early site permits (ESPs), and all prospective vendors of nuclear power plants in the United States.


==INTENT==
==INTENT==
The NRC is issuing this regulatory issue summary (RIS) to inform addressees of the availabilityof Review Standard (RS) 002, "Processing Applications for Early Site Permits.This RIS
The NRC is issuing this regulatory issue summary (RIS) to inform addressees of the availability of Review Standard (RS) 002, Processing Applications for Early Site Permits. This RIS
requires no action or written response on the part of an addressee.
requires no action or written response on the part of an addressee.


==BACKGROUND INFORMATION==
==BACKGROUND INFORMATION==
The regulations in Title 10 of the Code of Federal Regulations, Part 52 (10 CFR Part 52),Subpart A, "Early Site Permits," specify the requirements for issuing an ESP. The ESP process is intended to allow a prospective applicant for a nuclear power reactor facility to resolve site- related licensing issues and obtain approval of a site (or sites) without having to file an application for a construction permit or a combined license. An ESP is effective for a period of up to 20 years.Three ESP applications were submitted to the NRC in 2003 and are currently under review. Additional ESP applications may be submitted in the future (though no entities have stated firm intentions of submitting such applications). Consequently, the NRC has prepared RS-002 to provide guidance to NRC staff reviewers of ESP applications to help ensure that the applications currently under review and any future applications will be reviewed in a consistent, effective, efficient, and thorough manner.
The regulations in Title 10 of the Code of Federal Regulations, Part 52 (10 CFR Part 52),
Subpart A, Early Site Permits, specify the requirements for issuing an ESP. The ESP process is intended to allow a prospective applicant for a nuclear power reactor facility to resolve site- related licensing issues and obtain approval of a site (or sites) without having to file an application for a construction permit or a combined license. An ESP is effective for a period of up to 20 years.
 
Three ESP applications were submitted to the NRC in 2003 and are currently under review.
 
Additional ESP applications may be submitted in the future (though no entities have stated firm intentions of submitting such applications). Consequently, the NRC has prepared RS-002 to provide guidance to NRC staff reviewers of ESP applications to help ensure that the applications currently under review and any future applications will be reviewed in a consistent, effective, efficient, and thorough manner.


==SUMMARY OF ISSUE==
==SUMMARY OF ISSUE==
RS-002 provides guidance for the NRC staff to use in reviewing ESP applications. Thedocument also identifies for stakeholders the types of information that the NRC staff will look for in an ESP application. For each area of review, the review standard provides staff guidance on acceptance criteria, review procedures, and sample evaluation findings. The review standard was developed from existing regulatory guidance, such as that found in NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants.
RS-002 provides guidance for the NRC staff to use in reviewing ESP applications. The document also identifies for stakeholders the types of information that the NRC staff will look for in an ESP application. For each area of review, the review standard provides staff guidance on acceptance criteria, review procedures, and sample evaluation findings. The review standard was developed from existing regulatory guidance, such as that found in NUREG-0800,
Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants.
 
The guidance in RS-002 differs to some extent from the guidance in NUREG-0800 in that it addresses the 10 CFR Part 52 regulatory framework and, in particular, ESPs, which did not exist when most sections of NUREG-0800 were last revised.
 
A draft version of RS-002 was issued for interim use and public comment in December 2002 (as announced in RIS 2003-03). The NRC staff addressed comments received and provided the revised draft to the Commission for approval in SECY 03-0227. The Commission approved issuance of RS-002 in a staff requirements memorandum.


" The guidance in RS-002 differs to some extent from the guidance in NUREG-0800 in that it addresses the 10 CFR Part 52 regulatory framework and, in particular, ESPs, which did not exist when most sections of NUREG-0800 were last revised.A draft version of RS-002 was issued for interim use and public comment in December 2002(as announced in RIS 2003-03).  The NRC staff addressed comments received and provided the revised draft to the Commission for approval in SECY 03-0227.  The Commission approved issuance of RS-002 in a staff requirements memorandum. In its staff requirements memorandum, the Commission directed the staff to update reviewguidance, including Regulatory Guide 1.76, "Design Basis Tornado for Nuclear Power Plants,"
In its staff requirements memorandum, the Commission directed the staff to update review guidance, including Regulatory Guide 1.76, "Design Basis Tornado for Nuclear Power Plants,"
to reflect the more recent tornado wind speed data that are available. The Commission required that the results (e.g., technical basis) of this initiative be made available on a schedule that supports the current early site permit reviews. The staff is currently evaluating available data to address this concern and will revise applicable review guidance as appropriate when the evaluation is complete. The review standard is available electronically in the NRC
to reflect the more recent tornado wind speed data that are available. The Commission required that the results (e.g., technical basis) of this initiative be made available on a schedule that supports the current early site permit reviews. The staff is currently evaluating available data to address this concern and will revise applicable review guidance as appropriate when the evaluation is complete.
's Public Document Room at OneWhite Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, or from the Publicly Available Records System (PARS) component of the NRC Agencywide Documents Access and Management System (ADAMS). PARS is accessible from the NRC
 
's public Web site athttp://www.nrc.gov/reading-rm/adams.html; the ADAMS accession number for RS-002 isML040700094.
The review standard is available electronically in the NRCs Public Document Room at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, or from the Publicly Available Records System (PARS) component of the NRC Agencywide Documents Access and Management System (ADAMS). PARS is accessible from the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html; the ADAMS accession number for RS-002 is ML040700094.


==BACKFIT DISCUSSION==
==BACKFIT DISCUSSION==
This RIS requires no action or written response and, therefore, does not constitute a backfitunder 10 CFR 50.109. Consequently, the staff did not perform a backfit analysis.
This RIS requires no action or written response and, therefore, does not constitute a backfit under 10 CFR 50.109. Consequently, the staff did not perform a backfit analysis.


===FEDERAL REGISTER NOTIFICATION===
===FEDERAL REGISTER NOTIFICATION===
A notice of opportunity for public comment on this RIS was not published in the FederalRegister because it is informational.
A notice of opportunity for public comment on this RIS was not published in the Federal Register because it is informational.


===PAPERWORK REDUCTION ACT STATEMENT===
===PAPERWORK REDUCTION ACT STATEMENT===
This RIS does not require any specific action or written response and, therefore, is not subjectto the requirements of the Paperwork Reduction Act. If you have any questions about this matter, contact the individual listed below./RA/William D. Beckner, Chief Reactor Operations Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation
This RIS does not require any specific action or written response and, therefore, is not subject to the requirements of the Paperwork Reduction Act.
 
If you have any questions about this matter, contact the individual listed below.
 
/RA/
                                            William D. Beckner, Chief Reactor Operations Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation  


===Technical Contact:===
===Technical Contact:===
Michael L. Scott, NRR301-415-1421 E-mail: mls3@nrc.gov Attachment: List of Recently Issued NRC Regulatory Issue Summaries  
Michael L. Scott, NRR
                      301-415-1421 E-mail: mls3@nrc.gov Attachment: List of Recently Issued NRC Regulatory Issue Summaries
 
ML041340058 DOCUMENT NAME: C:\ORPCheckout\FileNET\ML041340058.wpd OFFICE NRR/DIPM/IROB Tech Editor          NRR/DRIP/RNRP      NRR/DRIP/RNRP NRR/DRIP/RNRP
  NAME CDPetrone            PKleene/pk/    MLScott *          LADudes          JELyons DATE        /  /2004      05/07/2004      05/05/2004          05/06/2004        05/07/2004 OFFICE SC:SPSB:DSSA      OGC            NRR/DIPM/IROB        NRR/DIPM/IROB
  NAME RLDennig            APH            CPJackson            WDBeckner DATE    05/10/2004        05/10/2004    05/17/2004          05/19/2004
 
Attachment LIST OF RECENTLY ISSUED
                                  NRC REGULATORY ISSUE SUMMARIES
_____________________________________________________________________________________
Regulatory Issue                                            Date of Summary No.                  Subject                      Issuance                Issued to
_____________________________________________________________________________________
2004-06          Independent Survey of Power                04/16/2004 All holders of operating licenses Reactor Licensees                                    for nuclear power reactors except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.
 
2004-05          Grid Reliability and the Impact on        04/15/2004 All holders of operating licenses Plant Risk and the Operability of                    for nuclear power reactors except Offsite Power                                        those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.
 
2004-04          Use of Code Cases N-588, N-640,            04/05/2004 All holders of construction permits and N-641 in Developing                              or operating licenses for nuclear Pressure-Temperature Operating                        power reactors except those who Limits                                                have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.
 
2004-03          Risk-informed Approach For Post-          03/02/2004 All holders of operating licenses Fire Safe-Shutdown Associated                        for nuclear power reactors, except Circuit Inspections                                  those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.


ML041340058DOCUMENT NAME:  C:\ORPCheckout\FileNET\ML041340058.wpd  OFFICENRR/DIPM/IROBTech EditorNRR/DRIP/RNRPNRR/DRIP/RNRPNRR/DRIP/RNRPNAMECDPetronePKleene/pk/MLScott *LADudesJELyonsDATE      /      /200405/07/200405/05/200405/06/200405/07/2004  OFFICESC:SPSB:DSSAOGCNRR/DIPM/IROBNRR/DIPM/IROBNAMERLDennigAPHCPJacksonWDBecknerDATE05/10/2004 05/10/200405/17/200405/19/2004  
2004-02          Deferral of Active Regulation of          02/23/2004 All holders of materials licenses Ground-Water Protection at in Situ                    for uranium and thorium recovery Leach Uranium Extraction                              facilities.
______________________________________________________________________________________OL = Operating License


CP = Construction PermitAttachment LIST OF RECENTLY ISSUEDNRC REGULATORY ISSUE SUMMARIES
Facilities Note:             NRC generic communications may be received in electronic format shortly after they are issued by subscribing to the NRC listserver as follows:
_____________________________________________________________________________________Regulatory Issue  Date of Summary No.      Subject  IssuanceIssued to
                  To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the following command in the message portion:
_____________________________________________________________________________________2004-06Independent Survey of PowerReactor Licensees04/16/2004All holders of operating licensesfor nuclear power reactors except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.2004-05Grid Reliability and the Impact onPlant Risk and the Operability of Offsite Power04/15/2004All holders of operating licensesfor nuclear power reactors except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.2004-04Use of Code Cases N-588, N-640,and N-641 in Developing Pressure-Temperature Operating Limits04/05/2004All holders of construction permitsor operating licenses for nuclear power reactors except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.2004-03Risk-informed Approach For Post-Fire Safe-Shutdown Associated Circuit Inspections03/02/2004All holders of operating licensesfor nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.2004-02Deferral of Active Regulation ofGround-Water Protection at in SituLeach Uranium Extraction Facilities02/23/2004All holders of materials licensesfor uranium and thorium recovery facilities.Note:NRC generic communications may be received in electronic format shortly after they areissued by subscribing to the NRC listserver as follows:To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the followingcommand in the message portion:subscribe gc-nrr firstname lastname
                                    subscribe gc-nrr firstname lastname
______________________________________________________________________________________
OL = Operating License CP = Construction Permit
}}
}}


{{RIS-Nav}}
{{RIS-Nav}}

Latest revision as of 02:09, 24 November 2019

Release of Final Standard (RS)-002, Processing Applications for Early Site Permits.
ML041340058
Person / Time
Issue date: 05/19/2004
From: Beckner W
NRC/NRR/DIPM/IROB
To:
Scott M L, NRR/ADIP/NRLPO, 301-415-1421
References
TAC MC3059 RIS-04-007
Download: ML041340058 (6)


UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, DC 20555-0001 May 19, 2004 NRC REGULATORY ISSUE SUMMARY 2004-07 RELEASE OF FINAL REVIEW STANDARD (RS)-002, PROCESSING APPLICATIONS FOR EARLY SITE PERMITS

ADDRESSEES

All holders of operating licenses for nuclear power reactors, all applicants for early site permits (ESPs), and all prospective vendors of nuclear power plants in the United States.

INTENT

The NRC is issuing this regulatory issue summary (RIS) to inform addressees of the availability of Review Standard (RS) 002, Processing Applications for Early Site Permits. This RIS

requires no action or written response on the part of an addressee.

BACKGROUND INFORMATION

The regulations in Title 10 of the Code of Federal Regulations, Part 52 (10 CFR Part 52),

Subpart A, Early Site Permits, specify the requirements for issuing an ESP. The ESP process is intended to allow a prospective applicant for a nuclear power reactor facility to resolve site- related licensing issues and obtain approval of a site (or sites) without having to file an application for a construction permit or a combined license. An ESP is effective for a period of up to 20 years.

Three ESP applications were submitted to the NRC in 2003 and are currently under review.

Additional ESP applications may be submitted in the future (though no entities have stated firm intentions of submitting such applications). Consequently, the NRC has prepared RS-002 to provide guidance to NRC staff reviewers of ESP applications to help ensure that the applications currently under review and any future applications will be reviewed in a consistent, effective, efficient, and thorough manner.

SUMMARY OF ISSUE

RS-002 provides guidance for the NRC staff to use in reviewing ESP applications. The document also identifies for stakeholders the types of information that the NRC staff will look for in an ESP application. For each area of review, the review standard provides staff guidance on acceptance criteria, review procedures, and sample evaluation findings. The review standard was developed from existing regulatory guidance, such as that found in NUREG-0800,

Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants.

The guidance in RS-002 differs to some extent from the guidance in NUREG-0800 in that it addresses the 10 CFR Part 52 regulatory framework and, in particular, ESPs, which did not exist when most sections of NUREG-0800 were last revised.

A draft version of RS-002 was issued for interim use and public comment in December 2002 (as announced in RIS 2003-03). The NRC staff addressed comments received and provided the revised draft to the Commission for approval in SECY 03-0227. The Commission approved issuance of RS-002 in a staff requirements memorandum.

In its staff requirements memorandum, the Commission directed the staff to update review guidance, including Regulatory Guide 1.76, "Design Basis Tornado for Nuclear Power Plants,"

to reflect the more recent tornado wind speed data that are available. The Commission required that the results (e.g., technical basis) of this initiative be made available on a schedule that supports the current early site permit reviews. The staff is currently evaluating available data to address this concern and will revise applicable review guidance as appropriate when the evaluation is complete.

The review standard is available electronically in the NRCs Public Document Room at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, or from the Publicly Available Records System (PARS) component of the NRC Agencywide Documents Access and Management System (ADAMS). PARS is accessible from the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html; the ADAMS accession number for RS-002 is ML040700094.

BACKFIT DISCUSSION

This RIS requires no action or written response and, therefore, does not constitute a backfit under 10 CFR 50.109. Consequently, the staff did not perform a backfit analysis.

FEDERAL REGISTER NOTIFICATION

A notice of opportunity for public comment on this RIS was not published in the Federal Register because it is informational.

PAPERWORK REDUCTION ACT STATEMENT

This RIS does not require any specific action or written response and, therefore, is not subject to the requirements of the Paperwork Reduction Act.

If you have any questions about this matter, contact the individual listed below.

/RA/

William D. Beckner, Chief Reactor Operations Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation

Technical Contact:

Michael L. Scott, NRR

301-415-1421 E-mail: mls3@nrc.gov Attachment: List of Recently Issued NRC Regulatory Issue Summaries

ML041340058 DOCUMENT NAME: C:\ORPCheckout\FileNET\ML041340058.wpd OFFICE NRR/DIPM/IROB Tech Editor NRR/DRIP/RNRP NRR/DRIP/RNRP NRR/DRIP/RNRP

NAME CDPetrone PKleene/pk/ MLScott * LADudes JELyons DATE / /2004 05/07/2004 05/05/2004 05/06/2004 05/07/2004 OFFICE SC:SPSB:DSSA OGC NRR/DIPM/IROB NRR/DIPM/IROB

NAME RLDennig APH CPJackson WDBeckner DATE 05/10/2004 05/10/2004 05/17/2004 05/19/2004

Attachment LIST OF RECENTLY ISSUED

NRC REGULATORY ISSUE SUMMARIES

_____________________________________________________________________________________

Regulatory Issue Date of Summary No. Subject Issuance Issued to

_____________________________________________________________________________________

2004-06 Independent Survey of Power 04/16/2004 All holders of operating licenses Reactor Licensees for nuclear power reactors except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.

2004-05 Grid Reliability and the Impact on 04/15/2004 All holders of operating licenses Plant Risk and the Operability of for nuclear power reactors except Offsite Power those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.

2004-04 Use of Code Cases N-588, N-640, 04/05/2004 All holders of construction permits and N-641 in Developing or operating licenses for nuclear Pressure-Temperature Operating power reactors except those who Limits have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.

2004-03 Risk-informed Approach For Post- 03/02/2004 All holders of operating licenses Fire Safe-Shutdown Associated for nuclear power reactors, except Circuit Inspections those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.

2004-02 Deferral of Active Regulation of 02/23/2004 All holders of materials licenses Ground-Water Protection at in Situ for uranium and thorium recovery Leach Uranium Extraction facilities.

Facilities Note: NRC generic communications may be received in electronic format shortly after they are issued by subscribing to the NRC listserver as follows:

To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the following command in the message portion:

subscribe gc-nrr firstname lastname

______________________________________________________________________________________

OL = Operating License CP = Construction Permit