{{#Wiki_filter:AVERAGEDAILYUNITPOWERLEVELNov.8,1980COMPLETED IIYV.T.Ch3.1SO>4MONTHOCTOBER~1980DAYAVERAGEDAILYPOWERLEVEL{MWe.Net)
{{#Wiki_filter:AVERAGE DAILY UNIT POWER LEVEL Nov.8, 1980 COMPLETED IIY V.T.Ch3.1SO>4 MONTH OCTOBER~1980 DAY AVERAGE DAILY POWER LEVEL{MWe.Net)I 628 627 631 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17 18 19 4 636 62 20 21 22 10 I'2 13 15 16 24 25 27 28 59 30 31 INSTRUCTIONS On this format.list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole megawat t.(o/77)
I628627631DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) 17181946366220212210I'213151624252728593031INSTRUCTIONS Onthisformat.listtheaveragedailyunitpowerlevelinMWe-Netforeachdayinthereporting month.Computetothenearestwholemegawatt.(o/77)
OPERATING DATA REPORT, DOCKET NO.DATE 39?~~180 COMPLETED 8Y V.T.Chilson TELEPHONE~305~5-3824 OPERATING STATUS Turke Poiat Unit No.3 2200 760 693 I~Unit Name 2.Reporting Period: o 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): 680 646 Notes-Unit No.3'perated at approximately 9?X R.P.until the unit was removed'rom service on Oct.6,1980, for scheduled Steam Generator Tube Inspection Program, maintenance aad inspections.
OPERATING DATAREPORT,DOCKETNO.DATE39?~~180COMPLETED 8YV.T.ChilsonTELEPHONE
8.If Changes Occur In Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, lf Any: NONE This Month Yr..to-Date Cumulative 69 321i6 53 090.4 213.4 51 338;6 121.8 103 694 623 32 925 350 31 163 890 74.1 74.2 69.9 64.9 2.5 I I.Hours In Reporting Period/45;0 7 320;0 13.Reactor Reserve Shutdown Hours-a--0-14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours>>0--0-16.Gross Thermal Energy Ge'netated (MWH)257 027 12 225 989 17.Gross Electrical Energy Generated (MWH)79 650 3 844 350 18.Net Electrical Energy Generated (MWH)72 844 3 641 796 19.Unit Service Factor 16.3 77'20.Unit Availability Factor 16.3 7?.2 21.Unit Capacity Factor (Using MDC Net)15.1 77.0 22.Unit Capacity Factor (Using DER Net)14.1 71.8 23.Unit Forced Outage Rate-0-1.2 24.Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each l: Refuelin maintenance and ins ections-March 1 1981-Ma 10 1981.25.If Shut Down At End Of Report Period.Estimated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation):
~305~5-3824 OPERATING STATUSTurkePoiatUnitNo.32200760693I~UnitName2.Reporting Period:o3.LicensedThermalPower(MWt):4.Nameplate Rating(GrossMWe):5.DesignElectrical Rating(NetMWe):6.MaximumDependable Capacity(GrossMWe):7.MaximumDependable Capacity(NetMWe):680646Notes-UnitNo.3'perated atapproximately 9?XR.P.untiltheunitwasremoved'rom serviceonOct.6,1980,forscheduled SteamGenerator TubeInspection Program,maintenance aadinspections.
November 1 1980.Forecast.Achieved INITIAL CRITICALITY INITIAL ELEGTRICITY
8.IfChangesOccurInCapacityRatings(ItemsNumber3Through7)SinceLastReport,GiveReasons:9.PowerLevelToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, lfAny:NONEThisMonthYr..to-Date Cumulative 69321i653090.4213.451338;6121.8103694623329253503116389074.174.269.964.92.5II.HoursInReporting Period/45;07320;013.ReactorReserveShutdownHours-a--0-14.HoursGenerator On-Line15.UnitReserveShutdownHours>>0--0-16.GrossThermalEnergyGe'netated (MWH)2570271222598917.GrossElectrical EnergyGenerated (MWH)79650384435018.NetElectrical EnergyGenerated (MWH)72844364179619.UnitServiceFactor16.377'20.UnitAvailability Factor16.37?.221.UnitCapacityFactor(UsingMDCNet)15.177.022.UnitCapacityFactor(UsingDERNet)14.171.823.UnitForcedOutageRate-0-1.224.Shutdowns Scheduled OverNext6Months(Type,Date,andDurationofEachl:Refuelinmaintenance andinsections-March11981-Ma101981.25.IfShutDownAtEndOfReportPeriod.Estimated DateofStartup:26.UnitslnTestStatus(PriortoCommercial Operation):
>~i~a i'~~~~" COMMERClAL OPERATlON ('>/77)
November11980.Forecast.AchievedINITIALCRITICALITY INITIALELEGTRICITY
UNIT SHUTDOWNS AND POIVER REDUCTIONS REPORT MONTII OCTOBER 1980 COhI PLETED BY No.Dale PI Vl r3 Q Liccnsec Event ReportEl c!Cl Q D-~C~Cause&Corrective Action to Prevent Rccurrcnce 19 80-10-06 S 623.7 B N/A HB HTEXCH (P)Unit was removed from service for scheduled Steam Generator Tube In-spection Program, maintenance, and inspections.(Nuclear and Non-nuclear systems)F: Forced S: Scheduled!~~'!)/77)Reason: A-Equipment Failure (Explain)B-h(alntenance or Test.C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G.Operational Error (Explain)II Other (Explain)3 hlcthod: I.Manual 2-Manual Scram.3-Autotnatic Scram.4.Other (Explain)Exhibit G-Instructions lor Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-016I)Exhibit I-Saute Source AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO.UNIT Nov.8 1980 COMPLETED 8Y V.T.Chilson TELEPHONE MONTH OCTOBER P 1 9 8 0 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAlLY POWER LEVEL (MWe-Net I 17 627 630 6 4 639 638 18 19 20 621 625 626 626 10 13 14 15 652 651 641 641 643'24 26 28 29 30 31 641 587 221 641 626 619 612 16 Average daily power level greater than 646 MWe due to cooler condenser cooling water.NOTE: INSTRUCTIONS On this format.list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole rnegawat t.(n/77)
>~i~ai'~~~~"COMMERClAL OPERATlON
OPERATING DATA REPORT DOCKET NO.DATE Eov.8 19 0 COMPLETED BY Z'Kg~on TELEPHONE~~~2-3824 OPERATING STATUS 1.Unit Name: Turke Point Unit No.4 2.Reporting period: October, 1980 3.Licensed Thermal Power (MWt): 4.Namephte Rating (Gross MWe): 760 5.Design Electrical Rating (Ne!MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): Notes-Unit No.4 operated at approximately 100X R.P., ex-cept for outage of 0'ct.25-26 1980;and load restriction t 50X R.P.on Oct.26-27, 1980, after the unit was returned to service.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: Thh Month Yr.-to-Date Cumuhtive 7 320.0 5 995.0 166.6 45 088;9 31.2 94 009 117 29 865 038 28 284 899 71.5 71.6 69.7'64.7 2.9 II.Hours In Reporting Period 63 049.0 12.Number Of Hours Reactor Was Critical 742.9 46 822.8 13.Reactor Reserve Shutdown Hours 12.3 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours-Jt=12.3 16.Gross Thermal Energy Generated (MWH)1 582 803 12 790 137 17.Gross Electrical Energy Generated (MWH)481 620 3 961 560 19.Unit Service Factor 99.6 80.7 20.Unit Availability Factor 99.6 80.9 21.Unit Capacity Factor (Using MDC Net)94.8 79.4".Unit Capacity Factor (Using DER Net)*88.4 74.0 23.Unit Forced Outage Rate 0.4 0.3 24.Shutdowns Scheduled Over Next 6 Months (Type.Date, and Duration of Each): e uelin maintenance and ins ections-November 9, 1980-January 10, 1981.25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
('>/77)
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY'OMMERCIAL OPERATION ('>/77)
UNITSHUTDOWNS ANDPOIVERREDUCTIONS REPORTMONTIIOCTOBER1980COhIPLETEDBYNo.DalePIVlr3QLiccnsecEventReportElc!ClQD-~C~Cause&Corrective ActiontoPreventRccurrcnce 1980-10-06S623.7BN/AHBHTEXCH(P)Unitwasremovedfromserviceforscheduled SteamGenerator TubeIn-spectionProgram,maintenance, andinspections.
UNIT SIIVTDOWNS AND POWER REDUCTIONS DOCKET NO.50'2&l UNITNAME Turke Point IJ it No.4 REPORT MONT(I OCTOBER 1980 No.Date U~c~Ch d Licenscc Event Repurt>C<0 4 rir G gtA O Cause Ec Corrective Actiun tu Prevent Recurrence
(NuclearandNon-nuclearsystems)F:ForcedS:Scheduled
~i 18 80-10-.25 P 33.A 3 N/A ED Unit was tripped by the reactor pro-tection system due to the loss of power supply to vit;al instrument AC...Bus No.4B.19 80-10-26 P-0-N/A RC zzzzzz Load restricted to 50X R.P.due to axial off-set limitations after the unit was returned to service.(Nuclear system).I F: Forced S: Scheduled Reason: A-Equipment Failure (Explain)B.Maintenance or Test.C-Refueling D.Regulatory Restriction E.Operator Training h, License Exatnination F-Administrative G.Operational Errur (Explain)I I-Other (Explain)Method: I-Manual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG.OI6 I)Exhibit I-Same Source
!~~'!)/77)Reason:A-Equipment Failure(Explain)
B-h(alntenance orTest.C-Refueling D-Regulatory Restriction E-Operator Training&LicenseExamination F-Administrative G.Operational Error(Explain)
IIOther(Explain) 3hlcthod:I.Manual2-ManualScram.3-Autotnatic Scram.4.Other(Explain)
ExhibitG-Instructions lorPreparation ofDataEntrySheetsforLicenseeEventReport(LER)File(NUREG-016I)ExhibitI-SauteSource AVERAGEDAlLYUNITPOWERLEVELDOCKETNO.UNITNov.81980COMPLETED 8YV.T.ChilsonTELEPHONE MONTHOCTOBERP1980DAYAVERAGEDAILYPOWERLEVEL(MWe-Net)
DAYAVERAGEDAlLYPOWERLEVEL(MWe-NetI176276306463963818192062162562662610131415652651641641643'24262829303164158722164162661961216Averagedailypowerlevelgreaterthan646MWeduetocoolercondenser coolingwater.NOTE:INSTRUCTIONS Onthisformat.listtheaveragedailyunitpowerlevelinMWe-Netforeachdayinthereporting month.Computetothenearestwholernegawatt.(n/77)
OPERATING DATAREPORTDOCKETNO.DATEEov.8190COMPLETED BYZ'Kg~onTELEPHONE
~~~2-3824 OPERATING STATUS1.UnitName:TurkePointUnitNo.42.Reporting period:October,19803.LicensedThermalPower(MWt):4.NamephteRating(GrossMWe):7605.DesignElectrical Rating(Ne!MWe):6.MaximumDependable Capacity(GrossMWe):7.MaximumDependable Capacity(NetMWe):Notes-UnitNo.4operatedatapproximately 100XR.P.,ex-ceptforoutageof0'ct.25-26 1980;andloadrestriction t50XR.P.onOct.26-27, 1980,aftertheunitwasreturnedtoservice.8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport,GiveReasons:9.PowerLevelToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:ThhMonthYr.-to-Date Cumuhtive 7320.05995.0166.645088;931.294009117298650382828489971.571.669.7'64.72.9II.HoursInReporting Period63049.012.NumberOfHoursReactorWasCritical742.946822.813.ReactorReserveShutdownHours12.314.HoursGenerator On-Line15.UnitReserveShutdownHours-Jt=12.316.GrossThermalEnergyGenerated (MWH)15828031279013717.GrossElectrical EnergyGenerated (MWH)481620396156019.UnitServiceFactor99.680.720.UnitAvailability Factor99.680.921.UnitCapacityFactor(UsingMDCNet)94.879.4".UnitCapacityFactor(UsingDERNet)*88.474.023.UnitForcedOutageRate0.40.324.Shutdowns Scheduled OverNext6Months(Type.Date,andDurationofEach):euelinmaintenance andinsections-November9,1980-January10,1981.25.IfShutDownAtEndOfReportPeriod,Estimated DateofStartup:26.UnitsInTestStatus(PriortoCommercial Operation):
ForecastAchievedINITIALCRITICALITY INITIALELECTRICITY'OMMERCIAL OPERATION
('>/77)
UNITSIIVTDOWNS ANDPOWERREDUCTIONS DOCKETNO.50'2&lUNITNAMETurkePointIJitNo.4REPORTMONT(IOCTOBER1980No.DateU~c~ChdLicensccEventRepurt>C<04rirGgtAOCauseEcCorrective ActiuntuPreventRecurrence
~i1880-10-.25 P33.A3N/AEDUnitwastrippedbythereactorpro-tectionsystemduetothelossofpowersupplytovit;alinstrument AC...BusNo.4B.1980-10-26P-0-N/ARCzzzzzzLoadrestricted to50XR.P.duetoaxialoff-setlimitations aftertheunitwasreturnedtoservice.(Nuclearsystem).IF:ForcedS:Scheduled Reason:A-Equipment Failure(Explain)
B.Maintenance orTest.C-Refueling D.Regulatory Restriction E.Operator Trainingh,LicenseExatnination F-Administrative G.Operational Errur(Explain)
II-Other(Explain)
Method:I-Manual2-ManualScram.3-Automatic Scram.4-Other(Explain) 4ExhibitG-Instructions forPreparation ofDataEntrySheetsforLicenseeEventReport(LER)File(NUREG.OI6I)ExhibitI-SameSource


AVERAGEDAILYUNITPOWERLEVELSt.LucieDATENov.81980JRILJ->>4MON~OCTOBER'980 DAYAVERAGEDAILYPOWERLEVEL(MWe-Net)DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) 79117.81013141516INSTRUCTIONS 77978478678678678979079078978979018192021222425167728793031NOTE:78878767783785787783784Averagedailypower'evelgreaterthan777MWeduetocoolercondenser coolingwater.Onthisformat.listtheaveragedailyunitpowerlevelinMWeNetforeachdayinthereporting month.Computelothenearestwholemegawatt.(o/771 OPERATING DATAREPORT,DOCKETNO.DATEgtn~~80COMPLETED'Y
AVERAGE DAILY UNIT POWER LEVEL St.Lucie DATE Nov.8 1980 JRILJ->>4 MON~OCTOBER'980 DAY AVERAGE DAILY POWER LEVEL (M We-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)791 17.8 10 13 14 15 16 INSTRUCTIONS 779 784 786 786 786 789 790 790 789 789 790 18 19 20 21 22 24 25 16 77 28 79 30 31 NOTE: 788 78 767 783 785 787 783 784 Average daily power'evel greater than 777 MWe due to cooler condenser cooling water.On this format.list the average daily unit power level in MWe Net for each day in the reporting month.Compute lo the nearest whole megawat t.(o/77 1 OPERATING DATA REPORT, DOCKET NO.DATE gtn~~80 COMPLETED'Y
~~~sonTELEPHONE MlR~-3824OPERATING STATUSSt.I;ucieUnitNo.1256085082l.UnitName:2.Reporting Period:3.LicensedThermalPower(MWt):4.Nameplate Rating(GrossMWc):5.DesignElectrical Rating(NetMWc):6.MaximumDependable Capacity(GrossMWe):7.MaximumDependable Capacity(NetMWe):822777Notes-Unitoperatedatapproximately 100XR.P.,ex-ceptforoutageof(7ct.21,1980.8.IfChangesOccurinCapacityRatings(ItqmsNumber3Through7)SinceLastReport,GiveReasons:9.PowerLevelToWhichRestricted.
~~~son TELEPHONE MlR~-3824 OPERATING STATUS St.I;ucie Unit No.1 2560 850 8 2 l.Unit Name: 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWc): 5.Design Electrical Rating (Net MWc): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): 822 777 Notes-Unit operated at approximately 100X R.P., ex-cept for outage of (7ct.21, 1980.8.If Changes Occur in Capacity Ratings (Itqms Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.
IfAny(NctMWe):10.ReasonsForRestrictions, lfAny:ThisMonthYr.-to-Date 7320.05457.7-0-5345.37.3132719934299700404835073.073.171.269.0.8.411.HoursInReporting Period745.012.NumberOfHoursReactorWasCritical740.313.ReactorReserveShutdownHours14.HoursGenerator On-Line739.215.UnitReserveShutdownHours-0-16.GrossThermalEnergyGe'nerated (MWH)188567617.GrossElectrical EnergyGenerated (MWH)61242018.NetElectrica EnergyGenerated (MWH)19.UnitServiceFactor99.220.UnitAvailability Factor99.221.UnitCapacityFactor(UsingMDCNet)100.122.UnitCapacityFactor(UsingDERNct)97.023.UnitForcedOutageRate0.824.Shutdowns Scheduled OverNext6Months(Type,Date.andDurationofEach):Cumulative 33864.026967.5-129.526175;339.3635315592059420019'7624677.377.473.6'71.3'.125.IfShutDownAtEndOfReportPeriod,Estimated DateofStartup:26.UnitsInTestStatus(PriortoCommercial Operation):
If Any (Nct MWe): 10.Reasons For Restrictions, lf Any: This Month Yr.-to-Date 7 320.0 5 457.7-0-5 345.3 7.3 13 271 993 4 299 700 4 048 350 73.0 73.1 71.2 69.0.8.4 11.Hours In Reporting Period 745.0 12.Number Of Hours Reactor Was Critical 740.3 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 739.2 15.Unit Reserve Shutdown Hours-0-16.Gross Thermal Energy Ge'nerated (MWH)1 885 676 17.Gross Electrical Energy Generated (MWH)612 420 18.Net Electrica Energy Generated (MWH)19.Unit Service Factor 99.2 20.Unit Availability Factor 99.2 21.Unit Capacity Factor (Using MDC Net)100.1 22.Unit Capacity Factor (Using DER Nct)97.0 23.Unit Forced Outage Rate 0.8 24.Shutdowns Scheduled Over Next 6 Months (Type, Date.and Duration of Each): Cumulative 33 864.0 26 967.5-129.5 26 175;3 39.3 63 531 559 20 594 200 19'76 246 77.3 77.4 73.6'71.3'.1 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
ForecastAcilieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION I'/77)
Forecast Acilieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I'/77)
UNITSHUTDOWNS ANDPOWERREDUCTIONS REPORThIONTIIOCTOBER1980C~~-LtS%KAr)nQLicensccEventReport>)=<Cl4lIAcnCrC0CQCrCause&Correclive Actionlo~PreventRecurrence 1780-.10-21 5.8N/AHHINSTRUUnitwastrippedbythesteamgeneratorlevelprotection systemcausedbyaspuriouscontrolsignaltofeedwater controlvalveNo.1A.IF:ForcedS:Scheduled
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT hIONTII OCTOBER 1980 C~~-L tS%K A r)n Q Licenscc Event Report>)=<Cl 4l IA cn Cr C 0 C Q Cr Cause&Correclive Action lo~Prevent Recurrence 17 80-.10-21 5.8 N/A HH INSTRU Unit was tripped by the steam genera tor level protection system caused by a spurious control signal to feedwater control valve No.1A.I F: Forced S: Scheduled ('t177)Reason: A Equipment Failure (Explain)B.h(aintenance or Test.C-Refueling D Regulatory Restriction E.Operator Training&Uccnsc Examination F-Administrative G.Operational Error (Explain)I I Other (Explain)3 Method: I-Manual 2.Manual Scram.3-Automatic Scram.4%ther (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREC.OI6 I)Exhibit I-Satnc Source
('t177)Reason:AEquipment Failure(Explain)
~~P.O, 80:C 5"9100, iVilAMI, FL 33'52~'-CHID@>CVlcR i:G>7 QC~N<;A~iY November 8, 1980 Office of Management Information and Program Controls U.S.Regulatory Commission Washington, D.C.20555 Gentlemen:
B.h(aintenance orTest.C-Refueling DRegulatory Restriction E.Operator Training&UccnscExamination F-Administrative G.Operational Error(Explain)
Attached are the October, 1980, Operating Summary Reports for Turkey Point Unit Nos.3 and 4 and St.Lucie Unit No.l.Very truly yours, A.D.Schmidt Vice President Power Resources VTC/ddc cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire  
IIOther(Explain) 3Method:I-Manual2.ManualScram.3-Automatic Scram.4%ther(Explain)
ExhibitG-Instructions forPreparation ofDataEntrySheetsforLicenseeEventReport(LER)File(NUREC.OI6I)ExhibitI-SatncSource
~~P.O,80:C5"9100,iVilAMI,FL33'52~'-CHID@>CVlcRi:G>7QC~N<;A~iY November8,1980OfficeofManagement Information andProgramControlsU.S.Regulatory Commission Washington, D.C.20555Gentlemen:
AttachedaretheOctober,1980,Operating SummaryReportsforTurkeyPointUnitNos.3and4andSt.LucieUnitNo.l.Verytrulyyours,A.D.SchmidtVicePresident PowerResources VTC/ddccc:Mr.JamesP.O'ReillyRobertLowenstein, Esquire SUMMARYOFOPERATING EXPERIENCE POCKETNO.50-250UNITTurkeyPointUnitNo3DATENovember8,1980COMPLETED BY'.T.ChilsonTELEPHONE (305)552-3824REPORTMONTHOCTOBER8UnitNo.3operatedatapproximately 97%R.P.,untiltheunitwasremovedfromserviceonOctober6,1980,forscheduled.Steam
-Generator TubeIn-spectionProgram,maintenance andinspections.'efer to"UnitShutdowns andPowerReductions" Sectionof'October, 1980,Operating StatusReportforadditional information.
MajorSafety-related maintenance activities, performed.
duringthemonthincluded:
Inspections andrequirements ofIE.Bulletins andNUREG-0578 arecontinuing.
FloridaPower6LightCompanycommitments forNUREG-0578 implementation arecontinuing.
Refertocorrespondence betweenFPLandNRCforad-ditionalinformation.
Completed SteamGenerator TubeInspection Program.Installed feedwater pipingsectionstorepaircrackintheHeatAffectedZone(HAZ)oftheweldconnecting thefeedwater pipingtothe18"x14"concentric reducerofSteamGenerator Nos.3A,3B,and3C.


SUMMA'RYOFOPERATING EXPERIENCE POCKETNO.50-251TurkeyPointUnitNo.4DATENovember8,1980COMPLETED BYTELEPHONE V.T.Chilson(305)552-3824REPORTMONTHOCTOBER1980UnitNo.4operatedatapproximately 100%R..P.,exceptforoutageofOctober25-26,1980,andloadrestriction.
==SUMMARY==
to50%R.P.onOctober26-27,1980,aftertheunitwasreturnedtoservice.Referto"UnitShutdowns andPowerReductions" sectionoftheOctober,1980,.Operating StatusReportforadditional information.
OF OPERATING EXPERIENCE POCKET NO.50-250 UNIT Turkey Point Unit No 3 DATE November 8, 1980 COMPLETED BY'.T.Chilson TELEPHONE (305)552-3824 REPORT MONTH OCTOBER 8 Unit No.3 operated at approximately 97%R.P., until the unit was removed from service on October 6, 1980, for scheduled.Steam-Generator Tube In-spection Program, maintenance and inspections.'efer to"Unit Shutdowns and Power Reductions" Section of'October, 1980, Operating Status Report for additional information.
MajorSafety-related maintenance activities performed duringthemonthincluded:
Major Safety-related maintenance activities, performed.
Inspections andrecpxirements of.IEBulletins andNUREG-0578 inprogress.
during the month included: Inspections and requirements of IE.Bulletins and NUREG-0578 are continuing.
FloridaPower&LightCompanycommitments for.NUREG-0578 implementation arecontinuing.
Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing.
Refertocorrespondence betwe'enFPLandNRCforad-ditionalinformation.
Refer to correspondence between FPL and NRC for ad-ditional information.
00SUMMARYOFOPERATING EXPERIENCE DOCKETNO.UNIT50-335St.LucieUnitNo.1DATENov.8,1980REPORTMONTHOCTOBER1980COMPLETED BYTELEPHONE V.T.Chilson(305)552-3824Unitoperatedatapproximately 100%R.P.,exceptforoutageofOct.21,1980.Referto"UnitShutdowns andPowerReductions" sectionoftheOctober,1980,Operating StatusReportforadditional information.
Completed Steam Generator Tube Inspection Program.Installed feedwater piping sections to repair crack in the Heat Affected Zone (HAZ)of the weld connecting the feedwater piping to the 18" x 14" concentric reducer of Steam Generator Nos.3A, 3B, and 3C.
MajorSafety-related maintenance activities performed duringtherponthincluded:
 
Inspections andrequirements ofIEBulletins andNUREG-0578, are'ontinuing.
SUMMA'RY OF OPERATING EXPERIENCE POCKET NO.50-251 Turkey Point Unit No.4 DATE November 8, 1980 COMPLETED BY TELEPHONE V.T.Chilson (305)552-3824 REPORT MONTH OCTOBER 1980 Unit No.4 operated at approximately 100%R..P., except for outage of October 25-26, 1980, and load restriction.
FloridaPowerSLightCompanycommitments'or NUREG-0578 implementation arecontinuing.
to 50%R.P.on October 26-27, 1980, after the unit was returned to service.Refer to"Unit Shutdowns and Power Reductions" section of the October, 1980,.Operating Status Report for additional information.
Refertocorrespondence..between FPLandNRCforad-ditionalinformation.}}
Major Safety-related maintenance activities performed during the month included: Inspections and recpxirements of.IE Bulletins and NUREG-0578 in progress.Florida Power&Light Company commitments for.NUREG-0578 implementation are continuing.
Refer to correspondence betwe'en FPL and NRC for ad-ditional information.
0 0
 
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.UNIT 50-335 St.Lucie Unit No.1 DATE Nov.8, 1980 REPORT MONTH OCTOBER 1980 COMPLETED BY TELEPHONE V.T.Chilson (305)552-3824 Unit operated at approximately 100%R.P., except for outage of Oct.21, 1980.Refer to"Unit Shutdowns and Power Reductions" section of the October, 1980, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the rponth included: Inspections and requirements of IE Bulletins and NUREG-0578, are'ontinuing.
Florida Power S Light Company commitments'or NUREG-0578 implementation are continuing.
Refer to correspondence..between FPL and NRC for ad-ditional information.}}

Revision as of 18:18, 7 July 2018

Monthly Operating Repts for Oct 1980
ML17209A353
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 11/08/1980
From: CHILSON V T
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17209A354 List:
References
NUDOCS 8011180604
Download: ML17209A353 (15)


Text

AVERAGE DAILY UNIT POWER LEVEL Nov.8, 1980 COMPLETED IIY V.T.Ch3.1SO>4 MONTH OCTOBER~1980 DAY AVERAGE DAILY POWER LEVEL{MWe.Net)I 628 627 631 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17 18 19 4 636 62 20 21 22 10 I'2 13 15 16 24 25 27 28 59 30 31 INSTRUCTIONS On this format.list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole megawat t.(o/77)

OPERATING DATA REPORT, DOCKET NO.DATE 39?~~180 COMPLETED 8Y V.T.Chilson TELEPHONE~305~5-3824 OPERATING STATUS Turke Poiat Unit No.3 2200 760 693 I~Unit Name 2.Reporting Period: o 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): 680 646 Notes-Unit No.3'perated at approximately 9?X R.P.until the unit was removed'rom service on Oct.6,1980, for scheduled Steam Generator Tube Inspection Program, maintenance aad inspections.

8.If Changes Occur In Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, lf Any: NONE This Month Yr..to-Date Cumulative 69 321i6 53 090.4 213.4 51 338;6 121.8 103 694 623 32 925 350 31 163 890 74.1 74.2 69.9 64.9 2.5 I I.Hours In Reporting Period/45;0 7 320;0 13.Reactor Reserve Shutdown Hours-a--0-14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours>>0--0-16.Gross Thermal Energy Ge'netated (MWH)257 027 12 225 989 17.Gross Electrical Energy Generated (MWH)79 650 3 844 350 18.Net Electrical Energy Generated (MWH)72 844 3 641 796 19.Unit Service Factor 16.3 77'20.Unit Availability Factor 16.3 7?.2 21.Unit Capacity Factor (Using MDC Net)15.1 77.0 22.Unit Capacity Factor (Using DER Net)14.1 71.8 23.Unit Forced Outage Rate-0-1.2 24.Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each l: Refuelin maintenance and ins ections-March 1 1981-Ma 10 1981.25.If Shut Down At End Of Report Period.Estimated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation):

November 1 1980.Forecast.Achieved INITIAL CRITICALITY INITIAL ELEGTRICITY

>~i~a i'~~~~" COMMERClAL OPERATlON ('>/77)

UNIT SHUTDOWNS AND POIVER REDUCTIONS REPORT MONTII OCTOBER 1980 COhI PLETED BY No.Dale PI Vl r3 Q Liccnsec Event ReportEl c!Cl Q D-~C~Cause&Corrective Action to Prevent Rccurrcnce 19 80-10-06 S 623.7 B N/A HB HTEXCH (P)Unit was removed from service for scheduled Steam Generator Tube In-spection Program, maintenance, and inspections.(Nuclear and Non-nuclear systems)F: Forced S: Scheduled!~~'!)/77)Reason: A-Equipment Failure (Explain)B-h(alntenance or Test.C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G.Operational Error (Explain)II Other (Explain)3 hlcthod: I.Manual 2-Manual Scram.3-Autotnatic Scram.4.Other (Explain)Exhibit G-Instructions lor Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-016I)Exhibit I-Saute Source AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO.UNIT Nov.8 1980 COMPLETED 8Y V.T.Chilson TELEPHONE MONTH OCTOBER P 1 9 8 0 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAlLY POWER LEVEL (MWe-Net I 17 627 630 6 4 639 638 18 19 20 621 625 626 626 10 13 14 15 652 651 641 641 643'24 26 28 29 30 31 641 587 221 641 626 619 612 16 Average daily power level greater than 646 MWe due to cooler condenser cooling water.NOTE: INSTRUCTIONS On this format.list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole rnegawat t.(n/77)

OPERATING DATA REPORT DOCKET NO.DATE Eov.8 19 0 COMPLETED BY Z'Kg~on TELEPHONE~~~2-3824 OPERATING STATUS 1.Unit Name: Turke Point Unit No.4 2.Reporting period: October, 1980 3.Licensed Thermal Power (MWt): 4.Namephte Rating (Gross MWe): 760 5.Design Electrical Rating (Ne!MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): Notes-Unit No.4 operated at approximately 100X R.P., ex-cept for outage of 0'ct.25-26 1980;and load restriction t 50X R.P.on Oct.26-27, 1980, after the unit was returned to service.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: Thh Month Yr.-to-Date Cumuhtive 7 320.0 5 995.0 166.6 45 088;9 31.2 94 009 117 29 865 038 28 284 899 71.5 71.6 69.7'64.7 2.9 II.Hours In Reporting Period 63 049.0 12.Number Of Hours Reactor Was Critical 742.9 46 822.8 13.Reactor Reserve Shutdown Hours 12.3 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours-Jt=12.3 16.Gross Thermal Energy Generated (MWH)1 582 803 12 790 137 17.Gross Electrical Energy Generated (MWH)481 620 3 961 560 19.Unit Service Factor 99.6 80.7 20.Unit Availability Factor 99.6 80.9 21.Unit Capacity Factor (Using MDC Net)94.8 79.4".Unit Capacity Factor (Using DER Net)*88.4 74.0 23.Unit Forced Outage Rate 0.4 0.3 24.Shutdowns Scheduled Over Next 6 Months (Type.Date, and Duration of Each): e uelin maintenance and ins ections-November 9, 1980-January 10, 1981.25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY'OMMERCIAL OPERATION ('>/77)

UNIT SIIVTDOWNS AND POWER REDUCTIONS DOCKET NO.50'2&l UNITNAME Turke Point IJ it No.4 REPORT MONT(I OCTOBER 1980 No.Date U~c~Ch d Licenscc Event Repurt>C<0 4 rir G gtA O Cause Ec Corrective Actiun tu Prevent Recurrence

~i 18 80-10-.25 P 33.A 3 N/A ED Unit was tripped by the reactor pro-tection system due to the loss of power supply to vit;al instrument AC...Bus No.4B.19 80-10-26 P-0-N/A RC zzzzzz Load restricted to 50X R.P.due to axial off-set limitations after the unit was returned to service.(Nuclear system).I F: Forced S: Scheduled Reason: A-Equipment Failure (Explain)B.Maintenance or Test.C-Refueling D.Regulatory Restriction E.Operator Training h, License Exatnination F-Administrative G.Operational Errur (Explain)I I-Other (Explain)Method: I-Manual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG.OI6 I)Exhibit I-Same Source

AVERAGE DAILY UNIT POWER LEVEL St.Lucie DATE Nov.8 1980 JRILJ->>4 MON~OCTOBER'980 DAY AVERAGE DAILY POWER LEVEL (M We-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)791 17.8 10 13 14 15 16 INSTRUCTIONS 779 784 786 786 786 789 790 790 789 789 790 18 19 20 21 22 24 25 16 77 28 79 30 31 NOTE: 788 78 767 783 785 787 783 784 Average daily power'evel greater than 777 MWe due to cooler condenser cooling water.On this format.list the average daily unit power level in MWe Net for each day in the reporting month.Compute lo the nearest whole megawat t.(o/77 1 OPERATING DATA REPORT, DOCKET NO.DATE gtn~~80 COMPLETED'Y

~~~son TELEPHONE MlR~-3824 OPERATING STATUS St.I;ucie Unit No.1 2560 850 8 2 l.Unit Name: 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWc): 5.Design Electrical Rating (Net MWc): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): 822 777 Notes-Unit operated at approximately 100X R.P., ex-cept for outage of (7ct.21, 1980.8.If Changes Occur in Capacity Ratings (Itqms Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.

If Any (Nct MWe): 10.Reasons For Restrictions, lf Any: This Month Yr.-to-Date 7 320.0 5 457.7-0-5 345.3 7.3 13 271 993 4 299 700 4 048 350 73.0 73.1 71.2 69.0.8.4 11.Hours In Reporting Period 745.0 12.Number Of Hours Reactor Was Critical 740.3 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 739.2 15.Unit Reserve Shutdown Hours-0-16.Gross Thermal Energy Ge'nerated (MWH)1 885 676 17.Gross Electrical Energy Generated (MWH)612 420 18.Net Electrica Energy Generated (MWH)19.Unit Service Factor 99.2 20.Unit Availability Factor 99.2 21.Unit Capacity Factor (Using MDC Net)100.1 22.Unit Capacity Factor (Using DER Nct)97.0 23.Unit Forced Outage Rate 0.8 24.Shutdowns Scheduled Over Next 6 Months (Type, Date.and Duration of Each): Cumulative 33 864.0 26 967.5-129.5 26 175;3 39.3 63 531 559 20 594 200 19'76 246 77.3 77.4 73.6'71.3'.1 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):

Forecast Acilieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I'/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT hIONTII OCTOBER 1980 C~~-L tS%K A r)n Q Licenscc Event Report>)=<Cl 4l IA cn Cr C 0 C Q Cr Cause&Correclive Action lo~Prevent Recurrence 17 80-.10-21 5.8 N/A HH INSTRU Unit was tripped by the steam genera tor level protection system caused by a spurious control signal to feedwater control valve No.1A.I F: Forced S: Scheduled ('t177)Reason: A Equipment Failure (Explain)B.h(aintenance or Test.C-Refueling D Regulatory Restriction E.Operator Training&Uccnsc Examination F-Administrative G.Operational Error (Explain)I I Other (Explain)3 Method: I-Manual 2.Manual Scram.3-Automatic Scram.4%ther (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREC.OI6 I)Exhibit I-Satnc Source

~~P.O, 80:C 5"9100, iVilAMI, FL 33'52~'-CHID@>CVlcR i:G>7 QC~N<;A~iY November 8, 1980 Office of Management Information and Program Controls U.S.Regulatory Commission Washington, D.C.20555 Gentlemen:

Attached are the October, 1980, Operating Summary Reports for Turkey Point Unit Nos.3 and 4 and St.Lucie Unit No.l.Very truly yours, A.D.Schmidt Vice President Power Resources VTC/ddc cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire

SUMMARY

OF OPERATING EXPERIENCE POCKET NO.50-250 UNIT Turkey Point Unit No 3 DATE November 8, 1980 COMPLETED BY'.T.Chilson TELEPHONE (305)552-3824 REPORT MONTH OCTOBER 8 Unit No.3 operated at approximately 97%R.P., until the unit was removed from service on October 6, 1980, for scheduled.Steam-Generator Tube In-spection Program, maintenance and inspections.'efer to"Unit Shutdowns and Power Reductions" Section of'October, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities, performed.

during the month included: Inspections and requirements of IE.Bulletins and NUREG-0578 are continuing.

Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for ad-ditional information.

Completed Steam Generator Tube Inspection Program.Installed feedwater piping sections to repair crack in the Heat Affected Zone (HAZ)of the weld connecting the feedwater piping to the 18" x 14" concentric reducer of Steam Generator Nos.3A, 3B, and 3C.

SUMMA'RY OF OPERATING EXPERIENCE POCKET NO.50-251 Turkey Point Unit No.4 DATE November 8, 1980 COMPLETED BY TELEPHONE V.T.Chilson (305)552-3824 REPORT MONTH OCTOBER 1980 Unit No.4 operated at approximately 100%R..P., except for outage of October 25-26, 1980, and load restriction.

to 50%R.P.on October 26-27, 1980, after the unit was returned to service.Refer to"Unit Shutdowns and Power Reductions" section of the October, 1980,.Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included: Inspections and recpxirements of.IE Bulletins and NUREG-0578 in progress.Florida Power&Light Company commitments for.NUREG-0578 implementation are continuing.

Refer to correspondence betwe'en FPL and NRC for ad-ditional information.

0 0

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT 50-335 St.Lucie Unit No.1 DATE Nov.8, 1980 REPORT MONTH OCTOBER 1980 COMPLETED BY TELEPHONE V.T.Chilson (305)552-3824 Unit operated at approximately 100%R.P., except for outage of Oct.21, 1980.Refer to"Unit Shutdowns and Power Reductions" section of the October, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the rponth included: Inspections and requirements of IE Bulletins and NUREG-0578, are'ontinuing.

Florida Power S Light Company commitments'or NUREG-0578 implementation are continuing.

Refer to correspondence..between FPL and NRC for ad-ditional information.