{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257 March 11, 2015  Mr. Brian K. Taber  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION  
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257
  March 11, 2015  
   Mr. Brian K. Taber  
Vice President  
Vice President  
Southern Nuclear Operating Company, Inc.  
Southern Nuclear Operating Company, Inc.  
Vogtle Electric Generating Plant  
Vogtle Electric Generating Plant  
7821 River Road Waynesboro, GA 30830   
7821 River Road Waynesboro, GA 30830  
   
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED  
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED  
  OPERATOR INITIAL EXAMINATION 05000424/2015301 AND 05000425/2015301  
  OPERATOR INITIAL EXAMINATION 05000424/2015301 AND 05000425/2015301  
  Dear Mr. Taber:   
 
  Dear Mr. Taber:  
   
In a telephone conversation on February 12, 2015, between Mr. John Acree, Nuclear  
In a telephone conversation on February 12, 2015, between Mr. John Acree, Nuclear  
Operations Training Supervisor, Mr. Kenneth  and Mr. Richard S. Baldwin, Senior Operations  
Operations Training Supervisor, Mr. Kenneth  and Mr. Richard S. Baldwin, Senior Operations  
Line 30: Line 36:
be administered the week of September 21, 2015.  The on-site preparatory week is scheduled  
be administered the week of September 21, 2015.  The on-site preparatory week is scheduled  
for the week of August 3, 2015.  
for the week of August 3, 2015.  
   
   
As agreed during the telephone conversation, your staff will prepare both the operating test and written examinations based on the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory  
As agreed during the telephone conversation, your staff will prepare both the operating test and written examinations based on the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory  
Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered.  Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.  Your staff furnished the operating test outlines in February 2015.  Mr. Richard S. Baldwin  
Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered.  Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.  
  Your staff furnished the operating test outlines in February 2015.  Mr. Richard S. Baldwin  
provided written examination outlines to your staff in November 2014.  The written  
provided written examination outlines to your staff in November 2014.  The written  
examinations, operating test and the supporting reference materials identified in Attachment 3 to  
examinations, operating test and the supporting reference materials identified in Attachment 3 to  
ES-201 will be due by May 8, 2015.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of  
ES-201 will be due by May 8, 2015.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of  
Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations, and test before they are submitted to the NRC for review and approval.  All materials shall be complete and ready-to-use.   
Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee  
shall approve the examinations, and test before they are submitted to the NRC for review and approval.  All materials shall be complete and ready-to-use.   
 
   
   
We request that any personal, proprietary, sensitive unclassified, or safeguards information in  
We request that any personal, proprietary, sensitive unclassified, or safeguards information in  
your response be contained in a separate enclosure and appropriately marked.  Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.   
your response be contained in a separate enclosure and appropriately marked.  Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.   
B. Taber 2  In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and  
B. Taber 2  
   In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and  
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination  
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination  
results are final.  
results are final.  
   
   
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.  To permit timely NRC review and evaluation, your staff should submit preliminary reactor  
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.  
  To permit timely NRC review and evaluation, your staff should submit preliminary reactor  
operator and senior reactor operator license applications (Office of Management and Budget  
operator and senior reactor operator license applications (Office of Management and Budget  
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (OMB approval number 3150-0090) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the first examination date, a postponement may be necessary.  Signed applications certifying that all  
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (OMB approval number 3150-0090) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the first examination date, a postponement may be necessary.  Signed applications certifying that all  
training has been completed should be submitted at least 14 days before the first examination  
training has been completed should be submitted at least 14 days before the first examination  
date.   
date.   
  This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB under approval number 3150-0018, which expires on April 30, 2016.  The public reporting burden for  
  This letter contains information collections that are subject to the  
Paperwork Reduction Act of  
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB under approval number 3150-0018, which expires on April 30, 2016.  The public reporting burden for  
this collection of information is estimated to average 2500 hours per response, including the  
this collection of information is estimated to average 2500 hours per response, including the  
time for reviewing instructions, gathering and maintaining the data needed, writing the  
time for reviewing instructions, gathering and maintaining the data needed, writing the  
examinations, and completing and reviewing the collection of information.  Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,  
examinations, and completing and reviewing the collection of information.  Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,  
Washington, DC 20555-0001, or by Internet electronic mail at BJS1@nrc.gov; and to the Desk  
Washington, DC 20555-0001, or by Internet electronic mail at BJS1@nrc.gov; and to the Desk  
Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an  
 
Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.  
  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an  
information collection, unless it displays a currently valid OMB control number.  
information collection, unless it displays a currently valid OMB control number.  
   
   
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding,"  
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding,"  
of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and  
of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and  
Management System (ADAMS).  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).   
Management System (ADAMS).  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).  
B. Taber 3  Thank you for your cooperation in this matter.  Mr. Acree has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Richard S. Baldwin at (404) 997-4642, (Internet E-mail: Richard.Baldwin@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov)  Sincerely,  
    
B. Taber 3  
   Thank you for your cooperation in this matter.  Mr. Acree has been advised of the policies and guidelines referenced in this letter.  If y
ou have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Richard S. Baldwin at (404) 997-4642, (Internet E-
mail: Richard.Baldwin@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov
)  Sincerely,  
 
  /RA/  Eugene F. Guthrie, Chief      Operations Branch 2  
  /RA/  Eugene F. Guthrie, Chief      Operations Branch 2  
       Division of Reactor Safety  
       Division of Reactor Safety  
  Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81  
 
  Docket Nos.: 50-424, 50-425  
License Nos.: NPF-68, NPF-81  
 
   
   
   
   

Revision as of 04:14, 1 July 2018

Vogtle Electric Generating Plant - Notification of Licensed Operator Initial Examination 05000424/2015301 and 05000425/2015301
ML15070A493
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/11/2015
From: Guthrie E F
Division of Reactor Safety II
To: Taber B K
Southern Nuclear Operating Co
References
50-424/15-301, 50-425/15-301
Download: ML15070A493 (4)


See also: IR 05000424/2015301

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257

March 11, 2015

Mr. Brian K. Taber

Vice President

Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant

7821 River Road Waynesboro, GA 30830

SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000424/2015301 AND 05000425/2015301

Dear Mr. Taber:

In a telephone conversation on February 12, 2015, between Mr. John Acree, Nuclear

Operations Training Supervisor, Mr. Kenneth and Mr. Richard S. Baldwin, Senior Operations

Engineer, arrangements were made for the administration of licensing examinations at the Vogtle Electric Generating Plant. The operating test is scheduled to be administered during the weeks of August 31, 2015 and September 14, 2015. The written examination is scheduled to

be administered the week of September 21, 2015. The on-site preparatory week is scheduled

for the week of August 3, 2015.

As agreed during the telephone conversation, your staff will prepare both the operating test and written examinations based on the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.

Your staff furnished the operating test outlines in February 2015. Mr. Richard S. Baldwin

provided written examination outlines to your staff in November 2014. The written

examinations, operating test and the supporting reference materials identified in Attachment 3 to

ES-201 will be due by May 8, 2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of

Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee

shall approve the examinations, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

B. Taber 2

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the first examination date, a postponement may be necessary. Signed applications certifying that all

training has been completed should be submitted at least 14 days before the first examination

date.

This letter contains information collections that are subject to the

Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for

this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, writing the

examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at BJS1@nrc.gov; and to the Desk

Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding,"

of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).

B. Taber 3

Thank you for your cooperation in this matter. Mr. Acree has been advised of the policies and guidelines referenced in this letter. If y

ou have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Richard S. Baldwin at (404) 997-4642, (Internet E-

mail: Richard.Baldwin@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov

) Sincerely,

/RA/ Eugene F. Guthrie, Chief Operations Branch 2

Division of Reactor Safety

Docket Nos.: 50-424, 50-425

License Nos.: NPF-68, NPF-81

cc: Distribution via Listserv

__ML1500A493_____________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE EFG FOR EFG NAME BALDWIN GUTHRIE DATE 3/11/2015 3/11/2015 3/ /2015 3/ /2015 3/ /2015 3/ /2015 3/ /2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO