ML16207A675: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Revision18* The Unit 1 Cycle 20 core contains 56 RCCAs with no RCCA installed at core location D-6. Unit 1 has seven (7) rods for shutdown bank SA. The total number of rods for Unit 1 is twenty-seven (27) for the shutdown banks.***}} | {{#Wiki_filter:Revision18 | ||
* The Unit 1 Cycle 20 core contains 56 RCCAs with no RCCA installed at | |||
core location D-6. Unit 1 has seven | |||
(7) rods for shutdown bank SA. The | |||
total number of rods for Unit 1 is | |||
twenty-seven (27) for the shutdown | |||
banks.***}} |
Revision as of 05:29, 30 June 2018
ML16207A675 | |
Person / Time | |
---|---|
Site: | South Texas ![]() |
Issue date: | 04/28/2016 |
From: | South Texas |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML16207A547 | List:
|
References | |
NOC-AE-16003371 | |
Download: ML16207A675 (65) | |
Text
Revision18
- The Unit 1 Cycle 20 core contains 56 RCCAs with no RCCA installed at
core location D-6. Unit 1 has seven
(7) rods for shutdown bank SA. The
total number of rods for Unit 1 is
twenty-seven (27) for the shutdown
banks.***