ML16081A326: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION  BEFORE THE ATOMIC SAFETY AND LICENSING BOARD  In the Matter of    )      ) ENTERGY NUCLEAR OPERATIONS, INC. )  Docket Nos. 50-247-LR, 50-286-LR ) (Indian Point Nuclear Generating  ) Units 2 and 3)    )  CERTIFICATE OF SERVICE  Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that corrected copies of the "NRC STAFF TESTIMONY OF DR. ALLEN HISER, JEFFREY POEHLER, DR. CHING NG, AND ON YEE REGARDING NYS-25, NYS-26B, AND NYS-38/RK-TC-5" (Public, Redacted), letter from Sherwin E. Turk to the Atomic Safety and Licensing Board, and an Updated Exhibit List, all dated March 21, 2016, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRC's E-Filing System, this 21st day of March, 2016.    /Signed (electronically) by/          Brian G. Harris              Counsel for NRC Staff        U.S. Nuclear Regulatory Commission        Office of the General Counsel        Mail Stop - O-15D21        Washington, DC  20555        Telephone:  (301) 415-1392        E-mail: brian.harris@nrc.gov        Date of signature:  March 21, 2016 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION  BEFORE THE ATOMIC SAFETY AND LICENSING BOARD  In the Matter of    )      ) ENTERGY NUCLEAR OPERATIONS, INC. )  Docket Nos. 50-247-LR, 50-286-LR ) (Indian Point Nuclear Generating  ) Units 2 and 3)    )  CERTIFICATE OF SERVICE  Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that corrected copies of the "NRC STAFF TESTIMONY OF DR. ALLEN HISER, JEFFREY POEHLER, DR. CHING NG, AND ON YEE REGARDING NYS-25, NYS-26B, AND NYS-38/RK-TC-5" (Public, Redacted), letter from Sherwin E. Turk to the Atomic Safety and Licensing Board, and an Updated Exhibit List, all dated March 21, 2016, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRC's E-Filing System, this 21st day of March, 2016.    /Signed (electronically) by/          Brian G. Harris              Counsel for NRC Staff        U.S. Nuclear Regulatory Commission        Office of the General Counsel        Mail Stop - O-15D21        Washington, DC  20555        Telephone:  (301) 415-1392        E-mail: brian.harris@nrc.gov        Date of signature:  March 21, 2016}}

Revision as of 14:44, 30 May 2018

Certificate of Service for Corrected Staff Testimony
ML16081A326
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/21/2016
From: Harris B G
NRC/OGC
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01, RAS 51017
Download: ML16081A326 (1)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247-LR, 50-286-LR ) (Indian Point Nuclear Generating ) Units 2 and 3) ) CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that corrected copies of the "NRC STAFF TESTIMONY OF DR. ALLEN HISER, JEFFREY POEHLER, DR. CHING NG, AND ON YEE REGARDING NYS-25, NYS-26B, AND NYS-38/RK-TC-5" (Public, Redacted), letter from Sherwin E. Turk to the Atomic Safety and Licensing Board, and an Updated Exhibit List, all dated March 21, 2016, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRC's E-Filing System, this 21st day of March, 2016. /Signed (electronically) by/ Brian G. Harris Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1392 E-mail: brian.harris@nrc.gov Date of signature: March 21, 2016 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247-LR, 50-286-LR ) (Indian Point Nuclear Generating ) Units 2 and 3) ) CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that corrected copies of the "NRC STAFF TESTIMONY OF DR. ALLEN HISER, JEFFREY POEHLER, DR. CHING NG, AND ON YEE REGARDING NYS-25, NYS-26B, AND NYS-38/RK-TC-5" (Public, Redacted), letter from Sherwin E. Turk to the Atomic Safety and Licensing Board, and an Updated Exhibit List, all dated March 21, 2016, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRC's E-Filing System, this 21st day of March, 2016. /Signed (electronically) by/ Brian G. Harris Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1392 E-mail: brian.harris@nrc.gov Date of signature: March 21, 2016