| finding integer = 02 | | finding integer = 02 | ||
| quarter = 2018Q1 | | quarter = 2018Q1 | ||
| IR section = | | IR section = 1R21 | ||
| finding type = NCV | | finding type = NCV | ||
| significance = | | significance = Green | ||
| cornerstone = Barrier Integrity | | cornerstone = Barrier Integrity | ||
| violation of = 10 CFR 50 Appendix B Criterion III | | violation of = 10 CFR 50 Appendix B Criterion III | ||
| identified by = NRC | | identified by = NRC | ||
| Inspection procedure = IP | | Inspection procedure = IP 71111.21N | ||
| Inspector = | | Inspector = T Fanelli, M Riley, C Franklin, M Sykes | ||
| CCA = | | CCA = | ||
| INPO aspect = | | INPO aspect = | ||
| description = Calculation VCS-0423-DC-1, Valcor Voltage and Current Reducing Resistors, Rev. 0, dated September 10, 1981, located in Tab E1 of EQDP-H-VO4-V01 for solenoid operated valve XVX06050A, indicated a 300 ohm resistor was in series with the valve and that it reduced the voltage in the coil to approximately 32VDC at minimum conditions. The team questioned if the valve was seismically qualified at the lower voltage since the seismic qualification in test report QR 52600-515, Section 4.2.5, Seismic Vibrations, stated that it was performed at 108VAC. The team noted that the Valcor SOV was not installed in the same configuration that it was seismically qualified. The failure to ensure the valve was seismically qualified, as configured, did not ensure that damage would not occur during a seismic event. FSAR Section 3.10 stated that seismic qualification must be done in 7 Enclosureaccordance with IEEE 344-1971. Section 3.2.2.2 of IEEE 344-1971 states the device being tested should demonstrate its ability to perform its intended safety function and sufficient monitoring equipment should be used to evaluate its performance. The team determined that the licensee did not demonstrate the seismic qualification of valve XVX06050A in its current plant configuration at reduced voltage. Corrective Actions: On February 15, 2018, the licensee entered this issue into their corrective action program as CR 18-00686 and performed an immediate determination of operability to verify that the valve could still perform its intended safety function. Corrective Action Reference: CR 18-00686 Performance Assessment: The licensees failure to verify the adequacy of the seismic design and qualification of valve XVX06050A in accordance with IEEE 344-1971 was a performance deficiency (PD). The PD was determined to be more than minor because it adversely affected the Design Control attribute of the Barrier Integrity cornerstone and adversely affected the cornerstone objective of providing reasonable assurance that physical design barriers protect the public from radionuclide releases caused by accidents or events. Specifically, the failure to verify the adequacy of design for seismic qualification of the valve resulted in the valve being installed in an unqualified configuration. The team used inspection manual chapter (IMC) 0609, Att. 4, Initial Characterization of Findings, issued December 7, 2016, for barriers, and IMC 0609, App. A, The Significance Determination Process (SDP) for Findings At-Power, issued June 19, 2012, and determined the finding to be of very low safety significance (Green) because the finding did not represent an actual open pathway in the physical integrity of reactor containment, containment isolation system, and heat removal components and did not involve an actual reduction in function of hydrogen igniters in the reactor containment. Since the underlying cause of the issue occurred on August 30, 1988, the team determined that no crosscutting aspect was applicable because the finding was not indicative of current licensee performance. Enforcement: Title10 CFR Part 50, Appendix B, Criterion III Design Control, requires, in part, that The design control measures shall provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program. Contrary to the above, since August 30, 1988, the licensee failed to verify valve XVX06050A was seismically qualified in its current configuration in accordance with IEEE 344-1971. This violation is being treated as an NCV, consistent Section 2.3.2 of the Enforcement Policy. | | description = Calculation VCS-0423-DC-1, Valcor Voltage and Current Reducing Resistors, Rev. 0, dated September 10, 1981, located in Tab E1 of EQDP-H-VO4-V01 for solenoid operated valve XVX06050A, indicated a 300 ohm resistor was in series with the valve and that it reduced the voltage in the coil to approximately 32VDC at minimum conditions. The team questioned if the valve was seismically qualified at the lower voltage since the seismic qualification in test report QR 52600-515, Section 4.2.5, Seismic Vibrations, stated that it was performed at 108VAC. The team noted that the Valcor SOV was not installed in the same configuration that it was seismically qualified. The failure to ensure the valve was seismically qualified, as configured, did not ensure that damage would not occur during a seismic event. FSAR Section 3.10 stated that seismic qualification must be done in 7 Enclosureaccordance with IEEE 344-1971. Section 3.2.2.2 of IEEE 344-1971 states the device being tested should demonstrate its ability to perform its intended safety function and sufficient monitoring equipment should be used to evaluate its performance. The team determined that the licensee did not demonstrate the seismic qualification of valve XVX06050A in its current plant configuration at reduced voltage. Corrective Actions: On February 15, 2018, the licensee entered this issue into their corrective action program as CR 18-00686 and performed an immediate determination of operability to verify that the valve could still perform its intended safety function. Corrective Action Reference: CR 18-00686 Performance Assessment: The licensees failure to verify the adequacy of the seismic design and qualification of valve XVX06050A in accordance with IEEE 344-1971 was a performance deficiency (PD). The PD was determined to be more than minor because it adversely affected the Design Control attribute of the Barrier Integrity cornerstone and adversely affected the cornerstone objective of providing reasonable assurance that physical design barriers protect the public from radionuclide releases caused by accidents or events. Specifically, the failure to verify the adequacy of design for seismic qualification of the valve resulted in the valve being installed in an unqualified configuration. The team used inspection manual chapter (IMC) 0609, Att. 4, Initial Characterization of Findings, issued December 7, 2016, for barriers, and IMC 0609, App. A, The Significance Determination Process (SDP) for Findings At-Power, issued June 19, 2012, and determined the finding to be of very low safety significance (Green) because the finding did not represent an actual open pathway in the physical integrity of reactor containment, containment isolation system, and heat removal components and did not involve an actual reduction in function of hydrogen igniters in the reactor containment. Since the underlying cause of the issue occurred on August 30, 1988, the team determined that no crosscutting aspect was applicable because the finding was not indicative of current licensee performance. Enforcement: Title10 CFR Part 50, Appendix B, Criterion III Design Control, requires, in part, that The design control measures shall provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program. Contrary to the above, since August 30, 1988, the licensee failed to verify valve XVX06050A was seismically qualified in its current configuration in accordance with IEEE 344-1971. This violation is being treated as an NCV, consistent Section 2.3.2 of the Enforcement Policy. | ||
}} | }} |
Latest revision as of 08:00, 30 May 2018
Site: | Summer |
---|---|
Report | IR 05000395/2018010 Section 1R21 |
Date counted | Mar 31, 2018 (2018Q1) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.21N |
Inspectors (proximate) | T Fanelli M Riley C Franklin M Sykes |
Violation of: | 10 CFR 50 Appendix B Criterion III, Design Control |