05000528/FIN-2004006-02: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{finding | {{finding | ||
| title = Failure to Provide an Evaluation of a Change to the Facility | | title = Failure to Provide an Evaluation of a Change to the Facility as Described in the UFSAR, Under 10 CFR 50.59 Requirements | ||
| docket = 05000528, 05000529, 05000530 | | docket = 05000528, 05000529, 05000530 | ||
| inspection report = IR 05000528/2004006 | | inspection report = IR 05000528/2004006 |
Latest revision as of 22:03, 29 May 2018
Site: | Palo Verde |
---|---|
Report | IR 05000528/2004006 Section 4OA2 |
Date counted | Jun 30, 2004 (2004Q2) |
Type: | TEV: Severity level IV |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | J Clark R Mullikin L Smith J Melfi G Miller |
INPO aspect | |
' | |