Page 1 of 208/30/201609:33:11Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteColumbia Generating StatiInspection / Activity Plan07/01/2016-06/30/2018EXAM-INITIAL EXAM42 INITIAL EXAM CGS (02/2017)X0258601/23/201701/27/20172 INITIAL EXAM CGS (02/2017)X0258602/27/201703/09/2017ISFSI-ROUTINE ISFSI (ONE WEEK IN MONTH)12 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.107/01/201607/30/2016RS 24-RADIATION SAFETY22 IPOccupational ALARA Planning and Controls71124.0208/29/201609/02/20162 IPOccupational Dose Assessment71124.0408/29/201609/02/2016EB1-07T-CGS HEAT SINK PERFORMANCE12 IPHeat Sink Performance7111107T09/12/201609/16/2016INSP-BIENNIAL REQUAL INSPECTION32 IPLicensed Operator Requalification Program7111111B12/05/201612/09/2016EP-1-BIENNIAL EP PROGRAM INSPECTION12 IPAlert and Notification System Testing711140201/30/201702/03/20172 IPEmergency Preparedness Organization Staffing and Augmentation System711140301/30/201702/03/20172 IPEmergency Action Level and Emergency Plan Changes711140401/30/201702/03/20172 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140501/30/201702/03/2017EP-2-EP PERFORMANCE INDICATOR VERIFICATION12 IPDrill/Exercise Performance71151-EP0101/30/201702/03/20172 IPERO Readiness71151-EP0201/30/201702/03/20172 IPAlert & Notification System Reliability71151-EP0301/30/201702/03/2017TSB 52B-BIENNIAL PI&R52 IPProblem Identification and Resolution71152B02/13/201702/17/20172 IPProblem Identification and Resolution71152B02/27/201703/03/201771111.08-INSERVICE INSPECTION12 IPInservice Inspection Activities - BWR7111108G05/22/201705/26/2017RS 12 PI-RADIATION SAFETY32 IPRadiological Hazard Assessment and Exposure Controls71124.0105/22/201705/26/20172 IPOccupational ALARA Planning and Controls71124.0205/22/201705/26/20172 IPOccupational Exposure Control Effectiveness71151-OR0105/22/201705/26/20172 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0105/22/201705/26/2017RS 5678-RS TEAM52 IPRadiation Monitoring Instrumentation71124.0509/11/201709/15/20172 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0609/11/201709/15/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | Page 1 of 208/30/201609:33:11Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteColumbia Generating StatiInspection / Activity Plan07/01/2016-06/30/2018EXAM-INITIAL EXAM42 INITIAL EXAM CGS (02/2017)X0258601/23/201701/27/20172 INITIAL EXAM CGS (02/2017)X0258602/27/201703/09/2017ISFSI-ROUTINE ISFSI (ONE WEEK IN MONTH)12 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.107/01/201607/30/2016RS 24-RADIATION SAFETY22 IPOccupational ALARA Planning and Controls71124.0208/29/201609/02/20162 IPOccupational Dose Assessment71124.0408/29/201609/02/2016EB1-07T-CGS HEAT SINK PERFORMANCE12 IPHeat Sink Performance7111107T09/12/201609/16/2016INSP-BIENNIAL REQUAL INSPECTION32 IPLicensed Operator Requalification Program7111111B12/05/201612/09/2016EP-1-BIENNIAL EP PROGRAM INSPECTION12 IPAlert and Notification System Testing711140201/30/201702/03/20172 IPEmergency Preparedness Organization Staffing and Augmentation System711140301/30/201702/03/20172 IPEmergency Action Level and Emergency Plan Changes711140401/30/201702/03/20172 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140501/30/201702/03/2017EP-2-EP PERFORMANCE INDICATOR VERIFICATION12 IPDrill/Exercise Performance71151-EP0101/30/201702/03/20172 IPERO Readiness71151-EP0201/30/201702/03/20172 IPAlert & Notification System Reliability71151-EP0301/30/201702/03/2017TSB 52B-BIENNIAL PI&R52 IPProblem Identification and Resolution71152B02/13/201702/17/20172 IPProblem Identification and Resolution71152B02/27/201703/03/201771111.08-INSERVICE INSPECTION12 IPInservice Inspection Activities - BWR7111108G05/22/201705/26/2017RS 12 PI-RADIATION SAFETY32 IPRadiological Hazard Assessment and Exposure Controls71124.0105/22/201705/26/20172 IPOccupational ALARA Planning and Controls71124.0205/22/201705/26/20172 IPOccupational Exposure Control Effectiveness71151-OR0105/22/201705/26/20172 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0105/22/201705/26/2017RS 5678-RS TEAM52 IPRadiation Monitoring Instrumentation71124.0509/11/201709/15/20172 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0609/11/201709/15/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | ||
Page 2 of 208/30/201609:33:11Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteColumbia Generating StatiInspection / Activity Plan07/01/2016-06/30/2018RS 5678-RS TEAM52 IPRadiological Environmental Monitoring Program71124.0709/11/201709/15/20172 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0809/11/201709/15/2017EB1-17T-CGS 50.59 EVALUATIONS OF CHANGES, TEST,32 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T10/02/201710/06/20172 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T10/16/201710/20/2017EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION42 IPFire Protection [Triennial]7111105T04/09/201804/13/20182 IPFire Protection [Triennial]7111105T04/23/201804/27/2018EP-1-EP EXERCISE INSPECTION42 IPExercise Evaluation711140103/26/201803/30/20182 IPEmergency Action Level and Emergency Plan Changes711140403/26/201803/30/2018EP-3-EP PERFORMANCE INDICATORS12 IPDrill/Exercise Performance71151-EP0103/26/201803/30/20182 IPERO Readiness71151-EP0203/26/201803/30/20182 IPAlert & Notification System Reliability71151-EP0303/26/201803/30/2018EB1-07T-CGS HEAT SINK PERFORMANCE12 IPHeat Sink Performance7111107T05/14/201805/18/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | Page 2 of 208/30/201609:33:11Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteColumbia Generating StatiInspection / Activity Plan07/01/2016-06/30/2018RS 5678-RS TEAM52 IPRadiological Environmental Monitoring Program71124.0709/11/201709/15/20172 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0809/11/201709/15/2017EB1-17T-CGS 50.59 EVALUATIONS OF CHANGES, TEST,32 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T10/02/201710/06/20172 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T10/16/201710/20/2017EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION42 IPFire Protection [Triennial]7111105T04/09/201804/13/20182 IPFire Protection [Triennial]7111105T04/23/201804/27/2018EP-1-EP EXERCISE INSPECTION42 IPExercise Evaluation711140103/26/201803/30/20182 IPEmergency Action Level and Emergency Plan Changes711140403/26/201803/30/2018EP-3-EP PERFORMANCE INDICATORS12 IPDrill/Exercise Performance71151-EP0103/26/201803/30/20182 IPERO Readiness71151-EP0203/26/201803/30/20182 IPAlert & Notification System Reliability71151-EP0303/26/201803/30/2018EB1-07T-CGS HEAT SINK PERFORMANCE12 IPHeat Sink Performance7111107T05/14/201805/18/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | ||
ML16239A241 SUNSI Review By: JRG ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE: RIV SPE: DRP/A D: DRS D: DRP C: DRP/A NAME RAlexander AVegel TWPruett JGroom SIGNATURE /RA/ /RA-JClark for /RA/ /RA/ DATE 8/22/16 8/19/16 8/22/16 8/26/16 | |||
Letter to Mark Reddemann from Jeremy Groom dated August 31, 2016 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR COLUMBIA GENERATING STATION (REPORT 05000483/2016005) DISTRIBUTION: Regional Administrator (Kriss.Kennedy@nrc.gov) Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Gregory.Kolcum@nrc.gov) Resident Inspector (Dan.Bradley@nrc.gov) Administrative Assistant (Vacant) Branch Chief, DRP/A (Jeremy.Groom@nrc.gov) Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) Project Engineer (Thomas.Sullivan@nrc.gov) Project Engineer (Matthew.Kirk@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (John.Klos@nrc.gov) Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) RIV RSLO (Bill.Maier@nrc.gov) Director, DIRS, NRR (Chris.Miller@nrc.gov) Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov) Director, DORL, NRR (Anne.Boland@nrc.gov) Deputy Director, DORL, NRR (George.Wilson@nrc.gov) Director, NSIR (Brian.Holian@nrc.gov) Director, DPR, NSIR (Marissa.Bailey@nrc.gov) DRP Branch Chiefs (R4DRPBC@nrc.gov) DRS Branch Chiefs (R4DRSBC@nrc.gov) ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov | Letter to Mark Reddemann from Jeremy Groom dated August 31, 2016 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR COLUMBIA GENERATING STATION (REPORT 05000483/2016005) DISTRIBUTION: Regional Administrator (Kriss.Kennedy@nrc.gov) Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Gregory.Kolcum@nrc.gov) Resident Inspector (Dan.Bradley@nrc.gov) Administrative Assistant (Vacant) Branch Chief, DRP/A (Jeremy.Groom@nrc.gov) Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) Project Engineer (Thomas.Sullivan@nrc.gov) Project Engineer (Matthew.Kirk@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (John.Klos@nrc.gov) Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) RIV RSLO (Bill.Maier@nrc.gov) Director, DIRS, NRR (Chris.Miller@nrc.gov) Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov) Director, DORL, NRR (Anne.Boland@nrc.gov) Deputy Director, DORL, NRR (George.Wilson@nrc.gov) Director, NSIR (Brian.Holian@nrc.gov) Director, DPR, NSIR (Marissa.Bailey@nrc.gov) DRP Branch Chiefs (R4DRPBC@nrc.gov) DRS Branch Chiefs (R4DRSBC@nrc.gov) ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov | ||
ML16256A268 / PACKAGE: ML16256A263 SUNSI Review By: EDU ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE TL: IPAT NAME THipschman SIGNATURE /RA/ DATE 9/12/16 | |||
Letter to Mr. Mark E. Reddeman from Thomas R. Hipschman dated September 12, 2016 SUBJECT: ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR COLUMBIA GENERATING STATION (REPORT 05000397/2016005) DISTRIBUTION: | Letter to Mr. Mark E. Reddeman from Thomas R. Hipschman dated September 12, 2016 SUBJECT: ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR COLUMBIA GENERATING STATION (REPORT 05000397/2016005) DISTRIBUTION: | ||
Regional Administrator (Kriss.Kennedy@nrc.gov) Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Gregory.Kolcum@nrc.gov) Resident Inspector (Dan.Bradley@nrc.gov) Administrative Assistant (Vacant) Branch Chief, DRP/A (Jeremy.Groom@nrc.gov) Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) Project Engineer (Thomas.Sullivan@nrc.gov) Project Engineer (Matthew.Kirk@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (John.Klos@nrc.gov) Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) RIV RSLO (Bill.Maier@nrc.gov) Director, DIRS, NRR (Chris.Miller@nrc.gov) Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov) Director, DORL, NRR (Anne.Boland@nrc.gov) Deputy Director, DORL, NRR (George.Wilson@nrc.gov) Director, NSIR (Brian.Holian@nrc.gov) Director, DPR, NSIR (Marissa.Bailey@nrc.gov) DRP Branch Chiefs (G-R4-DRP-BC@nrc.gov) DRS Branch Chiefs (R4DRS-BC1@nrc.gov) ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov | Regional Administrator (Kriss.Kennedy@nrc.gov) Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Gregory.Kolcum@nrc.gov) Resident Inspector (Dan.Bradley@nrc.gov) Administrative Assistant (Vacant) Branch Chief, DRP/A (Jeremy.Groom@nrc.gov) Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) Project Engineer (Thomas.Sullivan@nrc.gov) Project Engineer (Matthew.Kirk@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (John.Klos@nrc.gov) Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) RIV RSLO (Bill.Maier@nrc.gov) Director, DIRS, NRR (Chris.Miller@nrc.gov) Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov) Director, DORL, NRR (Anne.Boland@nrc.gov) Deputy Director, DORL, NRR (George.Wilson@nrc.gov) Director, NSIR (Brian.Holian@nrc.gov) Director, DPR, NSIR (Marissa.Bailey@nrc.gov) DRP Branch Chiefs (G-R4-DRP-BC@nrc.gov) DRS Branch Chiefs (R4DRS-BC1@nrc.gov) ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov | ||
}} | }} | ||
Revision as of 12:37, 10 May 2018
| ML16256A268 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/12/2016 |
| From: | Hipschman T R Division of Reactor Safety IV |
| To: | Reddemann M E Energy Northwest |
| Hipschman T R | |
| Shared Package | |
| ML16256A263 | List: |
| References | |
| ML16239A241 IR 2016005 | |
| Download: ML16256A268 (11) | |
See also: IR 05000483/2016005
Text
September 12, 2016 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest 76 North Power Plant Loop P.O. Box 968 - Mail Drop 1023 Richland, WA 99352-0968
SUBJECT: ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR COLUMBIA GENERATING STATION (REPORT 05000397/2016005) Dear Mr. Reddemann:
It was identified that the enclosed inspection plan in a letter to you dated August 31, 2016 (ML16239A241) was improperly marked. The inspection plan contained the markings of "Official Use Only - Sensitive Internal Information/Security-Related Information", however, the inspection plan did not contain information under that category. The inspection plan that was originally placed into ADAMS has been corrected by striking through the markings. The original Mid-Cycle Assessment Letter and the corrected inspection plan are enclosed. Please note that neither the content of the assessment letter, nor the inspection plan has changed. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/ Thomas R. Hipschman, Team Leader Inspection Program and Assessment Team Division of Reactor Safety Docket No: 50-397 License No: NPF-21 Enclosures: 1. Columbia Generating Station Inspection/Activity Plan 2. 2016 Mid-Cycle Assessment Letter (ML16239A241) UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511
Page 1 of 208/30/201609:33:11Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteColumbia Generating StatiInspection / Activity Plan07/01/2016-06/30/2018EXAM-INITIAL EXAM42 INITIAL EXAM CGS (02/2017)X0258601/23/201701/27/20172 INITIAL EXAM CGS (02/2017)X0258602/27/201703/09/2017ISFSI-ROUTINE ISFSI (ONE WEEK IN MONTH)12 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.107/01/201607/30/2016RS 24-RADIATION SAFETY22 IPOccupational ALARA Planning and Controls71124.0208/29/201609/02/20162 IPOccupational Dose Assessment71124.0408/29/201609/02/2016EB1-07T-CGS HEAT SINK PERFORMANCE12 IPHeat Sink Performance7111107T09/12/201609/16/2016INSP-BIENNIAL REQUAL INSPECTION32 IPLicensed Operator Requalification Program7111111B12/05/201612/09/2016EP-1-BIENNIAL EP PROGRAM INSPECTION12 IPAlert and Notification System Testing711140201/30/201702/03/20172 IPEmergency Preparedness Organization Staffing and Augmentation System711140301/30/201702/03/20172 IPEmergency Action Level and Emergency Plan Changes711140401/30/201702/03/20172 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140501/30/201702/03/2017EP-2-EP PERFORMANCE INDICATOR VERIFICATION12 IPDrill/Exercise Performance71151-EP0101/30/201702/03/20172 IPERO Readiness71151-EP0201/30/201702/03/20172 IPAlert & Notification System Reliability71151-EP0301/30/201702/03/2017TSB 52B-BIENNIAL PI&R52 IPProblem Identification and Resolution71152B02/13/201702/17/20172 IPProblem Identification and Resolution71152B02/27/201703/03/201771111.08-INSERVICE INSPECTION12 IPInservice Inspection Activities - BWR7111108G05/22/201705/26/2017RS 12 PI-RADIATION SAFETY32 IPRadiological Hazard Assessment and Exposure Controls71124.0105/22/201705/26/20172 IPOccupational ALARA Planning and Controls71124.0205/22/201705/26/20172 IPOccupational Exposure Control Effectiveness71151-OR0105/22/201705/26/20172 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0105/22/201705/26/2017RS 5678-RS TEAM52 IPRadiation Monitoring Instrumentation71124.0509/11/201709/15/20172 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0609/11/201709/15/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 208/30/201609:33:11Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteColumbia Generating StatiInspection / Activity Plan07/01/2016-06/30/2018RS 5678-RS TEAM52 IPRadiological Environmental Monitoring Program71124.0709/11/201709/15/20172 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0809/11/201709/15/2017EB1-17T-CGS 50.59 EVALUATIONS OF CHANGES, TEST,32 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T10/02/201710/06/20172 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T10/16/201710/20/2017EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION42 IPFire Protection [Triennial]7111105T04/09/201804/13/20182 IPFire Protection [Triennial]7111105T04/23/201804/27/2018EP-1-EP EXERCISE INSPECTION42 IPExercise Evaluation711140103/26/201803/30/20182 IPEmergency Action Level and Emergency Plan Changes711140403/26/201803/30/2018EP-3-EP PERFORMANCE INDICATORS12 IPDrill/Exercise Performance71151-EP0103/26/201803/30/20182 IPERO Readiness71151-EP0203/26/201803/30/20182 IPAlert & Notification System Reliability71151-EP0303/26/201803/30/2018EB1-07T-CGS HEAT SINK PERFORMANCE12 IPHeat Sink Performance7111107T05/14/201805/18/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
August 31, 2016 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest 76 North Power Plant Loop P.O. Box 968 - Mail Drop 1023 Richland, WA 99352-0968 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR COLUMBIA GENERATING STATION (REPORT 05000397/2016005) Dear Mr. Reddemann: On August 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Columbia Generating Station. The NRC reviewed the most recent
quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Columbia Generating Station operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Columbia Generating Station during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact
you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC conducted audits of licensee efforts
towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by
M. Reddemann - 2 - performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness
Communication/Staffing/Multi-Unit Dose Assessment Plans." In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 817-200-1148 with any questions you have regarding this letter. Sincerely, /RA/ Jeremy R. Groom, Chief Projects Branch A Division of Reactor Projects Docket No. 50-397 License No. NPF-21 Enclosure: Columbia Plant Inspection/Activity Plan
Page 1 of 208/30/201609:33:11Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteColumbia Generating StatiInspection / Activity Plan07/01/2016-06/30/2018EXAM-INITIAL EXAM42 INITIAL EXAM CGS (02/2017)X0258601/23/201701/27/20172 INITIAL EXAM CGS (02/2017)X0258602/27/201703/09/2017ISFSI-ROUTINE ISFSI (ONE WEEK IN MONTH)12 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.107/01/201607/30/2016RS 24-RADIATION SAFETY22 IPOccupational ALARA Planning and Controls71124.0208/29/201609/02/20162 IPOccupational Dose Assessment71124.0408/29/201609/02/2016EB1-07T-CGS HEAT SINK PERFORMANCE12 IPHeat Sink Performance7111107T09/12/201609/16/2016INSP-BIENNIAL REQUAL INSPECTION32 IPLicensed Operator Requalification Program7111111B12/05/201612/09/2016EP-1-BIENNIAL EP PROGRAM INSPECTION12 IPAlert and Notification System Testing711140201/30/201702/03/20172 IPEmergency Preparedness Organization Staffing and Augmentation System711140301/30/201702/03/20172 IPEmergency Action Level and Emergency Plan Changes711140401/30/201702/03/20172 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140501/30/201702/03/2017EP-2-EP PERFORMANCE INDICATOR VERIFICATION12 IPDrill/Exercise Performance71151-EP0101/30/201702/03/20172 IPERO Readiness71151-EP0201/30/201702/03/20172 IPAlert & Notification System Reliability71151-EP0301/30/201702/03/2017TSB 52B-BIENNIAL PI&R52 IPProblem Identification and Resolution71152B02/13/201702/17/20172 IPProblem Identification and Resolution71152B02/27/201703/03/201771111.08-INSERVICE INSPECTION12 IPInservice Inspection Activities - BWR7111108G05/22/201705/26/2017RS 12 PI-RADIATION SAFETY32 IPRadiological Hazard Assessment and Exposure Controls71124.0105/22/201705/26/20172 IPOccupational ALARA Planning and Controls71124.0205/22/201705/26/20172 IPOccupational Exposure Control Effectiveness71151-OR0105/22/201705/26/20172 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0105/22/201705/26/2017RS 5678-RS TEAM52 IPRadiation Monitoring Instrumentation71124.0509/11/201709/15/20172 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0609/11/201709/15/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 208/30/201609:33:11Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteColumbia Generating StatiInspection / Activity Plan07/01/2016-06/30/2018RS 5678-RS TEAM52 IPRadiological Environmental Monitoring Program71124.0709/11/201709/15/20172 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0809/11/201709/15/2017EB1-17T-CGS 50.59 EVALUATIONS OF CHANGES, TEST,32 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T10/02/201710/06/20172 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T10/16/201710/20/2017EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION42 IPFire Protection [Triennial]7111105T04/09/201804/13/20182 IPFire Protection [Triennial]7111105T04/23/201804/27/2018EP-1-EP EXERCISE INSPECTION42 IPExercise Evaluation711140103/26/201803/30/20182 IPEmergency Action Level and Emergency Plan Changes711140403/26/201803/30/2018EP-3-EP PERFORMANCE INDICATORS12 IPDrill/Exercise Performance71151-EP0103/26/201803/30/20182 IPERO Readiness71151-EP0203/26/201803/30/20182 IPAlert & Notification System Reliability71151-EP0303/26/201803/30/2018EB1-07T-CGS HEAT SINK PERFORMANCE12 IPHeat Sink Performance7111107T05/14/201805/18/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
ML16239A241 SUNSI Review By: JRG ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE: RIV SPE: DRP/A D: DRS D: DRP C: DRP/A NAME RAlexander AVegel TWPruett JGroom SIGNATURE /RA/ /RA-JClark for /RA/ /RA/ DATE 8/22/16 8/19/16 8/22/16 8/26/16
Letter to Mark Reddemann from Jeremy Groom dated August 31, 2016 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR COLUMBIA GENERATING STATION (REPORT 05000483/2016005) DISTRIBUTION: Regional Administrator (Kriss.Kennedy@nrc.gov) Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Gregory.Kolcum@nrc.gov) Resident Inspector (Dan.Bradley@nrc.gov) Administrative Assistant (Vacant) Branch Chief, DRP/A (Jeremy.Groom@nrc.gov) Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) Project Engineer (Thomas.Sullivan@nrc.gov) Project Engineer (Matthew.Kirk@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (John.Klos@nrc.gov) Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) RIV RSLO (Bill.Maier@nrc.gov) Director, DIRS, NRR (Chris.Miller@nrc.gov) Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov) Director, DORL, NRR (Anne.Boland@nrc.gov) Deputy Director, DORL, NRR (George.Wilson@nrc.gov) Director, NSIR (Brian.Holian@nrc.gov) Director, DPR, NSIR (Marissa.Bailey@nrc.gov) DRP Branch Chiefs (R4DRPBC@nrc.gov) DRS Branch Chiefs (R4DRSBC@nrc.gov) ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov
ML16256A268 / PACKAGE: ML16256A263 SUNSI Review By: EDU ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE TL: IPAT NAME THipschman SIGNATURE /RA/ DATE 9/12/16
Letter to Mr. Mark E. Reddeman from Thomas R. Hipschman dated September 12, 2016 SUBJECT: ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR COLUMBIA GENERATING STATION (REPORT 05000397/2016005) DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov) Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Gregory.Kolcum@nrc.gov) Resident Inspector (Dan.Bradley@nrc.gov) Administrative Assistant (Vacant) Branch Chief, DRP/A (Jeremy.Groom@nrc.gov) Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) Project Engineer (Thomas.Sullivan@nrc.gov) Project Engineer (Matthew.Kirk@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (John.Klos@nrc.gov) Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) RIV RSLO (Bill.Maier@nrc.gov) Director, DIRS, NRR (Chris.Miller@nrc.gov) Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov) Director, DORL, NRR (Anne.Boland@nrc.gov) Deputy Director, DORL, NRR (George.Wilson@nrc.gov) Director, NSIR (Brian.Holian@nrc.gov) Director, DPR, NSIR (Marissa.Bailey@nrc.gov) DRP Branch Chiefs (G-R4-DRP-BC@nrc.gov) DRS Branch Chiefs (R4DRS-BC1@nrc.gov) ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov