| | ML17125A106 *via e-mail CFO-0009 OFFICE NRR/DORL/PM OCFO/DPB/LFPT NRR/DORL/LA NRR/DRA/APHB/BC NRR/DORL/BC NAME MOrenak WBlaney KGoldstein GCasto MMarkley DATE 5/17/17 5/22/17 5/08/17 5/23/17 5/18/17 OFFICE NRR/DORL/D NRR/D OGC OCFO/DOC OCFO/DPB/LFPT NAME MJRoss-Lee (A) WDean JSuttenburg DD'Abate MKaplan DATE 5/24/17 5/30/17 6/15/17 6/16/17 06/27/17 OFFICE OCFO/DPB OCFO/DPB D/CFO CFO NAME RAllwein LFicks MCMuessle MEWylie DATE 06/27/17 06/27/17 07/03/17 07/03/17 |
| VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - REQUEST FOR FEE WAIVER REGARDING PILOT REVIEW OF TORNADO MISSILE RISK EVALUATOR LICENSE AMENDMENT REQUEST DATED: July 3, 2017
| |
| | |
| DISTRIBUTION: EMiller, NRR JDudek, OCFO MBlair, OCFO RidsNrrOd RidsNrrDorl RidsNrrDorlLpl2-1 RidsNrrDraAphb RidsNrrPMVogtle RidsNrrLAKGoldstein PACKAGE: ML17128A158; Incoming Letter: ML17094A895 ADAMS: Yes No Initials: SUNSI Review: Publicly Available Non-Publicly Available Sensitive Non-Sensitive ADAMS Accession No: ML17125A106 *via e-mail CFO-0009 OFFICE NRR/DORL/PM OCFO/DPB/LFPT NRR/DORL/LA NRR/DRA/APHB/BC NRR/DORL/BC NAME MOrenak WBlaney KGoldstein GCasto MMarkley DATE 5/17/17 5/22/17 5/08/17 5/23/17 5/18/17 OFFICE NRR/DORL/D NRR/D OGC OCFO/DOC OCFO/DPB/LFPT NAME MJRoss-Lee (A) WDean JSuttenburg DD'Abate MKaplan DATE 5/24/17 5/30/17 6/15/17 6/16/17 06/27/17 OFFICE OCFO/DPB OCFO/DPB D/CFO CFO NAME RAllwein LFicks MCMuessle MEWylie DATE 06/27/17 06/27/17 07/03/17 07/03/17 OFFICIAL RECORD COPY
| |
| }} | | }} |
Letter Sequence Approval |
---|
|
|
MONTHYEARML17125A1062017-07-0303 July 2017 Request for Fee Waiver Regarding Pilot Review of Tornado Missile Risk Evaluator License Amendment Request Project stage: Approval 2017-07-03
[Table View] |
|
---|
Category:Letter
MONTHYEARML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) IR 05000424/20244032024-05-0101 May 2024 Cyber Security Inspection Report 05000424/2024403 and 05000425/2024403 Public ML24120A2832024-04-30030 April 2024 Project Manager Reassignment NL-24-0170, Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report2024-04-25025 April 2024 Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000424/20240012024-04-23023 April 2024 –Integrated Inspection Report 05000424/2024001 and 05000425/2024001 NL-24-0154, Preservice Inspection Progam Owners Activity Report2024-04-16016 April 2024 Preservice Inspection Progam Owners Activity Report 2024-09-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
Mr. James J. Hutto Regulatory Affairs Director Southern Nuclear Operating Company 40 Iverness Center Parkway P.O. Box 1295 Birmingham, AL 35242
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - REQUEST FOR FEE WAIVER REGARDING PILOT REVIEW OF TORNADO MISSILE RISK EVALUATOR LICENSE AMENDMENT REQUEST (CAC NOS. MF9679 AND MF9680)
Dear Mr. Hutto:
On behalf of the U.S. Nuclear Regulatory Commission (NRC), I am responding to your letter dated April 4, 2017 (Agencywide Documents Access and Management System Accession No. ML17094A895), requesting a fee waiver under Title 10 of the Code of Federal Regulations (10 CFR) 170.11(b) for NRC review of a risk-informed methodology known as the Tornado Missile Risk Evaluator (TMRE) and for NRC activities performed during the pilot review of the proposed TMRE license amendment request (LAR) for the Vogtle Electric Generating Plant (VEGP), Units 1 and 2.
The TMRE methodology is being developed by the Nuclear Energy Institute (NEI) to address non-conforming conditions associated with the tornado missile protection features at nuclear power plants. VEGP, Units 1 and 2, along with Shearon Harris Nuclear Plant, Unit 1, and Grand Gulf Nuclear Station, Unit 1, have all requested pilot status to assist in the development of the TMRE methodology and to demonstrate how it might handle unique site characteristics. This letter only addresses the VEGP, Units 1 and 2, request. The NRC has established regulations for the granting of fee exemptions under 10 CFR 170.11, "Exemptions," for which licensees may apply in accordance with 10 CFR 170.5, "Communications." The regulation in 10 CFR 170.11(b) states:
(b) The Commission may, upon application by an interested person, or upon its own initiative, grant such exemptions from the requirements of this part as it determines are authorized by law and are otherwise in the public interest.
Applications for exemption under this paragraph may include activities such as, but not limited to, the use of licensed materials for educational or noncommercial public displays or scientific collections. July 3, 2017 J. Hutto However, the NRC does not need to evaluate whether granting a fee waiver would be in the public interest because the NRC can consider your request based on 10 CFR 170.11(a), which states:
No application fees, license fees, renewal fee, inspection fees, or special project fees shall be required for: (1) A special project that is a request/report submitted to the NRC-(ii) In response to an NRC request from the Office Director level or above to resolve an identified safety, safeguards, or environmental issue, or to assist NRC in developing a rulemaking, regulatory guide, policy statement, generic letter or bulletin; In your letter dated April 4, 2017, you state that the TMRE methodology may support the resolution of low risk compliance issues and improve risk-informed regulations associated with tornado missiles on identified unprotected components. The letter further states that it is anticipated that the basis for the request is to assist in developing NRC guidance for the implementation of TMRE.
The NRC staff anticipates receiving 15 to 20 TMRE LARs in the upcoming fiscal years. Development of the TMRE methodology and NRC guidance, in parallel with NRC review of the VEGP, Units 1 and 2, pilot LAR, is proposed to support the eventual acceptability of the methodology. The development of the TMRE methodology and NRC guidance for future TMRE LARs will save NRC and industry resources by increasing the efficiency of the review time and effort. Thus, the request from SNC with regards to NRC review of the TMRE methodology and pilot LAR applies to 10 CFR 170.11(a)(1)(ii) because it assists in the development of NRC guidance.
Additionally, 10 CFR 170.11(a)(13) states:
All fee exemption requests must be submitted in writing to the Chief Financial Officer in accordance with § 170.5, and the Chief Financial Officer will grant or deny such requests in writing.
The fee exemption request for the NRC development activities regarding the TMRE methodology and VEGP, Units 1 and 2, LAR was submitted in writing by SNC to the NRC Document Control Desk and, thus, to the NRC Chief Financial Officer. Therefore, SNC's request meets the requirement in 10 CFR 170.11(a)(13).
The NRC staff concludes that the development of the TMRE methodology and review of the proposed LAR for VEGP, Units 1 and 2, meets the applicable criteria under 10 CFR 170.11. Therefore, the request for a fee waiver is approved for the NRC staff review of the TMRE methodology and the LAR for VGEP, Units 1 and 2.
The expiration of this specific fee waiver will occur with any of the following: (1) issuance, withdrawal, or denial of the initial LAR for VEGP, Units 1 and 2; (2) publishing of the TMRE methodology by NEI; or (3) 1-year from the date of the initial LAR submittal for VEGP, Units 1 and 2. Any future review of the TMRE methodology beyond that cited in the granting of this fee waiver will require a new fee waiver request for NRC consideration, pursuant to the fee exemption provisions under 10 CFR 170.11.
J. Hutto If you have any technical questions regarding this matter, please contact, Mr. G. Edward Miller at 301-415-2481. Please contact Mr. William Blaney, of my staff, at 301-415-5092, for any fee-related questions. Sincerely, /RA/ Mary C. Muessle (for) Maureen E. Wylie
Docket Nos. 50-424 and 50-425
ML17125A106 *via e-mail CFO-0009 OFFICE NRR/DORL/PM OCFO/DPB/LFPT NRR/DORL/LA NRR/DRA/APHB/BC NRR/DORL/BC NAME MOrenak WBlaney KGoldstein GCasto MMarkley DATE 5/17/17 5/22/17 5/08/17 5/23/17 5/18/17 OFFICE NRR/DORL/D NRR/D OGC OCFO/DOC OCFO/DPB/LFPT NAME MJRoss-Lee (A) WDean JSuttenburg DD'Abate MKaplan DATE 5/24/17 5/30/17 6/15/17 6/16/17 06/27/17 OFFICE OCFO/DPB OCFO/DPB D/CFO CFO NAME RAllwein LFicks MCMuessle MEWylie DATE 06/27/17 06/27/17 07/03/17 07/03/17