ENS 58012: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 23: Line 23:
This event is being reported under 10 CFR 50.72(b)(2)(iv)(B) and 10 CFR 50.72(b)(2)(xi) for the unplanned actuation of the reactor protection system while the reactor is critical and for the offsite notification to PEMA.
This event is being reported under 10 CFR 50.72(b)(2)(iv)(B) and 10 CFR 50.72(b)(2)(xi) for the unplanned actuation of the reactor protection system while the reactor is critical and for the offsite notification to PEMA.
The NRC Resident Inspector has been notified.
The NRC Resident Inspector has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251029en.html#en58012
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251030en.html#en58012
}}{{unit info
}}{{unit info
| Unit = 2
| Unit = 2

Latest revision as of 06:20, 30 October 2025

ENS 58012 +/-
Where
Susquehanna Talen Energy icon.png
Pennsylvania (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation
Time - Person (Reporting Time:+-0.12 h-0.005 days <br />-7.142857e-4 weeks <br />-1.64376e-4 months <br />)
Opened: Kenneth Hulbert
22:57 Oct 28, 2025
NRC Officer: Kerby Scales
Last Updated: Oct 28, 2025
58012 - NRC Website
Loading map...