ML20078S353: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_-
{{#Wiki_filter:r i
r i
Wisconsin l Electnc POWER COMPANY I
Wisconsin                                                                               l l Electnc                                                                                 ;
Point Beoch Nuclear Plant o610 Nuclear Rd., two Rm WI $4241 (414) 755 2321 PBL 95-0043 February 17, 1995 i
POWER COMPANY I
Document Control Desk U.
Point Beoch Nuclear Plant                                                                                 l o610 Nuclear Rd., two Rm WI $4241                                                 (414) 755 2321 l
S.
l PBL 95-0043 February 17, 1995 i
NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, D.C.
Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, D.C. 20555                             ,                                                    !
20555 Gentlemen:
Gentlemen:
Docket 50-301 j
Docket 50-301                                                                                           j FILING OF OWNER;S INSERVICE INSPECTION  
FILING OF OWNER;S INSERVICE INSPECTION  


==SUMMARY==
==SUMMARY==
REPORT                                                   '
REPORT POINT DEACH NUCLEAR PLANT, UNIT 2 Attached in the Owner's Inservice Inspection Summary which is submitted in accordance with ASME Section XI, IWA-6230.
POINT DEACH NUCLEAR PLANT, UNIT 2 Attached in the Owner's Inservice Inspection Summary which is submitted in accordance with ASME Section XI, IWA-6230.             Included in this submittal is the Innervice Inspection Summary Report for Form NIS-1 and the Repair / Replacement Summary Report for NIS-2.
Included in this submittal is the Innervice Inspection Summary Report for Form NIS-1 and the Repair / Replacement Summary Report for NIS-2.
This information contained in the report reflects the inservice inspection activities during the second outage of the first period of the third 10-year                             ,
This information contained in the report reflects the inservice inspection activities during the second outage of the first period of the third 10-year interval, of Wisconsin Electric Power Company's Point Beach Nuclear Plant, Unit 2.
interval, of Wisconsin Electric Power Company's Point Beach Nuclear Plant,                             ;
Sincerely, m
Unit 2.
f G.
Sincerely,                                                                                             ,
J, iaxfield Plant Manager 1
m                                                                                   !
S rift Attachment 9502240099 950217 PDR ADOCK 05000301 G
G. J,     iaxfield                                                                                   f Plant Manager 1
r;q
S rift l
%k '1t'TCl
Attachment 9502240099 950217 PDR   ADOCK 05000301 G                       r;q g
\\
                                                                                              %k '1t'T Cl
g
                                                                                                    \
.4 sakfagaf htvwn Eneas Gpnuw
                                    .4 sakfagaf htvwn Eneas Gpnuw                           +
+
                                                                                                            -}}
-}}

Latest revision as of 06:28, 26 May 2025

Forwards Owners Inservice Insp Summary,Reflecting Inservice Insp Activities During Second Outage of First Period of Third 10-yr Interval
ML20078S353
Person / Time
Site: Point Beach 
Issue date: 02/17/1995
From: Maxfield G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078S354 List:
References
PBL-95-0043, PBL-95-43, NUDOCS 9502240099
Download: ML20078S353 (1)


Text

r i

Wisconsin l Electnc POWER COMPANY I

Point Beoch Nuclear Plant o610 Nuclear Rd., two Rm WI $4241 (414) 755 2321 PBL 95-0043 February 17, 1995 i

Document Control Desk U.

S.

NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, D.C.

20555 Gentlemen:

Docket 50-301 j

FILING OF OWNER;S INSERVICE INSPECTION

SUMMARY

REPORT POINT DEACH NUCLEAR PLANT, UNIT 2 Attached in the Owner's Inservice Inspection Summary which is submitted in accordance with ASME Section XI, IWA-6230.

Included in this submittal is the Innervice Inspection Summary Report for Form NIS-1 and the Repair / Replacement Summary Report for NIS-2.

This information contained in the report reflects the inservice inspection activities during the second outage of the first period of the third 10-year interval, of Wisconsin Electric Power Company's Point Beach Nuclear Plant, Unit 2.

Sincerely, m

f G.

J, iaxfield Plant Manager 1

S rift Attachment 9502240099 950217 PDR ADOCK 05000301 G

r;q

%k '1t'TCl

\\

g

.4 sakfagaf htvwn Eneas Gpnuw

+

-