ML20078S353: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:r i | ||
r i | Wisconsin l Electnc POWER COMPANY I | ||
Wisconsin | Point Beoch Nuclear Plant o610 Nuclear Rd., two Rm WI $4241 (414) 755 2321 PBL 95-0043 February 17, 1995 i | ||
POWER COMPANY I | Document Control Desk U. | ||
Point Beoch Nuclear Plant | S. | ||
NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, D.C. | |||
Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, D.C. 20555 | 20555 Gentlemen: | ||
Gentlemen: | Docket 50-301 j | ||
Docket 50-301 | FILING OF OWNER;S INSERVICE INSPECTION | ||
==SUMMARY== | ==SUMMARY== | ||
REPORT | REPORT POINT DEACH NUCLEAR PLANT, UNIT 2 Attached in the Owner's Inservice Inspection Summary which is submitted in accordance with ASME Section XI, IWA-6230. | ||
POINT DEACH NUCLEAR PLANT, UNIT 2 Attached in the Owner's Inservice Inspection Summary which is submitted in accordance with ASME Section XI, IWA-6230. | Included in this submittal is the Innervice Inspection Summary Report for Form NIS-1 and the Repair / Replacement Summary Report for NIS-2. | ||
This information contained in the report reflects the inservice inspection activities during the second outage of the first period of the third 10-year | This information contained in the report reflects the inservice inspection activities during the second outage of the first period of the third 10-year interval, of Wisconsin Electric Power Company's Point Beach Nuclear Plant, Unit 2. | ||
interval, of Wisconsin Electric Power Company's Point Beach Nuclear Plant, | Sincerely, m | ||
Unit 2. | f G. | ||
Sincerely, | J, iaxfield Plant Manager 1 | ||
m | S rift Attachment 9502240099 950217 PDR ADOCK 05000301 G | ||
G. J, | r;q | ||
S rift | %k '1t'TCl | ||
Attachment 9502240099 950217 PDR | \\ | ||
g | |||
.4 sakfagaf htvwn Eneas Gpnuw | |||
+ | |||
-}} | |||
Latest revision as of 06:28, 26 May 2025
| ML20078S353 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 02/17/1995 |
| From: | Maxfield G WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20078S354 | List: |
| References | |
| PBL-95-0043, PBL-95-43, NUDOCS 9502240099 | |
| Download: ML20078S353 (1) | |
Text
r i
Wisconsin l Electnc POWER COMPANY I
Point Beoch Nuclear Plant o610 Nuclear Rd., two Rm WI $4241 (414) 755 2321 PBL 95-0043 February 17, 1995 i
Document Control Desk U.
S.
NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, D.C.
20555 Gentlemen:
Docket 50-301 j
FILING OF OWNER;S INSERVICE INSPECTION
SUMMARY
REPORT POINT DEACH NUCLEAR PLANT, UNIT 2 Attached in the Owner's Inservice Inspection Summary which is submitted in accordance with ASME Section XI, IWA-6230.
Included in this submittal is the Innervice Inspection Summary Report for Form NIS-1 and the Repair / Replacement Summary Report for NIS-2.
This information contained in the report reflects the inservice inspection activities during the second outage of the first period of the third 10-year interval, of Wisconsin Electric Power Company's Point Beach Nuclear Plant, Unit 2.
Sincerely, m
f G.
J, iaxfield Plant Manager 1
S rift Attachment 9502240099 950217 PDR ADOCK 05000301 G
r;q
%k '1t'TCl
\\
g
.4 sakfagaf htvwn Eneas Gpnuw
+
-