| number = ML20154S711
| number = ML20154S711
| issue date = 09/26/1988
| issue date = 09/26/1988
| title = Ack Receipt of 880829 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/88-19
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/88-19
| author name = Callan L
| author name = Callan L
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8810050141
| document report number = NUDOCS 8810050141
| title reference date = 08-29-1988
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:. ..
{{#Wiki_filter:.
  ,
..
    .  .
.
                                                  SEP 2 61988
,
    In Reply Refer To:
.
    Dodket:     STN 50-482/88-19
SEP 2 61988
    Wolf Creek Nuclea.' Operating Corporation
In Reply Refer To:
    ATTN: Bart D. Withers
Dodket:
              President and Chief Executive Officer
STN 50-482/88-19
    P.O. Box 411
Wolf Creek Nuclea.' Operating Corporation
    Burlington, Kansas 66839
ATTN: Bart D. Withers
    Gentlemen:
President and Chief Executive Officer
            Thank you for your letter of August 29, 1988, in response to our letter and
P.O. Box 411
    Notice of Violation dated July 29, 1988. We have reviewed your reply and find
Burlington, Kansas 66839
    it responsive to the concerns raised in our Notice of Violation. We will review
Gentlemen:
    the implementation of your corrective actions during a future inspection to
Thank you for your letter of August 29, 1988, in response to our letter and
    determine that full compliance has been achieved and will be maintaiaed.
Notice of Violation dated July 29, 1988. We have reviewed your reply and find
                                                Sincerely.
it responsive to the concerns raised in our Notice of Violation. We will review
                                                Original Signed Sy:
the implementation of your corrective actions during a future inspection to
                                                  L J; CALLAN
determine that full compliance has been achieved and will be maintaiaed.
          88100b0141 000926
Sincerely.
          PDR
Original Signed Sy:
          0
L J; CALLAN
                ADocKosoog4t[                   1.. J. Callan, Director
88100b0141 000926
                                                Division of Reactor Projects
ADocKosoog4t[
    cc:
1..
    Wolf Cree ( Nuclear Operating Corporation
J. Callan, Director
    ATTh: Otto Maycard, Manager
PDR
                of Licensing
0
    P,0. Box 411
Division of Reactor Projects
    Burlington, Kansas 65839
cc:
    Wolf Creek Nuclear Operating Corporation
Wolf Cree ( Nuclear Operating Corporation
    ATTN: Gary Boyer, Plant Manager
ATTh: Otto Maycard, Manager
    P.O. Box 411
of Licensing
    Burlington, Kansas 66839
P,0. Box 411
      Kansas Corporation Comission
Burlington, Kansas 65839
    ATTN:     Robert D. Elliott, Chief Engineer
Wolf Creek Nuclear Operating Corporation
      Fourth Floor. Docking State Office Building
ATTN: Gary Boyer, Plant Manager
      Topeka, Kansas 66612-1571
P.O. Box 411
      Kansas Radiation Control Program Director
Burlington, Kansas 66839
      bec to DMB (IE01)           _
Kansas Corporation Comission
      RIV:PSA .-ji           C YS                 D:b
ATTN:
      ATHowellydf           DDCharrberlain       LJCallan                               \
Robert D. Elliott, Chief Engineer
      9/h/88                 9/2 6/88             9/'lh88
Fourth Floor. Docking State Office Building
                                                                                      6{b
Topeka, Kansas 66612-1571
Kansas Radiation Control Program Director
bec to DMB (IE01)
_
RIV:PSA .-ji
C YS
D:b
\\
ATHowellydf
DDCharrberlain
LJCallan
6{b
9/h/88
9/2 6/88
9/'lh88


    . . .
.
      .     .
. .
          Wolf Creek Nuclear Operating         -2-
.
            Corporation
.
          bec distrib. by RIV:
Wolf Creek Nuclear Operating
          RRI                             R. D. Martin, RA
-2-
          SectionChief(DRP/A)             DRP
Corporation
          RPB-DRSS                         B. DeFayette, RIII
bec distrib. by RIV:
          RIV File                         SRI, Callaway, RIII
RRI
          MIS System                       RSTS Operator
R. D. Martin, RA
          Project Engineer, DRP/A         Lisa Slea, RM/ALF
SectionChief(DRP/A)
          P. O'Connor, NRR Project Manager
DRP
          DRS
RPB-DRSS
B. DeFayette, RIII
RIV File
SRI, Callaway, RIII
MIS System
RSTS Operator
Project Engineer, DRP/A
Lisa Slea, RM/ALF
P. O'Connor, NRR Project Manager
DRS
'
'
l
l
,
,
.,
.,
..
..
i
i
a
a


    .   ,.
.
  *
,.
          ...                                                                                                    '
*
      ,
W4) NUCLEAR OPERATING
  .
'!~~4._.. /, J
                                        -
...
                                                                                                        '!~~4._..
                                                                                                            s      /, J
                                          W4) NUCLEAR OPERATING                                    i -
                                                                                                          L
                                                                                                          '
                                                                                                                    'j
                s ut o. w e ers
                m ene                                                                                                  -
                ***                                                                August 29, 1988
                                                                                  VM 83-0212
                U. S. Nuclear Regulatory Com:nission
                ATTH:      Doc urnen t Control Desk
                Mail Station Pl-137
                Washington, D. C. 20555
                                Reference: Letter dated July 29, 1988 from L. J. Callan, NRC, to
                                            B. D. Withers, WCHOC
                                Subject      Docket No. 50-482 : Response to Violation 482/8819-01
                Gent ietsen :
                Attached is Wolf Creek Nuclear Operating Corporation's response to violation                            ,
                482/8819-01 which was docu:sented in the Reference.                        Violation 482/8819-01
                  involved a f ailure to complete the required fire impairment control permit
                  for two fire doors.
                  If you have any questionr. cuncerning this artter,                      please contact ro e or
                  Mr. O. L. M.syna:d o f my sta f f.
                                                                                    Very truly yours,
'
'
,
s
-
.
L
'j
i
-
'
'
                                                                                    Bart D. Withers
s ut o. w e ers
                                                                                    Prealdent and
m ene
                                                                                    Chiaf Executive Officer
-
                  B DW/,l ad
***
                  Attachraent
August 29, 1988
                  ces     B. L. Bartsett (HRC), w/a
VM 83-0212
                          D. D. Chamberl. tin' (NRC), w/a
U. S. Nuclear Regulatory Com:nission
                          R. D. Martin (NRC), w/a
ATTH:
                          P. W. O'Connor ( NRC), w/a (2)
Doc urnen t Control Desk
              ,
Mail Station Pl-137
        4949 %620g zPP                     r 0 ,m. . , , ,,,on. x. t, n ,rsce. <>,t> 3 4 3,
Washington, D. C. 20555
            ,                                          m-..-, t,-, ou
Reference: Letter dated July 29, 1988 from L. J. Callan, NRC, to
      'h           , -)
B. D. Withers, WCHOC
Subject
Docket No. 50-482 : Response to Violation 482/8819-01
Gent ietsen :
Attached is Wolf Creek Nuclear Operating Corporation's response to violation
,
482/8819-01 which was docu:sented in the Reference.
Violation 482/8819-01
f ailure to complete the required fire impairment control permit
involved a
for two fire doors.
If you have any questionr. cuncerning this artter,
please contact ro e or
Mr. O. L. M.syna:d o f my sta f f.
Very truly yours,
'
Bart D. Withers
Prealdent and
'
Chiaf Executive Officer
B DW/,l ad
Attachraent
ces
B. L. Bartsett (HRC), w/a
D. D. Chamberl. tin' (NRC), w/a
R. D. Martin (NRC), w/a
P. W. O'Connor ( NRC), w/a (2)
,
4949 %620g zPP
r 0 ,m. . , ,
,,,on. x. t, n ,rsce.
<>,t> 3 4
3,
m-..-, t,-, ou
'h
,
-)
,


          . __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ __ - _ _ - _ - _ _ _ _ _ _ _ - _ _                         _.
. __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ __ - _ _ - _ - _ _ _ _ _ _ _ - _ _
  ;
_.
      e . . o
;
    '
e . . o
              s                     *                    e
'
        '
*
                                                        Attachment to WM 88-0212
s
    *
e
                                                        Page 1 of 1
'
    '.                                                                                                  .
Attachment to WM 88-0212
                                                                                                    '
*
                                                                  .
'.
                                                        Violation (482 /8819-01):                               Failure to Follow Procedure
Page 1 of 1
                                                          F_ipling:                                                                                                     .
.
                                                                                                                                                                        i
'
                                                          Technical Specification                                 6.8.1   requires   that   written procedures be ,   [
.
Violation (482 /8819-01):
Failure to Follow Procedure
F_ipling:
.
i
Technical Specification
6.8.1
requires
that
written
procedures
be ,
[
established,
implemented,
and maintained for the fire protection program.
4
<
<
                                                        established,                                  implemented,  and maintained for the fire protection program.    4
Procedure ADM 13-103,
                                                          Procedure ADM 13-103,                               Revision 5, "Fire protection:       Impairment Control," !
Revision 5,
                                                          implements procedures for impaired fire protection equipment including                                       {
"Fire protection:
                                                                                                                                          requires that fire protetton
Impairment Control,"
                                                                                                                                                                        ~
!
4                                                        degraded fire doors.                                 ADM 13-103, Section 4,                                   '
implements procedures
                                                          impairment control permit forms be prepared for all fire protection system
for impaired
                                                          impairments.                               In addition, Section 4 requires that entries be made in the       t
fire protection equipment including
                                                            fire protection impairment control log for the impairments.                                                 !
{
                                                                                                                                                                        l
degraded fire doors.
ADM 13-103,
Section 4,
requires that fire protetton
~
4
'
impairment control permit forms be prepared for all fire protection system
impairments.
In addition, Section 4 requires that entries be made in the
t
fire protection impairment control log for the impairments.
!
l
(
(
i                                                         contrary to the above,                                 on June 6,     1988 Fire Doors 13261 and 13281 were   j
i
i                                                         observed to be standing open.                                 Neither fire protection im pairment control     i
contrary to the above,
                                                          permits nnr log entries had been completed for those doors.                                                   I
on June 6,
1988
Fire Doors 13261 and 13281 were
j
i
observed to be standing open.
Neither fire protection im pairment control
i
permits nnr log entries had been completed for those doors.
I
a
a
I                                                         Reason for Violation:
I
I                                                                                                                                                                       i
Reason for Violation:
:                                                         Fire doors 13261 and 13281 were lef t open by operations personnel without                                   ;
I
                                                          the required fire protection impairment control permits or los entries due                                   i
i
:
Fire doors 13261
and 13281 were lef t open by operations personnel without
;
the required fire protection impairment control permits or los entries due
i
to incorrectly interpreting the requirements of ADM 13-103.
The involved
'
'
                                                          to incorrectly interpreting the requirements of ADM 13-103. The involved                                      ;
;
!                                                         operations pwesonnel believed it was acceptable to leave the duors open                                       :
!
                                                          without a fire impairment pe rmit when in the area performine, Technical
operations pwesonnel believed it was acceptable to leave the duors open
                                                          Specification sutveillance tests since the operator was                                         fire   watch ;
:
without
a
fire impairment pe rmit when in the area performine, Technical
Specification sutveillance tests since the operator was
fire
watch
;
qualified.
,
,
                                                          qualified.
<
<
l                                                          Cos vective _Sys Wich inve Been taken and Results Achf.eved
                                                                                                                                                                        '
!                                                          Thst "vire Protaction Impairment Control" procedure, ADM 13-103, has been                                    ,
i                                                          reviced to clearly identify the requirement fer obtalaing fire impairment                                    i
                                                            perait any r N a fire door is to be left open.                                    The Operations Supervisor  l
l
l
Cos vective _Sys Wich inve Been taken and Results Achf.eved
'
!
!
                                                            instructed all Operations personnel by memo of the reqvirement to isst.e a                                   !
Thst "vire Protaction Impairment Control" procedure,
                                                                                                                                                                        '
ADM 13-103, has been
l                                                           tire im pa iree n': wnenever any fire door is le f t open for any reason, except
,
l                                                         normal passage.                                                                                               ,
i
reviced to clearly identify the requirement fer obtalaing
fire impairment
i
l
perait any r N a fire door is to be left open.
The Operations Supervisor
l
!
instructed all Operations personnel by memo of the reqvirement to isst.e a
!
'
l
tire im pa iree n': wnenever any fire door is le f t open for any reason, except
l
normal passage.
,
i
i
                                                          prrectiv_e__Sf eos Which Will Be Taken To Avoid Further Violations
prrectiv_e__Sf eos Which Will Be Taken To Avoid Further Violations
                                                                                                                                                                        *
.
.
!                                                           In addition to the corrective steps discussed above, the procedure change to                               !
*
                                                          ADM 13'-103 was placed in operations required reading as required reading                                     l
!
l                                                           entry number 88-160 to reinforce the memo sent to all Operations personnel.                                 !
In addition to the corrective steps discussed above, the procedure change to
!
ADM 13'-103 was placed
in operations required reading as required reading
l
l
entry number 88-160 to reinforce the memo sent to all Operations personnel.
!
;
;
                                                                                                                                                                        l
l
I
I
                                                            Date When Full Compilance Will Be_ Achieved:
Date When Full Compilance Will Be_ Achieved:
                                                            Full ecwspliance has been achieved.
Full ecwspliance has been achieved.
                                                                                                                                                                        :
:
.
.
                                                                                                                                                                        !
!
I                                                                                                                                                                       ;
I
;
*
*
                                                                                                                                                                        '
I
I
i                                                                                                                                                                       :
'
i                                                                                                                                                                       i
i
                                                                                                                                                                        ;
:
                                                                                                                                                                        L
i
i
;
L
i
i
l
l
;                                                                                                                                                                       ;
;
;
}}
}}

Latest revision as of 10:10, 24 May 2025

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/88-19
ML20154S711
Person / Time
Site: Wolf Creek 
Issue date: 09/26/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
References
NUDOCS 8810050141
Download: ML20154S711 (2)


See also: IR 05000482/1988019

Text

.

..

.

,

.

SEP 2 61988

In Reply Refer To:

Dodket:

STN 50-482/88-19

Wolf Creek Nuclea.' Operating Corporation

ATTN: Bart D. Withers

President and Chief Executive Officer

P.O. Box 411

Burlington, Kansas 66839

Gentlemen:

Thank you for your letter of August 29, 1988, in response to our letter and

Notice of Violation dated July 29, 1988. We have reviewed your reply and find

it responsive to the concerns raised in our Notice of Violation. We will review

the implementation of your corrective actions during a future inspection to

determine that full compliance has been achieved and will be maintaiaed.

Sincerely.

Original Signed Sy:

L J; CALLAN

88100b0141 000926

ADocKosoog4t[

1..

J. Callan, Director

PDR

0

Division of Reactor Projects

cc:

Wolf Cree ( Nuclear Operating Corporation

ATTh: Otto Maycard, Manager

of Licensing

P,0. Box 411

Burlington, Kansas 65839

Wolf Creek Nuclear Operating Corporation

ATTN: Gary Boyer, Plant Manager

P.O. Box 411

Burlington, Kansas 66839

Kansas Corporation Comission

ATTN:

Robert D. Elliott, Chief Engineer

Fourth Floor. Docking State Office Building

Topeka, Kansas 66612-1571

Kansas Radiation Control Program Director

bec to DMB (IE01)

_

RIV:PSA .-ji

C YS

D:b

\\

ATHowellydf

DDCharrberlain

LJCallan

6{b

9/h/88

9/2 6/88

9/'lh88

.

. .

.

.

Wolf Creek Nuclear Operating

-2-

Corporation

bec distrib. by RIV:

RRI

R. D. Martin, RA

SectionChief(DRP/A)

DRP

RPB-DRSS

B. DeFayette, RIII

RIV File

SRI, Callaway, RIII

MIS System

RSTS Operator

Project Engineer, DRP/A

Lisa Slea, RM/ALF

P. O'Connor, NRR Project Manager

DRS

'

l

,

.,

..

i

a

.

,.

W4) NUCLEAR OPERATING

'!~~4._.. /, J

...

'

,

s

-

.

L

'j

i

-

'

s ut o. w e ers

m ene

-

August 29, 1988

VM 83-0212

U. S. Nuclear Regulatory Com:nission

ATTH:

Doc urnen t Control Desk

Mail Station Pl-137

Washington, D. C. 20555

Reference: Letter dated July 29, 1988 from L. J. Callan, NRC, to

B. D. Withers, WCHOC

Subject

Docket No. 50-482 : Response to Violation 482/8819-01

Gent ietsen :

Attached is Wolf Creek Nuclear Operating Corporation's response to violation

,

482/8819-01 which was docu:sented in the Reference.

Violation 482/8819-01

f ailure to complete the required fire impairment control permit

involved a

for two fire doors.

If you have any questionr. cuncerning this artter,

please contact ro e or

Mr. O. L. M.syna:d o f my sta f f.

Very truly yours,

'

Bart D. Withers

Prealdent and

'

Chiaf Executive Officer

B DW/,l ad

Attachraent

ces

B. L. Bartsett (HRC), w/a

D. D. Chamberl. tin' (NRC), w/a

R. D. Martin (NRC), w/a

P. W. O'Connor ( NRC), w/a (2)

,

4949 %620g zPP

r 0 ,m. . , ,

,,,on. x. t, n ,rsce.

<>,t> 3 4

3,

m-..-, t,-, ou

'h

,

-)

,

. __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ __ - _ _ - _ - _ _ _ _ _ _ _ - _ _

_.

e . . o

'

s

e

'

Attachment to WM 88-0212

'.

Page 1 of 1

.

'

.

Violation (482 /8819-01):

Failure to Follow Procedure

F_ipling:

.

i

Technical Specification 6.8.1

requires

that

written

procedures

be ,

[

established,

implemented,

and maintained for the fire protection program.

4

<

Procedure ADM 13-103,

Revision 5,

"Fire protection:

Impairment Control,"

!

implements procedures

for impaired

fire protection equipment including

{

degraded fire doors.

ADM 13-103,

Section 4,

requires that fire protetton

~

4

'

impairment control permit forms be prepared for all fire protection system

impairments.

In addition, Section 4 requires that entries be made in the

t

fire protection impairment control log for the impairments.

!

l

(

i

contrary to the above,

on June 6,

1988

Fire Doors 13261 and 13281 were

j

i

observed to be standing open.

Neither fire protection im pairment control

i

permits nnr log entries had been completed for those doors.

I

a

I

Reason for Violation:

I

i

Fire doors 13261

and 13281 were lef t open by operations personnel without

the required fire protection impairment control permits or los entries due

i

to incorrectly interpreting the requirements of ADM 13-103.

The involved

'

!

operations pwesonnel believed it was acceptable to leave the duors open

without

a

fire impairment pe rmit when in the area performine, Technical

Specification sutveillance tests since the operator was

fire

watch

qualified.

,

<

l

Cos vective _Sys Wich inve Been taken and Results Achf.eved

'

!

Thst "vire Protaction Impairment Control" procedure,

ADM 13-103, has been

,

i

reviced to clearly identify the requirement fer obtalaing

fire impairment

i

l

perait any r N a fire door is to be left open.

The Operations Supervisor

l

!

instructed all Operations personnel by memo of the reqvirement to isst.e a

!

'

l

tire im pa iree n': wnenever any fire door is le f t open for any reason, except

l

normal passage.

,

i

prrectiv_e__Sf eos Which Will Be Taken To Avoid Further Violations

.

!

In addition to the corrective steps discussed above, the procedure change to

!

ADM 13'-103 was placed

in operations required reading as required reading

l

l

entry number 88-160 to reinforce the memo sent to all Operations personnel.

!

l

I

Date When Full Compilance Will Be_ Achieved:

Full ecwspliance has been achieved.

.

!