ML20203L897: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _
{{#Wiki_filter:_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _
                                      [p* **%go.                                           UNITI:3 STATE.S
[p* **%go.
                                      y ',t,- ' ,;
UNITI:3 STATE.S
        *
y
                                                                          NUCLE AR REGULATORY COMMISSION
',t,-
                                      siM
' ,;
                                      O,             g
NUCLE AR REGULATORY COMMISSION
                                                      g                                       ntcoora iv
*
                                                                                  0l1 AVAP4 PL A!A OthvE SUITE 400
si
                                      5
g
                                        q   "o
ntcoora iv
                                          .....
O, M
                                                  [                                Af 4LifJC TOf 4 1 E * AS N/)11.an64
g
                                                                                        March 4, 1998
0l1 AVAP4 PL A!A OthvE SUITE 400
                                            EA 97-414
q
                                            Harold B. Ray, Executive Vice President
[
                                            Southem Califomia Edison Co.
Af 4LifJC TOf 4 1 E * AS N/)11.an64
                                            San Onofre Nuclear Generating Station
5
                                            P.O. Box 128
"o
                                            San Clemente, Califomia 92674-0128
.....
                                            SUBJECT: RESPONSE TO NRC INSPECTION REPORT 50-361/9715; 50-362/9715
March 4, 1998
                                            Dear Mr. Ray:
EA 97-414
Harold B. Ray, Executive Vice President
Southem Califomia Edison Co.
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, Califomia 92674-0128
SUBJECT: RESPONSE TO NRC INSPECTION REPORT 50-361/9715; 50-362/9715
Dear Mr. Ray:
,
,
                                                      Thank you for your letters of October 24,1997, and January 30,1998, in response to
Thank you for your letters of October 24,1997, and January 30,1998, in response to
                                            our letter and Notice of Violation of September 10,1997, and letter of January 15,1998,
our letter and Notice of Violation of September 10,1997, and letter of January 15,1998,
                                            concerning the failure to adequately evaluate the appropriateness of the performance of
concerning the failure to adequately evaluate the appropriateness of the performance of
                                            prev 6ntive maintenance prior to placing the Unit 3 reactor coolant system under a 10 CFR
prev 6ntive maintenance prior to placing the Unit 3 reactor coolant system under a 10 CFR
                                            50.65(a)(2) category. We have reviewed your reply and find it responsive to the concems raised
50.65(a)(2) category. We have reviewed your reply and find it responsive to the concems raised
                                              in our Notice of Violation. We will review the implementation of your corrective actions during a
in our Notice of Violation. We will review the implementation of your corrective actions during a
                                            future inspection to determine that full compliance has been achieved and will be :naintained.
future inspection to determine that full compliance has been achieved and will be :naintained.
                                                                                                  Sincerely,
Sincerely,
                                                                                                                      p
p
                                                                                                          e
e
                                                                                                                        D
D
                                                                                                    rthur Howellf& 111, Direc or
rthur f&
                                                                                                  Division of Reactor Safety
Howell 111, Direc or
                                              Docket Nos.: 50-361;50-362
Division of Reactor Safety
                                              License Nos.: NPF 10; NPF e5
Docket Nos.: 50-361;50-362
                                              cc:
License Nos.: NPF 10; NPF e5
                                              Chairman, Board of Supervisors
cc:
                                              County of San Diego
Chairman, Board of Supervisors
                                              1600 Pacific Highway, Room 335
County of San Diego
                                              San Diego, California 92101 --                                                             I
1600 Pacific Highway, Room 335
                                                9003060289     9s03o4                                                           b
San Diego, California 92101 --
                                                PDR   ADOCK 05000361
I
                                                0                     PDR
9003060289 9s03o4
b
PDR
ADOCK 05000361
0
PDR


                                            .- - ._- . _ - .. .-. .. - ...- .. - - - - ..-
.- - ._- . _ - .. .-. .. - ...- ..
                                                                                            i
- - - - ..-
  .
i
                                                                                            -
.
.
    Southem Califomia Edison Co.         3-
-
                                                                                            ,
.
                                                                                            i
Southem Califomia Edison Co.
    Mr. Truman Bums %4r. Robert Kinosien
3-
    Califomia Public Utilities Commission
,
    505 Van Ness, Rm 4102
i
    San Francisco, Califomia 94102
Mr. Truman Bums %4r. Robert Kinosien
Califomia Public Utilities Commission
505 Van Ness, Rm 4102
San Francisco, Califomia 94102


            . _ __- _
. _ __- _
    *
*
  .
.
      Southem Califomia Edison Co.                               -4-
Southem Califomia Edison Co.
                                                                                                                    .
-4-
      E Mail oport to T. Frye (TJF)
.
      E Mell report to D. Lange (DJL)
E Mail oport to T. Frye (TJF)
      E Mail repoti to NRR Event Tracking System (IPAS)
E Mell report to D. Lange (DJL)
      E-Mail report to Document Control Desk (DOCDESK)
E Mail repoti to NRR Event Tracking System (IPAS)
      bec to DCD (IE01)
E-Mail report to Document Control Desk (DOCDESK)
      bec distrib. by RIV:
bec to DCD (IE01)
      Regional Administrator                                           Resident Inspector
bec distrib. by RIV:
      DRS Director                                                     DRS Deputy Director
Regional Administrator
      DRP Director                                                     DRS PSB
Resident Inspector
      Branch Chief (DRP/F, WCFO)                                       MIS System
DRS Director
      Senior Project inspector (DRP/F, WCFO)                           RIV File
DRS Deputy Director
i    Branch Chief (DRP/TSS)
DRP Director
DRS PSB
Branch Chief (DRP/F, WCFO)
MIS System
Senior Project inspector (DRP/F, WCFO)
RIV File
Branch Chief (DRP/TSS)
i
l
l
      WCFO File                                                                                                           ,
WCFO File
      DOCUMENT NAME: R:\_SO23\SO715ak2.lB
,
      To receive copy of document, Indicate in box:"C" = Copy wthout enclosures *E" = Copy wlth enclosures "N" = No copy
DOCUMENT NAME: R:\\_SO23\\SO715ak2.lB
        RIV:TA:DRS           sg     D:DRE][)(
To receive copy of document, Indicate in box:"C" = Copy wthout enclosures *E" = Copy wlth enclosures "N" = No copy
        IBames/imb ME)   '
RIV:TA:DRS
                                      ATHowdtf
sg
        02W98                         02$98                                                                           __
D:DRE][)(
                                                  OFFICIAL RECORD COPY
IBames/imb ME) ATHowdtf
                                              .
02W98
02$98
'
__
OFFICIAL RECORD COPY
.


  *
*
e
e
    Southern California Edison Co.                             -4
Southern California Edison Co.
                                                                                                                    .
-4
    E Mail report to T. Frye (TJF) -
.
    E Mail report to D. Lange (DJL)
E Mail report to T. Frye (TJF) -
    E. Mail report to NRR Event Tracking System (IPAS)
E Mail report to D. Lange (DJL)
    E Mail report to Document Control Desk (DOCDESK)
E. Mail report to NRR Event Tracking System (IPAS)
    bec to DCD (IE01)
E Mail report to Document Control Desk (DOCDESK)
    bec distrib, by RIV:
bec to DCD (IE01)
    Regional Administrator                                             Resident inspector
bec distrib, by RIV:
    DRS Director                                                       DRS Deputy Director
Regional Administrator
    DRP Director                                                       DRS PSB
Resident inspector
    Branch Chief (DRP/F, WCFO)                                         MIS System
DRS Director
    Senior Project 1,1spector (DRP/F, WCFO)                           RIV File
DRS Deputy Director
    Branch Chief (DRP/TSS)
DRP Director
    WCFO File
DRS PSB
    DOCUMENT NAME: R:\ SO23\SO715ak2.lB
Branch Chief (DRP/F, WCFO)
    To receive copy of document, Indicate in boa: *C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
MIS System
    RIV:TA:DRS           sg     D;DRJ91[)(
Senior Project 1,1spector (DRP/F, WCFO)
    IBarnes/Imb 6/2)! ' Now#
RIV File
                      '
Branch Chief (DRP/TSS)
    02W98                        l02fj98
WCFO File
                                                OFFICIAL RECORD COPY
DOCUMENT NAME: R:\\ SO23\\SO715ak2.lB
                            ..
To receive copy of document, Indicate in boa: *C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV:TA:DRS
sg
D;DRJ91[)(
IBarnes/Imb 6/2)! ' Now#
02W98
l02fj98
'
OFFICIAL RECORD COPY
..
..
.


                                                            -       .- -     - -           - - - -
-
    .
.- -
      .
- -
      . ga o,mmu,-
- - - -
                                                                                            =
.
.
  7l d EDISON
.. ga o,mmu,-
        An (D/$0V IV7s AA47 TON 4L Company
.
                                                              January 30,1998
7l d EDISON
                                                                                      ~
=
                  U. S. Nuclear Regulatory Commission                                                     >
An (D/$0V IV7s AA47 TON 4L Company
                  Document Control Desk                                             pg 4       ,           ,
January 30,1998
                  Washington, D.C. 20555                                                                   t
U. S. Nuclear Regulatory Commission
                                                                                        '
~
                  Gentlemen:                                                   _. 2               _ . _ _
>
                  Subject:         Docket Nos. 50-361 and 50 362
Document Control Desk
                                    Reply to a Notice of Violation
pg
                                      San Onofre Nuclear Generating Station, Units 2 and 3
4
                  References: (1) Lette,', Mr. A. T. Howall 111 (USNRC) to Mr. Harold B. Ray (f 3E),
,
                                          dated September 10,1997
,
                                      (2) Letter, Mr. Harold B. Ray (SCE) to Mr. E. W. Merschoff (USNRC),
Washington, D.C. 20555
                                          dated October 24,1997
t
                                      (3) Letter, Mr. E. W. Merschoff (USNRC) to Mr. Harold B. Ray (SCE),
Gentlemen:
                                          dated January 15,1998
_. 2
                  Reference 1 transmitted the results of NRC Inspection Report No. 50 361/97-15 and
'
                  50-362/97-15, conducted June 30 through July 3,1997, at the San Onofre Nuclear
_ . _ _
                  Generating Station, Units 2 and 3. The enclosure to Reference 1 also transmitted a
Subject:
                  Notice of Violation (9715-01). This violation involved the failure to adequately evaluate
Docket Nos. 50-361 and 50 362
                  the appropriateness of the performance of preventive maintenance prior to placing the
Reply to a Notice of Violation
                  Unit 3 reactor coolant system (RCS) under a 10 CFR 50.65(a)(2) category.
San Onofre Nuclear Generating Station, Units 2 and 3
                  Reference 2 transmitted SCE's original response to the Notice of Violation. In that
References: (1) Lette,', Mr. A. T. Howall 111 (USNRC) to Mr. Harold B. Ray (f 3E),
                  response it was stated that SCE believes no violation of the Maintenance Rule
dated September 10,1997
                  occurred. Notwithstanding this conclusion, in accordance with your guidance in
(2) Letter, Mr. Harold B. Ray (SCE) to Mr. E. W. Merschoff (USNRC),
                  Reference 3, we are providing the following response to bring the issue to closure. As
dated October 24,1997
                  noted in References 2 and 3, the reason for the violation was that the failure history
(3) Letter, Mr. E. W. Merschoff (USNRC) to Mr. Harold B. Ray (SCE),
                  screening performed as part of the Maintenance Rule implementation prior to July 10,
dated January 15,1998
                    1996, did not include a review of construction work orders (CWOs). Thus, SCE's
Reference 1 transmitted the results of NRC Inspection Report No. 50 361/97-15 and
                  decision to place the RCS under 10 CFR 50.65(a)(2) was based on incomplete data.
50-362/97-15, conducted June 30 through July 3,1997, at the San Onofre Nuclear
                  As corrective actions SCE has: 1) completed a review of CWOs implemented sinca
Generating Station, Units 2 and 3. The enclosure to Reference 1 also transmitted a
                    July 1993 and determined that this was an isolated occurrence; 2) changed the
Notice of Violation (9715-01). This violation involved the failure to adequately evaluate
                    Maintenance Rule monthly review process to include CWO's; 3) placed the reactor
the appropriateness of the performance of preventive maintenance prior to placing the
                    coolant systems of both units in Category (a)(1) as a result of occurrence- 1 RCS
Unit 3 reactor coolant system (RCS) under a 10 CFR 50.65(a)(2) category.
                      P.O,Ikn 128
Reference 2 transmitted SCE's original response to the Notice of Violation. In that
                    San Clemente. CA 92674-0128
response it was stated that SCE believes no violation of the Maintenance Rule
                      714 168 1480                                       _
occurred. Notwithstanding this conclusion, in accordance with your guidance in
                      m , , . ,_
Reference 3, we are providing the following response to bring the issue to closure. As
                                                                    ,
noted in References 2 and 3, the reason for the violation was that the failure history
  JSozosp= n sm                                                           _               _                 _
screening performed as part of the Maintenance Rule implementation prior to July 10,
1996, did not include a review of construction work orders (CWOs). Thus, SCE's
decision to place the RCS under 10 CFR 50.65(a)(2) was based on incomplete data.
As corrective actions SCE has: 1) completed a review of CWOs implemented sinca
July 1993 and determined that this was an isolated occurrence; 2) changed the
Maintenance Rule monthly review process to include CWO's; 3) placed the reactor
coolant systems of both units in Category (a)(1) as a result of occurrence- 1 RCS
P.O,Ikn 128
San Clemente. CA 92674-0128
714 168 1480
_
m , , . ,_
,
JSozosp= n sm
_
_
_


  _ _ _ _ - _ _ _ _ _ -                                       - - .
_ _ _ _ - _ _ _ _ _ -
                          .
- - .
                          . , .
.
                        .
. , .
                                Document Control Desk                       2-                         January 30,1998
.
                                pret sure boundary leakage, including nozzle leakage; and 4) revised the Alloy 600
Document Control Desk
                                prog'am plan,90022," Susceptibility of Reactor Coolant System Alloy 600 Nozzles to
2-
                                Primary Water Stress Corrosion Cracking and Replacement Program," to implement a
January 30,1998
                                strategy to replace penetrations over time. As noted in Reference 3, we plan to
pret sure boundary leakage, including nozzle leakage; and 4) revised the Alloy 600
                                complete allinstrument nozzle repairs by the end of the Cycle 10 refueling outages.
prog'am plan,90022," Susceptibility of Reactor Coolant System Alloy 600 Nozzles to
                                No further corrective actions are planned, and the date of full compliance was July 23,
Primary Water Stress Corrosion Cracking and Replacement Program," to implement a
                                1997, when the Unit 3 RCS was placed in Category (a)(1).
strategy to replace penetrations over time. As noted in Reference 3, we plan to
                                If you have any further questions, please contact me.
complete allinstrument nozzle repairs by the end of the Cycle 10 refueling outages.
No further corrective actions are planned, and the date of full compliance was July 23,
1997, when the Unit 3 RCS was placed in Category (a)(1).
If you have any further questions, please contact me.
.
.
                                                                            Sincerely,
Sincerely,
S&E. k
'
'
                                                                    "\       S&E.            k
"\\
                                                                            Dwight E. Nunn
Dwight E. Nunn
                                cc:   E. W. Merschoff, Regional Administrator, NRC Region IV
cc:
                                      K. E. Perkins, Director, Walnut Creek Field Office, NRC Region IV
E. W. Merschoff, Regional Administrator, NRC Region IV
                                      M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3
K. E. Perkins, Director, Walnut Creek Field Office, NRC Region IV
                                      J. A. Sloan, NRC Senior Resident in:pector, San Onofre Units 2 and 3
M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3
J. A. Sloan, NRC Senior Resident in:pector, San Onofre Units 2 and 3
l
l
                                                                                                                        <
<
                                                                    -
-
}}
}}

Latest revision as of 00:10, 24 May 2025

Ack Receipt of 971024 & s Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-361/97-15 & 50-362/97-15 on 970630-0703
ML20203L897
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/04/1998
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
References
50-361-97-15, 50-362-97-15, EA-97-414, NUDOCS 9803060289
Download: ML20203L897 (3)


See also: IR 05000361/1997015

Text

_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _

[p* **%go.

UNITI:3 STATE.S

y

',t,-

' ,;

NUCLE AR REGULATORY COMMISSION

si

g

ntcoora iv

O, M

g

0l1 AVAP4 PL A!A OthvE SUITE 400

q

[

Af 4LifJC TOf 4 1 E * AS N/)11.an64

5

"o

.....

March 4, 1998

EA 97-414

Harold B. Ray, Executive Vice President

Southem Califomia Edison Co.

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, Califomia 92674-0128

SUBJECT: RESPONSE TO NRC INSPECTION REPORT 50-361/9715; 50-362/9715

Dear Mr. Ray:

,

Thank you for your letters of October 24,1997, and January 30,1998, in response to

our letter and Notice of Violation of September 10,1997, and letter of January 15,1998,

concerning the failure to adequately evaluate the appropriateness of the performance of

prev 6ntive maintenance prior to placing the Unit 3 reactor coolant system under a 10 CFR 50.65(a)(2) category. We have reviewed your reply and find it responsive to the concems raised

in our Notice of Violation. We will review the implementation of your corrective actions during a

future inspection to determine that full compliance has been achieved and will be :naintained.

Sincerely,

p

e

D

rthur f&

Howell 111, Direc or

Division of Reactor Safety

Docket Nos.: 50-361;50-362

License Nos.: NPF 10; NPF e5

cc:

Chairman, Board of Supervisors

County of San Diego

1600 Pacific Highway, Room 335

San Diego, California 92101 --

I

9003060289 9s03o4

b

PDR

ADOCK 05000361

0

PDR

.- - ._- . _ - .. .-. .. - ...- ..

- - - - ..-

i

.

-

.

Southem Califomia Edison Co.

3-

,

i

Mr. Truman Bums %4r. Robert Kinosien

Califomia Public Utilities Commission

505 Van Ness, Rm 4102

San Francisco, Califomia 94102

. _ __- _

.

Southem Califomia Edison Co.

-4-

.

E Mail oport to T. Frye (TJF)

E Mell report to D. Lange (DJL)

E Mail repoti to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident Inspector

DRS Director

DRS Deputy Director

DRP Director

DRS PSB

Branch Chief (DRP/F, WCFO)

MIS System

Senior Project inspector (DRP/F, WCFO)

RIV File

Branch Chief (DRP/TSS)

i

l

WCFO File

,

DOCUMENT NAME: R:\\_SO23\\SO715ak2.lB

To receive copy of document, Indicate in box:"C" = Copy wthout enclosures *E" = Copy wlth enclosures "N" = No copy

RIV:TA:DRS

sg

D:DRE][)(

IBames/imb ME) ATHowdtf

02W98

02$98

'

__

OFFICIAL RECORD COPY

.

e

Southern California Edison Co.

-4

.

E Mail report to T. Frye (TJF) -

E Mail report to D. Lange (DJL)

E. Mail report to NRR Event Tracking System (IPAS)

E Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE01)

bec distrib, by RIV:

Regional Administrator

Resident inspector

DRS Director

DRS Deputy Director

DRP Director

DRS PSB

Branch Chief (DRP/F, WCFO)

MIS System

Senior Project 1,1spector (DRP/F, WCFO)

RIV File

Branch Chief (DRP/TSS)

WCFO File

DOCUMENT NAME: R:\\ SO23\\SO715ak2.lB

To receive copy of document, Indicate in boa: *C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:TA:DRS

sg

D;DRJ91[)(

IBarnes/Imb 6/2)! ' Now#

02W98

l02fj98

'

OFFICIAL RECORD COPY

..

..

.

-

.- -

- -

- - - -

.

.. ga o,mmu,-

.

7l d EDISON

=

An (D/$0V IV7s AA47 TON 4L Company

January 30,1998

U. S. Nuclear Regulatory Commission

~

>

Document Control Desk

pg

4

,

,

Washington, D.C. 20555

t

Gentlemen:

_. 2

'

_ . _ _

Subject:

Docket Nos. 50-361 and 50 362

Reply to a Notice of Violation

San Onofre Nuclear Generating Station, Units 2 and 3

References: (1) Lette,', Mr. A. T. Howall 111 (USNRC) to Mr. Harold B. Ray (f 3E),

dated September 10,1997

(2) Letter, Mr. Harold B. Ray (SCE) to Mr. E. W. Merschoff (USNRC),

dated October 24,1997

(3) Letter, Mr. E. W. Merschoff (USNRC) to Mr. Harold B. Ray (SCE),

dated January 15,1998

Reference 1 transmitted the results of NRC Inspection Report No. 50 361/97-15 and

50-362/97-15, conducted June 30 through July 3,1997, at the San Onofre Nuclear

Generating Station, Units 2 and 3. The enclosure to Reference 1 also transmitted a

Notice of Violation (9715-01). This violation involved the failure to adequately evaluate

the appropriateness of the performance of preventive maintenance prior to placing the

Unit 3 reactor coolant system (RCS) under a 10 CFR 50.65(a)(2) category.

Reference 2 transmitted SCE's original response to the Notice of Violation. In that

response it was stated that SCE believes no violation of the Maintenance Rule

occurred. Notwithstanding this conclusion, in accordance with your guidance in

Reference 3, we are providing the following response to bring the issue to closure. As

noted in References 2 and 3, the reason for the violation was that the failure history

screening performed as part of the Maintenance Rule implementation prior to July 10,

1996, did not include a review of construction work orders (CWOs). Thus, SCE's

decision to place the RCS under 10 CFR 50.65(a)(2) was based on incomplete data.

As corrective actions SCE has: 1) completed a review of CWOs implemented sinca

July 1993 and determined that this was an isolated occurrence; 2) changed the

Maintenance Rule monthly review process to include CWO's; 3) placed the reactor

coolant systems of both units in Category (a)(1) as a result of occurrence- 1 RCS

P.O,Ikn 128

San Clemente. CA 92674-0128

714 168 1480

_

m , , . ,_

,

JSozosp= n sm

_

_

_

_ _ _ _ - _ _ _ _ _ -

- - .

.

. , .

.

Document Control Desk

2-

January 30,1998

pret sure boundary leakage, including nozzle leakage; and 4) revised the Alloy 600

prog'am plan,90022," Susceptibility of Reactor Coolant System Alloy 600 Nozzles to

Primary Water Stress Corrosion Cracking and Replacement Program," to implement a

strategy to replace penetrations over time. As noted in Reference 3, we plan to

complete allinstrument nozzle repairs by the end of the Cycle 10 refueling outages.

No further corrective actions are planned, and the date of full compliance was July 23,

1997, when the Unit 3 RCS was placed in Category (a)(1).

If you have any further questions, please contact me.

.

Sincerely,

S&E. k

'

"\\

Dwight E. Nunn

cc:

E. W. Merschoff, Regional Administrator, NRC Region IV

K. E. Perkins, Director, Walnut Creek Field Office, NRC Region IV

M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3

J. A. Sloan, NRC Senior Resident in:pector, San Onofre Units 2 and 3

l

<

-