ML20210R443: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
#REDIRECT [[IR 05000302/1986014]]
{{Adams
| number = ML20210R443
| issue date = 09/26/1986
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-302/86-14.NRC Will Advise Util Re Acceptability of Response at Later Date
| author name = Walker R
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee name = Wilgus W
| addressee affiliation = FLORIDA POWER CORP.
| docket = 05000302
| license number =
| contact person =
| document report number = NUDOCS 8610070308
| title reference date = 08-21-1986
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
}}
See also: [[see also::IR 05000302/1986014]]
 
=Text=
{{#Wiki_filter:SEP 2 61986
.
F1,orida Power Corporation
gTN: Mr. W. S. Wilgus
Vice President Nuclear Operations
P. O. Box 14042, M.A.C. C-2-M
St. Petersburg, FL 33733
Gentlemen:
SUBJECT: NRC INSPECTION REPORT N0. 50-302/86-14
Thank you for your response of August 21, 1986, to our Notice of Violation issued
on July 25, 1986, concerning activities conducted at your Crystal River facility.
We are evaluating your response and will advise you of its acceptability at a
later date.
We appreciate your cooperation in this matter.
Sincerely,
Original Signed by
Luis A. Reyes /for
Roger D. Walker, Director
Division of Reactor Projects
% F. McKee, Director, Nuclear
cc:
Plant Operations
yC.Widell, Manager, Nuclear
Operations Licensing and Fuel
Management
bec:
RC Resident Inspector
Document Control Desk
State of Florida
RII
RII
HChristensen
SElrod
) d(VB f
C
9/g /86
9/ v/86
g
f6
f
NESc4 888aggo ,
PDR
,
DI
g
}}

Latest revision as of 14:15, 23 May 2025

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-302/86-14.NRC Will Advise Util Re Acceptability of Response at Later Date
ML20210R443
Person / Time
Site: Crystal River 
Issue date: 09/26/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
References
NUDOCS 8610070308
Download: ML20210R443 (1)


See also: IR 05000302/1986014

Text

SEP 2 61986

.

F1,orida Power Corporation

gTN: Mr. W. S. Wilgus

Vice President Nuclear Operations

P. O. Box 14042, M.A.C. C-2-M

St. Petersburg, FL 33733

Gentlemen:

SUBJECT: NRC INSPECTION REPORT N0. 50-302/86-14

Thank you for your response of August 21, 1986, to our Notice of Violation issued

on July 25, 1986, concerning activities conducted at your Crystal River facility.

We are evaluating your response and will advise you of its acceptability at a

later date.

We appreciate your cooperation in this matter.

Sincerely,

Original Signed by

Luis A. Reyes /for

Roger D. Walker, Director

Division of Reactor Projects

% F. McKee, Director, Nuclear

cc:

Plant Operations

yC.Widell, Manager, Nuclear

Operations Licensing and Fuel

Management

bec:

RC Resident Inspector

Document Control Desk

State of Florida

RII

RII

HChristensen

SElrod

) d(VB f

C

9/g /86

9/ v/86

g

f6

f

NESc4 888aggo ,

PDR

,

DI

g