ML20211C323: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
#REDIRECT [[IR 05000438/1986007]]
{{Adams
| number = ML20211C323
| issue date = 02/12/1987
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-438/86-07 & 50-439/86-07
| author name = Zech G
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee name = White S
| addressee affiliation = TENNESSEE VALLEY AUTHORITY
| docket = 05000438, 05000439
| license number =
| contact person =
| document report number = NUDOCS 8702200066
| title reference date = 01-28-1987
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
}}
See also: [[see also::IR 05000438/1986007]]
 
=Text=
{{#Wiki_filter:-
_
,
FEB 121937
Tennessee Valley Authority
LATTN: Mr. S. A. White
Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT:
REPORT N05. 50-438/438/86-07 AND 50-439/439/86-07
Thank you for your response of January 28, 1987, to our Notice of Violation
issued on December 29, 1986, concerning activities conducted at your Bellefonte
facility.
We have evaluated you" response and found that it meets the require-
ments of 10 CFR 2.201.
We will examine the implementation of your corrective
' actions during future inspections.
We appreciate your cooperation in this matter.
<
Sincerely,
Original signed by S. A. Elrod
Gary G. Zech, Director
Division of TVA Projects
cc: 4 Y P. Darling, Site Director
Bellefonte Nuclear Plant
(E. W. Cantrell, Acting Director
Nuclear Engineering
(# L. Gridley, Director
Nuclear Safety and Licensing
W. L. Terrill, Site Licensing
Manager
bec: J, N. Grace, RII
LY. R. Denton, NRR
g L. Thompson, NRR
tF M. Taylor, IE
dVB. Hayes, 01
@ R. Connelly, 01A
K
P. Barr, RII
MCResidentInspector
NRC Document control Desk
State of Alabama
8702200066 870212
gDR
ADOCK 05000438
PDR
RII
RII
r
RII
AJo#h on
Algna ns
r
2/)0/87
2//c/87
2{s/87
l
teol
' O
__
.
-
.
  ..- .
.
- .
_ _ _ . _
-
}}

Latest revision as of 13:38, 23 May 2025

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-438/86-07 & 50-439/86-07
ML20211C323
Person / Time
Site: Bellefonte  
Issue date: 02/12/1987
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8702200066
Download: ML20211C323 (1)


See also: IR 05000438/1986007

Text

-

_

,

FEB 121937

Tennessee Valley Authority

LATTN: Mr. S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Gentlemen:

SUBJECT:

REPORT N05. 50-438/438/86-07 AND 50-439/439/86-07

Thank you for your response of January 28, 1987, to our Notice of Violation

issued on December 29, 1986, concerning activities conducted at your Bellefonte

facility.

We have evaluated you" response and found that it meets the require-

ments of 10 CFR 2.201.

We will examine the implementation of your corrective

' actions during future inspections.

We appreciate your cooperation in this matter.

<

Sincerely,

Original signed by S. A. Elrod

Gary G. Zech, Director

Division of TVA Projects

cc: 4 Y P. Darling, Site Director

Bellefonte Nuclear Plant

(E. W. Cantrell, Acting Director

Nuclear Engineering

(# L. Gridley, Director

Nuclear Safety and Licensing

W. L. Terrill, Site Licensing

Manager

bec: J, N. Grace, RII

LY. R. Denton, NRR

g L. Thompson, NRR

tF M. Taylor, IE

dVB. Hayes, 01

@ R. Connelly, 01A

K

P. Barr, RII

MCResidentInspector

NRC Document control Desk

State of Alabama

8702200066 870212

gDR

ADOCK 05000438

PDR

RII

RII

r

RII

AJo#h on

Algna ns

r

2/)0/87

2//c/87

2{s/87

l

teol

' O

__

.

-

.

..- .

.

.

- .

_ _ _ . _

-