ENS 57618: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 25: Line 25:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
At the time of the event, condensate flushing evolutions were ongoing. It should be noted that prior to the reactor scram, a single feedwater pump tripped which would lower reactor water level.
At the time of the event, condensate flushing evolutions were ongoing. It should be noted that prior to the reactor scram, a single feedwater pump tripped which would lower reactor water level.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20250320en.html#en57618
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20250321en.html#en57618
}}{{unit info
}}{{unit info
| Unit = 1
| Unit = 1

Latest revision as of 06:20, 21 March 2025

ENS 57618 +/-
Where
Monticello Xcel Energy icon.png
Minnesota (NRC Region 3)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-0.4 h-0.0167 days <br />-0.00238 weeks <br />-5.4792e-4 months <br />)
Opened: Tom Johnson
16:12 Mar 19, 2025
NRC Officer: Ernest West
Last Updated: Mar 19, 2025
57618 - NRC Website
Loading map...