Revision No. 3 Faulted JPM
Revision No. 3 Faulted JPM


PAGE 0 Ir                                                                                                 ii I CONTROL ROOM EVACUATION           (DUTIES OF NROATC)     (NRC)                                   II Ir                                                                         II li                                                                         II TRAINEE                                         EVALUATOR                                     II II II II   EVALUATOR SIGNATURE                                                 DATE                     II II                                                                                                   II II   EVALUATION METHOD:           PERFORM                                                         II II   EVALUATION LOCATION:         SIMULATOR                                                       II II                                                                                                   II ESTIMATED TIME:               10.0 MINUTES                   TIME STARTED:                     II II                                                                                                   if II     10CFR55.45(a)12       DEMONSTRATE THE KNOWLEDGE AND ABILITY AS APPROPRIATE TO THE ASSIGNED POSITION TO ASSUME THE RESPONSIBILITIES ASSOCIATED                                 II WITH THE SAFE OPERATION OF THE FACILITY II                                                                                                   II TIME CRITICAL:     No                 FAULTED JPM:     Yes TRAINEE PERFORMANCE:           SATISFACTORY               UNSATISFACTORY II Ii i'                                                                                                   II I,
PAGE 0 Ir ii I
ii    READ TO OPERATOR:
CONTROL ROOM EVACUATION (DUTIES OF NROATC)
II II    WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE I'    INITIATING CUES. I WILL DESCRIBE GENERAL CONDITIONS UNDER WHICH THIS TASK                   II
(NRC)
'I      IS TO BE PERFORMED AND     PROVIDE THE NECESSARY       TOOLS WITH WHICH TO PERFORM THIS   'I II    TASK. BEFORE STARTING,     I   WILL EXPLAIN THE INITIAL CONDITIONS,       WHICH STEPS     Ii II    TO SIMULATE   OR DISCUSS,     AND   PROVIDE INITIATING     CUES.                           'I II    WHEN YOU COMPLETE THE TASK SUCCESSFULLY,             THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.                                                   ii 1I                                                                                                -  I INITIAL CONDITIONS:
II Ir II li II TRAINEE EVALUATOR II II II II EVALUATOR SIGNATURE DATE II II II II EVALUATION METHOD:
: 1.     The plant is operating at 100% power, all             controls in automatic. A bomb has been found           in the Control Room. Shift Supervisor has directed         a   Control   Room evacuation.
PERFORM II II EVALUATION LOCATION:
SIMULATOR II II II ESTIMATED TIME:
10.0 MINUTES TIME STARTED:
II II if II 10CFR55.45(a)12 DEMONSTRATE THE KNOWLEDGE AND ABILITY AS APPROPRIATE TO THE ASSIGNED POSITION TO ASSUME THE RESPONSIBILITIES ASSOCIATED II WITH THE SAFE OPERATION OF THE FACILITY II II TIME CRITICAL:
No FAULTED JPM:
Yes TRAINEE PERFORMANCE:
SATISFACTORY UNSATISFACTORY II Ii i'
II I,
READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES.
I WILL DESCRIBE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK.
BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES.
WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
II II
'I Ii 'I ii INITIAL CONDITIONS:
: 1. The plant is operating at 100% power, all controls in automatic. A bomb has been found in the Control Room. Shift Supervisor has directed a Control Room evacuation.
TOOLS AND EQUIPMENT NEEDED:
TOOLS AND EQUIPMENT NEEDED:
: 1.     AOP-600.1 REFERENCED DOCUMENTS:                                                     REV DATE
: 1. AOP-600.1 REFERENCED DOCUMENTS:
: 1.       AOP*600. 1         CONTROL ROOM EVACUATION                          03/14/95
REV DATE CONTROL ROOM EVACUATION ii II I'
'I II II II 1I I
03/14/95
: 1.
AOP*600. 1


0                                 0     PAGE 1 ii l
0 0
iI   CONTROL ROOM EVACUATION (DUTIES OF NROATC)     (NRC)                     Ii I -
iI CONTROL ROOM EVACUATION (DUTIES OF NROATC)
(NRC)
TASK STANDARDS:
TASK STANDARDS:
: 1. Reactor is tripped.
: 1. Reactor is tripped.
: 2. Turbine is tripped.
: 2.
: 3. RCP "B" ist ipped.
Turbine is tripped.
: 3.
RCP "B" ist ipped.
INITIATING CUES:
INITIATING CUES:
: 1. The SI             ;or directs that the Control Room should be evacui              .S directs the NROATC to complete Attachment I of "
: 1. The SI evacui I of "
TERMINATING CUES:
;or directs that the Control Room should be  
: 1.     'B' RCP is secured.
.S directs the NROATC to complete Attachment TERMINATING CUES:
: 1.  
'B' RCP is secured.
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
: 1. ROTATING EQUIPMENT
: 1.
: 2. HIGH NOISE AREA
ROTATING EQUIPMENT
: 2.
HIGH NOISE AREA PAGE 1 ii Ii I -
l


                                      .0 JOB PERFORMANCE MEASURE CHECKLIST                           PAGE 2 (S) DENOTES SEQUENCED ELEMENT
.0 JOB PERFORMANCE MEASURE CHECKLIST (S)
(*) DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:                                                           SAT. UNSAT.
DENOTES SEQUENCED ELEMENT
STEP                                   STANDARD Sl1. Trip Reactor manually from the     Position the reactor trip switch MCB.                                (CS-CR01 or CS-CRO0A) to the TRIP position COMMENTS:
(*)
STEP                                   STANDARD
DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:
: 2. verify all reactor trip           TRIP BKR A & B indicate red light OFF, breakers open.                    green light ON.
SAT.
STEP                                  STANDARD
UNSAT.
: 3. Verify all  rod bottom lights      All rod bottom lights are lit by DRPI lit.                              indication.
STEP Sl1.
STEP                                  STANDARD
Trip Reactor manually from the MCB.
: 4. Verify reactor power level        Reactor power level decreasing on N35 decreasing.                        and N36 indication.
STANDARD Position the reactor trip switch (CS-CR01 or CS-CRO0A) to the TRIP position COMMENTS:
STEP                                  STANDARD 5  Trips turbine from MCB.            Momentarily depresses EMER TRIP pushbutton.
STEP
STEP                                  STANDARD 6    Verifies turbine stop valves      STM STOP VLVs indicate open by dim closed.                            indication on XCP-6114 status lights.
: 2.
from iNOTE 7:   The student may also call the TBAO to locally trip the turbine the Front Standard.
verify all reactor trip breakers open.
STEP                                   STANDARD S-7. Stops EHC pumps A & B and         EHC pumps A & B switches placed in PULL
STEP
: 3.
Verify all rod bottom lights lit.
STEP
: 4.
Verify reactor power level decreasing.
STEP 5 Trips turbine from MCB.
STEP 6
Verifies turbine stop valves closed.
STANDARD TRIP BKR A & B indicate red light OFF, green light ON.
STANDARD All rod bottom lights are lit by DRPI indication.
STANDARD Reactor power level decreasing on N35 and N36 indication.
STANDARD Momentarily depresses EMER TRIP pushbutton.
STANDARD STM STOP VLVs indicate open by dim indication on XCP-6114 status lights.
iNOTE 7:
The student may also call the TBAO to locally trip the turbine from the Front Standard.
STEP S-7.
Stops EHC pumps A & B and STANDARD EHC pumps A & B switches placed in PULL PAGE 2


0 JOB PERFORMANCE MEASURE CHECKLIST 4 PAGE 3 (S) DENOTES SEQUENCED ELEMENT
0 4
(*) DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:                                         SAT. UNSAT.
JOB PERFORMANCE MEASURE CHECKLIST (S)
place in PULL TO LOCK.       TO LK NON-A
DENOTES SEQUENCED ELEMENT
(*)
DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:
place in PULL TO LOCK.
TO LK NON-A PAGE 3 SAT. UNSAT.


JOB PERFORMANCE MEASURE CHECKLIST                                 PAGE 4 (S) DENOTES SEQUENCED ELEMENT t*) DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:                                                                         SAT. UNSAT.
JOB PERFORMANCE MEASURE CHECKLIST (S) DENOTES SEQUENCED ELEMENT t*) DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:
COMMENTS:
PAGE 4 SAT.
INOTE 8:   The student may manually trip   the generator breaker, field     breaker,       II I           and exciter   field breaker before the turbine   trips automatically.           I I          This is acceptable if   >30 seconds after   NSIVs closed (reactor   trip).     i STEP                                       STANDARD
UNSAT.
: 8. Ensures GEN BKR open (after 30         GEN BKR indicates red light OFF,      green second time delay).                    light ON.
INOTE 8:
STEP                                       STANDARD
The student may manually trip the generator breaker, field
: 9. Ensures generator field               GEN FIELD BKR indicates red light OFF, breaker is open.                       green light ON STEP                                       STANDARD
: breaker, I
  "-10. Trips Exciter Field breaker.           EXC FIELD BKR indicates   red light OFF, green light ON.
and exciter field breaker before the turbine trips automatically.
I This is acceptable if  
>30 seconds after NSIVs closed (reactor trip).
STEP
: 8.
Ensures GEN BKR open (after 30 second time delay).
STEP
: 9.
Ensures generator field breaker is open.
STEP  
"-10. Trips Exciter Field breaker.
STANDARD GEN BKR indicates red light OFF, green light ON.
STANDARD GEN FIELD BKR indicates red light OFF, green light ON STANDARD EXC FIELD BKR indicates red light OFF, green light ON.
COMENTS:
COMENTS:
STEP                                       STANDARD
STEP
: 11. Stop RCP 'B'.                           XPP-0030B, RCP B, indicates red light OFF, green light ON, normal running amps
: 11.
Stop RCP 'B'.
STANDARD XPP-0030B, RCP B, indicates red light OFF, green light ON, normal running amps COMMENTS:
I I I
i


JOB PERFORMANCE MEASURE CHECKLIST                             PAGE S (S) DENOTES SEQUENCED ELEMENT
JOB PERFORMANCE MEASURE CHECKLIST (S)
(*) DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:                                                               SAT. UNSAT.
DENOTES SEQUENCED ELEMENT
(*) DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:
PAGE S SAT. UNSAT.
COMMENTS:
COMMENTS:
jNOTE 12: The student may close PCV-444C,   PZR SPRAY. This is not required.
jNOTE 12:
STEP                                     STANDARD
The student may close PCV-444C, PZR SPRAY.
: 12. Verify RCP 'A' is running.       Notes XPP-0030A, RCP A, indicates red light OFF, green light ON.
This is not required.
STEP                                    STANDARD
STEP
  "*13. Keeps RCP 'C'  running.            XPP-0030C, RCP C, indicates red light ON, green light OFF.
: 12.
Verify RCP  
'A' is running.
STEP
"*13.
Keeps RCP 'C' running.
STANDARD Notes XPP-0030A, RCP A, indicates red light OFF, green light ON.
STANDARD XPP-0030C, RCP C, indicates red light ON, green light OFF.
COMMENTS:
COMMENTS:
Examiner Stops JPM At This Point TIME STOPPED:
Examiner Stops JPM At This Point TIME STOPPED:  


==GENERAL COMMENT==
==GENERAL COMMENT==
S:
S:


PAGE 6 11 CONTROL ROOM EVACUATION (DUTIES OF NROATC) (NRC)
PAGE 6 11 CONTROL ROOM EVACUATION (DUTIES OF NROATC)
(NRC)
NRC KA  
NRC KA  


==REFERENCES:==
==REFERENCES:==
 
KA NUMBER 000068.EK3.12 000068.EK3.18 Knowledge of the reason for the required sequence of actions for emergency evacuation of control room.
KA NUMBER                                     IMPORTANCE  FACTOR RO        SRO 000068.EK3.12   Knowledge of the reason for   4.1          4.5 the required sequence of actions for emergency evacuation of control room.
Knowledge of the reason for actions contained in EOP for control room evacuation.
000068.EK3.18    Knowledge of the reason for   4.2          4.5 actions contained in EOP for control room evacuation.}}
IMPORTANCE RO 4.1 4.2 FACTOR SRO 4.5 4.5}}

Latest revision as of 15:49, 16 January 2025

NRC Job Performance Measure; JPSF-056; Control Room Evacuation (Duties of Nroatc)
ML022630198
Person / Time
Site: Summer 
Issue date: 09/16/2002
From:
NRC/RGN-II
To:
References
FOIA/PA-2002-0371
Download: ML022630198 (8)


Text

V.C. SUMMER NUCLEAR STATION NRC JOB PERFORMANCE MEASURE JPSF-056 CONTROL ROOM EVACUATION (DUTIES OF NROATC) (NRC)

Revision No. 3 Faulted JPM

PAGE 0 Ir ii I

CONTROL ROOM EVACUATION (DUTIES OF NROATC)

(NRC)

II Ir II li II TRAINEE EVALUATOR II II II II EVALUATOR SIGNATURE DATE II II II II EVALUATION METHOD:

PERFORM II II EVALUATION LOCATION:

SIMULATOR II II II ESTIMATED TIME:

10.0 MINUTES TIME STARTED:

II II if II 10CFR55.45(a)12 DEMONSTRATE THE KNOWLEDGE AND ABILITY AS APPROPRIATE TO THE ASSIGNED POSITION TO ASSUME THE RESPONSIBILITIES ASSOCIATED II WITH THE SAFE OPERATION OF THE FACILITY II II TIME CRITICAL:

No FAULTED JPM:

Yes TRAINEE PERFORMANCE:

SATISFACTORY UNSATISFACTORY II Ii i'

II I,

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES.

I WILL DESCRIBE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK.

BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES.

WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.

II II

'I Ii 'I ii INITIAL CONDITIONS:

1. The plant is operating at 100% power, all controls in automatic. A bomb has been found in the Control Room. Shift Supervisor has directed a Control Room evacuation.

TOOLS AND EQUIPMENT NEEDED:

1. AOP-600.1 REFERENCED DOCUMENTS:

REV DATE CONTROL ROOM EVACUATION ii II I'

'I II II II 1I I

03/14/95

1.

AOP*600. 1

0 0

iI CONTROL ROOM EVACUATION (DUTIES OF NROATC)

(NRC)

TASK STANDARDS:

1. Reactor is tripped.
2.

Turbine is tripped.

3.

RCP "B" ist ipped.

INITIATING CUES:

1. The SI evacui I of "
or directs that the Control Room should be

.S directs the NROATC to complete Attachment TERMINATING CUES:

1.

'B' RCP is secured.

SAFETY CONSIDERATIONS:

1.

ROTATING EQUIPMENT

2.

HIGH NOISE AREA PAGE 1 ii Ii I -

l

.0 JOB PERFORMANCE MEASURE CHECKLIST (S)

DENOTES SEQUENCED ELEMENT

(*)

DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:

SAT.

UNSAT.

STEP Sl1.

Trip Reactor manually from the MCB.

STANDARD Position the reactor trip switch (CS-CR01 or CS-CRO0A) to the TRIP position COMMENTS:

STEP

2.

verify all reactor trip breakers open.

STEP

3.

Verify all rod bottom lights lit.

STEP

4.

Verify reactor power level decreasing.

STEP 5 Trips turbine from MCB.

STEP 6

Verifies turbine stop valves closed.

STANDARD TRIP BKR A & B indicate red light OFF, green light ON.

STANDARD All rod bottom lights are lit by DRPI indication.

STANDARD Reactor power level decreasing on N35 and N36 indication.

STANDARD Momentarily depresses EMER TRIP pushbutton.

STANDARD STM STOP VLVs indicate open by dim indication on XCP-6114 status lights.

iNOTE 7:

The student may also call the TBAO to locally trip the turbine from the Front Standard.

STEP S-7.

Stops EHC pumps A & B and STANDARD EHC pumps A & B switches placed in PULL PAGE 2

0 4

JOB PERFORMANCE MEASURE CHECKLIST (S)

DENOTES SEQUENCED ELEMENT

(*)

DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:

place in PULL TO LOCK.

TO LK NON-A PAGE 3 SAT. UNSAT.

JOB PERFORMANCE MEASURE CHECKLIST (S) DENOTES SEQUENCED ELEMENT t*) DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:

PAGE 4 SAT.

UNSAT.

INOTE 8:

The student may manually trip the generator breaker, field

breaker, I

and exciter field breaker before the turbine trips automatically.

I This is acceptable if

>30 seconds after NSIVs closed (reactor trip).

STEP

8.

Ensures GEN BKR open (after 30 second time delay).

STEP

9.

Ensures generator field breaker is open.

STEP

"-10. Trips Exciter Field breaker.

STANDARD GEN BKR indicates red light OFF, green light ON.

STANDARD GEN FIELD BKR indicates red light OFF, green light ON STANDARD EXC FIELD BKR indicates red light OFF, green light ON.

COMENTS:

STEP

11.

Stop RCP 'B'.

STANDARD XPP-0030B, RCP B, indicates red light OFF, green light ON, normal running amps COMMENTS:

I I I

i

JOB PERFORMANCE MEASURE CHECKLIST (S)

DENOTES SEQUENCED ELEMENT

(*) DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:

PAGE S SAT. UNSAT.

COMMENTS:

jNOTE 12:

The student may close PCV-444C, PZR SPRAY.

This is not required.

STEP

12.

Verify RCP

'A' is running.

STEP

"*13.

Keeps RCP 'C' running.

STANDARD Notes XPP-0030A, RCP A, indicates red light OFF, green light ON.

STANDARD XPP-0030C, RCP C, indicates red light ON, green light OFF.

COMMENTS:

Examiner Stops JPM At This Point TIME STOPPED:

GENERAL COMMENT

S:

PAGE 6 11 CONTROL ROOM EVACUATION (DUTIES OF NROATC)

(NRC)

NRC KA

REFERENCES:

KA NUMBER 000068.EK3.12 000068.EK3.18 Knowledge of the reason for the required sequence of actions for emergency evacuation of control room.

Knowledge of the reason for actions contained in EOP for control room evacuation.

IMPORTANCE RO 4.1 4.2 FACTOR SRO 4.5 4.5