V.C. SUMMER NUCLEAR STATION NRC JOB PERFORMANCE MEASURE JPSF-056 CONTROL ROOM EVACUATION (DUTIES OF NROATC) (NRC)
Revision No. 3 Faulted JPM
PAGE 0 Ir ii I
CONTROL ROOM EVACUATION (DUTIES OF NROATC)
(NRC)
II Ir II li II TRAINEE EVALUATOR II II II II EVALUATOR SIGNATURE DATE II II II II EVALUATION METHOD:
PERFORM II II EVALUATION LOCATION:
SIMULATOR II II II ESTIMATED TIME:
10.0 MINUTES TIME STARTED:
II II if II 10CFR55.45(a)12 DEMONSTRATE THE KNOWLEDGE AND ABILITY AS APPROPRIATE TO THE ASSIGNED POSITION TO ASSUME THE RESPONSIBILITIES ASSOCIATED II WITH THE SAFE OPERATION OF THE FACILITY II II TIME CRITICAL:
No FAULTED JPM:
Yes TRAINEE PERFORMANCE:
SATISFACTORY UNSATISFACTORY II Ii i'
II I,
READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES.
I WILL DESCRIBE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK.
BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES.
WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
II II
'I Ii 'I ii INITIAL CONDITIONS:
- 1. The plant is operating at 100% power, all controls in automatic. A bomb has been found in the Control Room. Shift Supervisor has directed a Control Room evacuation.
TOOLS AND EQUIPMENT NEEDED:
- 1. AOP-600.1 REFERENCED DOCUMENTS:
REV DATE CONTROL ROOM EVACUATION ii II I'
'I II II II 1I I
03/14/95
- 1.
AOP*600. 1
0 0
iI CONTROL ROOM EVACUATION (DUTIES OF NROATC)
(NRC)
TASK STANDARDS:
- 1. Reactor is tripped.
- 2.
Turbine is tripped.
- 3.
RCP "B" ist ipped.
INITIATING CUES:
- 1. The SI evacui I of "
- or directs that the Control Room should be
.S directs the NROATC to complete Attachment TERMINATING CUES:
- 1.
'B' RCP is secured.
SAFETY CONSIDERATIONS:
- 1.
ROTATING EQUIPMENT
- 2.
HIGH NOISE AREA PAGE 1 ii Ii I -
l
.0 JOB PERFORMANCE MEASURE CHECKLIST (S)
DENOTES SEQUENCED ELEMENT
(*)
DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:
SAT.
UNSAT.
STEP Sl1.
Trip Reactor manually from the MCB.
STANDARD Position the reactor trip switch (CS-CR01 or CS-CRO0A) to the TRIP position COMMENTS:
STEP
- 2.
verify all reactor trip breakers open.
STEP
- 3.
Verify all rod bottom lights lit.
STEP
- 4.
Verify reactor power level decreasing.
STEP 5 Trips turbine from MCB.
STEP 6
Verifies turbine stop valves closed.
STANDARD TRIP BKR A & B indicate red light OFF, green light ON.
STANDARD All rod bottom lights are lit by DRPI indication.
STANDARD Reactor power level decreasing on N35 and N36 indication.
STANDARD Momentarily depresses EMER TRIP pushbutton.
STANDARD STM STOP VLVs indicate open by dim indication on XCP-6114 status lights.
iNOTE 7:
The student may also call the TBAO to locally trip the turbine from the Front Standard.
STEP S-7.
Stops EHC pumps A & B and STANDARD EHC pumps A & B switches placed in PULL PAGE 2
0 4
JOB PERFORMANCE MEASURE CHECKLIST (S)
DENOTES SEQUENCED ELEMENT
(*)
DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:
place in PULL TO LOCK.
TO LK NON-A PAGE 3 SAT. UNSAT.
JOB PERFORMANCE MEASURE CHECKLIST (S) DENOTES SEQUENCED ELEMENT t*) DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:
PAGE 4 SAT.
UNSAT.
INOTE 8:
The student may manually trip the generator breaker, field
- breaker, I
and exciter field breaker before the turbine trips automatically.
I This is acceptable if
>30 seconds after NSIVs closed (reactor trip).
STEP
- 8.
Ensures GEN BKR open (after 30 second time delay).
STEP
- 9.
Ensures generator field breaker is open.
STEP
"-10. Trips Exciter Field breaker.
STANDARD GEN BKR indicates red light OFF, green light ON.
STANDARD GEN FIELD BKR indicates red light OFF, green light ON STANDARD EXC FIELD BKR indicates red light OFF, green light ON.
COMENTS:
STEP
- 11.
Stop RCP 'B'.
STANDARD XPP-0030B, RCP B, indicates red light OFF, green light ON, normal running amps COMMENTS:
I I I
i
JOB PERFORMANCE MEASURE CHECKLIST (S)
DENOTES SEQUENCED ELEMENT
(*) DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:
PAGE S SAT. UNSAT.
COMMENTS:
jNOTE 12:
The student may close PCV-444C, PZR SPRAY.
This is not required.
STEP
- 12.
Verify RCP
'A' is running.
STEP
"*13.
Keeps RCP 'C' running.
STANDARD Notes XPP-0030A, RCP A, indicates red light OFF, green light ON.
STANDARD XPP-0030C, RCP C, indicates red light ON, green light OFF.
COMMENTS:
Examiner Stops JPM At This Point TIME STOPPED:
GENERAL COMMENT
S:
PAGE 6 11 CONTROL ROOM EVACUATION (DUTIES OF NROATC)
(NRC)
NRC KA
REFERENCES:
KA NUMBER 000068.EK3.12 000068.EK3.18 Knowledge of the reason for the required sequence of actions for emergency evacuation of control room.
Knowledge of the reason for actions contained in EOP for control room evacuation.