{{#Wiki_filter:iristine LIMS - Uraxi LN Tor uavis tesse uraer       ____ __                                                    Pane I -9I From:             Jennifer Dixon-Herrity/ @ £ To:               Brent Clayton; Carl Lyon Date:             2/24/04 1:55PM
{{#Wiki_filter:iristine LIMS - Uraxi LN Tor uavis tesse uraer Pane I I
-9 From:
Jennifer Dixon-Herrity/ @ £ To:
Brent Clayton; Carl Lyon Date:
2/24/04 1:55PM


==Subject:==
==Subject:==
Draft EN for Davis Besse Order Here is the draft EN we put together. Please let me know of comments/concerns and when it should go out. The EN should be issued the same day as the Order.
Draft EN for Davis Besse Order Here is the draft EN we put together. Please let me know of comments/concerns and when it should go out. The EN should be issued the same day as the Order.
Jen
Jen A  
* A
+
                                                                                                                +


February XX, 2004 EN 04-0XX OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:       FirstEnergy Nuclear Operating Company       (EA-03-214)
February XX, 2004 EN 04-0XX OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:
Davis-Besse Nuclear Power Station, Unit 1 Docket No. 50-346 Subiect:         CONFIRMATORY ORDER MODIFYING LICENSE (EFFECTIVE IMMEDIATELY)
FirstEnergy Nuclear Operating Company (EA-03-214)
Davis-Besse Nuclear Power Station, Unit 1 Docket No. 50-346 Subiect:
CONFIRMATORY ORDER MODIFYING LICENSE (EFFECTIVE IMMEDIATELY)
This is to inform the Commission that a Confirmatory Order Modifying License (effective immediately) will be issued on or about February XX, 2004, to the FirstEnergy Nuclear Operating Company (FENOC). This action is based on NRC inspection reports which concluded that FENOC's failure to properly implement its boric acid corrosion control and corrective action programs was a performance deficiency that allowed reactor coolant system pressure boundary leakage to occur undetected for a prolonged time, resulting in reactor pressure vessel upper head degradation. The NRC recognizes that FENOC has implemented significant corrective actions resulting in improved performance and self-assessment capability.
This is to inform the Commission that a Confirmatory Order Modifying License (effective immediately) will be issued on or about February XX, 2004, to the FirstEnergy Nuclear Operating Company (FENOC). This action is based on NRC inspection reports which concluded that FENOC's failure to properly implement its boric acid corrosion control and corrective action programs was a performance deficiency that allowed reactor coolant system pressure boundary leakage to occur undetected for a prolonged time, resulting in reactor pressure vessel upper head degradation. The NRC recognizes that FENOC has implemented significant corrective actions resulting in improved performance and self-assessment capability.
Nevertheless, considering the problems identified, the NRC requires independent outside assessments to ensure continued effective Licensee self-assessments and sustained safe performance in the areas of operations, engineering, corrective actions, and safety culture.
Nevertheless, considering the problems identified, the NRC requires independent outside assessments to ensure continued effective Licensee self-assessments and sustained safe performance in the areas of operations, engineering, corrective actions, and safety culture.
Line 31: Line 36:
Based on these comprehensive actions, the staff has concluded that its concerns can be resolved through the confirmation of FENOC commitments as outlined in the Confirmatory Order.
Based on these comprehensive actions, the staff has concluded that its concerns can be resolved through the confirmation of FENOC commitments as outlined in the Confirmatory Order.
The schedule of issuance and notification Is:
The schedule of issuance and notification Is:
Mailing of Confirmatory Order                       February XX, 2004 Telephone Notification of Licensee                 February XX, 2004 The State of Ohio will be notified.
Mailing of Confirmatory Order February XX, 2004 Telephone Notification of Licensee February XX, 2004 The State of Ohio will be notified.
Contacts: David Nelson, OE, 415-3280; Frank Congel, OE, 415-2741 PRE     NARY INFOI
Contacts: David Nelson, OE, 415-3280; Frank Congel, OE, 415-2741 PRE NARY INFOI OT FOR PUL!
* OT FOR PUL!       I     OSUREXUNTIL
I OSUREXUNTIL


VERIFICATION THAT LICENSEE HAS RECEIVED ACTION Distribution OWFN                 OWFN            TWEN            Regional Office Chairman Diaz       EDO              OCFO            RI              RIV Comm. McGaffigan     DEDR            OP CTR          RH_
VERIFICATION THAT LICENSEE HAS RECEIVED ACTION Distribution OWFN Chairman Diaz Comm. McGaffigan Comm. Merrifield SECY OCA PA IP OWFN EDO DEDR DEDMRS OE OGC NRR NSIR OI STP TWEN OCFO OP CTR NMSS OCIO OIG RES ACRS Regional Office RI RH_
Comm. Merrifield     DEDMRS           NMSS            RI_
RI_
SECY                OE               OCIO OCA                  OGC             OIG            MAIL PA                  NRR             RES            PUBLIC IP                  NSIR             ACRS OI STP OE:ES               OE:D J. Dixon-Herrity     F. Congel 2/ /04               2/ /04}}
RIV MAIL PUBLIC OE:ES J. Dixon-Herrity 2/ /04 OE:D F. Congel 2/ /04}}

Latest revision as of 03:37, 16 January 2025

E-Mail from Dixon-Herrity to Clayton Re Draft EN for Davis Besse Order
ML041050118
Person / Time
Site: Davis Besse 
Issue date: 02/24/2004
From: Jennifer Dixon-Herrity
NRC/OE
To: Clayton H, Lyon C
NRC/RGN-III
References
FOIA/PA-2004-0140
Download: ML041050118 (3)


Text

iristine LIMS - Uraxi LN Tor uavis tesse uraer Pane I I

-9 From:

Jennifer Dixon-Herrity/ @ £ To:

Brent Clayton; Carl Lyon Date:

2/24/04 1:55PM

Subject:

Draft EN for Davis Besse Order Here is the draft EN we put together. Please let me know of comments/concerns and when it should go out. The EN should be issued the same day as the Order.

Jen A

+

February XX, 2004 EN 04-0XX OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:

FirstEnergy Nuclear Operating Company (EA-03-214)

Davis-Besse Nuclear Power Station, Unit 1 Docket No. 50-346 Subiect:

CONFIRMATORY ORDER MODIFYING LICENSE (EFFECTIVE IMMEDIATELY)

This is to inform the Commission that a Confirmatory Order Modifying License (effective immediately) will be issued on or about February XX, 2004, to the FirstEnergy Nuclear Operating Company (FENOC). This action is based on NRC inspection reports which concluded that FENOC's failure to properly implement its boric acid corrosion control and corrective action programs was a performance deficiency that allowed reactor coolant system pressure boundary leakage to occur undetected for a prolonged time, resulting in reactor pressure vessel upper head degradation. The NRC recognizes that FENOC has implemented significant corrective actions resulting in improved performance and self-assessment capability.

Nevertheless, considering the problems identified, the NRC requires independent outside assessments to ensure continued effective Licensee self-assessments and sustained safe performance in the areas of operations, engineering, corrective actions, and safety culture.

FENOC has committed to take comprehensive actions to address NRC concerns. Specifically, FENOC has committed (1) to contract with independent outside organizations to conduct comprehensive annual assessments of the Davis-Besse operations performance, organizational safety culture, including safety conscious work environment, the corrective action program implementation, and the engineering program effectiveness for five years and (2) to conduct a visual examination of the reactor pressure vessel upper head bare metal surface, including the head-to-penetration interfaces; the reactor pressure vessel lower head bare metal surface including the head-to penetration interfaces; and the control rod drive mechanism flanges, using VT-2 qualified personnel and procedures during the Cycle 14 midoycle outage.

Based on these comprehensive actions, the staff has concluded that its concerns can be resolved through the confirmation of FENOC commitments as outlined in the Confirmatory Order.

The schedule of issuance and notification Is:

Mailing of Confirmatory Order February XX, 2004 Telephone Notification of Licensee February XX, 2004 The State of Ohio will be notified.

Contacts: David Nelson, OE, 415-3280; Frank Congel, OE, 415-2741 PRE NARY INFOI OT FOR PUL!

I OSUREXUNTIL

VERIFICATION THAT LICENSEE HAS RECEIVED ACTION Distribution OWFN Chairman Diaz Comm. McGaffigan Comm. Merrifield SECY OCA PA IP OWFN EDO DEDR DEDMRS OE OGC NRR NSIR OI STP TWEN OCFO OP CTR NMSS OCIO OIG RES ACRS Regional Office RI RH_

RI_

RIV MAIL PUBLIC OE:ES J. Dixon-Herrity 2/ /04 OE:D F. Congel 2/ /04