{{#Wiki_filter:Page 1 of 2                                                                                    Robinson 08/30/2004    14:10:38                                                              Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit                                                                                                                          No. of Staff     Planned Dates          Inspection Number      Inspection Activity                                                  Title                                          on Site       Start      End              Type EB1-TFP       - FIRE PROTECTION-TRIENNIAL                                                                                 4 2              IP 7111105T            Fire Protection                                                                                      08/30/2004 09/03/2004 Baseline Inspections OL EXAM       - INITIAL EXAM                                                                                               3 2                V23218              ROBINSON/EXAMS AT POWER FACILITIES                                                                    08/30/2004 09/03/2004 Not Applicable EB2ISFSI       - ISFSI CONSTRUCTION / OPERATION                                                                             3 2              IP 60853              On-Site Fabrication Of Components And Construction On An ISFSI                                       10/04/2004 10/08/2004 Other Routine 2              IP 60855              Operation Of An ISFSI                                                                                 10/04/2004  10/08/2004 Other Routine PB4-PI&R       - PROBLEM IDENTIFICATION & RESOLUTION                                                                       3 2              IP 71152B              Identification and Resolution of Problems                                                            10/04/2004 10/08/2004 Baseline Inspections PB4-PI&R       - PROBLEM IDENTIFICATION AND RESOLUTION                                                                     3 2              IP 71152B              Identification and Resolution of Problems                                                            10/18/2004 10/22/2004 Baseline Inspections EB2TI159       - REVIEW OF GENERIC LETTER 89-13                                                                             4 2              IP 2515/159            Review of Generic Letter 89-13: Service Water System Problems Affecting Safety-Related E             10/24/2004 10/28/2004 Safety Issues OL EP          - EP INSPECTION                                                                                              1 2              IP 7111402            Alert and Notification System Testing                                                                 12/13/2004 12/17/2004 Baseline Inspections 2              IP 7111403            Emergency Response Organization Augmentation Testing                                                 12/13/2004 12/17/2004 Baseline Inspections 2              IP 7111404            Emergency Action Level and Emergency Plan Changes                                                     12/13/2004 12/17/2004 Baseline Inspections 2              IP 7111405            Correction of Emergency Preparedness Weaknesses and Deficiencies                                     12/13/2004 12/17/2004 Baseline Inspections 2              IP 71151              Performance Indicator Verification                                                                   12/13/2004  12/17/2004 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT                                                                                       2 2              IP 7111121            Safety System Design and Performance Capability                                                      01/17/2005 01/21/2005 Baseline Inspections PS-RP         - RP PUBLIC AND ISFSI                                                                                       3 2              IP 60855.1            Operation of an Independent Spent Fuel Storage Installation at Operating Plants                       01/31/2005 02/04/2005 Other Routine 2              IP 7112103            Radiation Monitoring Instrumentation and Protective Equipment                                         01/31/2005 02/04/2005 Baseline Inspections 2              IP 7112201            Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                             01/31/2005 02/04/2005 Baseline Inspections 2              IP 7112203            Radiological Environmental Monitoring Program                                                         01/31/2005 02/04/2005 Baseline Inspections 2              IP 71151              Performance Indicator Verification                                                                   01/31/2005  02/04/2005 Baseline Inspections OL RQ         - REQUAL INSPECTION                                                                                         2 2              IP 7111111B            Licensed Operator Requalification Program                                                            02/14/2005 02/18/2005 Baseline Inspections EB1SSDPC - SSDPC                                                                                                           5 2              IP 7111121            Safety System Design and Performance Capability                                                      02/14/2005 02/19/2005 Baseline Inspections 2              IP 7111121            Safety System Design and Performance Capability                                                       02/28/2005 03/04/2005 Baseline Inspections 60854         - ISFSI DRY RUN INSPECTION                                                                                   1 2              IP 60854              Preoperational Testing Of An ISFSI                                                                    06/20/2005 06/24/2005 Other Routine This report does not include INPO and OUTAGE activities.
{{#Wiki_filter:Robinson Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2004 14:10:38 Report 22 4
EB1-TFP
- FIRE PROTECTION-TRIENNIAL Baseline Inspections 08/30/2004 09/03/2004 Fire Protection IP 7111105T 2
3 OL EXAM
- INITIAL EXAM Not Applicable 08/30/2004 09/03/2004 ROBINSON/EXAMS AT POWER FACILITIES V23218 2
3 EB2ISFSI
- ISFSI CONSTRUCTION / OPERATION Other Routine 10/04/2004 10/08/2004 On-Site Fabrication Of Components And Construction On An ISFSI IP 60853 2
Other Routine 10/04/2004 10/08/2004 Operation Of An ISFSI IP 60855 2
3 PB4-PI&R
- PROBLEM IDENTIFICATION & RESOLUTION Baseline Inspections 10/04/2004 10/08/2004 Identification and Resolution of Problems IP 71152B 2
3 PB4-PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 10/18/2004 10/22/2004 Identification and Resolution of Problems IP 71152B 2
4 EB2TI159
- REVIEW OF GENERIC LETTER 89-13 Safety Issues 10/24/2004 10/28/2004 Review of Generic Letter 89-13: Service Water System Problems Affecting Safety-Related E IP 2515/159 2
1 OL EP
- EP INSPECTION Baseline Inspections 12/13/2004 12/17/2004 Alert and Notification System Testing IP 7111402 2
Baseline Inspections 12/13/2004 12/17/2004 Emergency Response Organization Augmentation Testing IP 7111403 2
Baseline Inspections 12/13/2004 12/17/2004 Emergency Action Level and Emergency Plan Changes IP 7111404 2
Baseline Inspections 12/13/2004 12/17/2004 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 2
Baseline Inspections 12/13/2004 12/17/2004 Performance Indicator Verification IP 71151 2
2 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 01/17/2005 01/21/2005 Safety System Design and Performance Capability IP 7111121 2
3 PS-RP
- RP PUBLIC AND ISFSI Other Routine 01/31/2005 02/04/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 2
Baseline Inspections 01/31/2005 02/04/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 2
Baseline Inspections 01/31/2005 02/04/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 2
Baseline Inspections 01/31/2005 02/04/2005 Radiological Environmental Monitoring Program IP 7112203 2
Baseline Inspections 01/31/2005 02/04/2005 Performance Indicator Verification IP 71151 2
2 OL RQ
- REQUAL INSPECTION Baseline Inspections 02/14/2005 02/18/2005 Licensed Operator Requalification Program IP 7111111B 2
5 EB1SSDPC - SSDPC Baseline Inspections 02/14/2005 02/19/2005 Safety System Design and Performance Capability IP 7111121 2
Baseline Inspections 02/28/2005 03/04/2005 Safety System Design and Performance Capability IP 7111121 2
1 60854
- ISFSI DRY RUN INSPECTION Other Routine 06/20/2005 06/24/2005 Preoperational Testing Of An ISFSI IP 60854 2
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
ENCLOSURE
ENCLOSURE


Page 2 of 2                                                                                    Robinson 08/30/2004    14:10:38                                                                Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit                                                                                                          No. of Staff     Planned Dates        Inspection Number      Inspection Activity                                                    Title                        on Site       Start      End            Type EB2 HEAD       - REACTOR HEAD REPLACEMENT                                                                   2 2              IP 71007              Reactor Vessel Head Replacement Inspection                                            08/15/2005 08/19/2005 Other Routine 2              IP 71007              Reactor Vessel Head Replacement Inspection                                           09/05/2005 09/07/2005 Other Routine EB2-ISI       - ISI                                                                                       1 2              IP 7111108P            Inservice Inspection Activities - PWR                                                09/06/2005 09/09/2005 Baseline Inspections PS - RP       - RP OCCUPATIONAL                                                                           1 2              IP 7112101            Access Control to Radiologically Significant Areas                                    09/12/2005 09/16/2005 Baseline Inspections 2              IP 7112102            ALARA Planning and Controls                                                          09/12/2005 09/16/2005 Baseline Inspections EB2SGISI       - STEAM GENERATOR ISI                                                                       1 2              IP 7111108P            Inservice Inspection Activities - PWR                                                09/19/2005 09/23/2005 Baseline Inspections EB2-MODS - MODIFICATIONS/10CFR50.59                                                                         1 2              IP 7111102            Evaluation of Changes, Tests, or Experiments                                          01/30/2006 02/03/2006 Baseline Inspections 2              IP 7111117B            Permanent Plant Modifications                                                        01/30/2006 02/03/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.
Robinson Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2004 14:10:38 Report 22 2
EB2 HEAD
- REACTOR HEAD REPLACEMENT Other Routine 08/15/2005 08/19/2005 Reactor Vessel Head Replacement Inspection IP 71007 2
Other Routine 09/05/2005 09/07/2005 Reactor Vessel Head Replacement Inspection IP 71007 2
1 EB2-ISI
- ISI Baseline Inspections 09/06/2005 09/09/2005 Inservice Inspection Activities - PWR IP 7111108P 2
1 PS - RP
- RP OCCUPATIONAL Baseline Inspections 09/12/2005 09/16/2005 Access Control to Radiologically Significant Areas IP 7112101 2
Baseline Inspections 09/12/2005 09/16/2005 ALARA Planning and Controls IP 7112102 2
1 EB2SGISI
- STEAM GENERATOR ISI Baseline Inspections 09/19/2005 09/23/2005 Inservice Inspection Activities - PWR IP 7111108P 2
1 EB2-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 01/30/2006 02/03/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 2
Baseline Inspections 01/30/2006 02/03/2006 Permanent Plant Modifications IP 7111117B 2
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 01:37, 16 January 2025

Inspection/Activity Plan for Robinson 09/01/2004 - 03/31/2006/
ML042430608
Person / Time
Site: Robinson, 07200003  
Issue date: 08/30/2004
From:
NRC/RGN-II
To:
Shared Package
ML042430597 List:
References
-RFPFR
Download: ML042430608 (2)


Text

Robinson Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2004 14:10:38 Report 22 4

EB1-TFP

- FIRE PROTECTION-TRIENNIAL Baseline Inspections 08/30/2004 09/03/2004 Fire Protection IP 7111105T 2

3 OL EXAM

- INITIAL EXAM Not Applicable 08/30/2004 09/03/2004 ROBINSON/EXAMS AT POWER FACILITIES V23218 2

3 EB2ISFSI

- ISFSI CONSTRUCTION / OPERATION Other Routine 10/04/2004 10/08/2004 On-Site Fabrication Of Components And Construction On An ISFSI IP 60853 2

Other Routine 10/04/2004 10/08/2004 Operation Of An ISFSI IP 60855 2

3 PB4-PI&R

- PROBLEM IDENTIFICATION & RESOLUTION Baseline Inspections 10/04/2004 10/08/2004 Identification and Resolution of Problems IP 71152B 2

3 PB4-PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 10/18/2004 10/22/2004 Identification and Resolution of Problems IP 71152B 2

4 EB2TI159

- REVIEW OF GENERIC LETTER 89-13 Safety Issues 10/24/2004 10/28/2004 Review of Generic Letter 89-13: Service Water System Problems Affecting Safety-Related E IP 2515/159 2

1 OL EP

- EP INSPECTION Baseline Inspections 12/13/2004 12/17/2004 Alert and Notification System Testing IP 7111402 2

Baseline Inspections 12/13/2004 12/17/2004 Emergency Response Organization Augmentation Testing IP 7111403 2

Baseline Inspections 12/13/2004 12/17/2004 Emergency Action Level and Emergency Plan Changes IP 7111404 2

Baseline Inspections 12/13/2004 12/17/2004 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 2

Baseline Inspections 12/13/2004 12/17/2004 Performance Indicator Verification IP 71151 2

2 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 01/17/2005 01/21/2005 Safety System Design and Performance Capability IP 7111121 2

3 PS-RP

- RP PUBLIC AND ISFSI Other Routine 01/31/2005 02/04/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 2

Baseline Inspections 01/31/2005 02/04/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 2

Baseline Inspections 01/31/2005 02/04/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 2

Baseline Inspections 01/31/2005 02/04/2005 Radiological Environmental Monitoring Program IP 7112203 2

Baseline Inspections 01/31/2005 02/04/2005 Performance Indicator Verification IP 71151 2

2 OL RQ

- REQUAL INSPECTION Baseline Inspections 02/14/2005 02/18/2005 Licensed Operator Requalification Program IP 7111111B 2

5 EB1SSDPC - SSDPC Baseline Inspections 02/14/2005 02/19/2005 Safety System Design and Performance Capability IP 7111121 2

Baseline Inspections 02/28/2005 03/04/2005 Safety System Design and Performance Capability IP 7111121 2

1 60854

- ISFSI DRY RUN INSPECTION Other Routine 06/20/2005 06/24/2005 Preoperational Testing Of An ISFSI IP 60854 2

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

ENCLOSURE

Robinson Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2004 14:10:38 Report 22 2

EB2 HEAD

- REACTOR HEAD REPLACEMENT Other Routine 08/15/2005 08/19/2005 Reactor Vessel Head Replacement Inspection IP 71007 2

Other Routine 09/05/2005 09/07/2005 Reactor Vessel Head Replacement Inspection IP 71007 2

1 EB2-ISI

- ISI Baseline Inspections 09/06/2005 09/09/2005 Inservice Inspection Activities - PWR IP 7111108P 2

1 PS - RP

- RP OCCUPATIONAL Baseline Inspections 09/12/2005 09/16/2005 Access Control to Radiologically Significant Areas IP 7112101 2

Baseline Inspections 09/12/2005 09/16/2005 ALARA Planning and Controls IP 7112102 2

1 EB2SGISI

- STEAM GENERATOR ISI Baseline Inspections 09/19/2005 09/23/2005 Inservice Inspection Activities - PWR IP 7111108P 2

1 EB2-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 01/30/2006 02/03/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 2

Baseline Inspections 01/30/2006 02/03/2006 Permanent Plant Modifications IP 7111117B 2

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.