{{#Wiki_filter:Page 1 of 2                                                                                  Crystal River 08/30/2004    14:17:49                                                                Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit                                                                                                          No. of Staff     Planned Dates          Inspection Number      Inspection Activity                                                    Title                        on Site       Start      End            Type EB1-TFP       - TRIENNIAL FIRE PROTECTION PRE-INSP VISIT                                                   7 3            IP 7111105T            Fire Protection                                                                      12/13/2004 12/17/2004 Baseline Inspections EB1-TFP       - TRIENNIAL FIRE PROTECTION                                                                 4 3            IP 7111105T            Fire Protection                                                                      01/10/2005 01/14/2005 Baseline Inspections 3            IP 7111105T            Fire Protection                                                                      01/24/2005 01/29/2005 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT                                                                       2 3            IP 7111121            Safety System Design and Performance Capability                                      03/28/2005 04/01/2005 Baseline Inspections OL EP         - EP INSPECTION                                                                             1 3            IP 7111402            Alert and Notification System Testing                                                 04/25/2005 04/29/2005 Baseline Inspections 3            IP 7111403            Emergency Response Organization Augmentation Testing                                 04/25/2005 04/29/2005 Baseline Inspections 3            IP 7111404            Emergency Action Level and Emergency Plan Changes                                     04/25/2005 04/29/2005 Baseline Inspections 3            IP 7111405            Correction of Emergency Preparedness Weaknesses and Deficiencies                     04/25/2005 04/29/2005 Baseline Inspections 3            IP 71151              Performance Indicator Verification                                                   04/25/2005  04/29/2005 Baseline Inspections EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY                                                         5 3            IP 7111121            Safety System Design and Performance Capability                                      04/25/2005 04/29/2005 Baseline Inspections 3            IP 7111121            Safety System Design and Performance Capability                                       05/09/2005 05/13/2005 Baseline Inspections OL PREP       - INITIAL EXAM PREP                                                                         2 3              V23237              CRYSTAL RIVER/EXAMS AT POWER FACILITIES                                              08/08/2005 08/12/2005 Not Applicable EB2-MR         - MAINTENANCE EFFECTIVENESS                                                                 1 3            IP 7111112B            Maintenance Effectiveness                                                            08/15/2005 08/19/2005 Baseline Inspections OL EXAM       - INITIAL EXAM                                                                               3 3              V23237              CRYSTAL RIVER/EXAMS AT POWER FACILITIES                                              08/29/2005 09/02/2005 Not Applicable EB2-ISI       - INSERVICE INSPECTION                                                                       1 3            IP 7111108P            Inservice Inspection Activities - PWR                                                10/10/2005 10/14/2005 Baseline Inspections PS-RP         - RP OCCUPATIONAL BASELINE - WEEK 1                                                         2 3            IP 7112101            Access Control to Radiologically Significant Areas                                   10/17/2005 10/21/2005 Baseline Inspections 3            IP 7112102            ALARA Planning and Controls                                                           10/17/2005 10/21/2005 Baseline Inspections 3            IP 7112202            Radioactive Material Processing and Transportation                                   10/17/2005 10/21/2005 Baseline Inspections 3            IP 71151              Performance Indicator Verification                                                   10/17/2005  10/21/2005 Baseline Inspections EB2SGISI       - STEAM GENERATOR ISI                                                                       1 3            IP 7111108P            Inservice Inspection Activities - PWR                                                10/24/2005 10/28/2005 Baseline Inspections PS-RP         - RP OCCUPATIONAL BASELINE - WEEK 2                                                         2 3            IP 7112101            Access Control to Radiologically Significant Areas                                    10/31/2005 11/04/2005 Baseline Inspections 3            IP 7112102            ALARA Planning and Controls                                                          10/31/2005 11/04/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.
{{#Wiki_filter:Crystal River Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2004 14:17:49 Report 22 7
EB1-TFP
- TRIENNIAL FIRE PROTECTION PRE-INSP VISIT Baseline Inspections 12/13/2004 12/17/2004 Fire Protection IP 7111105T 3
4 EB1-TFP
- TRIENNIAL FIRE PROTECTION Baseline Inspections 01/10/2005 01/14/2005 Fire Protection IP 7111105T 3
Baseline Inspections 01/24/2005 01/29/2005 Fire Protection IP 7111105T 3
2 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 03/28/2005 04/01/2005 Safety System Design and Performance Capability IP 7111121 3
1 OL EP
- EP INSPECTION Baseline Inspections 04/25/2005 04/29/2005 Alert and Notification System Testing IP 7111402 3
Baseline Inspections 04/25/2005 04/29/2005 Emergency Response Organization Augmentation Testing IP 7111403 3
Baseline Inspections 04/25/2005 04/29/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 3
Baseline Inspections 04/25/2005 04/29/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 3
Baseline Inspections 04/25/2005 04/29/2005 Performance Indicator Verification IP 71151 3
5 EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 04/25/2005 04/29/2005 Safety System Design and Performance Capability IP 7111121 3
Baseline Inspections 05/09/2005 05/13/2005 Safety System Design and Performance Capability IP 7111121 3
2 OL PREP
- INITIAL EXAM PREP Not Applicable 08/08/2005 08/12/2005 CRYSTAL RIVER/EXAMS AT POWER FACILITIES V23237 3
1 EB2-MR
- MAINTENANCE EFFECTIVENESS Baseline Inspections 08/15/2005 08/19/2005 Maintenance Effectiveness IP 7111112B 3
3 OL EXAM
- INITIAL EXAM Not Applicable 08/29/2005 09/02/2005 CRYSTAL RIVER/EXAMS AT POWER FACILITIES V23237 3
1 EB2-ISI
- INSERVICE INSPECTION Baseline Inspections 10/10/2005 10/14/2005 Inservice Inspection Activities - PWR IP 7111108P 3
2 PS-RP
- RP OCCUPATIONAL BASELINE - WEEK 1 Baseline Inspections 10/17/2005 10/21/2005 Access Control to Radiologically Significant Areas IP 7112101 3
Baseline Inspections 10/17/2005 10/21/2005 ALARA Planning and Controls IP 7112102 3
Baseline Inspections 10/17/2005 10/21/2005 Radioactive Material Processing and Transportation IP 7112202 3
Baseline Inspections 10/17/2005 10/21/2005 Performance Indicator Verification IP 71151 3
1 EB2SGISI
- STEAM GENERATOR ISI Baseline Inspections 10/24/2005 10/28/2005 Inservice Inspection Activities - PWR IP 7111108P 3
2 PS-RP
- RP OCCUPATIONAL BASELINE - WEEK 2 Baseline Inspections 10/31/2005 11/04/2005 Access Control to Radiologically Significant Areas IP 7112101 3
Baseline Inspections 10/31/2005 11/04/2005 ALARA Planning and Controls IP 7112102 3
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
ENCLOSURE
ENCLOSURE


Page 2 of 2                                                                                Crystal River 08/30/2004    14:17:49                                                              Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit                                                                                                        No. of Staff     Planned Dates        Inspection Number      Inspection Activity                                                Title                          on Site       Start      End            Type PS-RP         - RP OCCUPATIONAL BASELINE - WEEK 2                                                       2 3            IP 7112202            Radioactive Material Processing and Transportation                                  10/31/2005 11/04/2005 Baseline Inspections 3            IP 71151              Performance Indicator Verification                                                  10/31/2005 11/04/2005 Baseline Inspections EB2-MODS - MODIFICATIONS/10CFR50.59                                                                       4 3            IP 7111102            Evaluation of Changes, Tests, or Experiments                                        11/14/2005 11/18/2005 Baseline Inspections 3            IP 7111117B            Permanent Plant Modifications                                                      11/14/2005 11/18/2005 Baseline Inspections EB2-HS         - HEAT SINK                                                                               1 3            IP 7111107B            Heat Sink Performance                                                              01/09/2006 01/13/2006 Baseline Inspections OL RQ         - REQUAL INSPECTION                                                                       2 3            IP 7111111B            Licensed Operator Requalification Program                                          01/30/2006 02/03/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.
Crystal River Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2004 14:17:49 Report 22 2
PS-RP
- RP OCCUPATIONAL BASELINE - WEEK 2 Baseline Inspections 10/31/2005 11/04/2005 Radioactive Material Processing and Transportation IP 7112202 3
Baseline Inspections 10/31/2005 11/04/2005 Performance Indicator Verification IP 71151 3
4 EB2-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 11/14/2005 11/18/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 3
Baseline Inspections 11/14/2005 11/18/2005 Permanent Plant Modifications IP 7111117B 3
1 EB2-HS
- HEAT SINK Baseline Inspections 01/09/2006 01/13/2006 Heat Sink Performance IP 7111107B 3
2 OL RQ
- REQUAL INSPECTION Baseline Inspections 01/30/2006 02/03/2006 Licensed Operator Requalification Program IP 7111111B 3
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 01:37, 16 January 2025

Inspection/Activity Plan for 09/01/2004 - 03/31/2006
ML042430669
Person / Time
Site: Crystal River 
Issue date: 08/30/2004
From: Joel Munday
NRC/RGN-II/DRP/RPB3
To: Young D
Florida Power Corp
Shared Package
ML042430667 List:
References
Download: ML042430669 (2)


Text

Crystal River Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2004 14:17:49 Report 22 7

EB1-TFP

- TRIENNIAL FIRE PROTECTION PRE-INSP VISIT Baseline Inspections 12/13/2004 12/17/2004 Fire Protection IP 7111105T 3

4 EB1-TFP

- TRIENNIAL FIRE PROTECTION Baseline Inspections 01/10/2005 01/14/2005 Fire Protection IP 7111105T 3

Baseline Inspections 01/24/2005 01/29/2005 Fire Protection IP 7111105T 3

2 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 03/28/2005 04/01/2005 Safety System Design and Performance Capability IP 7111121 3

1 OL EP

- EP INSPECTION Baseline Inspections 04/25/2005 04/29/2005 Alert and Notification System Testing IP 7111402 3

Baseline Inspections 04/25/2005 04/29/2005 Emergency Response Organization Augmentation Testing IP 7111403 3

Baseline Inspections 04/25/2005 04/29/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 3

Baseline Inspections 04/25/2005 04/29/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 3

Baseline Inspections 04/25/2005 04/29/2005 Performance Indicator Verification IP 71151 3

5 EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 04/25/2005 04/29/2005 Safety System Design and Performance Capability IP 7111121 3

Baseline Inspections 05/09/2005 05/13/2005 Safety System Design and Performance Capability IP 7111121 3

2 OL PREP

- INITIAL EXAM PREP Not Applicable 08/08/2005 08/12/2005 CRYSTAL RIVER/EXAMS AT POWER FACILITIES V23237 3

1 EB2-MR

- MAINTENANCE EFFECTIVENESS Baseline Inspections 08/15/2005 08/19/2005 Maintenance Effectiveness IP 7111112B 3

3 OL EXAM

- INITIAL EXAM Not Applicable 08/29/2005 09/02/2005 CRYSTAL RIVER/EXAMS AT POWER FACILITIES V23237 3

1 EB2-ISI

- INSERVICE INSPECTION Baseline Inspections 10/10/2005 10/14/2005 Inservice Inspection Activities - PWR IP 7111108P 3

2 PS-RP

- RP OCCUPATIONAL BASELINE - WEEK 1 Baseline Inspections 10/17/2005 10/21/2005 Access Control to Radiologically Significant Areas IP 7112101 3

Baseline Inspections 10/17/2005 10/21/2005 ALARA Planning and Controls IP 7112102 3

Baseline Inspections 10/17/2005 10/21/2005 Radioactive Material Processing and Transportation IP 7112202 3

Baseline Inspections 10/17/2005 10/21/2005 Performance Indicator Verification IP 71151 3

1 EB2SGISI

- STEAM GENERATOR ISI Baseline Inspections 10/24/2005 10/28/2005 Inservice Inspection Activities - PWR IP 7111108P 3

2 PS-RP

- RP OCCUPATIONAL BASELINE - WEEK 2 Baseline Inspections 10/31/2005 11/04/2005 Access Control to Radiologically Significant Areas IP 7112101 3

Baseline Inspections 10/31/2005 11/04/2005 ALARA Planning and Controls IP 7112102 3

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

ENCLOSURE

Crystal River Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2004 14:17:49 Report 22 2

PS-RP

- RP OCCUPATIONAL BASELINE - WEEK 2 Baseline Inspections 10/31/2005 11/04/2005 Radioactive Material Processing and Transportation IP 7112202 3

Baseline Inspections 10/31/2005 11/04/2005 Performance Indicator Verification IP 71151 3

4 EB2-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 11/14/2005 11/18/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 3

Baseline Inspections 11/14/2005 11/18/2005 Permanent Plant Modifications IP 7111117B 3

1 EB2-HS

- HEAT SINK Baseline Inspections 01/09/2006 01/13/2006 Heat Sink Performance IP 7111107B 3

2 OL RQ

- REQUAL INSPECTION Baseline Inspections 01/30/2006 02/03/2006 Licensed Operator Requalification Program IP 7111111B 3

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.