ML042430669: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:Crystal River Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2004 14:17:49 Report 22 7 | ||
EB1-TFP | |||
- TRIENNIAL FIRE PROTECTION PRE-INSP VISIT Baseline Inspections 12/13/2004 12/17/2004 Fire Protection IP 7111105T 3 | |||
4 EB1-TFP | |||
- TRIENNIAL FIRE PROTECTION Baseline Inspections 01/10/2005 01/14/2005 Fire Protection IP 7111105T 3 | |||
Baseline Inspections 01/24/2005 01/29/2005 Fire Protection IP 7111105T 3 | |||
2 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 03/28/2005 04/01/2005 Safety System Design and Performance Capability IP 7111121 3 | |||
1 OL EP | |||
- EP INSPECTION Baseline Inspections 04/25/2005 04/29/2005 Alert and Notification System Testing IP 7111402 3 | |||
Baseline Inspections 04/25/2005 04/29/2005 Emergency Response Organization Augmentation Testing IP 7111403 3 | |||
Baseline Inspections 04/25/2005 04/29/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 3 | |||
Baseline Inspections 04/25/2005 04/29/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 3 | |||
Baseline Inspections 04/25/2005 04/29/2005 Performance Indicator Verification IP 71151 3 | |||
5 EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 04/25/2005 04/29/2005 Safety System Design and Performance Capability IP 7111121 3 | |||
Baseline Inspections 05/09/2005 05/13/2005 Safety System Design and Performance Capability IP 7111121 3 | |||
2 OL PREP | |||
- INITIAL EXAM PREP Not Applicable 08/08/2005 08/12/2005 CRYSTAL RIVER/EXAMS AT POWER FACILITIES V23237 3 | |||
1 EB2-MR | |||
- MAINTENANCE EFFECTIVENESS Baseline Inspections 08/15/2005 08/19/2005 Maintenance Effectiveness IP 7111112B 3 | |||
3 OL EXAM | |||
- INITIAL EXAM Not Applicable 08/29/2005 09/02/2005 CRYSTAL RIVER/EXAMS AT POWER FACILITIES V23237 3 | |||
1 EB2-ISI | |||
- INSERVICE INSPECTION Baseline Inspections 10/10/2005 10/14/2005 Inservice Inspection Activities - PWR IP 7111108P 3 | |||
2 PS-RP | |||
- RP OCCUPATIONAL BASELINE - WEEK 1 Baseline Inspections 10/17/2005 10/21/2005 Access Control to Radiologically Significant Areas IP 7112101 3 | |||
Baseline Inspections 10/17/2005 10/21/2005 ALARA Planning and Controls IP 7112102 3 | |||
Baseline Inspections 10/17/2005 10/21/2005 Radioactive Material Processing and Transportation IP 7112202 3 | |||
Baseline Inspections 10/17/2005 10/21/2005 Performance Indicator Verification IP 71151 3 | |||
1 EB2SGISI | |||
- STEAM GENERATOR ISI Baseline Inspections 10/24/2005 10/28/2005 Inservice Inspection Activities - PWR IP 7111108P 3 | |||
2 PS-RP | |||
- RP OCCUPATIONAL BASELINE - WEEK 2 Baseline Inspections 10/31/2005 11/04/2005 Access Control to Radiologically Significant Areas IP 7112101 3 | |||
Baseline Inspections 10/31/2005 11/04/2005 ALARA Planning and Controls IP 7112102 3 | |||
This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
ENCLOSURE | |||
Crystal River Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2004 14:17:49 Report 22 2 | |||
PS-RP | |||
- RP OCCUPATIONAL BASELINE - WEEK 2 Baseline Inspections 10/31/2005 11/04/2005 Radioactive Material Processing and Transportation IP 7112202 3 | |||
Baseline Inspections 10/31/2005 11/04/2005 Performance Indicator Verification IP 71151 3 | |||
4 EB2-MODS | |||
- MODIFICATIONS/10CFR50.59 Baseline Inspections 11/14/2005 11/18/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 3 | |||
Baseline Inspections 11/14/2005 11/18/2005 Permanent Plant Modifications IP 7111117B 3 | |||
1 EB2-HS | |||
- HEAT SINK Baseline Inspections 01/09/2006 01/13/2006 Heat Sink Performance IP 7111107B 3 | |||
2 OL RQ | |||
- REQUAL INSPECTION Baseline Inspections 01/30/2006 02/03/2006 Licensed Operator Requalification Program IP 7111111B 3 | |||
This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures.}} | |||
Latest revision as of 01:37, 16 January 2025
| ML042430669 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/30/2004 |
| From: | Joel Munday NRC/RGN-II/DRP/RPB3 |
| To: | Young D Florida Power Corp |
| Shared Package | |
| ML042430667 | List: |
| References | |
| Download: ML042430669 (2) | |
Text
Crystal River Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2004 14:17:49 Report 22 7
EB1-TFP
- TRIENNIAL FIRE PROTECTION PRE-INSP VISIT Baseline Inspections 12/13/2004 12/17/2004 Fire Protection IP 7111105T 3
4 EB1-TFP
- TRIENNIAL FIRE PROTECTION Baseline Inspections 01/10/2005 01/14/2005 Fire Protection IP 7111105T 3
Baseline Inspections 01/24/2005 01/29/2005 Fire Protection IP 7111105T 3
2 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 03/28/2005 04/01/2005 Safety System Design and Performance Capability IP 7111121 3
- EP INSPECTION Baseline Inspections 04/25/2005 04/29/2005 Alert and Notification System Testing IP 7111402 3
Baseline Inspections 04/25/2005 04/29/2005 Emergency Response Organization Augmentation Testing IP 7111403 3
Baseline Inspections 04/25/2005 04/29/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 3
Baseline Inspections 04/25/2005 04/29/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 3
Baseline Inspections 04/25/2005 04/29/2005 Performance Indicator Verification IP 71151 3
5 EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 04/25/2005 04/29/2005 Safety System Design and Performance Capability IP 7111121 3
Baseline Inspections 05/09/2005 05/13/2005 Safety System Design and Performance Capability IP 7111121 3
2 OL PREP
- INITIAL EXAM PREP Not Applicable 08/08/2005 08/12/2005 CRYSTAL RIVER/EXAMS AT POWER FACILITIES V23237 3
1 EB2-MR
- MAINTENANCE EFFECTIVENESS Baseline Inspections 08/15/2005 08/19/2005 Maintenance Effectiveness IP 7111112B 3
3 OL EXAM
- INITIAL EXAM Not Applicable 08/29/2005 09/02/2005 CRYSTAL RIVER/EXAMS AT POWER FACILITIES V23237 3
1 EB2-ISI
- INSERVICE INSPECTION Baseline Inspections 10/10/2005 10/14/2005 Inservice Inspection Activities - PWR IP 7111108P 3
2 PS-RP
- RP OCCUPATIONAL BASELINE - WEEK 1 Baseline Inspections 10/17/2005 10/21/2005 Access Control to Radiologically Significant Areas IP 7112101 3
Baseline Inspections 10/17/2005 10/21/2005 ALARA Planning and Controls IP 7112102 3
Baseline Inspections 10/17/2005 10/21/2005 Radioactive Material Processing and Transportation IP 7112202 3
Baseline Inspections 10/17/2005 10/21/2005 Performance Indicator Verification IP 71151 3
1 EB2SGISI
- STEAM GENERATOR ISI Baseline Inspections 10/24/2005 10/28/2005 Inservice Inspection Activities - PWR IP 7111108P 3
2 PS-RP
- RP OCCUPATIONAL BASELINE - WEEK 2 Baseline Inspections 10/31/2005 11/04/2005 Access Control to Radiologically Significant Areas IP 7112101 3
Baseline Inspections 10/31/2005 11/04/2005 ALARA Planning and Controls IP 7112102 3
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
ENCLOSURE
Crystal River Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2004 14:17:49 Report 22 2
PS-RP
- RP OCCUPATIONAL BASELINE - WEEK 2 Baseline Inspections 10/31/2005 11/04/2005 Radioactive Material Processing and Transportation IP 7112202 3
Baseline Inspections 10/31/2005 11/04/2005 Performance Indicator Verification IP 71151 3
4 EB2-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 11/14/2005 11/18/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 3
Baseline Inspections 11/14/2005 11/18/2005 Permanent Plant Modifications IP 7111117B 3
1 EB2-HS
- HEAT SINK Baseline Inspections 01/09/2006 01/13/2006 Heat Sink Performance IP 7111107B 3
- REQUAL INSPECTION Baseline Inspections 01/30/2006 02/03/2006 Licensed Operator Requalification Program IP 7111111B 3
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.